share_log

EnCore Energy Announces First Delivery Into Uranium Sales Agreement

EnCore Energy Announces First Delivery Into Uranium Sales Agreement

eNore Energy宣布首次交付铀销售协议
PR Newswire ·  2023/05/01 19:06

NYSE American:EU
TSXV:EU

纽约证券交易所美国证券交易所:EU
TSXV: EU

CORPUS CHRISTI, Texas, May 1, 2023 /PRNewswire/ - enCore Energy Corp. (NYSE American: EU) (TSXV: EU) (the "Company" or "enCore") announced today that it has made its first delivery into one of the Company's four previously announced contracted uranium sales agreements. This delivery of 200,000 pounds U3O8 represents the first portion of the annual deliveries into the 5-year agreement (announced on August 4, 2021) which covers 2 million pounds U3O8 of uranium with significant delivery flexibility for market related pricing. The Company successfully acquired uranium under favorable pricing terms in 2022 from a third party and delivered it into this agreement using current spot market pricing indicators to establish the sales price.

得克萨斯州科珀斯克里斯蒂2023年5月1日 /PRNewswire/- eNore Energy (纽约证券交易所美国股票代码:EU)(多伦多证券交易所:EU)(the”公司“或”eNCore”)今天宣布,该公司已首次向该公司先前宣布的四项铀销售合同之一交付。这次配送了 20 万英镑 U3O8 代表了为期五年的协议中年度交付的第一部分(宣布于 2021年8月4日) 可承受 200 万英镑 U3O8 铀在与市场相关的定价方面具有很大的交付灵活性。该公司在2022年以优惠的定价条件成功从第三方手中收购铀,并使用当前的现货市场定价指标将其交付到该协议中,以确定销售价格。

Paul Goranson, enCore Energy Chief Executive Officer said, "As enCore continues to execute on our pipeline to production strategy, it is also as important to execute on our uranium sales delivery commitments. This first uranium sales delivery demonstrates the flexibility we have built into this supply agreement, managing our uranium inventories as we advance our South Texas in-situ recovery uranium plants towards production. This delivery is the first of enCore's supply agreements planned from 2023 through 2030. Our contracting strategy has relied on spot market linked supply agreements with a portion of those agreements providing price ceilings and floors that are inflation adjusted. This assures that our production costs are protected and provides us the ability to realize higher prices that reflect what we believe will be an improving uranium price environment."

保罗·戈兰森,eNore Energy首席执行官表示:“随着eNcore继续执行我们的管道至生产战略,履行我们的铀销售交付承诺也同样重要。首次铀销售交付表明了我们在供应协议中体现的灵活性,即在推进供应协议的同时管理铀库存 南德克萨斯州 原地回收铀厂进入生产阶段。此次交付是eNcore计划在2023年至2030年之间签订的第一份供应协议。我们的签约战略依赖于现货市场挂钩的供应协议,其中一部分协议提供了经通货膨胀调整后的价格上限和下限。这确保了我们的生产成本得到保护,并使我们能够实现更高的价格,这反映了我们认为铀价格环境的改善。”

About enCore Energy Corp.
关于 EnCore Energy

enCore Energy Corp. is committed to providing clean, reliable, and affordable domestic nuclear energy by becoming the next United States uranium producer in 2023. enCore solely utilizes In-Situ Recovery (ISR) for uranium extraction, a well-known and proven technology co-developed by the leaders at enCore Energy. In-Situ Recovery extracts uranium in a non-invasive process through the use of natural groundwater and oxygen, coupled with a proven ion exchange process, to recover the uranium. Uranium production is planned at enCore's licensed and past-producing South Texas Rosita Processing Plant in 2023, and at its licensed and past-producing South Texas Alta Mesa Processing Plant in 2024. Future projects in enCore's production pipeline include the Dewey-Burdock project in South Dakota and the Gas Hills project in Wyoming, along with significant uranium resource endowments in New Mexico providing long-term opportunities. The enCore team is led by industry experts with extensive knowledge and experience in all aspects of ISR uranium operations and the nuclear fuel cycle. enCore diligently works to realize value from other owned assets, including our proprietary uranium database that includes technical information from many past producing companies, from our various non-core assets, and by leveraging our ISR expertise in researching opportunities that support the use of this technology as applied to other metals. enCore is also committed to working with local communities and indigenous governments to create positive impact from corporate developments.

EnCore Energy Corp. 致力于通过成为下一个核能来提供清洁、可靠和负担得起的国内核能 美国 2023年的铀生产商。eNCore仅使用原位回收(ISR)进行铀提取,这是一项由EnCore Energy领导者共同开发的众所周知且久经考验的技术。原位回收通过使用天然地下水和氧气,再加上经过验证的离子交换工艺,以非侵入性方式提取铀,从而回收铀。计划于2023年在EnCore的许可和过去生产的南德克萨斯州罗西塔加工厂生产铀,并于2024年在其获得许可和过去生产的南德克萨斯州阿尔塔梅萨加工厂进行铀生产。EnCore生产流程中的未来项目包括杜威-伯多克项目 南达科他州 以及位于的煤气山项目 怀俄明州,以及该国的大量铀资源储备 新墨西哥州 提供长期机会。eNcore 团队由在 ISR 铀运营和核燃料循环的各个方面拥有丰富知识和经验的行业专家领导。eNcore 努力从其他自有资产中实现价值,包括我们专有的铀数据库,其中包括来自许多过去生产公司的技术信息、来自我们各种非核心资产的技术信息,以及利用我们的 ISR 专业知识研究机会,支持将该技术应用于其他金属。eNCore 还致力于与当地合作社区和土著政府将从公司发展中产生积极影响。

Cautionary Note Regarding Forward-Looking Statements: Certain information contained in this news release, including: any information relating to the Company being a leading uranium company; and any other statements regarding future expectations, beliefs, goals or prospects; may constitute "forward-looking information" and "forward-looking statements" within the meaning of applicable Canadian and United States securities legislation (collectively, "forward-looking statements"). All statements in this news release that are not statements of historical fact (including statements containing the words "expects", "is expected", "does not expect", "plans", "anticipates", "does not anticipate", "believes", "intends", "estimates", "projects", "potential", "scheduled", "forecast", "budget" and similar expressions or variations (including negative variations) of such words and phrases, or statements that certain actions, events or results "may", "could", "would", "might" or "will" be taken) should be considered forward-looking statements. All such forward-looking statements are subject to important risk factors and uncertainties, many of which are beyond the companies' ability to control or predict. Forward-looking statements necessarily involve known and unknown risks, including, without limitation, risks associated with general economic conditions; adverse industry events; future legislative and regulatory developments; that results of past mining operations at the Alta Mesa and Rosita sites are indicative of the results of proposed mining activities at those sites; that a production decision will result in actual production commencing and that such production will be economically viable over time; the ability of enCore to implement its business strategies; and other risks. A number of important factors could cause actual results or events to differ materially from those indicated or implied by such forward-looking statements, including without limitation exploration and development risks, changes in commodity prices, access to skilled mining personnel, the results of exploration and development activities; production risks; uninsured risks; regulatory risks; defects in title; the availability of materials and equipment, timeliness of government approvals and unanticipated environmental impacts on operations; risks posed by the economic and political environments in which the Company operates and intends to operate; increased competition; assumptions regarding market trends and the expected demand and desires for the Company's products and proposed products; reliance on industry equipment manufacturers, suppliers and others; the failure to adequately protect intellectual property; the failure to adequately manage future growth; adverse market conditions, the failure to satisfy ongoing regulatory requirements and factors relating to forward looking statements listed above which include risks as disclosed in the companies' annual information form filings. Should one or more of these risks materialize, or should assumptions underlying the forward-looking statements prove incorrect, actual results may vary materially from those described herein as intended, planned, anticipated, believed, estimated or expected. The Company assumes no obligation to update the information in this communication, except as required by law. Additional information identifying risks and uncertainties is contained in filings by the Company with the various securities commissions which are available online at www.sec.gov and . Forward-looking statements are provided for the purpose of providing information about the current expectations, beliefs and plans of management. Such statements may not be appropriate for other purposes and readers should not place undue reliance on these forward-looking statements, that speak only as of the date hereof, as there can be no assurance that the plans, intentions or expectations upon which they are placed will occur. Such information, although considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may differ materially from those anticipated. Forward-looking statements contained in this news release are expressly qualified by this cautionary statement.

关于前瞻性陈述的警示说明: 本新闻稿中包含的某些信息,包括:与公司是领先的铀公司有关的任何信息;以及有关未来预期、信念、目标或前景的任何其他陈述;可能构成适用的加拿大人所指的 “前瞻性信息” 和 “前瞻性陈述” 美国 证券立法(统称为 “前瞻性陈述”)。本新闻稿中所有非历史事实陈述的陈述(包括包含 “预期”、“预期”、“预期”、“未预期”、“未预期”、“相信”、“打算”、“估计”、“项目”、“潜力”、“预期”、“预计”、“预算” 等词语的陈述)以及此类词语和短语的类似表达或变体(包括负面变体),或关于 “可能”、“可能”、“将”、“可能” 或 “将” 采取某些行动、事件或结果的陈述)应被视为前瞻性陈述。所有这些前瞻性陈述都受重要的风险因素和不确定性的影响,其中许多因素和不确定性超出了公司的控制或预测能力。前瞻性陈述必然涉及已知和未知的风险,包括但不限于与总体经济状况相关的风险;不利的行业事件;未来的立法和监管发展;阿尔塔梅萨和罗西塔基地过去采矿业务的结果表明这些地点拟议采矿活动的结果;生产决策将导致实际生产开始,随着时间的推移,此类生产将具有经济可行性;eNcore实施其业务战略的能力;和其他风险。许多重要因素可能导致实际业绩或事件与此类前瞻性陈述所表明或暗示的结果存在重大差异,包括但不限于勘探和开发风险、大宗商品价格变化、获得熟练采矿人员的机会、勘探和开发活动的结果;生产风险;未投保风险;监管风险;所有权缺陷;材料和设备的可用性、政府批准的及时性以及对运营的意外环境影响;带来的风险公司运营和打算运营的经济和政治环境;竞争加剧;对市场趋势以及对公司产品和拟议产品的预期需求和愿望的假设;对行业设备制造商、供应商和其他人的依赖;未能充分保护知识产权;未能充分管理未来增长;不利的市场条件、未能满足持续的监管要求以及与上述前瞻性陈述相关的因素,包括公司年度信息表文件中披露的风险。如果这些风险中的一项或多项得以实现,或者前瞻性陈述所依据的假设被证明不正确,则实际结果可能与本文描述的预期、计划、预期、相信、估计或预期的结果存在重大差异。除非法律要求,否则公司没有义务更新本通讯中的信息。识别风险和不确定性的其他信息包含在公司向各证券委员会提交的文件中,这些文件可在网上查阅 www.sec.gov 和。提供前瞻性陈述的目的是提供有关管理层当前期望、信念和计划的信息。此类陈述可能不适合用于其他目的,读者不应过分依赖这些前瞻性陈述,这些陈述仅代表截至本文发布之日,因为无法保证所提出的计划、意图或期望会实现。此类信息虽然在准备时被管理层认为是合理的,但可能被证明是不正确的,实际结果可能与预期的结果存在重大差异。本警告声明明确限定了本新闻稿中包含的前瞻性陈述。

SOURCE enCore Energy Corp.

来源 EnCore Energy

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发