share_log

IMetal Resources Completes Digitally Enhanced Prospecting Survey on Its Gowganda West Project

IMetal Resources Completes Digitally Enhanced Prospecting Survey on Its Gowganda West Project

iMetal Resources完成了其Gowganda West項目的數字增強型勘探調查
Accesswire ·  2023/09/26 18:00

VANCOUVER, BC / ACCESSWIRE / September 26, 2023 / iMetal Resources Inc. (TSXV:IMR)(OTCQB:IMRFF)(FRANKFURT:A7V) ("iMetal" or the "Company") is pleased to announce completion of Phase 1 of a Digitally Enhanced Prospecting (DEP) survey at the Company's Gowganda West project, which lies within the prolific Abitibi Greenstone Gold Belt. This survey covered three areas: the area of current exploration focus south of Aris Mining's Juby Project (Zone 1 to Zone 3), and the satellite areas of Pear Lake and Pigeon Lake.

溫哥華,卑詩省/ACCESSWIRE/9月26日,2023/ IMetal Resources Inc.(多倫多證券交易所股票代碼:IMR)(OTCQB:IMRFF)(法蘭克福:A7V)(“IMetals“或”公司)很高興地宣佈,公司位於多產的Abitibi Greenstone金礦帶內的Gowganda West專案的數位增強勘探(DEP)調查的第一階段已經完成。這項調查涵蓋了三個地區:Aris礦業的Juby專案南部的當前勘探重點區域(1區至3區),以及梨湖和鴿子湖的衛星區域。

Saf Dhillon, Chief Executive Officer, stated: "Our recent drill results at Gowganda West, including 48.5m of 0.85 g/t Au in hole IMGW-23-04 announced on June 6 th of this year, have further invigorated our interest in the area. As a result, we have targeted the area for DEP in an effort to increase our mineralization footprint and help guide future drilling efforts through mapping and sampling. Gowganda West is highly prospective but still remains largely under-explored, so this is our first step at probing further at that potential."

首席執行官SAF Dhillon表示:“我們最近在Gowganda West的鑽探結果,包括6月6日宣佈的IMGW-23-04孔中48.5米的0.85g/t Au這是今年,進一步激發了我們對該地區的興趣。因此,我們將該地區定為DEP區域,以努力增加我們的礦化足跡,並通過測繪和採樣幫助指導未來的鑽探工作。Gowganda West具有很高的前景,但仍在很大程度上未得到充分開發,因此這是我們進一步探索這一潛力的第一步。

Waring Minerals Inc. completed the DEP programs at Gowganda West. UAV LiDAR was flown in order to locate outcrops on the property for the purposes of sampling and mapping. The DEP results will be combined with previous IP, VTEM, and drilling results to guide the next stage of exploration which will include follow-up drilling programs. Surface samples have been reviewed by company geologists and select samples have been submitted to ALS Laboratories in Sudbury for analysis.

Wering Minerals Inc.在Gowganda West完成了DEP專案。無人機雷射雷達的飛行是為了確定該財產的露頭位置,以便進行採樣和測繪。DEP結果將與以前的激電、垂直瞬變電磁和鑽井結果相結合,以指導下一階段的勘探,其中將包括後續鑽井計劃。公司地質學家已經對錶面樣本進行了審查,選定的樣本已提交給薩德伯裡的ALS實驗室進行分析。

In addition to DEP, drone magnetics were flown at Gowganda West satellite properties Pear Lake and Pigeon Lake. These surveys are currently being interpreted and results will be released upon receipt of the final interpretation report.

除了DEP,無人機磁鐵還在Gowganda West衛星基地梨湖和鴿子湖飛行。目前正在對這些調查進行解釋,結果將在收到最後解釋報告後公佈。

Gowganda West is an exploration-stage gold project about 100 km south-southeast of Timmins, Ontario; contiguous to Aris Mining's Juby Project in the Shining Tree Camp of the southern part of the Abitibi Greenstone Gold Belt; and also contiguous to the Knight project that is part of the Strategic Partnership between Orefinders Resources Inc. and Agnico Eagle Mines Ltd. iMetal recently completed a 2,611 m drilling program in the fall of 2022 which intersected a new gold trend and resulted in the company announcing it's first 'Discovery Hole' (See NR dated June 6 th , 2023). The Property also has multiple-ounce grab samples from trends that have yet to be drill tested.

Gowganda West是一個勘探階段的金礦專案,位於安大略省蒂明斯東南偏南約100公里處;毗鄰Abitibi Greenstone金礦帶南部閃亮樹營的Aris Mining的Juby專案;也毗鄰作為Orefinders Resources Inc.和Agnico Eagle Mines Ltd.戰略合作夥伴關係的一部分的Knight專案。iMetals最近於2022年秋季完成了2611米的鑽探計劃,該專案與新的黃金趨勢相交,導致該公司宣佈它將成為第一個“發現孔”(見日期為6月6日的NR這是,2023年)。這處房產還擁有來自趨勢的多盎司抓取樣本,這些樣本尚未進行鑽探測試。

The scientific and technical information contained in this news release has been reviewed and approved by Scott Zelligan, P. Geo (Ontario), VP Exploration of iMetal and a qualified person as defined in National Instrument 43-101

本新聞稿中包含的科學和技術資訊已由安大略省P.Geo公司勘探副總裁Scott Zelligan和National Instrument 43-101中定義的合格人員審查和批准

Figure 1 - Plan Map of Gowganda West showing DEP Survey and Sample Locations

圖1-顯示DEP測量和樣本位置的Gowganda West平面圖

About iMetal Resources Inc.

關於iMetals Resources Inc.

iMetal is a Canadian based junior exploration company focused on the exploration and development of its portfolio of resource properties in Ontario and Quebec. The Flagship property Gowganda West, is an exploration-stage gold project with a recent discovery hole of 48.5m at 0.85 g/t gold that borders the Juby Deposit and is located within the Shining Tree Camp area in the southern part of the Abitibi Greenstone Gold Belt about 100 km south-southeast of the Timmins Gold Camp. The 665-hectare Kerrs Gold deposit comprises a series of gold-bearing pyritized quartz vein replacement breccias with a 2011 historic resource, 90 kilometres ENE of Timmins. The 220-hectare Ghost Mountain property, 42 kilometres NE of Kirkland Lake, lies 5 kilometres W of Agnico Eagle's Holt and Holloway Mine.

IMetals是一家總部位於加拿大的初級勘探公司,專注於勘探和開發其在安大略省和魁北克的資源資產組合。旗艦專案Gowganda West是一個勘探階段的金礦專案,最近發現了一個48.5米的洞,黃金質量為0.85g/t,毗鄰Juby礦床,位於Abitibi Greenstone金礦帶南部的閃亮樹營區域內,位於Timmins金礦營地東南偏南約100公里處。665公頃的Kerrs金礦由一系列含金黃鐵礦石英脈交代角礫巖組成,具有2011年的歷史資源,位於Timmins東北偏東90公里處。這座佔地220公頃的幽靈山莊位於柯克蘭湖東北42公里處,位於Agnico Eagle的Holt和Holloway礦以西5公里處。

ON BEHALF OF THE BOARD OF DIRECTORS,

我代表董事會

Saf Dhillon
President & CEO

蘇丹武裝部隊迪隆
總裁兼首席執行官

iMetal Resources Inc.

IMetal Resources Inc.

info@imetalresources.ca
Tel. (604-484-3031)
Suite 550, 800 West Pender Street, Vancouver, British Columbia, V6C 2V6.

郵箱:Info@imetalresource ces.ca
電話。(604-484-3031)
不列顛哥倫比亞省溫哥華西彭德街800號550號套房,V6C 2V6。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements include results of exploration, variations in results of mineralization, relationships with local communities, market prices, continued availability of capital and financing, and general economic, market or business conditions. There can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the applicable laws.

本新聞稿可能包括受風險和不確定性影響的前瞻性陳述。除有關歷史事實的陳述外,本文中的所有陳述均為前瞻性陳述。儘管公司認為這些前瞻性陳述中表達的預期是基於合理的假設,但這些陳述並不能保證未來的業績,實際結果或發展可能與前瞻性陳述中的大不相同。可能導致實際結果與前瞻性陳述中的結果大不相同的因素包括勘探結果、礦化結果的變化、與當地社區的關係、市場價格、資本和融資的持續可獲得性以及總體經濟、市場或商業狀況。不能保證這樣的陳述將被證明是準確的,因此,建議讀者依靠自己對這種不確定性的評估。除適用法律要求外,我們不承擔任何更新任何前瞻性陳述的義務。

SOURCE: iMetal Resources, Inc.

資料來源:IMetal Resources,Inc.


View source version on accesswire.com:
在Accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論