share_log

Enertopia Announces Third Update to Spring Drilling Program at WT Lithium Project

Enertopia Announces Third Update to Spring Drilling Program at WT Lithium Project

Enertopia宣布WT锂项目春季钻探计划的第三次更新
newsfile ·  2023/04/11 21:00

Kelowna, British Columbia--(Newsfile Corp. - April 11, 2023) - Enertopia Corporation (OTCQB: ENRT) (CSE: ENRT) ("Enertopia'' or the "Company") a company focused on building shareholder value through a combination of our Nevada lithium claims, intellectual property, & pending patents in the green technology space, is very pleased to provide the following lithium project update.

不列颠哥伦比亚省基洛纳--(Newsfile Corp.-2023 年 4 月 11 日)- Enertopia 公司 (OTCQB: ENRT) (CSE: ENRT)(“Enertopia” 或 “公司”)是一家专注于通过结合我们在内华达州的锂索赔、知识产权和绿色技术领域的待审专利来创造股东价值的公司,非常高兴提供以下锂项目最新情况。

We are happy to report that four additional drill holes have been completed with all intersecting the light green claystone horizon. The drill crew is back from their Easter break and the final part of the drill program is now underway. The company will provide additional summaries as the drilling program progresses to final assays being released.

我们很高兴地向大家报告,另外四个钻孔已经完成,所有钻孔都与浅绿色粘土岩地平线相交。演习人员从复活节假期回来了,演习计划的最后部分现在正在进行中。随着钻探计划的进展到最终分析结果的发布,该公司将提供更多摘要。

It is gratifying that thus far every hole in the 2023 drill program has intersected the green claystone horizon, which so far has hosted the higher-grade Lithium assays as reported during the 2022 drilling program.

令人欣慰的是,到目前为止,2023年钻探计划中的每个钻孔都与绿色粘土岩地平线相交,到目前为止,绿色粘土岩地平线是2022年钻探计划期间报告的更高等级的锂试验。

2023 Second Phase Drill Holes completed and reported today:

2023 年第二阶段钻孔已完成并于今日报告:

HOLE # From ft To ft Claystone Horizon type Comments
DH23-07 0 46 Overburden
46 105 Green claystone
105 113 Ash tuff
113 124 Green claystone
124 181 Dark green, claystone EOH
DH23-05 0 130 Overburden
130 195 Green claystone
195 221 Silt and ash tuff
221 255 Green claystone
255 265 Green claystone back to ash tuff
265 302 Green claystone
302 313 Green claystone and ash tuff
313 320 Green claystone
320 339 Green tan claystone and ash tuff
339 352 Green tan claystone EOH
DH23-04 0 114 Overburden
114 268 Green claystone
268 276 Green claystone / ash tuff
276 286 Dark tan claystone EOH
DH23-06 0 37 Overburden
37 87 Green claystone
87 91 Transition to black claystone
91 137 Black claystone / ash intervals EOH
洞 # 从英尺开始 太英尺了 粘土石地平线类型 评论意见
DH23-07 0 46 过重负担
46 105 绿色粘土石
105 113 灰凝灰岩
113 124 绿色粘土石
124 181 深绿色,粘土石 EOH
DH23-05 0 130 过重负担
130 195 绿色粘土石
195 221 泥沙和灰凝灰岩
221 255 绿色粘土石
255 265 绿色粘土石变成灰凝灰岩
265 302 绿色粘土石
302 313 绿色粘土石和灰凝灰岩
313 320 绿色粘土石
320 339 绿色棕褐色粘土石和灰凝灰岩
339 352 绿色棕褐色粘土石 EOH
DH23-04 0 114 过重负担
114 268 绿色粘土石
268 276 绿色粘土石/灰凝灰岩
276 286 深棕褐色粘土石 EOH
DH23-06 0 37 过重负担
37 87 绿色粘土石
87 91 过渡到黑粘土岩
91 137 黑粘土石/灰间隔 EOH

Inaugural 43-101 report

首份 43-101 报告

Upon completion of the 2023 drilling program (and once all assays are received), the Company will commission the writing of an inaugural 43-101 report for the West Tonopah Project, which covers 1,760 acres.

2023年钻探计划完成后(并收到所有分析结果),公司将委托为占地1,760英亩的西托诺帕项目撰写首份43-101报告。

"I am extremely pleased with every hole to date intersecting what is believed to be the higher-grade green claystone horizon thus far. We look forward to a steady stream of news and advancements in 2023," stated President Robert McAllister.

“我对迄今为止每一个洞都与据信是更高等级的绿色粘土岩地平线相交感到非常满意。我们期待2023年有源源不断的新闻和进展,” 总统罗伯特·麦卡利斯特说。

For additional project details please visit our website at .

欲了解更多项目详情,请访问我们的网站。

The Qualified Person:

合格人员:

The technical data in this news release have been reviewed by Randy Henkle, P. Geol. a qualified person under the terms of NI 43-101.

根据NI 43-101的条款,P.Geol的合格人员兰迪·汉克尔已经审查了本新闻稿中的技术数据。

About Enertopia

关于 Enertopia

Defines itself as an Environmental Solutions Company focused on using modern technology on extracting lithium and verifying or sourcing other intellectual property in the EV & green technologies to build shareholder value.

将自己定义为一家环境解决方案公司,专注于使用现代技术开采锂,验证或采购电动汽车和绿色技术中的其他知识产权,以创造股东价值。

Enertopia shares are quoted in the United States and Canada under ticker symbol ENRT. For additional information, please visit or call Robert McAllister, the President at 1-888-ENRT201.

Enertopia股票在美国和加拿大上市,股票代码为ENRT。欲了解更多信息,请访问或致电 1-888-ENRT201 总裁罗伯特·麦卡利斯特。

This release includes forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Statements which are not historical facts are forward-looking statements. The Company makes forward-looking public statements concerning its expected future financial position, results of operations, cash flows, financing plans, business strategy, products and services, potential and financing of its mining or technology projects, growth opportunities, plans and objectives of management for future operations, including statements that include words such as "anticipate," "if," "believe," "plan," "estimate," "expect," "intend," "may," "could," "should," "will," and other similar expressions that are forward-looking statements. Such forward-looking statements are estimates reflecting the Company's best judgment based upon current information and involve a number of risks and uncertainties, and there can be no assurance that other factors will not affect the accuracy of such forward-looking statements., foreign exchange and other financial markets; changes in the interest rates on borrowings; hedging activities; changes in commodity prices; changes in the investments and expenditure levels; litigation; legislation; environmental, judicial, regulatory, political and competitive developments in areas in which Enertopia Corporation operates. There can be no assurance that the testing for the brine recovery system will be effective for the recovery of Lithium and if effective will be economic or have any positive impact on Enertopia. There can be no assurance that the four pending patents will become patents and have a positive impact on Enertopia. The User should refer to the risk disclosures set out in the periodic reports and other disclosure documents filed by Enertopia Corporation from time to time with regulatory authorities.

本新闻稿包括经修订的1933年《证券法》第27A条和经修订的1934年《证券交易法》第21E条所指的前瞻性陈述。非历史事实的陈述是前瞻性陈述。公司就其预期的未来财务状况、经营业绩、现金流、融资计划、业务战略、产品和服务、采矿或科技项目的潜力和融资、增长机会、未来运营的管理计划和目标发表前瞻性公开声明,包括包含 “预期”、“如果”、“相信”、“计划”、“估计”、“预期”、“打算”、“可能” 等词语的声明 “应该”、“将” 和其他类似的前瞻性陈述表达方式。此类前瞻性陈述是反映公司根据当前信息做出的最佳判断的估计,涉及许多风险和不确定性,无法保证其他因素不会影响此类前瞻性陈述的准确性。、外汇和其他金融市场;借款利率的变化;套期保值活动;大宗商品价格的变化;投资和支出水平的变化;诉讼;立法;环境、司法、监管、政治和竞争Enertopia 公司运营领域的发展。无法保证盐水回收系统的测试对锂的回收有效,也无法保证是否有效,也无法保证对Enertopia产生任何积极影响。无法保证四项正在申请的专利将成为专利并对Enertopia产生积极影响。用户应参考Enertopia Corporation不时向监管机构提交的定期报告和其他披露文件中列出的风险披露。

The OTC and CSE have not reviewed and does not accept responsibility for the adequacy or accuracy of this release.

OTC和CSE尚未审查本新闻稿的充分性或准确性,也不承担任何责任。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发