share_log

Ivanhoe Mines Files a New NI 43-101 Technical Report for the Kamoa-Kakula Copper Complex in the Democratic Republic of Congo

Ivanhoe Mines Files a New NI 43-101 Technical Report for the Kamoa-Kakula Copper Complex in the Democratic Republic of Congo

艾芬豪礦業為剛果民主共和國的卡莫卡庫拉銅複合物提交 NI 43-101 技術報告
newsfile ·  2023/03/17 00:50

Johannesburg, South Africa--(Newsfile Corp. - March 16, 2023) - Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) announced today that the company has filed a new National Instrument 43-101 (NI 43-101) technical report covering the Kamoa-Kakula 2023 Integrated Development Plan (2023 IDP) for the world-leading Kamoa-Kakula Copper Complex in the Democratic Republic of Congo (DRC).

南非約翰尼斯堡--( 新聞檔案-2023 年 3 月 16 日)-艾芬豪礦業 (TSX: IVN) (OTCQX: IVPAF) 今天宣佈,該公司已就剛果民主共和國的鴨丘拉銅綜合體 (2023 IDP) 提交新的國家儀器 43-101 (NI 43-101) 技術報告,涵蓋卡莫卡庫拉 2023 綜合開發計畫 (2023 IDP) (剛果民主共和國).

The 2023 IDP consists of a Pre-Feasibility Study (Kamoa-Kakula 2023 PFS) for the Phase 3 and Phase 4 expansions of the Kamoa-Kakula Copper Complex over a 33-year mine life, as well as an updated Preliminary Economic Assessment (Kamoa-Kakula 2023 PEA) that includes a life-of-mine extension case to 42 years overall. The Kamoa-Kakula 2023 PFS evaluates a staged increase in production capacity at Kamoa-Kakula from the current nominal throughput rate of 7.6 million tonnes per annum (Mtpa) up to a total of 19.2 Mtpa by 2030.

2023 IDP 包括一項針對在 33 年礦山壽命期間內進行 3 期和第 4 階段擴展的可行性研究(Kamoa-Kakula 2023 PFS),以及更新的初步經濟評估(卡莫角拉 2023 PEA),其中包括礦山壽命延長案例至 42 年。「賀茂角拉 2023 PFS」的評估,鴨角拉的產能由目前的標稱吞吐量每年 760 萬噸(Mtpa)逐步提高至 2030 年的 19.2 個 Mtpa。

The Kamoa-Kakula 2023 IDP Technical Report was independently prepared by OreWin Pty Ltd. of Adelaide, Australia; China Nerin Engineering Co. Ltd. of Jiangxi, China; DRA Global of Johannesburg, South Africa; Epoch Resources of Johannesburg, South Africa; Golder Associates Africa of Midrand, South Africa; Outotec Oyj of Helsinki, Finland; Paterson and Cooke of Cape Town, South Africa; SRK Consulting Ltd. of Cape Town, South Africa; and, The MSA Group of Johannesburg, South Africa.

由澳洲阿德萊德奧瑞溫私人有限公司、中國奈林工程有限公司獨立編制的「賀茂卡庫拉 2023 IDP 技術報告」中國江西有限公司;南非約翰尼斯堡的 DRA Global;南非約翰尼斯堡的時代資源;南非中蘭德的高爾德協會非洲;芬蘭赫爾辛基的 Ototec Oyj;南非開普敦的帕特森和庫克;南非開普敦的 SRK 諮詢有限公司;以及南非約翰尼斯堡的 MSA 集團。

The independent Qualified Persons responsible for preparing the Kamoa-Kakula 2023 PFS, and Kamoa-Kakula 2023 PEA, on which the technical report was based, are Bernard Peters (OreWin); Jeremy Witley (MSA Group); Curtis Smith (OreWin); William Joughin (SRK); Marius Phillips (DRA Global); Alwyn Scholtz (DRA Global), and Andreas Savvas (Epoch).

獨立合格人員負責準備卡瑪卡庫拉 2023 PFS, 和卡瑪卡庫拉 2023 PEA, 在其技術報告的基礎上, 伯納德·彼得斯 (奧雷文); 傑里米·維特利 (MSA 集團); 柯蒂斯·史密斯 (奧雷文); 威廉·喬金 (SRK); 馬里烏斯·菲利普斯 (DRA 全球); 柯蒂斯·史密斯 (奧雷溫); 全球薩文 (Scholtz) 瓦斯(時代)。

The Kamoa-Kakula Copper Complex is operated as the Kamoa Holding joint venture between Ivanhoe Mines and Zijin Mining, and is approximately 25 kilometres southwest of the town of Kolwezi and about 270 kilometres west of Lubumbashi in the DRC. Ivanhoe and Zijin Mining each hold an indirect 39.6% interest in Kamoa-Kakula, Crystal River holds an indirect 0.8% interest, and the DRC government holds a direct 20% interest.

Kamoa-Kakula 銅複合體是作為艾芬豪礦業和紫金礦業之間的 Kamoa Holding 合資企業運營,位於科盧韋齊鎮西南約 25 公里,在剛果(金)的盧本巴希以西約 270 公里處。艾芬豪和紫金礦業分別持有卡瑪角拉 39.6% 的間接權益,水晶河擁有間接 0.8% 的權益,剛果民主共和國政府持有 20% 的直接權益。

The technical report titled "Kamoa-Kakula Integrated Development Plan 2023" has been filed on the SEDAR website at and on the Ivanhoe Mines website at .

標題為」的技術報告賀茂角區綜合發展規劃 2023「已在 SEDAR 網站上提交,並在艾芬豪礦業網站上。

Information contacts

資訊聯絡人

Vancouver: Matthew Keevil +1.604.558.1034

溫哥華:馬修·基斯德 +1.604.558.1034

London: Tommy Horton +44 7866 913 207

倫敦:湯米·霍頓

To view the source version of this press release, please visit

如欲查看此新聞稿的來源版本,請瀏覽

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論