share_log

Alerio and Auracle Collaboration Identifies Four New Significant Exploration Targets at Tassawini

Alerio and Auracle Collaboration Identifies Four New Significant Exploration Targets at Tassawini

Alerio和Auracle合作在塔薩維尼確定了四個新的重要勘探目標
Accesswire ·  2023/04/12 04:05

VANCOUVER, BC / ACCESSWIRE / April 11, 2023 / Alerio Gold Corp. ("Alerio" or the "Company") (CSE:ALE)(OTCQB:ALEEF) announces that its continued partnership with Auracle Geospatial Science (Auracle) has identified four new significant exploration targets at its 100% owned Tassawini Project ("Tassawini" or the "Property"), located in Guyana, South America.

不列顛哥倫比亞省溫哥華/ACCESSWIR 2023 年 4 月 11 日/Alerio Gold Corp. (”阿萊里奧“或者”公司“) (CSE: ALE) (OTCQB: ALEEF) 宣佈,其與Auracle地理空間科學(Auracle)的持續合作已在其位於南美圭亞那的100%擁有的塔薩維尼項目(“Tassawini” 或 “房產”)中確定了四個新的重要勘探目標。

The four newly identified interconnected gold targets, are hosted within a large 3.0 kilometre by 4.5 kilometre anomaly. Tassawini contains a Historical Mineral Resource of 437,000 ounces gold Indicatedandan additional 62,000 oz gold Inferred(1). The known extent of the Tassawini deposit occurs in the middle of a north to south trending portion of the anomaly, that is approximately three kilometres in length and 500 metres in width.

四個新發現的相互關聯的黃金目標位於一個3.0千米乘4.5千米的大異常區內。Tassawini 含有 43.7 萬盎司黃金的歷史礦產資源,另外還有 62,000 盎司黃金推斷 (1)。塔薩維尼礦牀的已知範圍位於異常區從北向南的趨勢部分的中間,即長約三千米,寬度約爲500米。

The joint effort with independent consultants Auracle produced new geographic and geological information with the aim of further defining and prioritizing targets for Alerio's future exploration programs at Tassawini. The new exploration targets were generated by Auracle's proprietary Mapped Underworld Dimension (or MUD) system, which uses satellite-borne radar to collect data at or near the subsurface in combination with select surface data. The system is particularly adept in identifying geological structures such as fractures and faults. The system has also identified a significant amount of artisanal mining at Tassawini, providing a strong indication of near surface gold outside of the known deposit.

與獨立顧問Auracle的共同努力產生了新的地理和地質信息,目的是進一步確定Alerio未來在塔薩維尼的勘探計劃的目標並確定其優先順序。新的探索目標由Auracle專有的Mapped Underworld Dimension(或MUD)系統生成,該系統使用星載雷達在地下或附近收集數據以及部分地表數據。該系統特別擅長識別裂縫和斷層等地質結構。該系統還發現了塔薩維尼有大量的手工採礦活動,這有力地表明已知礦牀之外有近地表金礦。

As mineralization at Tassawini is associated with strong to intense deformation, the MUD system computed the relative density of fractures and faults to identify the new anomalies.

由於塔薩維尼的礦化與強到強烈的變形有關,因此MUD系統計算了裂縫和斷層的相對密度,以確定新的異常。

"Our technology and mapping suite is unique, in that it uses radar satellite data to penetrate vegetation, ground cover, water, ice, rocks and soils. Our technology works at, near and under the Earth's surface so we can "see" through cover when direct identification isn't possible", explains David McLelland, Auracle Geospatial's CEO.

“我們的技術和測繪套件是獨一無二的,因爲它使用雷達衛星數據來穿透植被、地被、水、冰、岩石和土壤。我們的技術可以在地球表面、近地和地下工作,因此當無法直接識別時,我們可以在掩護下 “看見”,Auracle Geasiale首席執行官戴維·麥克萊蘭解釋說。

"It is very encouraging to note that the historic resource has a relatively small footprint, within a much larger anomaly that has not received any modern exploration, giving the company significant potential for additional discoveries. Utilizing the extensive amount of historical information available to us, in concert with Auracle's proprietary MUD system, has provided Alerio with a streamlined and cost-effective way to expedite and prioritize new targets that lie within this anomaly, forming the basis of exploration plans for 2023. Alerio now has a clear pathway toward the potential growth of our Tassawini Deposit. "States Al Fabbro, CEO.

“令人非常鼓舞的是,這種歷史資源的佔地面積相對較小,位於尚未經過任何現代勘探的更大異常之中,這爲公司提供了進一步發現的巨大潛力。利用我們現有的大量歷史信息,再加上Auracle專有的MUD系統,爲Alerio提供了一種簡化且具有成本效益的方法,可以加快和優先處理屬於這種異常情況的新目標,構成了2023年勘探計劃的基礎。Alerio現在有一條通往塔薩維尼存款潛在增長的明確道路。“首席執行官艾爾·法布羅說。

To view the new images and targets produced by Auracle, please follow this link to the company's April 5th, 2023 Corporate Deck:

要查看 Auracle 製作的新圖片和目標,請點擊此鏈接進入該公司 2023 年 4 月 5 日發佈的 Corporate Deck:

Qualified Persons and 43-101 Disclosure

合格人員和 43-101 披露

Greg Smith, P. Geo., COO and Director for the Company, is the designated Qualified Person for this news release within the meaning of National Instrument 43-101 ("NI 43-101") and has reviewed and verified that the technical information contained herein is accurate and approves of the written disclosure of same.

公司首席運營官兼董事格雷格·史密斯是National Instrument 43-101(“NI 43-101”)所指的本新聞稿的指定合格人士,他已審查並確認此處包含的技術信息準確無誤,並批准了該新聞稿的書面披露。

About Auracle Geospatial Science

關於 Oracle 地理空間科學

Auracle Geospatial Science is a global remote sensing company that provides spatial intelligence to the mining and mineral exploration industry over the lifecycle of a project. With its MUD subsurface technology, Auracle detects and visualizes geologic features, structures, outcrops and deposits at the surface and subsurface, over large and difficult to access areas. This ability narrows search areas to prospective targets. Going beyond its original application as an advanced exploration tool, MUDmodels and monitors the impact of the complex, dynamic earth on transportation routes, infrastructure, and the environment.

Auracle 地理空間科學是一家全球遙感公司,在項目的生命週期內爲採礦和礦產勘探行業提供空間情報。憑藉其 MUD 地下技術,Auracle 可在廣闊且難以進入的區域內探測和可視化地表和地下的地質特徵、結構、露頭和沉積物。此能力將搜索區域縮小到潛在目標。除了最初作爲高級探索工具的應用外,MudModels 還監測複雜的動態地球對交通路線、基礎設施和環境的影響。

About Auracle Geospatial Science

關於 Oracle 地理空間科學

Auracle Geospatial Science is a global remote sensing company that provides spatial intelligence to the mining and mineral exploration industry over the lifecycle of a project. With its MUD subsurface technology, Auracle detects and visualizes geologic features, structures, outcrops and deposits at the surface and subsurface, over large and difficult to access areas. This ability narrows search areas to prospective targets.

Auracle 地理空間科學是一家全球遙感公司,在項目的生命週期內爲採礦和礦產勘探行業提供空間情報。憑藉其 MUD 地下技術,Auracle 可在廣闊且難以進入的區域內探測和可視化地表和地下的地質特徵、結構、露頭和沉積物。此能力將搜索區域縮小到潛在目標。

Qualified Persons and 43-101 Disclosure

合格人員和 43-101 披露

Mr. Greg Smith, P. Geo. Director of Alerio Gold, is a Qualified Person as defined by NI 43-101 and has reviewed and approved the technical data and information contained in this news release.Mr. Smith has verified the technical and scientific discloser herein and has conducted appropriate verification on the underlying data.

Greg Smith 先生,P. Geo根據NI 43-101的定義,Alerio Gold董事是合格人員,已審查並批准了本新聞稿中包含的技術數據和信息。史密斯先生已經驗證了此處的技術和科學披露者,並對基礎數據進行了適當的驗證。

About Alerio Gold Corp.

關於 Alerio Gold Corp.

Alerio Gold is a mineral exploration and development company in the business of acquiring, and exploring gold properties, with a focus in Guyana, South America. The company currently has 100-per-cent interest in two properties located in Guyana S.A., including the advanced exploration Tassawini Gold Project and the earlier stage Puruni Project.

Alerio Gold是一家礦產勘探和開發公司,業務是收購和勘探黃金資產,重點是南美圭亞那。該公司目前對位於圭亞那的兩處房產擁有100%的權益,包括高級勘探塔薩維尼黃金項目和早期階段的普魯尼項目。

ON BEHALF OF THE BOARD OF DIRECTORS

代表董事會

"Allan Fabbro"

“艾倫法布羅”

Allan Fabbro, CEO

首席執行官艾倫·法布羅

For further information, please contact:

欲瞭解更多信息,請聯繫:

Adrian O'Brien
604-202-8165
Email: info@aleriogold.com

阿德里安·奧布萊恩
604-202-8165
電子郵件:info@aleriogold.com

Forward-Looking Information

前瞻性信息

This press release contains forward-looking statements. Forward-looking statements can be identified by the use of words such as, "anticipates", "expects", "is expected", "intends", "believes", or variations of such words and phrases or state that certain actions, events or results "may" or "will" be taken, occur or be achieved. Forward-looking statements include those relating to the acquisition by Alerio Gold Corp. of all of the Properties and the corresponding issuance of the Consideration Shares, the satisfaction of necessary terms and conditions of the Definitive Agreement to complete the Acquisition, and the ownership of the Properties via power of attorney.

本新聞稿包含前瞻性陳述。前瞻性陳述可以通過使用 “預期”、“期望”、“預期”、“打算”、“相信” 等詞語來識別,也可以用這些詞語和短語的變體來識別,或者陳述某些行動、事件或結果 “可能” 或 “將” 採取、發生或實現。前瞻性陳述包括與Alerio Gold Corp. 收購所有房產和相應發行對價股票、滿足完成收購的最終協議的必要條款和條件以及通過授權書擁有房產有關的陳述。

Forward-looking statements are not a guarantee of future performance and are based upon a number of estimates and assumptions of management in light of management's experience and perception of trends, current conditions and expected developments, including assumptions related to the ability of both companies to successfully complete all the conditions precedent under the Definitive Agreement and the companies receiving all necessary future approvals and permits. Actual results, performance or achievement could differ materially from that expressed in, or implied by, any forward-looking statements in this press release, and, accordingly, undue reliance should not be placed on any such forward-looking statements and they are not guarantees of future results. Forward-looking statements involve significant risks, assumptions, uncertainties and other factors that may cause actual future results or anticipated events to differ materially from those expressed or implied in any forward-looking statements. Except as required by law, Alerio Gold Corp. undertakes no obligation to publicly update any forward-looking statements, whether as a result of new information, future events or otherwise.

前瞻性陳述不能保證未來的業績,而是基於管理層根據管理層對趨勢、當前狀況和預期發展的經驗和看法,包括與兩家公司成功完成最終協議下所有先決條件的能力以及公司獲得未來所有必要批准和許可的能力有關的假設。實際業績、業績或成就可能與本新聞稿中任何前瞻性陳述中表達或暗示的有重大差異,因此,不應過分依賴任何此類前瞻性陳述,也不能保證未來的業績。前瞻性陳述涉及重大風險、假設、不確定性和其他因素,這些因素可能導致未來的實際業績或預期事件與任何前瞻性陳述中表達或暗示的結果存在重大差異。除非法律要求,否則Alerio Gold Corp. 沒有義務公開更新任何前瞻性陳述,無論是由於新信息、未來事件還是其他原因。

The CSE nor its market regulator does not accept responsibility for the adequacy or accuracy of this news release. The CSE has in no way passed upon the merits of the proposed Transaction and has neither approved nor disapproved the contents of this news release.

CSE及其市場監管機構對本新聞稿的充分性或準確性不承擔任何責任。CSE絲毫沒有透露擬議交易的案情,也沒有批准也沒有反對本新聞稿的內容。

  1. Notes for Historical Mineral Resource Estimate:
    1. The estimation practices, at a cut-off grade of 0.5 grams of gold per tonne (g/t), were in accordance with CIM Estimation of Mineral Resource and Mineral Reserve Best Practice Guidelines (November 29, 2019), and followed CIM Definition Standards for Mineral Resources and Mineral Reserves (May 10, 2014), that are incorporated by reference into National Instrument 43- 101 ("NI 43-101").
    2. The estimate was completed by SRK dated July 21,2008and revised on Feb. 10, 2010.
    3. Data and procedures employed by SRK and the historical resource is considered reliable and it was a valid resource estimation in 2010
    4. The historic resource estimate used geological interpretation to prepare wireframes, data validation, and statistical analyses including variograms. Composites were capped for gold grades, block size was determined by drill spacing, and grades were estimated into the block model using ordinary kriging.
    5. Mineral resource classification was carried out using a combination of drillhole spacing, geological and wireframe confidence. Pit optimization studies were conducted to determine the depth to which resource estimates were reported.
    6. Since2010, a qualified person has not done sufficient work to classify the historical estimation as current mineral resources and the Company is not treating the historical resource estimation as a current mineral resource. Additional confirmation drilling and updated topographic surveying is required to update the historic resource estimate. The historical estimate should not be relied upon.
    7. The Historical Mineral Resource is detailed in the technical report titled "Tassawini Gold Project, Co-operative Republic of Guyana", with an effective date of September7, 2021, prepared by Kangari Consulting LLC for Project One Resources in accordance with National Instrument 43-101 Standards of Disclosure for Mineral Projects and is available under Alerio's SEDAR profile at .
  1. 歷史礦產資源估算附註:
    1. 估算方法的臨界等級爲每噸0.5克金(g/t),符合CIM礦產資源和礦產儲量估算最佳實踐指南(2019年11月29日),遵循了CIM礦產資源和礦產儲量定義標準(2014年5月10日),該標準以引用方式納入了國家儀器43-101(“NI 43-101”)。
    2. 該估算由SRK於2008年7月21日完成,並於2010年2月10日進行了修訂。
    3. SRK採用的數據和程序以及歷史資源被認爲是可靠的,是2010年的有效資源估計
    4. 歷史資源估算使用地質解釋來準備線框圖、數據驗證和包括變異圖在內的統計分析。對複合材料的金等級設置了上限,區塊大小由鑽孔間距決定,使用普通克里金法估算區塊模型中的等級。
    5. 礦產資源分類是綜合使用鑽孔間距、地質和線框可信度進行的。進行了礦坑優化研究,以確定報告資源估算的深度。
    6. 自2010年以來,合格人員沒有做足夠的工作來將歷史估算歸類爲當前的礦產資源,公司也沒有將歷史資源估算視爲當前的礦產資源。要更新歷史資源估算,需要進行額外的確認鑽探和更新地形測量。不應依賴歷史估計。
    7. 名爲 “圭亞那合作共和國塔薩維尼黃金項目” 的技術報告中詳細介紹了歷史礦產資源,該報告生效日期爲2021年9月7日,該報告由Kangari Consulting LLC根據國家儀器43-101爲第一資源項目編寫 礦產項目披露標準 並且可以在Alerio的SEDAR個人資料下找到,網址爲.

SOURCE: Alerio Gold Corp.

來源: Alerio Gold Corp.


View source version on accesswire.com:
在 accesswire.com 上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論