share_log

Silver Hammer Files NI 43-101 Technical Report for the Silver Strand Project in Coeur D'Alene Mining District of Idaho and Announces Voting Results From 2023 Annual General Meeting

Silver Hammer Files NI 43-101 Technical Report for the Silver Strand Project in Coeur D'Alene Mining District of Idaho and Announces Voting Results From 2023 Annual General Meeting

Silver Hammer 提交了爱达荷州科达伦矿区银滩项目的 NI 43-101 技术报告,并公布了 2023 年年度股东大会的投票结果
newsfile ·  2023/04/05 19:35

Vancouver, British Columbia--(Newsfile Corp. - April 5, 2023) - Silver Hammer Mining Corp. (CSE: HAMR) (OTCQB: HAMRF) (FSE: 7BW0) (the "Company" or "Silver Hammer") is pleased to announce that it has filed a National Instrument 43-101 compliant technical report ("Technical Report") titled: Independent NI 43-101 Technical Report for the Silver Strand Gold-Silver Project (the "Project"), Kootenai County, Idaho, USA, on SEDAR.

温哥华,不列颠哥伦比亚省-(Newsfile Corp.-2023年4月5日)-银锤矿业公司(CSE:HAMR)(场外交易市场:HAMRF)(FSE:7BW0)(“公司”“银锤”“)很高兴地宣布,它已经提交了一份符合National Instrument 43-101标准的技术报告(”技术报告“)题为:独立NI 43-101银链黄金-白银项目技术报告项目),美国爱达荷州库特奈县,SEDAR。

"As we continue to evaluate our Silver Strand Project in Idaho, updating the 43-101 Technical Report is a positive step to fully understanding the exploration opportunity at the property. The recent completion of the geophysics compilation will help us target further priority exploration zones along the 5.8-kilometre-long Project," commented President & CEO, Peter A. Ball. "We are currently completing our Plan of Operations, to be submitted to the United States Forest Service, which will highlight our exploration strategy for the coming seasons at the Project."

随着我们继续评估我们在爱达荷州的银链项目,更新43-101技术报告是全面了解该项目勘探机会的积极一步。最近完成的地球物理汇编将有助于我们瞄准5.8公里长项目沿线的更多优先勘探区。总裁评论道,首席执行官彼得·A·鲍尔。我们目前正在完成我们的运营计划,将提交给美国林务局,这将突出我们在该项目未来几个季节的勘探战略。

The Technical Report was prepared in accordance with the Canadian Securities Administrators NI 43-101- Standards of Disclosure for Mineral Projects; and is available for review under the Company's profile on SEDAR at and the Company's website at .

该技术报告是根据加拿大证券管理人NI 43-101-矿物项目披露标准编写的,可在SEDAR上的公司简介和公司网站上查阅。

Annual General Meeting

股东周年大会

The Company is also pleased to report results from its annual general meeting of the shareholders ("the AGM") which took place on March 29, 2023, where all proposed resolutions were unanimously supported and all current board members of the Company re-elected, including Peter. A Ball (CEO), Alnesh Mohan (CFO), and independent directors, Lawrence Roulston, Ron Burk, and Joness Lang.

本公司亦欣然报告股东周年大会(“股东周年大会”)的结果。年度股东大会会议于2023年3月29日举行,所有提议的决议都获得一致支持,公司所有现任董事会成员,包括首席执行官彼得·鲍尔(Peter.Ball)、首席财务官(CFO)阿尔内什·莫汉(Alnesh Mohan)以及独立董事劳伦斯·罗尔斯顿(Lawrence Roulston)、罗恩·伯克(Ron Burk)和乔内斯·朗(Joness Lang)

Qualified Person

有资格的人

Technical aspects of this press release have been reviewed and approved under the supervision of Philip Mulholland (CPG). Mr. Mulholland is a Qualified Person (QP) under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

本新闻稿的技术方面已在菲利普·穆赫兰(CPG)的监督下进行了审查和批准。穆赫兰先生是符合国家标准43-101《矿产项目信息披露标准》的合格人员。

About Silver Hammer Mining Corp.

关于银锤矿业公司

Silver Hammer Mining Corp. is a junior resource exploration company advancing its flagship past-producing Silver Strand Mine in the Coeur d'Alene Mining District in Idaho, as well both the Eliza Silver Project and the Silverton Silver Mine in one of the world's most prolific mining jurisdictions in Nevada. Silver Hammer's primary focus is defining and developing silver deposits near past-producing mines that have not been adequately explored. The Company's portfolio also provides exposure to copper and gold discoveries.

银锤矿业公司是一家初级资源勘探公司,正在推进其位于爱达荷州Coeur d‘Alene矿区的过去生产的旗舰银链矿,以及位于内华达州世界上最多产的采矿管辖区之一的Eliza Silver Project和Silverton Silver矿。Silver Hammer的主要重点是确定和开发过去生产的矿山附近尚未得到充分勘探的银矿。该公司的投资组合还提供铜和金矿发现的风险敞口。

On Behalf of the Board of Silver Hammer Mining Corp.

代表银锤矿业公司董事会。

Peter A. Ball
President & CEO, Director
E: peter@silverhammermining.com

彼得·A·鲍尔
董事首席执行官总裁
电子邮件:peter@silverhammermining.com

For investor relations inquiries, contact:

如需投资者关系咨询,请联系:

Kristina Pillon
High Tide Consulting Corp.
T: 604.908.1695
E: investors@silverhammermining.com

克里斯蒂娜·皮隆
High Tide咨询公司。
电话:604.908.1695
电子邮箱:Investors@silverhammermining.com

Forward-Looking Statements

前瞻性陈述

This news release contains "forward-looking statements" within the meaning of Canadian securities legislation. Such forward-looking statements concern, without limitation, the Company's strategic plans, timing and expectations for the Company's exploration and drilling programs, estimates of mineralization from drilling, geological information projected from sampling results and the potential quantities and grades of the target zones. Such forward-looking statements or information are based on a number of assumptions, which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; and the historical basis for current estimates of potential quantities and grades of target zones. The actual results could differ materially from those anticipated in these forward-looking statements as a result of risk factors, including the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data, and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

本新闻稿包含加拿大证券法所指的“前瞻性陈述”。这些前瞻性陈述涉及但不限于公司的战略计划、对公司勘探和钻探计划的时间和预期、钻探的矿化估计、采样结果预测的地质信息以及目标区的潜在数量和等级。此类前瞻性陈述或信息基于一些假设,而这些假设可能被证明是不正确的。已就(其中包括):一般经济和金融市场状况;化验结果的准确性;钻探结果的地质解释、资本支出的时间和金额;现有实验室和其他相关服务的表现;未来运营成本;目标区潜在数量和等级的当前估计的历史基础等作出假设。由于风险因素,实际结果可能与前瞻性表述中预期的大不相同,这些风险因素包括:工作计划的时间和内容;勘探活动和矿产开发的结果;钻探结果和其他地质数据的解释和不确定性;许可证和矿产所有权的接收、维护和安全;环境和其他监管风险;项目成本超支或意外的成本和支出;资金的可用性;未能根据历史数据、一般市场和行业条件划定目标区的潜在数量和等级。前瞻性陈述是基于公司管理层在陈述发表之日的期望和意见。编制这些陈述时使用的假设虽然在编制时被认为是合理的,但可能被证明是不准确的,因此,提醒读者不要过度依赖这些前瞻性陈述,因为它们只反映了陈述作出之日的情况。除非适用法律另有要求,否则如果这些信念、估计和意见或其他情况发生变化,公司不承担更新或修改本新闻稿中包含的任何前瞻性陈述的义务。

The CSE does not accept responsibility for the adequacy or accuracy of this release. The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.

CSE不对本新闻稿的充分性或准确性承担责任。加拿大证券交易所既没有批准也没有反对本新闻稿的内容。

To view the source version of this press release, please visit

要查看本新闻稿的源版本,请访问

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发