share_log

Ur-Energy Announces Restart of Commercial Production and Completion of Casper Centralized Services Facility

Ur-Energy Announces Restart of Commercial Production and Completion of Casper Centralized Services Facility

Ur-Energy 宣布重启商业生产并完成 Casper 集中服务设施
Accesswire ·  2023/05/31 05:05

LITTLETON, CO / ACCESSWIRE / May 30, 2023 / Ur-Energy Inc. (NYSE American:URG)(TSX:URE) (the "Company" or "Ur-Energy") is pleased to announce the successful startup of production flow from Header House 2-4 at our Lost Creek In Situ Uranium Facility in Sweetwater County, Wyoming. Production rates will continue to increase as additional header houses in Mine Unit 2 come online this year. Lost Creek production inventory will be sold into our remaining 2023 contract book of 180,000 pounds U3O8 in the second half of the year. Beginning in 2024, the Company's total sales quantity under contract is 600,000 pounds U3O8 annually, plus or minus a small, optional flex.

科罗拉多州利特尔顿/ACCESSWIRE /2023 年 5 月 30 日/Ur-Energy Inc. 纽约证券交易所美国股票代码:URG)(多伦多证券交易所股票代码:URE)(“公司” 或 “Ur-Energy”)很高兴地宣布,Header House 2-4的生产流程已在我们的Lost Creek成功启动 在原地 怀俄明州斯威特沃特县的铀设施。随着今年Mine Unit 2的更多集管机上线,产量将继续提高。Lost Creek 的生产库存将出售到我们剩余的 2023 年合同账簿中,即 18 万英镑 U3O8 在下半年。从2024年开始,该公司的合同总销售量为60万英镑3O8 每年,加上或减去小额的可选弹性。

We are also pleased to announce that construction of our Casper, Wyoming centralized services facility, shown below, is complete and will facilitate full laboratory and construction services for each of our mining projects. The centralized location will allow for reduced drive times and improved safety for our employees while reducing operating costs and increasing efficiencies.

我们还很高兴地宣布,我们在怀俄明州卡斯珀的集中服务设施的建设已经完成,如下所示,它将为我们的每个采矿项目提供全面的实验室和施工服务。集中的位置将减少驾驶时间,提高员工的安全性,同时降低运营成本和提高效率。

Steve Hatten, the Company's COO stated, "I am very excited to see the planning and hard work pay off for our long-standing and new employees with these achievements at Lost Creek and completion of our new Casper facility. This restart of normal operations at Lost Creek marks the first of a series of planned production areas scheduled for 2023 and 2024. We hope our return to commercial production also is the beginning of a resurgence of the uranium mining industry in the United States."

该公司首席运营官Steve Hatten表示:“我很高兴看到Lost Creek取得的成就以及我们新的卡斯珀工厂的竣工,为我们的长期和新员工的计划和辛勤工作带来回报。Lost Creek的正常运营的重启标志着计划在2023年和2024年建造的一系列生产区中的第一个。我们希望我们恢复商业化生产也是美国铀矿开采业复苏的开始。”

About Ur-Energy

关于 Ur-Energy

Ur-Energy is a uranium mining company operating the Lost Creek in-situ recovery uranium facility in south-central Wyoming. We have produced and packaged approximately 2.7 million pounds U3O8 from Lost Creek since the commencement of operations. Ur-Energy now has all major permits and authorizations to begin construction at Shirley Basin, the Company's second in situ recovery uranium facility in Wyoming and is in the process of obtaining remaining amendments to Lost Creek authorizations for expansion of Lost Creek. Ur‐Energy is engaged in uranium mining, recovery and processing activities, including the acquisition, exploration, development, and operation of uranium mineral properties in the United States. The primary trading market for Ur‐Energy's common shares is on the NYSE American under the symbol "URG." Ur‐Energy's common shares also trade on the Toronto Stock Exchange under the symbol "URE." Ur-Energy's corporate office is in Littleton, Colorado and its registered office is in Ottawa, Ontario.

Ur-Energy 是一家运营 Lost Creek 的铀矿开采公司 就地 怀俄明州中南部的回收铀设施。我们已经生产和包装了大约 270 万磅 U3O8 自运营开始以来就来自 Lost Creek。Ur-Energy现在拥有该公司第二个在雪莉盆地开始施工的所有主要许可证和授权 就地 怀俄明州的铀回收设施,目前正在为扩建Lost Creek的Lost Creek授权获取剩余的修正案。Ur‐Energy从事铀矿开采、回收和加工活动,包括在美国收购、勘探、开发和运营铀矿产。Ur‐Energy普通股的主要交易市场在纽约证券交易所美国证券交易所,代码为 “URG”。Ur‐Energy的普通股也在多伦多证券交易所上市,股票代码为 “URE”。Ur-Energy的公司办公室位于科罗拉多州的利特尔顿,其注册办事处位于安大略省渥太华。

FOR FURTHER INFORMATION, PLEASE CONTACT

欲了解更多信息,请联系

John W. Cash, Chairman, CEO & President
866-981-4588, ext. 303
John.Cash@Ur-Energy.com

约翰·卡什,董事长、首席执行官兼总裁
866-981-4588,分机 303
John.Cash@Ur-Energy.com

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的警示说明

This release may contain "forward-looking statements" within the meaning of applicable securities laws regarding events or conditions that may occur in the future (e.g., the timing for additional header houses to come online at Lost Creek and the rates at which production levels will increase; whether the Casper facility will reduce operating costs and increase employee safety as projected; ability to timely deliver into our sales agreements and whether the flex will be exercised) and are based on current expectations that, while considered reasonable by management at this time, inherently involve a number of significant business, economic and competitive risks, uncertainties and contingencies. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as "plans," "expects," "does not expect," "is expected," "is likely," "estimates," "intends," "anticipates," "does not anticipate," or "believes," or variations of the foregoing, or statements that certain actions, events or results "may," "could," "might" or "will be taken," "occur," "be achieved" or "have the potential to." All statements, other than statements of historical fact, are considered to be forward-looking statements. Forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to be materially different from any future results, performance or achievements express or implied by the forward-looking statements. Factors that could cause actual results to differ materially from any forward-looking statements include, but are not limited to, capital and other costs varying significantly from estimates; failure to establish estimated resources and reserves; the grade and recovery of ore which is mined varying from estimates; production rates, methods and amounts varying from estimates; delays in obtaining or failures to obtain required governmental, environmental or other project approvals; inflation; changes in exchange rates; fluctuations in commodity prices; delays in development and other factors described in the public filings made by the Company at and www.sec.gov. Readers should not place undue reliance on forward-looking statements. The forward-looking statements contained herein are based on the beliefs, expectations and opinions of management as of the date hereof and Ur-Energy disclaims any intent or obligation to update them or revise them to reflect any change in circumstances or in management's beliefs, expectations or opinions that occur in the future.

本新闻稿可能包含适用证券法所指的 “前瞻性陈述”,内容涉及未来可能发生的事件或情况(例如, Lost Creek上线更多海头公司的时机以及产量水平的提高速度;卡斯珀工厂是否会如预期的那样降低运营成本并提高员工安全;及时交付销售协议的能力,以及是否会行使灵活性),基于当前的预期,尽管管理层目前认为合理,但本质上涉及许多重大的商业、经济和竞争风险、不确定性和突发事件。通常,前瞻性陈述可以通过使用前瞻性术语来识别,例如 “计划”、“期望”、“不期望”、“预期”、“很可能”、“估计”、“打算”、“预期”、“未预期” 或 “相信”,或上述内容的变体,或者关于某些行动、事件或结果 “可能”、“可能” 或 “将要采取” 的陈述,” “发生”、“实现” 或 “有可能”。除历史事实陈述外,所有陈述均被视为前瞻性陈述。前瞻性陈述涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致公司的实际业绩、业绩或成就与前瞻性陈述所明示或暗示的任何未来业绩、业绩或成就存在重大差异。可能导致实际业绩与任何前瞻性陈述存在重大差异的因素包括但不限于资本和其他成本与估计值有显著差异;未能确定估计的资源和储量;开采的矿石的等级和回收率与估计值不同;延迟获得或未能获得所需的政府、环境或其他项目批准;通货膨胀;汇率变化;大宗商品价格波动;延迟公司在和www.sec.gov上发布的公开文件中描述的发展和其他因素。读者不应过分依赖前瞻性陈述。此处包含的前瞻性陈述基于管理层截至本文发布之日的信念、期望和观点,Ur-Energy不打算或义务更新或修改这些陈述以反映未来情况或管理层信念、期望或观点的任何变化。

SOURCE: Ur-Energy Inc.

来源: Ur-Energy Inc.


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发