share_log

Enertopia Reports Two High Grade Li Zones for Advancement

Enertopia Reports Two High Grade Li Zones for Advancement

Enertopia 報告了兩個高等級 Li 區域有待改進
newsfile ·  2023/05/15 21:00

Kelowna, British Columbia--(Newsfile Corp. - May 15, 2023) - Enertopia Corporation (OTCQB: ENRT) and (CSE: ENRT) ("Enertopia'' or the "Company") a company focused on building shareholder value through a combination of our Nevada lithium claims, intellectual property, and pending patents in the green technology space, is very pleased to provide the following lithium project update.

不列顛哥倫比亞省基洛納-(Newsfile Corp.-2023年5月15日)-Enertopia公司(OTCQB:ENRT)和(CSE:ENRT)(“Enertopia”或“公司”)一家專注於通過我們的內華達州鋰主張、知識產權和綠色技術領域正在申請的專利相結合來建立股東價值的公司,非常高興地提供以下鋰專案的最新情況。

We are happy to report the final assay results from the last 7 holes of our 12-hole 2023 drilling program at our WT Project just west of Tonopah, NV. This year's drilling program has confirmed two areas of the higher-grade mineralization have been successfully expanded upon from last year's inaugural drilling program.

我們很高興地報告我們在內華達州託諾帕以西的WT專案的12孔2023鑽井計劃的最後7孔的最終測試結果。今年的鑽探計劃證實,與去年的首個鑽探計劃相比,已成功擴大了兩個較高品位礦化的區域。

DH23-02, was a 600 foot, step out to the east from DH23-01. And returned 184 feet of 828 ppm Li, with the EOH value running 1,040 ppm. This zone remains open to the east, west and south and at depth.

DH23-02,600英尺,從DH23-01向東走一步。Li以828ppm的速度返回184英尺,EOH值為1040ppm。這一區域仍然向東、西、南和縱深開放。

Drill holes DH23-10 and DH23-11 confirmed that a large area of higher-grade mineralization, covering the Southwest part of our project, remains open to the south and west and at depth. Both holes have multiple intervals running above 1,000 ppm Li each.

鑽探DH23-10和DH23-11證實,覆蓋本專案西南部的大片較高品位礦化仍向南、西和深部開放。兩個洞都有多個區間,每個都在1000ppm以上,Li。

Below is the drill assay table for the assay results reported today in order of drilling completion.

以下是今天報告的化驗結果的鑽井化驗表,按鑽井完成的順序排列。

HOLE # From ft To ft Thickness ft PPM Li Claystone Horizon Color Comments
DH23-07 0 181


EOH 480 ppm Li
Interval 50 181 131 516 Light Green, tan, gray
Interval 143 163 20 710 Green, gray Max ppm Li 760
DH23-05 0 352


EOH 700 ppm Li
Interval 150 180 30 456 Light Green
Interval 195 352 157 637 Light green High grade zone
including 231 236 5 1,030 Light green Highest grade
DH23-04 0 284


EOH 680 ppm Li
Interval 124 139 15 406 Light Green
Interval 174 284 110 593 Light green, tan
including 199 209 10 1,055 Light green, gray High grade zone
DH23-06 0 138


EOH 370 ppm Li
Interval 55 80 25 412 Tan light green
Interval 95 125 30 396 Green, dark green
DH23-11 0 341


EOH 700 ppm Li
Interval 53 73 20 343 Light green
Interval 93 341 248 844 Light green, tan, Dk green
including 204 209 5 1,270 Tan, light green Highest assay
including 263 288 25 1,042 Tan, light green High Assay 1,190
DH23-10 0 304


EOH 770 ppm Li
Interval 68 304 236 843 Tan, green, Dk green High assay 1,410
Including 128 143 15 1,210 Light green High assay 1,410
including 265 290 25 1,002 Dk green High assay 1,310
DH23-02 0 251


EOH 1,040 ppm Li
Interval 67 251 184 828 Light green, Dk green High Assay 1,510
Including 132 152 20 1,150 Light green High Assay 1,510
Including 237 251 14 1,113 Dk green High Assay 1,230
孔編號 從英尺開始 到英尺 厚度ft Ppm Li 克萊斯通地平線顏色 評論
DH23-07 0 181


乙基氫氧化物480ppm Li
間隔 50 181 131 516 淺綠色、棕褐色、灰色
間隔 143 163 20個 七百一十 綠色、灰色 最高分Li 760
DH23-05 0 352


EOH 700ppm Li
間隔 一百五十 180 30個 四五六 淺綠色
間隔 195 352 157 六三七 淺綠色 高級區
包括 二百三十一 236 5. 1030 淺綠色 最高品級
DH23-04 0 二百八十四


乙基氫氧化物680ppm Li
間隔 124 一百三十九 15個 406 淺綠色
間隔 一百七十四 二百八十四 110 五百九十三 淺綠色,棕褐色
包括 一百九十九 209 10 1,055 淺綠色、灰色 高級區
DH23-06 0 一百三十八


乙基氫氧化物370ppm Li
間隔 55 80 25個 412 棕褐色淺綠色
間隔 95 125 30個 三九六 綠色,深綠色
DH23-11 0 341


EOH 700ppm Li
間隔 53 73 20個 343 淺綠色
間隔 93 341 248 八百四十四 淺綠色、棕褐色、DK綠色
包括 204 209 5. 1270 淡黃色,淺綠色 最高化驗
包括 二百六十三 288 25個 1,042 淡黃色,淺綠色 高含量檢測1190
DH23-10 0 三百零四


乙基氫氧化物770ppm Li
間隔 68 三百零四 236 八百四十三 棕褐色、綠色、DK綠色 高含量1,410
包括 128 143 15個 1210 淺綠色 高含量1,410
包括 265 二百九十 25個 1,002 DK綠 高化驗1,310
DH23-02 0 251


乙酸乙酯1040ppm Li
間隔 67 251 一百八十四 八百二十八 淺綠色、DK綠色 高含量1,510
包括 132 一百五十二 20個 1150 淺綠色 高含量1,510
包括 二百三十七 251 14. 1113 DK綠 高含量1230

NOTE: All above intervals used a minimum 300 ppm Li cutoff grade. (EOH) means end of hole.

注:以上所有區間均使用了Li最低300ppm的分界線品位。(EOH)意思是洞的盡頭。

Summary from the above drill holes released today:

今天公佈的上述鑽孔摘要如下:

DH23-07 was drilled 1,250 feet SSW of DH23-05 and 1,175 feet NNE of DH23-08, to confirm the potential of the widespread Li mineralization. Due to time constraints on the drilling program this hole was drilled to a depth of only 181 feet. The shallow drilling has confirmed the Li mineralization from 50 feet to the EOH at 181 feet the Li horizon averaged 516 ppm Li.

DH23-07在DH23-05的西南向1,250英尺和DH23-08的東北向1,175英尺處進行了鑽探,以確認廣泛分佈的Li礦化的潛力。由於鑽井計劃的時間限制,這個洞只鑽到了181英尺深。淺層鑽探證實了Li礦化的深度為50英尺至EOH181英尺,Li層位平均為516ppm,Li。

DH23-05 was drilled on a line between DH23-04 and DH23-07 and a line between DH23-06 and DH23-11. This hole was a deeper test hole drilled to 352 feet, with a 157-foot interval averaging 637 ppm Li and the EOH averaging 700 ppm Li.

DH23-05在DH23-04和DH23-07之間的管線和DH23-06和DH23-11之間的管線上鑽井。這口井是一個更深的試驗井,鑽至352英尺,其中157英尺的井距平均為637ppm Li,EOH平均為700ppm Li。

DH23-04 was drilled 1,000 feet NE from DH22-10 and 1,000 feet SSW from hole DH22-08 to test the mineralized continuity and depth of mineralization between the two holes drilled last year. It confirmed the Li claystone is widespread and still open at a depth of 284 feet at a grade of 680 ppm Li. Two intercepts of over 1,000 ppm were intersected in this hole in the interval from 199 - 209 feet.

DH23-04在DH22-10和DH22-08孔分別鑽東北1,000英尺和南西1,000英尺,以測試去年鑽探的兩個孔之間的礦化連續性和礦化深度。它證實了Li黏土巖是普遍存在的,並在284英尺深的地方仍然開挖,等級為680ppm的Li。在199-209英尺的間隔內,兩個超過1,000 ppm的截獲物在這個洞中相交。

DH23-06 was drilled 975 feet east of DH23-05 to test for the eastern extent of the higher-grade part of the deposit. Lower Li grades and the amount of Ash and tuff could indicate the depositional lagoon margin.

DH23-06在DH23-05以東975英尺處鑽探,以測試礦床較高品位部分的東部範圍。較低的Li等級、灰分和凝灰岩含量可能指示了沉積的瀉湖邊緣。

DH23-11 was drilled 975 feet WSW from hole DH23-05. DH23-11 not only increased the aerial extent of the deposit to the SW but also intercepted the thickest mineralized zone of 248 feet of Li claystone averaging 844 ppm Li with 8 separate zones grading above 1,000 ppm Li. This looks to be one of the first areas for future drilling to add to any future resource numbers.

DH23-11是在DH23-05井西南偏西975英尺處鑽井的。DH23-11不僅增加了礦床向西南方向的空中範圍,還截獲了最厚的礦化帶--248英尺厚的Li黏土巖層,平均礦化度為844ppm Li,其中8個獨立礦化帶的品位超過1000ppm Li。這看起來是未來鑽探的第一批地區之一,將添加到未來的資源量中。

DH23-10 was drilled 1,000 feet west of DH22-10 drilled last year which returned 70 feet of 831 ppm Li including 1,045 at the EOH. We expected hole DH23-10 to confirm the grades intersected last year with increasing thickness. DH23-10 did not disappoint, returning 7 intercepts over 1,000 ppm Li or higher with a peak value over 5 ft of 1,410 ppm Li inside 236 feet averaging 843 ppm Li.

DH23-10是在DH22-10以西1,000英尺處鑽探的,去年鑽探的DH22-10開採出了70英尺的831ppm Li,其中包括在EOH的1,045英尺。我們預計DH23-10孔將確認去年隨著厚度的增加而相交的等級。DH23-10沒有令人失望,7次攔截Li超過1000ppm或更高,峰值超過5英尺,達到1410ppm Li在236英尺內,平均843ppm Li。

DH23-02 was drilled 600 feet east from DH23-01 to test the eastern extension of the high-grade zone. It confirmed the Li claystone is widespread and still open at a depth and to the east and south. 6 intercepts of over 1,000 ppm were intersected in this hole in the interval from 67 - 251 feet which returned 813 ppm Li, with the EOH assay at 251 feet being 1,040 ppm Li.

DH23-02在DH23-01以東600英尺處鑽探,以測試高級區的東部延伸。它證實了Li泥岩是廣泛存在的,並且仍然在一定深度內以及向東和向南開放。在67-251英尺的距離內,6個超過1000ppm的截距在這個井中相交,返回了813ppm的Li,而251英尺處的EOH測試結果是1040ppm的Li。

Summary of WT 2023 Drilling Program:

WT 2023鑽井計劃摘要:

After reviewing the drill data from the 2022 and 2023 drill programs we have come up with the following project understanding:

在回顧了2022年和2023年鑽探計劃的鑽探數據後,我們得出了以下專案理解:

We have confirmed two areas for future higher grade resource expansion. Area one around drill holes DH22-07, DH23-01, DH23-02 covering a distance of 1,000 feet from west to east, which is open to the west, east, south and at depth.

我們已經確定了未來更高品位資源擴張的兩個領域。DH22-07、DH23-01、DH23-02鑽孔周圍的第一區,自西向東、向西、向東、向南和向深,全長1000英尺。

The second and much larger area of higher-grade material encompasses DH22-04, DH22-10, DH23-04 to DH23-12. This area covers an area 3,900 feet north south and 2,500 feet west to east, which remains open to our western property boundary ~600 feet to the west and our southern property boundary ~1,200 feet to the south.

第二個也是更大的高級材料區域包括DH22-04、DH22-10、DH23-04到DH23-12。該區域北面3900英尺,南面2500英尺,向西向東2500英尺,向西約600英尺,向南約1200英尺,一直向我們的西部物業邊界開放。

WT Project Drill Hole Location Map

WT工程鑽孔位置圖

Note: Correction from our May 3, 2023 press release. The drilling summary from DH23-09 should have been reported as. Four intercepts of over 1,000 ppm were intersected in this hole in the interval from 205 - 310 feet.

注意事項更正自我們2023年5月3日的新聞稿。來自的鑽探摘要DH23-09應該被報告為。在205-310英尺的間隔內,在這個洞中相交了四個超過1,000 ppm的截距。

Inaugural 43-101 report

首屆43-101年度報告書

The company is going through the commissioning process for the writing of an inaugural 43-101 report for the West Tonopah Project, which covers 1,760 acres. We are expecting this report to be completed during the calendar 4th quarter of this year.

該公司正在為佔地1,760英畝的West Tonopah專案撰寫一份43-101年度的首份報告的委託程式。我們預計這份報告將在4號日曆期間完成這是今年第一季度。

"I am extremely pleased with the drill hole data from the 2022 and 2023 drilling programs as we are getting a better understanding of the Lithium claystone deposit. We look forward to a steady stream of news and advancements in 2023 not only from Enertopia but also from other Companies operating in the immediate area as work progresses," stated President Robert McAllister.

總裁羅伯特·麥卡利斯特表示:“我對2022年和2023年鑽探計劃的鑽孔數據感到非常滿意,因為我們對鋰黏土巖礦有了更好的瞭解。我們期待著2023年不僅來自Enertopia,而且隨著工作的進展,來自其他在該地區運營的公司的消息和進展源源不斷。”

For additional project details please visit our website at

欲瞭解更多專案詳情,請訪問我們的網站

The Qualified Person:

符合資格的人:

The technical data in this news release have been reviewed by Randy Henkle, P. Geol. a qualified person under the terms of NI 43-101.

本新聞稿中的技術數據已由P.Geol的Randy Henkle審閱。符合NI 43-101條款的合格人員。

On April 17th and April 18th, I, Randy Henkle, QP for this project visited the project and observed the drilling and sampling operations at DH23 -02. I also visited the sample storage facility for the project. All drilling and sampling operations that I observed were in compliance with CIMM Best Practice procedures.

4月17日和18日,我,這個專案的QP Randy Henkle,參觀了該專案,並觀察了DH23-02的鑽井和取樣操作。我還參觀了該專案的樣品儲存設施。我觀察到的所有鑽探和取樣操作都符合CIMM最佳實踐程式。

All samples were submitted to ALS Global in Reno, Nev., for analysis by ME-ICP61 plus Lithium. standards were inserted into the sample sequences at random intervals.

所有樣品都被提交給位於內華達州里諾的ALS Global,以供ME-ICP61加鋰進行分析。以隨機間隔將標準插入到樣本序列中。

About Enertopia

關於Enertopia

Defines itself as an Environmental Solutions Company focused on using modern technology on extracting lithium and verifying or sourcing other intellectual property in the EV & green technologies to build shareholder value.

將自己定義為一家環境解決方案公司,專注於使用現代技術提取鋰並驗證或採購電動汽車中的其他知識產權&綠色技術以建立股東價值。

Enertopia shares are quoted in the United States and Canada under ticker symbol ENRT. For additional information, please visit or call Robert McAllister, the President at 1-888-ENRT201.

Enertopia的股票在美國和加拿大上市,股票代碼為ENRT。如需更多資訊,請訪問或致電總裁的羅伯特·麥卡利斯特,電話:1-888-ENRT201。

This release includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company makes forward-looking public statements concerning its expected future financial position, results of operations, cash flows, financing plans, business strategy, products and services, potential and financing of its mining or technology projects, growth opportunities, plans and objectives of management for future operations, including statements that include words such as "anticipate," "if," "believe," "plan," "estimate," "expect," "intend," "may," "could," "should," "will," and other similar expressions that are forward-looking statements. Such forward-looking statements are estimates reflecting the Company's best judgment based upon current information and involve a number of risks and uncertainties, and there can be no assurance that other factors will not affect the accuracy of such forward-looking statements., foreign exchange and other financial markets; changes in the interest rates on borrowings; hedging activities; changes in commodity prices; changes in the investments and expenditure levels; litigation; legislation; environmental, judicial, regulatory, political and competitive developments in areas in which Enertopia Corporation operates. There can be no assurance that the drilling will result in an economic deposit or have any positive impact on Enertopia. There can be no assurance that the four pending patents will become patents and have a positive impact on Enertopia. The User should refer to the risk disclosures set out in the periodic reports and other disclosure documents filed by Enertopia Corporation from time to time with regulatory authorities.

本新聞稿包括根據修訂後的1933年證券法第27A節和修訂後的1934年證券交易法第21E節的含義作出的前瞻性陳述。非歷史事實的陳述屬於前瞻性陳述。公司就其預期的未來財務狀況、經營結果、現金流、融資計劃、業務戰略、產品和服務、採礦或技術專案的潛力和融資、增長機會、未來經營的計劃和管理目標等作出前瞻性的公開聲明,包括“預期”、“如果”、“相信”、“計劃”、“估計”、“預期”、“打算”、“可能”、“可能”、“應該”、“將”等辭彙。“以及其他類似表述,屬於前瞻性表述。此類前瞻性陳述反映了公司根據當前資訊作出的最佳判斷,涉及許多風險和不確定因素,不能保證其他因素不會影響此類前瞻性陳述的準確性。這些因素包括:外匯和其他金融市場;借款利率的變化;套期保值活動;大宗商品價格的變化;投資和支出水準的變化;訴訟;法律;Enertopia公司經營領域的環境、司法、監管、政治和競爭動態。不能保證鑽探將產生經濟礦藏或對Enertopia產生任何積極影響。不能保證這四項正在申請的專利將成為專利,並對Enertopia產生積極影響。用戶應參考Enertopia公司不時向監管機構提交的定期報告和其他披露檔案中列出的風險披露。

The OTC and CSE have not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

場外交易委員會和CSE沒有審查本新聞稿的充分性或準確性,也不承擔任何責任。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論