share_log

Stocks of the Hour: Melbana Energy, Azure Minerals, Empire Energy

Stocks of the Hour: Melbana Energy, Azure Minerals, Empire Energy

热门股票:Melbana Energy、Azure Minerals、帝国能源
sharecafe ·  2023/08/04 10:03

Melbana Energy (ASX:MAY) announced that the planned Total Depth of the Alameda-2 well has been reached ahead of schedule. Executive Chairman, Andrew Purcell, commented: "Excellent quality logs have been obtained over the entire Amistad interval – a great improvement on last time when logs could not be obtained over some of the most productive units." Shares are trading 10 per cent higher at 11 cents.

Melbana Energy (ASX: MAY) 宣布,Alameda-2油井的计划总深度已提前达到。执行董事长安德鲁·珀塞尔评论说:“在整个Amistad间隔内,我们获得了高质量的原木,这比上次无法从一些生产力最高的单位获得日志时有了很大的改进。”股价上涨10%,至11美分。

Azure Minerals (ASX:AZS) announced that 209m high-grade lithium intersection at their Andover Lithium Project. In response, Managing Director Tony Rovira said, "Encouragingly, the results suggest the mineralisation remains open along strike and to depth." Shares are trading 19.35 per cent higher at $2.59.

Azure Minerals (ASX: AZS) 宣布,其安多弗锂项目将建成2.09亿高品位锂交叉点。作为回应,董事经理托尼·罗维拉说:“令人鼓舞的是,结果表明,矿化在走向和深度上仍然处于开放状态。”股价上涨19.35%,至2.59美元。

Empire Energy (ASX:EEG) have provided shareholders with an update on the 100% owned EP187 located in the Beetaloo Basin of Northern Territory. Following a planned 5 month shut in period, the Carpentaria 3H well has been reopened for extended production testing. Testing may take up to 90 days and will provide the company with important data that will allow them to examine the benefits of "soaking" the well. The Extended Production Test will also provide the industry standard "IP30" or 30 Day Initial Production data – which will assist in delineating well production profiles for the Carpentaria Pilot Project. The Pilot Project is targeting Final Investment Decision (FID) later this year. Shares are trading 3.33 per cent lower at 14.5 cents.

帝国能源 (ASX: EEG) 向股东们提供了位于北领地Beetaloo盆地的100%持有的 EP187 的最新情况。在计划关闭5个月之后,Carpentaria 3H油井已重新开放,以延长生产测试。测试可能需要长达90天的时间,并将为公司提供重要的数据,使他们能够研究 “浸泡” 油井的好处。扩展生产测试还将提供行业标准 “IP30” 或30天初始生产数据,这将有助于为Carpentaria试点项目描绘油井生产概况。该试点项目的目标是今年晚些时候的最终投资决策(FID)。股价下跌3.33%,至14.5美分。

1x1.png?futu_img_keep_extra_domain=1

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发