Exploration Update: Several Multi-Kilometer Silver Trends Identified at Cruz De Plata
Exploration Update: Several Multi-Kilometer Silver Trends Identified at Cruz De Plata
Vancouver, British Columbia--(Newsfile Corp. - May 24, 2023) - CAPITAN MINING INC. (TSXV: CAPT) ("Capitan" or "the Company") is pleased to provide an exploration update for its Cruz de Plata project.
溫哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年5月24日)-卡皮坦礦業公司。(TSXV:CAPT)(“Capitan”或“The Company”)很高興為其Cruz de Plata專案提供最新勘探情況。
Highlights:
重點:
- New interpretation and analysis at Cruz de Plata based on data collected to date, identifies several important large trends that are prospective for future silver and gold discoveries:
- Jesus Maria Silver vein projects to a potential strike of 2.8 km
- Santa Teresa Silver vein projects a potential strike of 1.8 km
- San Rafael North Silver vein projects a potential strike of 1.3 km before going under cover
- New disseminated oxide gold target developing at Eastern end of Capitan vein projection, along the same stratigraphic contact that host the Capitan oxide gold deposit. Capitan East has a potential strike of at least 500m
- 根據迄今為止收集的數據,Cruz de Plata進行了新的解釋和分析,確定了幾個重要的大趨勢,這些趨勢有望在未來發現銀和金:
- 耶穌·瑪麗亞銀色礦脈預計可能發生2.8公里的罷工
- 聖特雷薩銀脈預計可能發生1.8公里的罷工
- 聖拉斐爾北部銀脈預計在掩護下之前可能發生1.3公里的罷工
- 新的浸染型氧化物金靶在海角靜脈投影的東端開發,沿著承載著Capitan Oxide金礦床的同一地層接觸。Capitan East可能發生至少500米的罷工
- New assays from surface sampling program at San Rafael North target returned values up to 1,263 g/t silver and 0.74 g/t gold from a grab dump sample beside an old mine working. This confirms the presence of high-grade silver mineralization at San Rafael
- Assays from surface rock sampling along the Santa Teresa West high-grade silver trend (New) returned up to 410 g/t silver, 0.9 g/t gold, 1.7% lead and 0.7% zinc over 0.6m.
- Surface rock sampling data shows continuity of mineralization at the Jesus Maria high-grade silver trend to a potential strike of 2.8 km
- New targets developing on recently acquired property, Providencia West (Ag-Au-Pb-Zn) and Providencia East (Ag-Au)
- Metal zonation suggests that Cruz de Plata hosts a robust mineralized system and has significant potential for additional discoveries
- Final drill results from the 2022 RC drill program continue to expand mineralization at Cruz de Plata
- 新的聖拉斐爾北部目標的地面採樣計劃的分析返回值高達1,263克/噸銀和0.74克/噸金從一個老礦場旁的垃圾堆樣本中。這證實了聖拉斐爾高品位銀礦化的存在。
- 聖特雷莎西部高品位白銀走向地表岩石取樣的分析(新增)已返回到410克/噸銀,0.9克/噸金,1.7%鉛和0.7%鋅超過0.6米。
- 地表岩石採樣數據顯示礦化在耶穌瑪利亞高品級白銀走勢至2.8公里潛在罷工
- 在最近收購的普羅維登西亞西部(銀-金-鉛-鋅)和普羅維登西亞東(銀-金)開發新的目標
- 金屬分帶表明,Cruz de Plata擁有一個強大的礦化系統,並有巨大的潛力進行更多的發現
- 2022年RC鑽探計劃的最終鑽探結果繼續擴大Cruz de Plata的礦化
Surface sampling at Cruz de Plata and Metal Zonation
克魯茲-德-普拉塔的表面取樣和金屬分帶
The Cruz de Plata Project contains 855 recent samples collected by Capitan Silver, 262 samples within the recently-acquired claims acquired from Fresnillo and 1,805 historical samples by previous operators (2011-2014) for a total of 2,922 surface rock samples. Assays for these samples have been plotted and crossed checked with the geology at Cruz de Plata to define three metal zones which include multiple targets (See Fig. 1). These zones are:
Cruz de Plata專案包含Capitan Silver最近收集的855個樣本、從Fresnillo最近獲得的索賠中的262個樣本以及之前運營商(2011-2014年)收集的1,805個歷史樣本,總計2,922個地表岩石樣本。對這些樣品的分析已經繪製出來,並與Cruz de Plata的地質學交叉檢查,以確定包括多個目標的三個金屬區(見圖1)。這些分區包括:
- Silver-Gold-Lead-Zinc: Includes Cruz de Plata's main and most advanced target, the Jesus María vein (1) as well as Santa Teresa (2), Providencia West (8) and at depth below the Capitan gold deposit, Jesus Maria South (7)
- High-grade Silver-Gold: Includes the second most advanced target, the Gully Fault Ag-Au zone (4), and the San Rafael North (3) and Escondida targets (6) to the East, as well as the new Providencia East target (8) to the northeast
- Vein hosted/Disseminated Gold: Includes the Capitan vein (5), disseminated Capitan oxide gold deposit and Capitan East target which is located along the continuation of the sediments-volcanics boundary to the East (5)
- 銀-金-鉛-鋅:包括克魯茲·德·普拉塔的主要和最先進的目標,耶穌瑪麗́a礦脈(1),以及聖特雷薩(2),普羅維登西亞西部(8),以及卡皮坦金礦下方的耶穌·瑪麗亞南部(7)
- 高品位銀金:包括第二個最先進的目標--溝谷斷層銀金帶(4個)、向東的聖拉斐爾北部(3個)和埃斯孔迪達目標(6個),以及東北方向的新的普羅維登西亞東部目標(8個
- 靜脈賦存/浸染金:包括卡皮坦脈(5)、浸染式卡皮坦氧化物金礦床和卡皮坦東部靶區,位於沉積-火山邊界以東的延續處(5)
Metal zonation appears to follow stratigraphic control and proximity to the diorite-granodiorite intrusive, which sits in the northern part of the property. High-grade silver mineralization appears to be proximal to the intrusive, mainly at the contact between the skarn alteration and the shales-limestones. Gold mineralization is observed more distal from the intrusive primarily at the contact of the sediments and the overlying tertiary rhyolites and volcanic breccias. A transition is observed on the silver trend from base-metal rich and higher arsenic to the west to base metal poor and low arsenic to the east. Currently this transition is interpreted to be a vertical zonation of the veins resulting in its current outcrop form by faulting and tilting mainly by the Peñoles fault.
金屬分帶似乎遵循地層控制和接近閃長巖-花崗閃長巖侵入岩,位於該財產的北部。高品位銀礦化似乎位於侵入岩附近,主要位於夕卡巖蝕變與葉巖灰巖的接觸部位。金礦化分佈在侵入岩更遠的地方,主要分佈在沉積物與上覆第三系流紋巖和火山角礫巖的接觸部位。銀由富賤金屬、高砷向西向貧賤金屬、低砷向東過渡。目前,這種轉換被解釋為礦脈的垂直分帶,導致其目前的露頭形式,主要是由PeñOLES斷層造成的斷層和傾斜。
Figure 1. Highlight surface samples, metal zonation and vein targets at the Cruz de Plata project, Durango, Mexico.
圖1.突出顯示墨西哥杜蘭戈Cruz de Plata專案的表面樣品、金屬分區和礦脈目標。
High-Grade Trends and Targets
高檔次趨勢和目標
Expansion of High-Grade Trends and Targets
拓展高檔次趨勢和目標
Drilling, prospecting and recent mapping has helped define a minimum of seven (7), multi-kilometer, high-grade silver trends and targets (shown in figure 2). This new interpretation, aided by the recent acquisition of claims from Fresnillo, which consolidated the main silver trend in the district, has led to a significant increase in the untested strike potential across the Cruz De Plata property package.
鑽探、勘探和最近的測繪幫助確定了至少七(7)個多公里的高品位白銀趨勢和目標(如圖2所示)。這種新的解讀,得益於最近從弗雷斯尼羅收購的所有權,鞏固了該地區的主要白銀趨勢,導致Cruz de Plata地產組合中未經考驗的罷工潛力大幅增加。
The most advanced targets to this point include western portions of the Jesus Maria Vein, and portions of the Gully Fault Zone, with the majority of Jesus Maria (Central and Eastern portions), Santa Teresa, and San Rafael North targets, defined by surface sampling and minimal, widely spaced, shallow drilling. It should be noted that the cumulative strike length of the targets above is approximately 7 km, with the majority of the current drilling concentrated over a 500-700m area at the western most portion of the Jesus Maria/Gully Fault zones. Drill results (previously released, table 1) from Jesus Maria and the Gully Fault zones demonstrate high, multi-ounce silver grades with good continuity along strike and at depth, from historic surface sampling and trenching (See Fig. 2). These results reflect the attention this area has received from multiple drill programs.
到目前為止,最先進的目標包括耶穌·瑪麗亞礦脈的西部部分和溝谷斷裂帶的部分,其中大部分是耶穌·瑪麗亞(中部和東部)、聖特雷薩和聖拉斐爾北部的目標,這些目標是通過地面採樣和最少的、分佈廣泛的淺層鑽探確定的。應該指出的是,上述目標的累計走向長度約為7公里,目前的大部分鑽探集中在耶穌瑪利亞/峽谷斷裂帶最西端500-700米的區域內。來自Jesse Maria和溝谷斷裂帶的鑽探結果(先前公佈,表1)顯示,從歷史上的地表採樣和挖溝(見圖2),沿走向和深度具有良好連續性的高、多盎司銀品位。這些結果反映了這一領域受到多個演練計劃的關注。
Future work along the silver trends in figure 2 include additional surface trenching and geochemistry to help prioritize these targets for first pass drilling or expansion drilling.
沿著圖2中的銀色趨勢,未來的工作包括更多的地表開挖和地球化學,以幫助確定這些目標的優先順序,以便首次通過鑽探或擴大鑽探。
Figure 2: High Grade Trends and Targets, Cruz De Plata Property
圖2:高級趨勢和目標,Cruz de Plata屬性
2022 Drill Program at Jesus Maria Silver Trend
2022年耶穌瑪麗亞銀色趨勢演練計劃
In 2022, following the acquisition of the Altiplano royalty on the Cruz de Plata project (PR date January 13, 2022), Capitan begin to focus on the robust silver opportunity on its property. In total 6,449 m have been drilled by Capitan with the following RC drill holes intersecting bonanza grade silver mineralization (See table 1 for additional results and detail):
2022年,在收購了Cruz de Plata專案的AltiPlano特許權使用費(PR日期為2022年1月13日)後,Capitan開始專注於其物業上強勁的白銀機會。Capitan總共鑽探了6,449米,以下RC鑽孔與富礦級別的銀礦化相交(更多結果和細節見表1):
- 21-JMRC-01: 42.7m of 207.82 g/t AgEq including 1.5m of 1,099.34 g/t AgEq and also including 1.5m of 1,267.22 g/t AgEq
- 21-JMRC-03: 10.7m of 403.43 g/t AgEq including 1.5m of 739.63 g/t AgEq, also including 1.5m of 800 g/t AgEq and also including 1.5m of 595.52 g/t AgEq
- 21-JMRC-10: 16.8m of 309.82 g/t AgEq including 1.5m of 2,250.12 g/t AgEq
- 21-JMRC-12: 21.3m of 133.04 g/t AgEq including 1.5m of 455.13 g/t AgEq and also including 1.5m of 305.61 g/t AgEq
- 22-JMRC-22: 10.7m of 314.54 g/t AgEq including 1.5m of 1,431.68 g/t AgEq
- 21-JMRC-01:42.7米207.82克/噸AgEq,包括1.5米1,099.34 g/t AgEq,還包括1.5米1,267.22 g/t AgEq
- 21-JMRC-03:10.7m/403.43 g/t AgEq,包括1.5 m/739.63 g/t AgEq,還包括1.5 m/800 g/t AgEq,還包括1.5 m/595.52 g/t AgEq
- 21-JMRC-10:16.8m/309.82 g/t AgEq,包括1.5m/2,250.12 g/t AgEq
- 21-JMRC-12:21.3米133.04克/噸AgEq,包括1.5米455.13 g/t AgEq,還包括1.5米305.61 g/t AgEq
- 22-JMRC-22:10.7m/314.54 g/t AgEq,包括1.5m/1,431.68 g/t AgEq
Silver mineralized zones intersected at the Jesus Maria vein with the RC drilling, were as large at 42m wide and averaged approximately 10m in true width.
在Jesse Maria礦脈與RC鑽探相交的銀礦化帶同樣大,寬42米,平均實際寬度約10米。
In late November 2022, Capitan acquired a key property from Fresnillo which allowed for the consolidation of high-grade silver vein trends at Cruz de Plata (See press release dated December 06, 2022). To date Capitan has confirmed the presence of high-grade silver mineralization through drilling at the Jesus Maria vein over 1.3km with mineralization remaining open along strike and at depth.
2022年11月下旬,Capitan從Fresnillo手中收購了一處關鍵資產,使Cruz de Plata的高品位銀脈趨勢得以整合(見2022年12月6日的新聞稿)。到目前為止,Capitan已通過在Jesse Maria礦脈超過1.3公里的鑽探證實存在高品位銀礦化,礦化沿走向和深度保持開放狀態。
The latest two drill holes in the program continued to target the down-dip and on-strike continuity of mineralization at the Jesus Maria vein and Gully Fault targets. Drillhole 22-JMRC-23 targeted the down-dip extension of the Jesus Maria Vein while drillhole 22-JMRC-24 targeted the down-plunge extension of the Gully Fault Zone (See Fig. 3). Drillhole 22-JMRC-23 intersected a new zone of mineralization located approximately 40m above the down plunge extension of the Gully Fault Zone, returning 118.44 g/t AgEq over 6.1m. The drillhole also intersected the main Jesus Maria Vein at depth, extending the zone an additional 105m down-dip, but mainly returned a wide intersection of lower grade mineralization including 24.4m of 48.95 g/t AgEq, which included 1.52m of 194.92 g/t AgEq.
該計劃中最新的兩個鑽孔繼續瞄準耶穌·瑪麗亞礦脈和峽谷斷層目標的向下和走向上的連續性礦化。22-JMRC-23號鑽孔的目標是耶穌·瑪麗亞礦脈向下的延伸,而22-JMRC-24號鑽孔的目標是溝谷斷裂帶的向下傾斜的延伸(見圖3)。22-JMRC-23號鑽孔與一個新的礦化帶相交,該礦化帶位於溝谷斷裂帶向下延伸上方約40米處,在6.1米處返回118.44克/噸AgEq。鑽探還在深度上與Jesse Maria主脈相交,向下延伸了105米,但主要返回了廣泛的低品位礦化交匯處,包括24.4m的48.95g/t AgEq,其中包括1.52米的194.92 g/t AgEq。
Drillhole 22-JMRC-24 was designed to test the orientation of the down-plunge extension of the Gully Fault zone. The hole appears to have been drilled too shallow and above the down-plunge extension of high-grade mineralization. The hole returned mainly low-grade silver mineralization, that appears to potentially line-up with the new zone intersected in hole 22-JMRC-23.
22-JMRC-24號鑽孔是為了測試溝谷斷裂帶向下傾延伸的方向而設計的。這個洞似乎鑽得太淺了,而且位於高品位礦化向下傾斜的延伸上方。該洞返回的主要是低品位銀礦化,這似乎與與22-JMRC-23號洞相交的新帶狀排列在一起。
Figure 3. Drill map for Jesus María West and Santa Teresa East veins
圖3.Jesse María West和Santa Teresa East的鑽探地圖
Pilot Drill Program at New Santa Teresa East Target
新聖特蕾莎東部目標的試點演習計劃
The Santa Teresa vein has been sampled on its westernmost and easternmost ends with assays in the west of up to 443 g/t Ag and up to 3.08 g/t Au with base metal contents in surface rock samples (table 2). At the eastern portion Santa Teresa vein, surface rock samples, with a 100 g/t Ag cutoff have returned between 132 g/t Ag and 209 g/t Ag over a strike length of about 500m. The eastern end of the Santa Teresa silver trend consists of multiple, historic mine workings and is located immediately north of the historic San Rafael historic mine workings on the eastern end of the Jesus Maria vein.;New sampling along the eastern portion of this trend assayed 1,364 g/t Ag and 0.74 g/t Au, indicative of the grades that had been mined at the site historically. This is also consistent with data reported by Riverside Resources which indicated that grades of around 1,000 g/t Ag were mined at San Rafael (See Riverside Press Release dated December 12, 2008).
聖特雷薩礦脈在其最西端和最東端進行了取樣,西端的分析結果高達443克/噸銀,3.08克/噸金,地表岩石樣品中的賤金屬含量(表2)。在聖特雷薩礦脈東部,地表岩石樣品的銀下限為100克/噸,在約500米的走向長度上返回了132克/噸至209克/噸的銀。聖特雷薩白銀趨勢東端由多個具有歷史意義的礦場組成,位於耶穌瑪利亞礦脈東端歷史悠久的聖拉斐爾礦場以北。沿這一趨勢東端的新取樣化驗出1,364克/噸銀和0.74克/噸金,表明該礦址歷史上已開採的品位。這也與Riverside Resources報告的數據一致,該數據表明在San Rafael開採了約1,000 g/t的銀(見2008年12月12日的Riverside新聞稿)。
In December 2022, Capitan designed a small pilot RC drill program to test the on-strike and down-dip continuity of the Santa Teresa target (See Figure 3). Four widely-spaced holes were drilled along the Santa Teresa zone with all of them intersecting multiple, sub-parallel zones of mineralization. Hole 22-SRRC-01 intersected 1.52m of 122 g/t Ag, within a wider 4.6m interval of 70.23 g/t Ag and 0.105 g/t Au; as well as a wide intercept of mineralization of 10.7m of 32.46 g/t Ag and 0.14 g/t Au. Hole 22-SRRC-03 intersected 1.52m of 182 g/t Ag and 0.105 g/t Au and hole 22-SRRC-04 intersected 3.0m of 127.4 g/t Ag (Table 3). While these drill holes did not intersect the expected higher grades, the wide-spaced program confirmed the continuity of silver and gold mineralization in the eastern most projections of the Santa Teresa vein over a strike length of about 370m and to a down-dip length of up to 270m. Follow-up drilling will continue to focus on the locating high-grade shoots within these zones.
2022年12月,Capitan設計了一個小型試點RC演習計劃,以測試Santa Teresa目標的打擊和下降連續性(見圖3)。沿著Santa Teresa帶鑽了四個大間距的洞,所有這些洞都與多個次平行的礦化帶相交。22-SRRC-01孔與1.52米的122g/t銀相交,4.6m的較寬間隔為70.23g/t Ag和0.105 g/t Au,與10.7m的32.46g/t Ag和0.14g/t Au的礦化相交。22-SRRC-03孔與1.52米長的182 g/t銀和0.105 g/t Au相交,22-SRRC-04孔與3.0米127.4 g/t銀相交(表3)。雖然這些鑽孔沒有與預期的較高品位相交,但廣泛的規劃證實了聖特雷莎礦脈東部大多數礦化的連續性,其走向長度約為370米,向下傾斜長度最高可達270米。後續鑽探將繼續集中於在這些區域內定位高品位竹筍。
Table 1. Highlights from previously reported drill holes from the high-grade silver targets
表1.先前報道的高品位銀靶鑽孔的要點
JM_DDH_11_01 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
|
Interval | 194.5 | 196.9 | 2.5 | 257.80 | 113.63 | 0.132 | 2.46 | 2.141 | |
Including | 194.5 | 195.1 | 0.6 | 931.15 | 392.55 | 0.416 | 9.55 | 7.800 | |
JM_DDH_13_06 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 66.6 | 80.3 | 13.7 | 381.06 | 280.40 | 0.171 | 1.19 | 2.121 | |
Including | 79.4 | 80.3 | 0.9 | 3,567.36 | 3,409.10 | 0.355 | 3.42 | 7.120 | |
JM_DDH_13_07 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 114.7 | 120.7 | 6.0 | 368.26 | 363.03 | 0.109 | 0.27 | 0.354 | |
Including | 114.7 | 116.7 | 2.0 | 970.77 | 988.50 | 0.225 | 0.34 | 0.490 | |
JM_DDH_14_10 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 18.9 | 59.5 | 40.6 | 160.05 | 123.89 | 0.536 | 0.07 | 0.138 | |
Including | 27.7 | 32.0 | 4.3 | 786.50 | 732.24 | 1.201 | 0.13 | 0.348 | |
JM_DDH_14_24 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 52.7 | 94.6 | 42.0 | 244.72 | 227.24 | 0.377 | 0.05 | 0.113 | |
Including | 79.0 | 86.1 | 7.1 | 1,024.38 | 988.43 | 1.240 | 0.13 | 0.189 | |
21-JMRC-01 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
|
Interval | 18.3 | 61.0 | 42.7 | 207.82 | 154.15 | 0.371 | 0.46 | 0.716 | |
Including | 19.8 | 21.3 | 1.5 | 1,099.34 | 1,044.00 | 1.028 | 0.80 | 0.730 | |
Including | 29.0 | 30.5 | 1.5 | 1,267.22 | 1,271.00 | 0.534 | 0.49 | 0.646 | |
Including | 38.1 | 39.6 | 1.5 | 341.60 | 286.00 | 0.660 | 0.38 | 0.493 | |
Including | 50.3 | 53.3 | 3.0 | 311.33 | 154.50 | 0.658 | 1.65 | 2.195 | |
21-JMRC-03 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 77.7 | 88.4 | 10.7 | 403.43 | 177.44 | 0.371 | 3.20 | 3.569 | |
Including | 79.2 | 80.8 | 1.5 | 739.63 | 290.00 | 0.762 | 6.82 | 6.560 | |
Including | 83.8 | 85.3 | 1.5 | 799.99 | 370.00 | 0.271 | 5.59 | 8.130 | |
Including | 86.9 | 88.4 | 1.5 | 595.52 | 281.00 | 0.513 | 5.92 | 3.820 | |
21-JMRC-07 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 112.8 | 135.6 | 22.9 | 71.53 | 56.91 | 0.101 | 0.13 | 0.219 | |
Including | 131.1 | 132.6 | 1.5 | 398.67 | 342.00 | 0.390 | 0.65 | 0.942 | |
21-JMRC-10 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 16.8 | 33.5 | 16.8 | 309.82 | 291.20 | 0.383 | 0.15 | 0.161 | |
Including | 19.8 | 21.3 | 1.5 | 2,250.12 | 2,217.00 | 1.766 | 1.06 | 0.438 | |
22-JMRC-12 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 15.2 | 36.6 | 21.3 | 133.04 | 100.50 | 0.249 | 0.25 | 0.421 | |
Including | 21.3 | 22.9 | 1.5 | 455.13 | 383.00 | 0.584 | 0.94 | 0.842 | |
Including | 24.4 | 25.9 | 1.5 | 305.61 | 239.00 | 0.331 | 0.96 | 0.917 | |
22-JMRC-14 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 140.2 | 144.8 | 4.6 | 218.68 | 183.10 | 0.632 | 0.05 | 0.049 | |
Including | 141.7 | 143.3 | 1.5 | 577.98 | 504.00 | 1.450 | 0.11 | 0.037 | |
22-JMRC-22 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) | |
Interval | 74.7 | 85.3 | 10.7 | 314.54 | 287.24 | 0.481 | 0.19 | 0.179 | |
Including | 74.7 | 76.2 | 1.5 | 1,431.68 | 1,381.00 | 1.358 | 0.85 | 0.480 |
JM_DDH_11_01 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅 (%) |
|
間隔 | 194.5 | 196.9 | 2.5 | 257.80 | 113.63 | 0.132 | 2.46 | 2.141 | |
包括 | 194.5 | 195.1 | 0.6 | 931.15 | 392.55 | 0.416 | 9.55 | 7.800 | |
JM_DDH_13_06 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 66.6 | 80.3 | 13.7 | 381.06 | 280.40 | 0.171 | 1.19 | 2.121 | |
包括 | 79.4 | 80.3 | 0.9 | 3,567.36 | 3,409.10 | 0.355 | 3.42 | 7.120 | |
JM_DDH_13_07 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 114.7 | 120.7 | 6.0 | 368.26 | 363.03 | 0.109 | 0.27 | 0.354 | |
包括 | 114.7 | 116.7 | 2.0 | 970.77 | 988.50 | 0.225 | 0.34 | 0.490 | |
JM_DDH_14_10 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 18.9 | 59.5 | 40.6 | 160.05 | 123.89 | 0.536 | 0.07 | 0.138 | |
包括 | 27.7 | 32.0 | 4.3 | 786.50 | 732.24 | 1.201 | 0.13 | 0.348 | |
JM_DDH_14_24 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 52.7 | 94.6 | 42.0 | 244.72 | 227.24 | 0.377 | 0.05 | 0.113 | |
包括 | 79.0 | 86.1 | 7.1 | 1,024.38 | 988.43 | 1.240 | 0.13 | 0.189 | |
21-JMRC-01 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅 (%) |
|
間隔 | 18.3 | 61.0 | 42.7 | 207.82 | 154.15 | 0.371 | 0.46 | 0.716 | |
包括 | 19.8 | 21.3 | 1.5 | 1,099.34 | 1,044.00 | 1.028 | 0.80 | 0.730 | |
包括 | 29.0 | 30.5 | 1.5 | 1,267.22 | 1,271.00 | 0.534 | 0.49 | 0.646 | |
包括 | 38.1 | 39.6 | 1.5 | 341.60 | 286.00 | 0.660 | 0.38 | 0.493 | |
包括 | 50.3 | 53.3 | 3.0 | 311.33 | 154.50 | 0.658 | 1.65 | 2.195 | |
21-JMRC-03 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 77.7 | 88.4 | 10.7 | 403.43 | 177.44 | 0.371 | 3.20 | 3.569 | |
包括 | 79.2 | 80.8 | 1.5 | 739.63 | 290.00 | 0.762 | 6.82 | 6.560 | |
包括 | 83.8 | 85.3 | 1.5 | 799.99 | 370.00 | 0.271 | 5.59 | 8.130 | |
包括 | 86.9 | 88.4 | 1.5 | 595.52 | 281.00 | 0.513 | 5.92 | 3.820 | |
21-JMRC-07 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 112.8 | 135.6 | 22.9 | 71.53 | 56.91 | 0.101 | 0.13 | 0.219 | |
包括 | 131.1 | 132.6 | 1.5 | 398.67 | 342.00 | 0.390 | 0.65 | 0.942 | |
21-JMRC-10 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 16.8 | 33.5 | 16.8 | 309.82 | 291.20 | 0.383 | 0.15 | 0.161 | |
包括 | 19.8 | 21.3 | 1.5 | 2250.12 | 2217.00 | 1.766 | 1.06 | 0.438 | |
22-JMRC-12 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 15.2 | 36.6 | 21.3 | 133.04 | 100.50 | 0.249 | 0.25 | 0.421 | |
包括 | 21.3 | 22.9 | 1.5 | 455.13 | 383.00 | 0.584 | 0.94 | 0.842 | |
包括 | 24.4 | 25.9 | 1.5 | 305.61 | 239.00 | 0.331 | 0.96 | 0.917 | |
22-JMRC-14 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 140.2 | 144.8 | 4.6 | 218.68 | 183.10 | 0.632 | 0.05 | 0.049 | |
包括 | 141.7 | 143.3 | 1.5 | 577.98 | 504.00 | 1.450 | 0.11 | 0.037 | |
22-JMRC-22 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) | |
間隔 | 74.7 | 85.3 | 10.7 | 314.54 | 287.24 | 0.481 | 0.19 | 0.179 | |
包括 | 74.7 | 76.2 | 1.5 | 1431.68 | 1,381.00 | 1.358 | 0.85 | 0.480 |
Intervals are reported as drilled lengths. True widths are approximately 70-95% of reported interval
Ageq values are calculated as follows: Ageq = (Ag x 0.94) + (Au x 0.86 x 80) + (Zn x 0.037 x 0.935) + (Pb x 0.03 x 0.92)
Recoveries have been estimated using an average of similar polymetallic deposits in Mexico as well as preliminary metallurgical work from 2014
Intervals are calculated based on a 25g/t Ageq cut-off (including recoveries) with no more than 3m of internal waste
間隔以鑽取長度報告。真的WID約為報告間隔的70%-95%
AgEq值計算如下:AgEq=(Agx0.94)+(Au x0.86x80)+(Zx 0.037 x 0.935)+(Pbx0.03x0.92)
利用墨西哥類似多金屬礦床的平均值以及2014年以來的初步冶金工作來估計採礦量
間隔期的計算以25g/t AgEq截止值(包括回收)為基礎,內部廢物不超過3m
Table 2. Highlight surface chip samples from the Santa Teresa West target
表2.突出顯示來自Santa Teresa West目標的表面晶片樣本
Sample | Easting | Northing | Length | Au (g/t) | Ag (g/t) | Pb (%) | Zn (%) |
69090 | 546,307 | 2,837,835 | 0.5 | 0.141 | 342 | 1.69 | 2.9 |
69091 | 546,307 | 2,837,835 | 0.6 | 0.904 | 410 | 1.67 | 0.7 |
69095 | 546,412 | 2,837,853 | 0.8 | 1.745 | 128 | 1.9 | 1.25 |
69096 | 546,412 | 2,837,853 | 0.6 | 3.083 | 344 | 0.77 | 0.67 |
69098 | 546,374 | 2,837,725 | 0.9 | 2.126 | 183 | 2.97 | 0.76 |
69102 | 546,128 | 2,837,868 | 0.6 | 0.539 | 414 | 2.4 | 0.38 |
69108 | 546,472 | 2,838,002 | 1.4 | 0.518 | 443 | 0.15 | 0.24 |
69113 | 546,546 | 2,838,000 | 0.9 | 0.24 | 140 | 0.007 | 0.01 |
69115 | 546,547 | 2,837,998 | 0.8 | 0.456 | 156 | 0.06 | 0.04 |
69117 | 546,569 | 2,837,990 | 1.4 | 0.202 | 147 | 0.08 | 0.18 |
69870 | 546,059 | 2,838,094 | 0.4 | 0.426 | 147 | 2.4 | 2.99 |
樣本 | 向東 | 北距 | 長度 | Au(克/噸) | 銀(克/噸) | PB(%) | 鋅(%) |
69090 | 546,307 | 2837,835 | 0.5 | 0.141 | 342 | 1.69 | 2.9 |
69091 | 546,307 | 2837,835 | 0.6 | 0.904 | 四百一十 | 1.67 | 0.7 |
69095 | 546,412 | 2837,853 | 0.8 | 1.745 | 128 | 1.9 | 1.25 |
69096 | 546,412 | 2837,853 | 0.6 | 3.083 | 三百四十四 | 0.77 | 0.67 |
69098 | 546,374 | 2837,725 | 0.9 | 2.126 | 一百八十三 | 2.97 | 0.76 |
69102 | 546,128 | 2837,868 | 0.6 | 0.539 | 四百一十四 | 2.4 | 0.38 |
69108 | 546,472 | 2,838,002 | 1.4 | 0.518 | 443 | 0.15 | 0.24 |
69113 | 546,546 | 2838,000人 | 0.9 | 0.24 | 140 | 0.007 | 0.01 |
69115 | 546,547 | 2837,998 | 0.8 | 0.456 | 一百五十六 | 0.06 | 0.04 |
69117 | 546,569 | 2837,990 | 1.4 | 0.202 | 一百四十七 | 0.08 | 0.18 |
69870 | 546,059 | 2838,094 | 0.4 | 0.426 | 一百四十七 | 2.4 | 2.99 |
Table 3. Drill results from Jesus Maria-Gully Fault zone drilling
表3.耶穌·瑪麗亞-峽谷斷裂帶鑽探結果
22-JMRC-23 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 115.8 | 121.9 | 6.1 | 118.44 | 102.78 | 0.120 | 0.03 | 0.371 |
Including | 118.9 | 120.4 | 1.5 | 213.12 | 185 | 0.195 | 0.02 | 0.738 |
Interval | 228.6 | 253.0 | 24.4 | 48.95 | 16.16 | 0.262 | 0.19 | 0.303 |
Including | 231.7 | 233.2 | 1.52 | 194.92 | 82.3 | 0.275 | 1.49 | 1.67 |
22-JMRC-24 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) | Pb (%) | Zn (%) |
Interval | 109.7 | 111.3 | 1.5 | 79.98 | 55.40 | 0.401 | 0.00 | 0.008 |
Interval | 117.3 | 118.9 | 1.5 | 93.73 | 93.60 | 0.072 | 0.02 | 0.010 |
22-JMRC-23 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅 (%) |
間隔 | 115.8 | 121.9 | 6.1 | 118.44 | 102.78 | 0.120 | 0.03 | 0.371 |
包括 | 118.9 | 120.4 | 1.5 | 213.12 | 185 | 0.195 | 0.02 | 0.738 |
間隔 | 228.6 | 253.0 | 24.4 | 48.95 | 16.16 | 0.262 | 0.19 | 0.303 |
包括 | 231.7 | 233.2 | 1.52 | 194.92 | 82.3 | 0.275 | 1.49 | 1.67 |
22-JMRC-24 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) | PB(%) | 鋅(%) |
間隔 | 109.7 | 111.3 | 1.5 | 79.98 | 55.40 | 0.401 | 0.00 | 0.008 |
間隔 | 117.3 | 118.9 | 1.5 | 93.73 | 93.60 | 0.072 | 0.02 | 0.010 |
Intervals are reported as drilled lengths. True widths are approximately 70-95% of reported interval
Ageq values are calculated as follows: Ageq = (Ag x 0.94) + (Au x 0.86 x 80) + (Zn x 0.037 x 0.935) + (Pb x 0.03 x 0.92)
Recoveries have been estimated using an average of similar polymetallic deposits in Mexico as well as preliminary metallurgical work from 2014
Intervals are calculated based on a 25g/t Ageq cut-off (including recoveries) with no more than 3m of internal waste
間隔以鑽取長度報告。真實寬度約為報告間隔的70%-95%
AgEq值計算如下:AgEq=(Agx0.94)+(Au x0.86x80)+(Zx 0.037 x 0.935)+(Pbx0.03x0.92)
利用墨西哥類似多金屬礦床的平均值以及2014年以來的初步冶金工作來估計採礦量
間隔期的計算以25g/t AgEq截止值(包括回收)為基礎,內部廢物不超過3m
Table 4. Drill results from Santa Teresa-Jesus Maria East zones drilling
表4.Santa Teresa-Jesse Maria East Zones鑽探結果
22-SRRC-01 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) |
Interval | 29.0 | 33.5 | 4.6 | 73.58 | 70.23 | 0.105 |
Including | 29.0 | 30.48 | 1.5 | 118.88 | 122 | 0.055 |
Interval | 51.8 | 62.5 | 10.7 | 40.98 | 32.36 | 0.140 |
22-SRRC-02 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) |
Interval | 135.6 | 137.2 | 1.5 | 72.94 | 49.50 | 0.380 |
Interval | 157.0 | 164.6 | 7.6 | 55.83 | 48.20 | 0.146 |
22-SRRC-03 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) |
Interval | 9.1 | 10.7 | 1.5 | 41.99 | 19.70 | 0.332 |
Interval | 27.4 | 33.5 | 6.1 | 58.48 | 55.85 | 0.084 |
Including | 32.0 | 33.5 | 1.5 | 178.55 | 182 | 0.105 |
22-SRRC-04 | From (m) | To (m) | Interval (m) | AgEq (g/t)* | Ag (g/t) | Au (g/t) |
Interval | 237.7 | 240.8 | 3.0 | 125.47 | 127.35 | 0.072 |
Including | 237.7 | 239.3 | 1.5 | 184.94 | 190 | 0.081 |
Interval | 269.7 | 274.3 | 4.6 | 71.31 | 53.00 | 0.306 |
including | 272.8 | 274.3 | 1.5 | 165.02 | 123 | 0.712 |
22-SRRC-01 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) |
間隔 | 29.0 | 33.5 | 4.6 | 73.58 | 70.23 | 0.105 |
包括 | 29.0 | 30.48 | 1.5 | 118.88 | 一百二十二 | 0.055 |
間隔 | 51.8 | 62.5 | 10.7 | 40.98 | 32.36 | 0.140 |
22-SRRC-02 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) |
間隔 | 135.6 | 137.2 | 1.5 | 72.94 | 49.50 | 0.380 |
間隔 | 157.0 | 164.6 | 7.6 | 55.83 | 48.20 | 0.146 |
22-SRRC-03 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) |
間隔 | 9.1 | 10.7 | 1.5 | 41.99 | 19.70 | 0.332 |
間隔 | 27.4 | 33.5 | 6.1 | 58.48 | 55.85 | 0.084 |
包括 | 32.0 | 33.5 | 1.5 | 178.55 | 182 | 0.105 |
22-SRRC-04 | 發件人(M) | 至(M) | 間隔(M) | AgEq(克/噸)* | 銀(克/噸) | Au(克/噸) |
間隔 | 237.7 | 240.8 | 3.0 | 125.47 | 127.35 | 0.072 |
包括 | 237.7 | 239.3 | 1.5 | 184.94 | 190 | 0.081 |
間隔 | 269.7 | 274.3 | 4.6 | 71.31 | 53.00 | 0.306 |
包括 | 272.8 | 274.3 | 1.5 | 165.02 | 123 | 0.712 |
Intervals are reported as drilled lengths. True widths are approximately 70-95% of reported interval
Ageq values are calculated as follows: Ageq = (Ag x 0.94) + (Au x 0.86 x 80) + (Zn x 0.037 x 0.935) + (Pb x 0.03 x 0.92)
Recoveries have been estimated using an average of similar polymetallic deposits in Mexico as well as preliminary metallurgical work from 2014
Intervals are calculated based on a 25g/t Ageq cut-off (including recoveries) with no more than 3m of internal waste
間隔以鑽取長度報告。真實寬度約為報告間隔的70%-95%
AgEq值計算如下:AgEq=(Agx0.94)+(Au x0.86x80)+(Zx 0.037 x 0.935)+(Pbx0.03x0.92)
利用墨西哥類似多金屬礦床的平均值以及2014年以來的初步冶金工作來估計採礦量
間隔期的計算以25g/t AgEq截止值(包括回收)為基礎,內部廢物不超過3m
Qualified Person & QA/QC:
合格人員和QA/QC:
The scientific and technical data contained in this news release pertaining to the Cruz de Plata Project was reviewed and approved by Marc Idziszek, P.Geo, a non-independent qualified person to Capitan Silver, who is responsible for ensuring that the technical information provided in this news release is accurate and who acts as a "qualified person" under National Instrument 43-101 Standards of Disclosure for Mineral Projects.
本新聞稿中包含的與Cruz de Plata專案有關的科學和技術數據已由Capitan Silver的非獨立合格人員Marc Idziszek,P.Geo審核和批准,他負責確保本新聞稿中提供的技術資訊是準確的,並根據National Instrument 43-101礦產專案披露標準擔任“合格人員”。
Capitan Silver Corp. has a Quality Assurance/Quality Control program that includes insertion and verification of control samples including standard reference material, blanks and duplicates consistent with industry standards.
Capitan Silver Corp.有一個品質保證/質量控制計劃,其中包括插入和驗證控制樣品,包括符合行業標準的標準參考材料、空白和複製品。
RC drill samples from the Cruz de Plata Project are collected and split at the drill site using a Gilson Universal Splitter. The samples are stored in either plastic bags (dry) or micropore bags (wet) and secured with plastic zip-ties and then transported to the preparation laboratory of Bureau Veritas in the city of Durango, Durango. The sample pulps are then transported to the Bureau Veritas' laboratory in Vancouver, where they are assayed for gold by fire assay with atomic absorption finish (FA430 assay method code; 0.005 to 10 ppm detection limit). Samples over 10 ppm Au and over 100 ppm Ag are assayed with gravimetric finish (Assay code FA530). All samples are also assayed by ICP-ES (code AQ300) for a suite of 33 elements. Samples over 1% Pb an d/ or 1% Zn are assayed by Aqua regia Ore Grade ICP-ES (AQ 370).
來自Cruz de Plata專案的RC鑽頭樣本在鑽探現場使用Gilson萬能分離器進行分離。樣品被儲存在塑膠袋(幹的)或微孔袋(濕的)中,並用塑料拉鍊固定,然後運輸到位於杜蘭戈市的Bureau Veritas的製備實驗室。然後,樣品紙漿被運送到溫哥華Veritas局的實驗室,在那裡用原子吸收光譜分析火分析金(FA430分析方法代碼;檢測下限為0.005至10ppm)。超過10ppm的Au和超過100ppm的Ag的樣品用重量法測定(分析代碼FA530)。所有樣品還用電感耦合等離子體發射光譜儀(代碼AQ300)對一套33種元素進行分析。超過1%鉛和/或1%鋅的樣品用王水礦石級電感耦合等離子體發射光譜儀(AQ 370)測定。
Diamond drill-hole samples, drilled by Fresnillo, reported in this press release were assayed at SGS Labs for gold by fire assay with atomic absorption finish (GE_FAA515 assay method code; 0.005 to 10 ppm detection limit). Samples over 10 ppm Au and over 100 ppm Ag are assayed with gravimetric finish (Assay code GEO_FAG515). All samples are also assayed by ICP-ES (code GE_ICP40B) for a suite of 33 elements. Samples over 1%Pb and Zn are assayed by Aqua regia Ore Grade ICP-ES (GO_ICP90Q).
本新聞稿中報道的由Fresnillo鑽探的鑽石鑽孔樣品在SGS實驗室用火焰原子吸收光譜分析(GE_FAA515分析方法代碼;0.005至10ppm的檢出限)進行金分析。超過10ppm的Au和超過100ppm的Ag的樣品用重量法測定(分析代碼GEO_FAG515)。所有樣品還用電感耦合等離子體發射光譜儀(代碼GE_ICP40B)對一套33種元素進行分析。鉛和鋅含量超過1%的樣品用王水礦石級電感耦合等離子體發射光譜儀(GO_ICP90Q)測定。
All summarized intervals reported in this press release were calculated using a 25 ppm Ag equivalent (AgEq) cut-off grade with AgEq considering Ag, Au, Pb and Zn and calculated as follows: AgEq = Ag g/t + (80x Au g/t) + (0.003 x Pb g/t) + (0.0037 x Zn g/t). Intervals contain no more than 3 metres of internal dilution. High grades have not been capped.
本新聞稿中報告的所有匯總區段均採用25ppm銀當量(AgEq)與AgEq的邊際品位計算,並考慮了Ag、Au、Pb和Zn,計算公式如下:AgEq=Agg/t+(80x Au g/t)+(0.003 x Pbg/t)+(0.0037 x Zn g/t)。井段內部稀釋度不超過3米。高分還沒有被封頂。
About Capitan Silver Corp.
關於Capitan Silver Corp.
Capitan Silver is a well-funded junior exploration company focused on its 100% owned gold and silver Cruz de Plata Project in Durango, Mexico. The Company is led by a management team that has successfully advanced and developed several heap leach operations in Mexico over the past 16 years.
Capitan Silver是一家資金雄厚的初級勘探公司,專注於其在墨西哥杜蘭戈的100%擁有的黃金和白銀Cruz de Plata專案。該公司由一支管理團隊領導,該團隊在過去16年裡成功地推進和開發了墨西哥的幾項堆浸業務。
More information for the Company can be found at
欲瞭解更多有關該公司的資訊,請訪問
ON BEHALF OF CAPITAN SILVER CORP.
我代表Capitan Silver公司。
"Alberto Orozco"
Alberto Orozco, CEO
《阿爾貝託·奧羅斯科》
Alberto Orozco,首席執行官
For additional information contact:
如需更多資訊,請聯繫:
Alberto Orozco
CEO
Capitan Silver Corp.
info@capitansilver.com
Phone: (78) 327-6671
Fax: (778) 327-6675
Web:
阿爾貝託·奧羅斯科
首席執行官
Capitan Silver Corp.
郵箱:Info@capansilver.com
電話:(78)327-6671
傳真:(778)327-6675
網頁:
Raffi Elmajian
Corporate Communications
Capitan Silver Corp.
info@capitansilver.com
Phone: (778) 327-6671
Web:
拉菲·埃爾馬吉安
企業通信
Capitan Silver Corp.
郵箱:Info@capansilver.com
電話:(778)327-6671
網頁:
Certain statements in this press release may be considered forward-looking information. These statements can be identified by the use of forward-looking terminology (e.g., "expect"," estimates", "intends", "anticipates", "believes", "plans"). Such information involves known and unknown risks -- including the availability of funds, the results of financing and exploration activities, the interpretation of exploration results and other geological data, or unanticipated costs and expenses and other risks identified by Capitan in its public securities filings that may cause actual events to differ materially from current expectations. Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release.
本新聞稿中的某些陳述可能被視為前瞻性資訊。可以通過使用前瞻性術語(例如,“預期”、“估計”、“打算”、“預期”、“相信”、“計劃”)來確定這些陳述。此類資訊涉及已知和未知風險--包括資金的可獲得性、融資和勘探活動的結果、對勘探結果和其他地質數據的解讀,或Capitan在其公開證券申報檔案中確定的意外成本和費用以及其他可能導致實際事件與當前預期大不相同的風險。告誡讀者不要過度依賴這些前瞻性陳述,這些陳述僅在本新聞稿發佈之日發表。
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。
To view the source version of this press release, please visit
要查看本新聞稿的源版本,請訪問
譯文內容由第三人軟體翻譯。