share_log

Silver Spruce and Its Partner, Colibri Resource, Announces Completion of Earn-in for 50% Interest in the Diamante Au-Ag Project, Sonora, Mexico

Silver Spruce and Its Partner, Colibri Resource, Announces Completion of Earn-in for 50% Interest in the Diamante Au-Ag Project, Sonora, Mexico

銀雲杉及其合作夥伴 Colibri 資源宣佈完成收入,以獲得墨西哥索諾拉迪亞曼泰 A-Ag 項目的 50% 權益
Accesswire ·  2023/02/13 20:02

BEDFORD, NS / ACCESSWIRE / February 13, 2023 / Silver Spruce Resources, Inc. (TSXV:SSE)(FRA:S6Q1) ("Silver Spruce" or the "Company") is pleased to report that the Company and its partner Silver Spruce Resources ("Silver Spruce") have earned a 50% ownership interest in the Diamante Gold & Silver Project ("Diamante" or "Project") located in Sonora, Mexico. Vendor Bimsa Minera SA de CV of Mexico ("Bimsa"), a privately owned Mexico based mineral exploration company, retains 50% ownership in the Property.

北卡羅來納州貝德福德/ACCESSWIRE/2023年2月13日/Silver Spruce Resources,Inc.(多倫多證券交易所股票代碼:SSE)(法蘭克福機場股票代碼:S6Q1)(以下簡稱“Silver Spruce”或“公司”)欣然宣佈,公司及其合作伙伴Silver Spruce Resources(“Silver Spruce”)已獲得位於墨西哥索諾拉的Diamante Gold&Silver Project(以下簡稱“Diamante”或“Project”)50%的權益。供應商墨西哥BIMSA Minera SA de CV(“BIMSA”)是一家總部位於墨西哥的私營礦產勘探公司,持有該礦產50%的所有權。

"We are very excited to fulfill, in partnership with Colibri, the Phase 1 exploration drilling program and technical reporting to earn our combined 50% interest in Diamante. There are numerous defined drill targets and other prospective areas offering future potential for mineralization of several genetic styles with precious and base metals," said Greg Davison, Silver Spruce Vice-President Exploration and Director. "The initial drilling successfully targeted known artisanal workings with high grade Zn-Pb-Ag with Cu and Au credits. We are looking forward to ground-based geological mapping, prospecting and focused geophysics as part of the follow-up program to prioritize the next phase of drilling."

銀雲杉總裁勘探副總裁兼董事首席執行官格雷格·戴維森表示:“我們非常高興能與Colibri合作完成第一階段勘探鑽探計劃和技術報告,從而贏得我們在Diamante的50%權益。這裏有無數明確的鑽探目標和其他遠景區域,為幾種成因類型的貴金屬和賤金屬提供了未來的礦化潛力。”最初的鑽探成功地瞄準了已知的手工開採,其中含有高品位的鋅鉛銀和銅和金。我們期待着地面地質測繪、勘探和重點關注的地球物理,作為後續計劃的一部分,以確定下一階段鑽探的優先順序。

Colibri News Release (February 7th, 2023 - Select Excerpts)

Colibri新聞發佈(2月7日)這是,2023-精選節選)

"We are extremely pleased to have completed the required exploration to earn an initial 50% of this large and highly prospective project. Diamante is located in the Sierra Madre volcanic sequence of Mexico and within a district of epithermal mineralization which hosts many producing and historic gold, silver and base metal mines. Diamante hosts many showings and the drilling completed in mid 2022, which returned very encouraging assays, was on just two of eight already-defined drill targets. We will plan to expand on these results and test the other targets in 2023 in conjunction with additional field exploration and possibly a geophysics program," said Ian McGavney, Chief Operating Officer of Colibri.

"我們非常高興地完成了所需的勘探,以賺取這個大型且極具前景的項目最初50%的股份。鑽石位於墨西哥馬德雷山脈火山巖系中,處於淺成熱液礦化區內,擁有許多產金、歷史悠久的金、銀和賤金屬礦。Diamante舉辦了許多展示活動,2022年年中完成的鑽探返回了非常令人鼓舞的測試結果,只針對已經定義的八個鑽探目標中的兩個。我們將計劃擴大這些結果,並在2023年測試其他目標,同時進行更多的野外勘探,並可能實施地球物理計劃。Colibri首席運營官Ian McGavney説。

About Diamante

關於戴曼特

Diamante is located within a belt of epithermal Au-Ag mineralization hosted by the Sierra Madre Occidental Volcanic Complex. Major gold mining operations in the area of the Diamante property include Alamos Golds' Los Mulatos Mine and Agnico Eagles' El India and Pinos Altos Mines. The Project is located approximately 12 kilometres ("km") northwest of Minera Alamos' Santana Au development project which is anticipated to commence commercial production within the near term. The Property is located approximately 170 km southeast of Sonora state capital Hermosillo and approximately 10 km northwest of the town of Tepoca and is accessed directly from Sonora state Highway 16.

輝綠巖位於馬德雷山脈西方火山雜巖賦存的淺成熱液金銀礦化帶內。Diamante礦區的主要金礦開採業務包括Alamos Gold的Los Mulatos礦和Agnico Eagles的El India和Pinos Altos礦。該項目位於Minera Alamos的Santana Au開發項目西北約12公里處,該項目預計將於近期內開始商業生產。該物業位於索諾拉州首府埃爾莫西洛東南約170公里處,特波卡鎮西北約10公里處,可從索諾拉州駭維金屬加工直接進入。

The 1,057-hectare Diamante property is located adjacent to the Jackie property, a joint venture with Colibri, which covers 1,113 hectares, providing the company with a total of 2,170 hectares of exploration ground. Diamante hosts a number of historical showings and combined with mineralization on the Mezquite and Jackie properties exhibit the geological characteristics of epithermal low to intermediate sulfidation Ag-Au (Pb-Zn), high sulfidation Au-Cu, and potential transition zones within and peripheral to porphyry style Au-Cu defined within the system of Sillitoe (2010).

該1,057公頃的Diamante物業毗鄰Jackie Property,後者是與Colibri的合資企業,佔地1113公頃,為該公司提供了總計2170公頃的勘探場地。二芒巖具有多個歷史顯示,並與Mezquit和Jackie上的礦化相結合,顯示出淺成熱液低至中硫化Ag-Au(鉛-鋅)、高硫化Au-Cu的地質特徵,以及Sillitoe(2010)系統內和周圍潛在的斑巖式Au-Cu過渡帶。

Highlights of drilling completed at the first two targets on the Diamante property during 2022 are summarized in the table below and highlighted by 257.6 g/t Ag Eq over 12.0 metres in DIA22-05 at El Pillado and 312.8 g/t Ag Eq over 9.0 metres in DIA22-16 at La Prieta.

下表概述了2022年在Diamante礦區的前兩個目標完成的鑽探重點,重點介紹了El Pillado的DIA22-05和La Prieta的DIA22-05在12米以上完成的257.6克/噸Ag Eq和在La Prieta的DIA22-16在9米以上完成的312.8 g/t Ag Eq。

El Pillado Target

Hole ID

From

To

Length

Au (g/t)

Ag (g/t)

Zn (%)

Pb (%)

Ag Eq (g/t)

Au Eq (g/t)

DIA22-01

27.0

37.5

10.5

0.04

9.87

0.37

0.12

35.46

0.40

DIA22-01

54.0

55.5

1.5

0.06

7.00

1.06

0.19

69.25

0.78

DIA22-01

72.0

73.5

1.5

0.03

13.50

1.52

0.66

110.35

1.24

DIA22-02

22.5

24.0

1.5

0.04

4.20

0.48

0.03

31.85

0.36

DIA22-02

43.5

54.0

10.5

0.04

6.27

0.78

0.12

51.71

0.58

includes

48.0

49.5

1.5

0.09

13.20

3.89

0.04

210.87

2.37

DIA22-02

64.5

66.0

1.5

0.03

3.60

0.83

0.04

47.84

0.54

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-03

16.5

18.0

1.5

0.20

6.60

0.06

0.01

27.13

0.30

DIA22-04

0.0

1.5

1.5

0.03

6.00

0.75

0.14

49.54

0.56

DIA22-05

24.0

36.0

12.0

0.18

145.49

1.35

1.01

257.63

2.89

includes

24.0

30.0

6.0

0.26

184.50

1.08

0.61

278.51

3.13

includes

33.0

36.0

3.0

0.16

209.10

3.15

2.79

461.65

5.19

includes

33.0

34.5

1.5

0.31

397.00

5.87

5.31

871.62

9.79

DIA22-05

43.5

60.0

16.5

0.21

41.75

2.14

0.68

185.13

2.08

includes

45.0

51.0

6.0

0.15

87.64

4.58

1.45

367.54

4.13

includes

46.5

48.0

1.5

0.21

257.00

7.84

5.23

815.53

9.16

El Pillado目標

孔ID

從…

長度

Au(克/噸)

銀(克/噸)

鋅(%)

PB(%)

AG Eq(克/噸)

Au Eq(克/噸)

DIA22-01

27.0

37.5

10.5

0.04

9.87

0.37

0.12

35.46

0.40

DIA22-01

54.0

55.5

1.5

0.06

7.00

1.06

0.19

69.25

0.78

DIA22-01

72.0

73.5

1.5

0.03

13.50

1.52

0.66

110.35

1.24

DIA22-02

22.5

24.0

1.5

0.04

4.20

0.48

0.03

31.85

0.36

DIA22-02

43.5

54.0

10.5

0.04

6.27

0.78

0.12

51.71

0.58

包括

48.0

49.5

1.5

0.09

13.20

3.89

0.04

210.87

2.37

DIA22-02

64.5

66.0

1.5

0.03

3.60

0.83

0.04

47.84

0.54

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-02

84.0

85.5

1.5

0.13

15.20

0.66

0.98

88.13

0.99

DIA22-03

16.5

18.0

1.5

0.20

6.60

0.06

0.01

27.13

0.30

DIA22-04

0.0

1.5

1.5

0.03

6.00

0.75

0.14

49.54

0.56

DIA22-05

24.0

36.0

12.0

0.18

145.49

1.35

1.01

257.63

2.89

包括

24.0

30.0

6.0

0.26

184.50

1.08

0.61

278.51

3.13

包括

33.0

36.0

3.0

0.16

209.10

3.15

2.79

461.65

5.19

包括

33.0

34.5

1.5

0.31

397.00

5.87

5.31

871.62

9.79

DIA22-05

43.5

60.0

16.5

0.21

41.75

2.14

0.68

185.13

2.08

包括

45.0

51.0

6.0

0.15

87.64

4.58

1.45

367.54

4.13

包括

46.5

48.0

1.5

0.21

257.00

7.84

5.23

815.53

9.16

Table 1: 2022 Drill Results at Diamante Project

表1:Diamante項目2022年的演練結果

DIA22-05

78.0

81.0

3.0

0.17

26.60

4.19

1.05

276.87

3.11

includes

78.0

79.5

1.5

0.27

35.80

6.91

1.60

443.58

4.98

DIA22-05

99.0

100.5

1.5

0.25

1.90

0.08

0.04

29.35

0.33

DIA22-05

118.5

120.0

1.5

0.04

12.20

0.43

0.34

46.96

0.53

DIA22-06

6.0

10.5

4.5

0.06

28.73

0.24

0.52

61.39

0.69

includes

6.0

7.5

1.5

0.07

60.40

0.20

1.21

113.45

1.27

DIA22-08

130.5

132.0

1.5

0.93

2.20

0.03

0.02

87.20

0.98

DIA22-09

117.0

120.0

3.0

0.11

19.85

0.50

0.09

56.65

0.64

La Prieta Target

Hole ID

From

To

Length

Au (g/t)

Ag (g/t)

Zn (%)

Pb (%)

Ag Eq (g/t)

Au Eq (g/t)

DIA22-10

48.0

54.0

6.0

0.46

56.88

1.06

0.53

165.47

1.86

includes

49.5

51.0

1.5

0.87

125.00

2.82

1.45

383.75

4.31

DIA22-11

54.0

55.5

1.5

0.15

4.50

0.16

0.09

28.25

0.32

DIA22-12

51.0

52.5

1.5

0.18

4.80

0.22

0.08

33.71

0.38

DIA22-13

49.5

51.0

1.5

0.31

53.70

1.49

0.39

165.09

1.85

DIA22-14

52.5

55.5

3.0

0.59

16.50

0.46

0.23

98.14

1.10

DIA22-15

36.0

37.5

1.5

0.54

0.25

0.01

0.00

48.70

0.55

DIA22-16

1.5

10.5

9.0

2.48

56.70

0.28

0.71

312.84

3.51

includes

1.5

6.0

4.5

3.87

75.43

0.08

0.97

453.26

5.09

DIA22-16

18.0

19.5

1.5

0.83

18.80

0.68

0.38

136.90

1.54

DIA22-16

36.0

46.5

10.5

0.63

38.49

1.61

0.64

192.52

2.16

includes

37.5

39.0

1.5

1.36

139.00

8.74

2.88

772.12

8.67

DIA22-17

30.0

43.5

13.5

0.56

38.48

1.76

0.76

196.95

2.21

includes

30.0

34.5

4.5

0.94

103.17

4.96

2.19

494.61

5.56

DIA22-05

78.0

81.0

3.0

0.17

26.60

4.19

1.05

276.87

3.11

包括

78.0

79.5

1.5

0.27

35.80

6.91

1.60

443.58

4.98

DIA22-05

99.0

100.5

1.5

0.25

1.90

0.08

0.04

29.35

0.33

DIA22-05

118.5

120.0

1.5

0.04

12.20

0.43

0.34

46.96

0.53

DIA22-06

6.0

10.5

4.5

0.06

28.73

0.24

0.52

61.39

0.69

包括

6.0

7.5

1.5

0.07

60.40

0.20

1.21

113.45

1.27

DIA22-08

130.5

132.0

1.5

0.93

2.20

0.03

0.02

87.20

0.98

DIA22-09

117.0

120.0

3.0

0.11

19.85

0.50

0.09

56.65

0.64

La Prieta目標

孔ID

從…

長度

Au(克/噸)

銀(克/噸)

鋅(%)

PB(%)

AG Eq(克/噸)

Au Eq(克/噸)

DIA22-10

48.0

54.0

6.0

0.46

56.88

1.06

0.53

165.47

1.86

包括

49.5

51.0

1.5

0.87

125.00

2.82

1.45

383.75

4.31

DIA22-11

54.0

55.5

1.5

0.15

4.50

0.16

0.09

28.25

0.32

DIA22-12

51.0

52.5

1.5

0.18

4.80

0.22

0.08

33.71

0.38

DIA22-13

49.5

51.0

1.5

0.31

53.70

1.49

0.39

165.09

1.85

DIA22-14

52.5

55.5

3.0

0.59

16.50

0.46

0.23

98.14

1.10

DIA22-15

36.0

37.5

1.5

0.54

0.25

0.01

0.00

48.70

0.55

DIA22-16

1.5

10.5

9.0

2.48

56.70

0.28

0.71

312.84

3.51

包括

1.5

6.0

4.5

3.87

75.43

0.08

0.97

453.26

5.09

DIA22-16

18.0

19.5

1.5

0.83

18.80

0.68

0.38

136.90

1.54

DIA22-16

36.0

46.5

10.5

0.63

38.49

1.61

0.64

192.52

2.16

包括

37.5

39.0

1.5

1.36

139.00

8.74

2.88

772.12

8.67

DIA22-17

30.0

43.5

13.5

0.56

38.48

1.76

0.76

196.95

2.21

包括

30.0

34.5

4.5

0.94

103.17

4.96

2.19

494.61

5.56

Table 1 continued: 2022 Drill Results at Diamante Project

表1續:Diamante項目2022年鑽探結果

DIA22-17

54.0

57.0

3.0

0.45

1.35

0.04

0.00

43.14

0.48

DIA22-17

72.0

75.0

3.0

0.26

18.65

0.15

0.07

51.50

0.58

DIA22-18

33.0

42.0

9.0

0.55

15.28

0.38

0.16

87.76

0.99

includes

37.5

40.5

3.0

1.07

38.80

0.63

0.35

175.81

1.98

DIA22-18

48.0

51.0

3.0

0.48

11.35

0.08

0.03

59.14

0.66

DIA22-19

10.5

13.5

3.0

1.36

86.80

1.69

0.91

317.91

3.57

includes

12.0

13.5

1.5

2.11

139.00

2.79

1.24

500.06

5.62

DIA22-19

39.0

45.0

6.0

0.64

11.20

0.31

0.21

89.84

1.01

DIA22-19

48.0

49.5

1.5

0.32

7.60

0.24

0.16

52.76

0.59

*Au and Ag equivalents were calculated using metal prices of US$1660 per ounce Au, US$18.65 per ounce Ag, US$1.32 per pound Zn, and US$0.83 per pound Pb; Lengths are intersection length. True widths are not known.
DIA22-17

54.0

57.0

3.0

0.45

1.35

0.04

0.00

43.14

0.48

DIA22-17

72.0

75.0

3.0

0.26

18.65

0.15

0.07

51.50

0.58

DIA22-18

33.0

42.0

9.0

0.55

15.28

0.38

0.16

87.76

0.99

包括

37.5

40.5

3.0

1.07

38.80

0.63

0.35

175.81

1.98

DIA22-18

48.0

51.0

3.0

0.48

11.35

0.08

0.03

59.14

0.66

DIA22-19

10.5

13.5

3.0

1.36

86.80

1.69

0.91

317.91

3.57

包括

12.0

13.5

1.5

2.11

139.00

2.79

1.24

500.06

5.62

DIA22-19

39.0

45.0

6.0

0.64

11.20

0.31

0.21

89.84

1.01

DIA22-19

48.0

49.5

1.5

0.32

7.60

0.24

0.16

52.76

0.59

*金和銀的當量是使用金屬價格計算的,每盎司Au為1660美元,銀為18.65美元,鋅為1.32美元,鉛為0.83美元;長度為相交長度。真正的寬度是未知的。

Table 1 continued: 2022 Drill Results at Diamante Project

表1續:Diamante項目2022年鑽探結果

Terms of Agreement

協議條款

Colibri, by way of its Mexico subsidiary Yaque Minerales Sa de CV, entered into an earn-in agreement which was announced February 2021 with Bimsa to purchase up to 100% of Diamante. The Diamante project was then placed into a new company called BIMCOL Minera SA de CV. Fifty percent of the shares in BIMCOL were then placed into trust on behalf of Yaque Minerales (to be released upon completion of the first phase of the agreement).

Colibri通過其墨西哥子公司Yaque Minerales Sa de CV與BIMSA簽訂了一項增持協議,將購買Diamante至多100%的股份。Diamante項目隨後被納入一家名為BIMCOL Minera SA de CV的新公司。BIMCOL 50%的股份隨後被託管給Yaque Minerales(將在協議第一階段完成後解除)。

Silver Spruce completed the execution of its Definitive Agreement and upon acceptance by the Toronto Stock Exchange (TSX), to earn its initial 25% interest in the Property, the Company agreed to pay Colibri an initial cash amount of $75,000 USD directed to the Vendor's $100,000 USD initial property payment whereupon Silver Spruce and Yaque each will hold a 25% interest in the Property and manage the Property as equal partners ("Partners").

Silver Spruce完成了其最終協議的簽署,經多倫多證券交易所(多倫多證券交易所)接納後,公司同意向Colibri支付75,000美元的初始現金金額75,000美元,用於賣方100,000美元的初始物業付款,據此Silver Spruce和Yaque將各自持有該物業的25%權益,並作為平等合夥人(“合夥人”)管理該物業。

Silver Spruce will be the designated operator of the Property during the earn-in period with the Vendor. The Company will manage the program via a Project Oversight Committee with Colibri.

Silver Spruce將在與供應商的進賬期間成為該物業的指定運營商。該公司將通過與Colibri共同成立的項目監督委員會管理該項目。

To earn its initial 50% of the Diamante project, Silver Spruce and Yaque also agreed to design, permit and drill a minimum of 2,000 metres on the Property within 24 months from the Execution Date of Yaque's final agreement with the Vendor; including any requisite exploration leading to the drill program, submit a final drilling report to meet NI 43-101 reporting guidelines and pay approved exploration costs at a ratio of Silver Spruce (75%) and Yaque (25%). The 75% portion paid by Silver Spruce included field exploration, lab costs for samples, road & pad building and drilling. The Partners will pay to the Vendor 50% of the bi-annual property taxes and surface rights payments.

為了賺取Diamante項目最初50%的權益,Silver Spruce和Yaque還同意自Yaque與供應商簽訂最終協議之日起24個月內,在該項目上進行至少2,000米的設計、許可和鑽探;包括任何導致鑽探計劃的必要勘探,提交最終鑽探報告以滿足NI 43-101報告指南,並按Silver Spruce(75%)和Yaque(25%)的比例支付批准的勘探成本。Silver Spruce支付的75%部分包括現場勘探、樣品實驗室成本、道路和墊層建設和鑽探。合作伙伴將向供應商支付兩年一次的財產税和表面權利付款的50%。

With completion of the initial earn-in, Silver Spruce and Yaque together will become equal joint venture partners with the Vendor in BIMCOL Minera ("BIMCOL"), a private Mexico company holding the concessions, pay to the Vendor 50% of the bi-annual property taxes and surface rights payments and pay approved pro rata exploration costs at a ratio of Silver Spruce (50%) and Yaque (50%). Now that Yaque Minerales has earned/purchased fifty percent of the shares of BIMCOL (the holder of Diamante) the project will be operated by Colibri/Silver Spruce. BIMCOL will have four Directors, two representatives from Bimsa and two from Colibri/Silver Spruce with the Chairperson from Colibri holding the ability to break a tie vote.

隨着初步收入的完成,Silver Spruce和Yaque將共同成為持有特許權的墨西哥私營公司BIMCOL Minera(“BIMCOL”)的供應商的平等合資夥伴,向供應商支付兩年兩次的物業税和地面權付款的50%,並按Silver Spruce(50%)和Yaque(50%)的比例支付批准的勘探成本。既然Yaque Minerales已經獲得/購買了BIMCOL(Diamante的持有者)50%的股份,該項目將由Colibri/Silver Spruce運營。BIMCOL將有四名董事,兩名來自BIMSA的代表和兩名來自Colibri/Silver Spruce的代表,Colibri的主席擁有打破平局投票的能力。

Yaque will have an exclusive period of six months to purchase the remaining 50% of BIMCOL by paying the Vendor either of: i) US$2.1 million or ii) US$1.45 million and the grant of a 2% net smelter royalty (NSR) on the project.

Yaque將有六個月的獨家期限購買BIMCOL剩餘50%的股份,方法是向賣方支付:i)210萬美元或ii)145萬美元,並就該項目授予2%的冶煉廠淨使用費(NSR)。

Should Yaque elect to exercise its right to purchase the remaining 50% of BIMCOL, Yaque will also grant Silver Spruce the option to purchase one-half of its additional ownership for one-half of the cost for a period not to exceed six (6) months from the date Yaque elects to exercise its right and Yaque will provide three (3) months notice to Silver Spruce for the purchase due date within the first three (3) months of the option period.

如果Yaque選擇行使其購買BIMCOL剩餘50%股權的權利,Yaque還將授予Silver Spruce以不超過Yaque選擇行使其權利之日起不超過六(6)個月的時間以一半成本購買其額外所有權的一半的選擇權,而Yaque將在期權期限的前三(3)個月內向Silver Spruce發出購買到期日的三(3)個月通知。

Going Forward

展望未來

Silver Spruce, Colibri and its partners currently are reviewing all project data and determining the next steps to be taken on the project. Plans will be released as they are finalized.

Silver Spruce、Colibri及其合作伙伴目前正在審查所有項目數據,並確定該項目的下一步行動。計劃將在最終敲定時公佈。

Qualified Person - Colibri Resource

人才--Colibri資源

Jamie Lavigne, P. Geo and a Director for Colibri is a Qualified Person as defined in NI 43-101 and has reviewed and approved the technical information in this press release.

Jamie Lavigne,P.Geo和Colibri的董事是NI 43-101中定義的合格人員,並已審查和批准了本新聞稿中的技術信息。

Qualified Person - Silver Spruce Resources

合格人員--銀雲杉資源

Greg Davison, PGeo, Silver Spruce VP Exploration and Director, is the Company's internal Qualified Person for the Diamante Project and has reviewed the technical content of this press release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101"), under TSX guidelines.

銀雲杉勘探副總裁兼董事副總裁Greg Davison是公司Diamante項目的內部合格人士,並已根據多倫多證交所的指導方針,按照National Instrument 43-101礦產項目披露標準(“NI 43-101”)的含義審查了本新聞稿的技術內容。

About Silver Spruce Resources Inc.

關於銀杉資源公司

Silver Spruce Resources Inc. is a Canadian junior exploration company which has signed Definitive Agreements to acquire 100% of the Melchett Lake Zn-Au-Ag project in northern Ontario, 100% interest in the Mystery Au project near recent discoveries by Sokoman Minerals Corp. and New Found Gold Corp. among others in the Exploits Subzone Gold Belt, Newfoundland and Labrador, 100% interest in the Pino de Plata Ag project located 15 kilometres west of Coeur Mining's Palmarejo Mine in western Chihuahua, Mexico and up to 50% interest in Colibri Resource's Diamante Au-Ag project located from 5 kilometres to 15 kilometres northwest from Minera Alamos's Nicho deposit in Sonora, Mexico. Silver Spruce recently signed a 50:50 joint venture agreement with Colibri on the nearby Jackie Au project. Silver Spruce Resources Inc. continues to investigate opportunities that Management has identified or that have been presented to the Company for consideration.

Silver Spruce Resources Inc.是一家加拿大初級勘探公司,它簽署了最終協議,收購了安大略省北部Melchett Lake鋅-金-銀項目的100%權益,最近發現的Mystery Au項目的100%權益;Sokoman Minerals Corp.和New Found Gold Corp等公司最近發現的神祕金礦項目的100%權益;位於墨西哥奇瓦瓦瓦西部Coeur礦業的Palmarejo礦以西15公里處的Pino de Plata Ag項目的100%權益;位於墨西哥索諾拉的Minera Alamos‘s Nicho礦牀西北5公里至15公里處的Colibri Resources公司Diamante Au-Ag項目的50%的股份。Silver Spruce最近與Colibri就附近的Jackie Au項目簽署了50:50的合資協議。Silver Spruce Resources Inc.繼續調查管理層已發現或已提交公司考慮的機會。

Contact:

聯繫方式:

Silver Spruce Resources Inc.

銀杉資源公司。

Greg Davison, PGeo, Vice-President Exploration and Director
(250) 521-0444
gdavison@silverspruceresources.com

格雷格·戴維森,PGeo,副總裁勘探和董事
(250) 521-0444
郵箱:gdavison@silverspuceresources.com

Michael Kinley, CEO
(902) 402-0388
mkinley@silverspruceresources.com

邁克爾·金利,首席執行官
(902) 402-0388
郵箱:mkinley@silverspuceresources.com

info@silverspruceresources.com

郵箱:info@silverspuceresources.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Notice Regarding Forward-Looking Statements

關於前瞻性陳述的通知

This news release contains "forward-looking statements," Statements in this press release which are not purely historical are forward-looking statements and include any statements regarding beliefs, plans, expectations or intentions regarding the future, including but not limited to, statements regarding the private placement.

本新聞稿包含“前瞻性陳述”,本新聞稿中非純粹歷史性的陳述均為前瞻性陳述,包括有關對未來的信念、計劃、預期或意圖的任何陳述,包括但不限於有關定向增發的陳述。

Actual results could differ from those projected in any forward-looking statements due to numerous factors. Such factors include, among others, the inherent uncertainties associated with mineral exploration and difficulties associated with obtaining financing on acceptable terms. We are not in control of metals prices and these could vary to make development uneconomic. These forward-looking statements are made as of the date of this news release, and we assume no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those projected in the forward-looking statements. Although we believe that the beliefs, plans, expectations and intentions contained in this press release are reasonable, there can be no assurance that such beliefs, plans, expectations or intentions will prove to be accurate.

由於許多因素,實際結果可能與任何前瞻性陳述中預測的結果不同。這些因素包括與礦產勘探有關的內在不確定性,以及以可接受的條件獲得融資的困難。我們無法控制金屬價格,這些價格可能會發生變化,使開發變得不經濟。這些前瞻性陳述是截至本新聞稿發佈之日作出的,我們沒有義務更新前瞻性陳述,也沒有義務更新實際結果可能與前瞻性陳述中預測的結果不同的原因。儘管我們相信本新聞稿中包含的信念、計劃、預期和意圖是合理的,但不能保證這些信念、計劃、預期或意圖將被證明是準確的。

SOURCE: Silver Spruce Resources Inc.

資料來源:銀杉資源公司。


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論