share_log

Canex Intersects 15.2 Metres of 1.0 G/t Gold and 6.1 Metres of 4.1 G/t Gold and Confirms New Parallel Mineralized Target at Gold Range, Arizona

Canex Intersects 15.2 Metres of 1.0 G/t Gold and 6.1 Metres of 4.1 G/t Gold and Confirms New Parallel Mineralized Target at Gold Range, Arizona

Canex與15.2米的1.0 g/t金和6.1米的4.1 g/t金相交,並確認了亞利桑那州黃金山脈的新平行礦化目標
Accesswire ·  2023/07/05 19:30

CALGARY, AB / ACCESSWIRE / July 5, 2023 / CANEX Metals Inc. ("CANEX" or the "Company") is pleased to announce results from 19 reverse circulation drill holes from multiple targets across the Gold Range Project, Arizona. This drilling has intersected strong gold mineralization within the Excelsior Zone and demonstrates a new area with good gold potential at East Excelsior, located immediately east of Excelsior.

阿肯色州卡爾加裡/2023年7月5日/CANEX Metals Inc.(“CANEX”或“公司”)高興地宣佈了來自亞利桑那州Gold Range Project多個目標的19個反迴圈鑽孔的結果。本次鑽探已在Excelsior區內穿過強烈的金礦化,並在Excelsior以東的East Excelsior發現了一個具有良好金礦潛力的新區域。

Highlights

亮點

  • Hole GR23-131 at the Excelsior Zone intersected 4.1 g/t gold over 6.10 metres including a high-grade vein returning 13.3 g/t gold over 1.53 metres
  • Hole GR23-136 at the Excelsior zone intersected 1.0 g/t gold over 15.24 metres including 2.4 g/t gold over 4.57 metres
  • 5 holes tested a 200-metre strike length at the East Excelsior Target with all 5 holes returning gold mineralization, confirming the exploration potential of the system
  • The East Excelsior Target contains multiple parallel mineralized structures within a zone up to 75 metres wide
  • The East Excelsior Target is fully permitted for further drill testing, a permit amendment is underway to allow further drill testing and definition of the new WestGold discovery
  • 精益區GR23-131孔相交6.10米以上4.1克/噸黃金包括一條高等級靜脈迴流1.53米以上13.3克/噸黃金
  • 精益區GR23-136孔相交15.24米以上1.0克/噸黃金包括4.57米以上2.4克/噸黃金
  • 5個洞在東方精益求精目標測試了200米的走向長度所有5個洞都返回了金礦化,確認了該系統的勘探潛力
  • 東方精益求精目標包含多個平行礦化構造在最高可達75米寬
  • East Excelsior Target完全被允許進行進一步的鑽探測試,一項許可修正案正在進行中,以允許進一步的鑽探測試和新的WestGold發現的定義

Assay results from drill holes GR23-119 and GR23-121 to 138 have been received and are presented here. These drill holes tested the Shaft Target, the East Excelsior Target, and Excelsior. A property drill hole location map is shown in Figure 1, a drill hole map for Excelsior and East Excelsior is shown in Figure 2, and cross sections through the new East Excelsior Target are shown in Figures 3 and 4. Significant gold intersections are shown in the Table below.

已收到GR23-119和GR23-121至138號鑽孔的化驗結果,現將其公佈。這些鑽孔測試了豎井目標、東方精益目標和精益求精目標。物業鑽孔位置圖如圖1所示,Excelsior和East Excelsior的鑽孔圖如圖2所示,穿過新的East Excelsior Target的橫截面如圖3和圖4所示。重要的黃金交叉點如下表所示。

Figure 1. Gold Range Property drill hole location map showing the Excelsior to WestGold trend, the Central and Lillian Zones, Shaft, and drill hole locations included in this release.

圖1.黃金範圍屬性鑽孔位置圖,顯示了Excelsior到WestGold趨勢、中部和Lillian區、豎井和鑽孔位置,包括在此版本中。

Hole GR23-131 tested a gap in the central part of the Excelsior zone and returned a high-grade gold intercept of 4.1 g/t gold over 6.1 metres including 13.3 g/t gold over 1.53 metres. The drill encountered a historic underground working immediately below this high-grade zone where no recovery was obtained over 3 metres. Hole GR23-136 was located 100 metres northeast of hole GR23-131 and returned 1.0 g/t gold over 15.24 metres including a higher-grade intercept returning 2.4 g/t gold over 4.57 metres. Holes GR23-131 to 137 successfully added and extended mineralization within the main Excelsior zone. Holes GR23-129, 130, and 138 tested the northeast and northwest extensions of the zone and did not encounter significant mineralization.

GR23-131孔測試了Excelsior區中部的一個缺口,並返回了一個高品位黃金截獲6.1米以上4.1克/噸黃金包括13.3克/噸黃金超過1.53米。鑽探遇到了一個歷史性的地下工作,就在這個高品位區的正下方,在那裡超過3米沒有取得任何開採成果。GR23-136孔位於GR23-131孔東北100米處,並返回15.24米以上1.0克/噸黃金包括更高級別的攔截返回4.57米以上2.4克/噸黃金。GR23-131至137號孔成功地在主要精益帶內增加和擴展了礦化。GR23-129、130和138號孔測試了該帶的東北和西北延伸,沒有遇到顯著的礦化。

Figure 2. Drill hole location map, Excelsior zone and East Excelsior Target.

圖2.鑽孔位置圖、精益區和東精益區目標。

Holes GR23-122 to 128 tested parallel mineralized trends at the East Excelsior Target with 5 of the 7 test holes encountering gold mineralization. One of the zones at East Excelsior was tested along a 200-metre strike length by holes GR123 to 127, with all 5 holes returning gold mineralization and confirming the exploration potential of the target which remains open along strike. Results from this initial test include hole GR23-124 which returned 1.1 g/t gold over 4.58 metres, and hole GR23-127 which returned 0.4 g/t gold over 9.15 metres and another 2.3 g/t gold over 3.05 metres.

GR23-122至128孔測試了East Excelsior Target的平行礦化趨勢,7個測試孔中有5個遇到了金礦化。東部Excelsior的其中一個區域沿著200米的走向長度進行了GR123至127孔的測試,其中所有5個洞都返回了金礦化確定沿走向敞開的目標的勘探潛力。該初始測試的結果包括返回的GR23-124孔4.58米以上1.1克/噸黃金,和返回的GR23-127號洞9.15米以上0.4克/噸黃金還有另一個3.05米以上2.3克/噸黃金。

At East Excelsior the corridor of mineralization is interpreted to contain multiple steep west dipping structures, which on Figure 4 occur within a 75 metre wide zone. There is very limited surface exposure over the area and additional drilling will be required to better understand the orientation, widths, grade, and continuity of the zone.

在East Excelsior,礦化走廊被解釋為包含多個陡峭的西傾構造,如圖4所示,這些構造位於75米寬的區域內。該地區的地表暴露非常有限,需要進行額外的鑽探,以更好地瞭解該區域的方向、寬度、坡度和連續性。

Figure 3. Cross section A - A' through the East Excelsior Target showing drill holes GR123 to 125.

圖3.通過East Excelsior Target的橫截面A-A‘,顯示鑽孔GR123至125。

Figure 4. Cross section B - B' through the East Excelsior Target showing drill holes GR127 and 128.

圖4.穿過East Excelsior Target的橫截面B-B‘,顯示鑽孔GR127和128。

Highlights from reverse circulation drill holes GR23-119 and GR23-121 to 138.

反迴圈鑽孔GR23-119和GR23-121至138的亮點。

Drill Hole

From (m)

To (m)

Width (m)*

Au g/t

GR23-123

59.44

67.06

7.62

0.3

including

59.44

60.96

1.52

1.2

GR23-123

82.3

91.44 EOH

9.14

0.2

GR23-124

85.34

89.92

4.58

1.1

including

85.34

86.87

1.53

2.9

GR23-125

28.96

32.00

3.04

0.3

GR23-126

35.05

44.20

9.141

0.3

including

38.10

39.62

1.52

1.2

GR23-126

62.48

67.06

4.58

0.2

GR23-126

134.11

135.64

1.53

0.3

GR23-127

7.62

16.76

9.14

0.2

GR23-127

28.96

32.00

3.04

0.2

GR23-127

53.34

67.06

13.721

0.3

including

54.86

64.01

9.15

0.4

GR23-127

79.25

82.30

3.05

2.3

GR23-129

42.67

44.20

1.53

0.6

GR23-130

35.05

36.58

1.53

0.4

GR23-130

76.20

79.25 EOH

3.05

0.7

including

77.72

79.25 EOH

1.52

1.3

GR23-131

30.48

36.58

6.102

4.1

including

32.00

33.53

1.53

13.3

GR23-132

48.77

50.29

1.52

1.7

GR23-133

30.48

42.67

12.19

0.7

including

33.53

36.58

3.05

2.3

GR23-133

68.58

76.2 EOH

7.62

0.2

GR23-134

33.53

42.67

9.14

0.4

GR23-135

41.15

57.91

16.76

0.5

including

51.82

56.39

4.57

1.3

GR23-136

22.86

38.10

15.24

1.0

including

25.91

30.48

4.57

2.4

GR23-137

44.20

57.91

13.71

0.4

GR23-138

85.34

86.87

1.53

0.2

鑽孔

發件人(M)

至(M)

寬度(米)*

Au g/t

GR23-123

59.44

67.06

7.62

0.3

包括

59.44

60.96

1.52

1.2

GR23-123

82.3

91.44 EOH

9.14

0.2

GR23-124

85.34

89.92

4.58

1.1

包括

85.34

86.87

1.53

2.9

GR23-125

28.96

32.00

3.04

0.3

GR23-126

35.05

44.20

9.141

0.3

包括

38.10

39.62

1.52

1.2

GR23-126

62.48

67.06

4.58

0.2

GR23-126

134.11

135.64

1.53

0.3

GR23-127

7.62

16.76

9.14

0.2

GR23-127

28.96

32.00

3.04

0.2

GR23-127

53.34

67.06

13.721

0.3

包括

54.86

64.01

9.15

0.4

GR23-127

79.25

82.30

3.05

2.3

GR23-129

42.67

44.20

1.53

0.6

GR23-130

35.05

36.58

1.53

0.4

GR23-130

76.20

79.25 EOH

3.05

0.7

包括

77.72

79.25 EOH

1.52

1.3

GR23-131

30.48

36.58

6.102.

4.1

包括

32.00

33.53

1.53

13.3

GR23-132

48.77

50.29

1.52

1.7

GR23-133

30.48

42.67

12.19

0.7

包括

33.53

36.58

3.05

2.3

GR23-133

68.58

76.2 EOH

7.62

0.2

GR23-134

33.53

42.67

9.14

0.4

GR23-135

41.15

57.91

16.76

0.5

包括

51.82

56.39

4.57

1.3

GR23-136

22.86

38.10

15.24

1.0

包括

25.91

30.48

4.57

2.4

GR23-137

44.20

57.91

13.71

0.4

GR23-138

85.34

86.87

1.53

0.2

*Drill hole intercepts, true widths have not been determined. Grades have not been capped in the averages.

*鑽孔截獲,實際寬度尚未確定。平均分中沒有設置分數上限。

1 Composite includes 1 unmineralized interval. 2 immediately below this interval drill hit 3m of historic workings with no sample recovered. EOH = end of hole.

1復合體包括1個未成礦層段。2.緊接著在這段時間內,鑽探擊中了3米長的歷史工作面,但沒有找到任何樣本。EOH=孔底。

Two holes testing the Shaft Target in the northeast part of the claim block (holes GR23-119 and 121) did not encounter significant gold mineralization.

在索賠區塊東北部測試豎井目標的兩個洞(GR23-119和121號洞)沒有遇到重大的金礦化。

Next Steps

接下來的步驟

Results for all 24 holes from the winter 2023 drill program at Gold Range have now been received and released. A permit amendment is underway to allow further drill testing and definition of the new WestGold discovery where the Company has identified a new zone of flat dipping gold mineralization that returned 0.7 g/t gold over 35 metres at a target that could extend over an area hundreds of metres by hundreds of metres (previously released, see May 8, 2023 news release).

黃金靶場2023年冬季鑽探計劃的所有24個孔的結果現在已經收到併發布。一項許可證修訂正在進行中,以允許對新的WestGold發現進行進一步的鑽探測試和定義,在該發現中,該公司發現了一個新的平緩浸金礦化區,該礦化帶的黃金儲量超過35米,目標可能延伸到數百米乘數百米(之前發佈的,見2023年5月8日的新聞稿)。

Recently acquired LiDar imagery, drill and surface sample assays, and field mapping data are being analysed and interpreted to further advance the ongoing targeting efforts at Gold Range. Additional field programs will be announced once finalized.

正在分析和解釋最近獲得的雷射雷達圖像、鑽探和地面樣本分析以及實地測繪數據,以進一步推動正在進行的Gold Range目標確定工作。其他實地計劃將在最終敲定後公佈。

Quality Control

質量控制

Reverse circulation drill cuttings were collected in numbered cloth sample bags from 5 foot (1.52m) intervals during drilling and were picked up from site and analyzed by Skyline Assayers and Laboratories in Tucson Arizona (which is ISO/IEC 17025 accredited). A 280g pulp was prepared and gold was assayed using a 50g fire assay with an atomic absorption finish (method FA-01-50g). Gold samples greater than 5 g/t are redone using a 50g fire assay method with a gravimetric finish (method FA-02 50g). The Company included certified reference standards, blanks, and duplicates in every sample batch and then checked to ensure proper quality assurance and quality control prior to releasing the data.

反迴圈鑽屑在鑽井過程中以5英尺(1.52米)的間隔收集在編號布樣袋中,並從現場採集並由亞利桑那州圖森市的Skyline Analyayers和實驗室(已通過國際標準化組織/國際電工委員會17025認證)進行分析。製備了280g紙漿,並用50g火焰原子吸收光譜分析法(FA-01-50G法)測定了金的含量。大於5g/t的黃金樣品用50g火試金法和重量法(FA-02 50g法)重做。該公司在每個樣品批次中都包括認證的參考標準、空白和複製品,然後在發佈數據之前進行檢查,以確保適當的品質保證和質量控制。

About Gold Range

關於Gold Range

The Gold Range project is a new bulk-tonnage oxide-gold target located within an underexplored metamorphic terrain in Northern Arizona. CANEX controls 5 kilometres of strike length along a highly prospective district scale structure where mineralization is being defined through surface sampling, mapping, and reverse circulation drilling. The main exploration target defined by surface work is 4000 metres long by up to 500 metres wide with multiple subparallel exploration targets identified. The target zone remains open along strike under basin cover. Drilling by CANEX has returned strong results including 1 g/t gold over 59.5 metres, 1.6 g/t gold over 35.1 metres, 2.2 g/t gold over 24.4 metres, and 0.3 g/t gold over 62.5 metres.

Gold Range專案是一個新的大噸位氧化金目標,位於亞利桑那州北部一個未被勘探的變質地帶。CANEX控制著沿著一個極具遠景的地區規模構造的5公里走向長度,該構造正在通過地表採樣、測繪和反迴圈鑽探確定礦化。地面工作確定的主要勘探目標是4000米長、500米寬,並確定了多個次平行勘探目標。目標區域在盆地覆蓋下沿走向保持開放。CANEX的鑽探獲得了強勁的結果,包括超過59.5米的1克/噸黃金,超過35.1米的1.6克/噸黃金,超過24.4米的2.2克/噸黃金,以及超過62.5米的0.3克/噸黃金。

About CANEX Metals

關於CANEX Metals

CANEX Metals (TSX.V:CANX) is a Canadian junior exploration company with a new gold discovery at the Gold Range Project in Northern Arizona, and high grade silver and gold mineralization at the Gibson property in British Columbia. CANEX is led by an experienced management team which has made three notable porphyry and bulk tonnage discoveries in North America and is sponsored by Altius Minerals (TSX: ALS) a large shareholder of the Company.

CANEX Metals(多倫多證券交易所股票代碼:CANX)是一家加拿大初級勘探公司,在亞利桑那州北部的Gold Range Project發現了新的金礦,在不列顛哥倫比亞省的Gibson礦發現了高品位的銀和金礦。CANEX由經驗豐富的管理團隊領導,該團隊在北美發現了三個著名的斑岩和散裝噸位,並由本公司的大股東Altius Minerals(多倫多證券交易所股票代碼:ALS)贊助。

Dr. Shane Ebert P.Geo., is the Qualified Person for CANEX Metals and has approved the technical disclosure contained in this news release.

Shane Ebert P.Geo博士是CANEX Metals的合格人士,並已批准本新聞稿中包含的技術披露。

"Shane Ebert",
Shane Ebert, President/Director

《謝恩·埃伯特》,
謝恩·埃伯特,總裁/董事

For Further Information Contact:

欲瞭解更多資訊,請聯繫:

Shane Ebert at 1.250.964.2699 or
Jean Pierre Jutras at 1.403.233.2636
Web:

肖恩·埃伯特電話:1.250.964.2699或
讓·皮埃爾·朱特拉斯報1.403.233.2636
網頁:

Neither the TSX Venture Exchange nor its regulation services provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Except for the historical and present factual information contained herein, the matters set forth in this news release, including words such as "expects", "projects", "plans", "anticipates" and similar expressions, are forward-looking information that represents management of CANEX Metals Inc. internal projections, expectations or beliefs concerning, among other things, future operating results and various components thereof or the economic performance of CANEX. The projections, estimates and beliefs contained in such forward-looking statements necessarily involve known and unknown risks and uncertainties, which may cause CANEX's actual performance and financial results in future periods to differ materially from any projections of future performance or results expressed or implied by such forward-looking statements. These risks and uncertainties include, among other things, those described in CANEX's filings with the Canadian securities authorities. Accordingly, holders of CANEX shares and potential investors are cautioned that events or circumstances could cause results to differ materially from those predicted. CANEX disclaims any responsibility to update these forward-looking statements.

除本文包含的歷史和現在的事實資訊外,本新聞稿中陳述的事項,包括“預期”、“專案”、“計劃”、“預期”和類似表述,均為前瞻性資訊,代表CANEX Metals Inc.管理層的內部預測、預期或信念,除其他外,涉及CANEX的未來經營業績及其各個組成部分或經濟表現。這些前瞻性陳述中包含的預測、估計和信念必然涉及已知和未知的風險和不確定因素,這可能會導致CANEX未來的實際業績和財務結果與此類前瞻性陳述明示或暗示的對未來業績或結果的任何預測大不相同。這些風險和不確定性包括CANEX向加拿大證券管理機構提交的檔案中描述的風險和不確定性。因此,CANEX股票的持有者和潛在投資者被告誡,事件或情況可能導致結果與預期的大不相同。CANEX不承擔更新這些前瞻性陳述的任何責任。

SOURCE: CANEX Metals Inc.

來源:CANEX Metals Inc.


View source version on accesswire.com:
在Accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論