share_log

High Tide Resources Enters Into Option Agreement to Acquire 100% of the Big Bang Lithium Project in NW Ontario

High Tide Resources Enters Into Option Agreement to Acquire 100% of the Big Bang Lithium Project in NW Ontario

漲潮資源簽訂期權協議,收購安大略省西北部大爆炸鋰項目的 100%
Accesswire ·  2023/02/09 19:01

TORONTO, ON / ACCESSWIRE / February 9, 2023 / High Tide Resources Corp. ("High Tide" or the "Company") (CSE:HTRC) is pleased to announce that it has entered into an option agreement (the "Agreement") to acquire a 100% interest in the Big Bang Lithium Project ("Big Bang" or the "Property") located about 275 km northeast of Thunder Bay, Ontario near the town of Geraldton (Figure 1).

多倫多,於/ACCESSWIRE/2023年2月9日/High Tide(“High Tide“或”公司") (CSE:HTRC)很高興地宣佈,它已達成一項期權協議(“協議“)收購大爆炸鋰項目的100%權益(《生活大爆炸》或者是“屬性位於安大略省桑德灣東北約275公里處,靠近Geraldton鎮(圖1)。

Steve Roebuck, Director, President & Interim CEO of High Tide states, "We are very pleased to announce the acquisition of our second lithium project which we are naming the "Big Bang Lithium Project" in NW Ontario. We continue to focus on identifying and acquiring high-quality lithium projects in top mining jurisdictions like Quebec and Ontario."

董事、總裁和High Tide臨時首席執行官史蒂夫·羅巴克表示我們非常高興地宣佈收購了我們的第二個鋰項目,我們將其命名為位於安大略省西北部的大爆炸鋰項目。我們將繼續專注於在魁北克和安大略省等頂級礦業管轄區識別和收購高質量的鋰項目。

Big Bang represents our second lithium project acquisition in less than one year and is similar to our 14,400-hectare Clearcut Lithium Project in Quebec (see press releases dated July 14, 2022 & January 23, 2023). Big Bang is road accessible and is located approximately 15 kilometres south of Highway 11 near the mining town of Geraldton and connected via a network of logging roads. Having road and trail access will enable the Company to keep explorations costs low while efficiently covering more ground than a remote helicopter supported exploration program. Additionally, being located in NW Ontario will provide access to regional lithium processing hubs which are currently in the planning stage.

Big Bang代表着我們在不到一年的時間裏第二次收購鋰項目,類似於我們在魁北克14,400公頃的明確削減的鋰項目(見2022年7月14日和2023年1月23日的新聞稿)。大爆炸是道路可達的,位於駭維金屬加工11號以南約15公里處,靠近礦業城鎮傑拉爾頓,並通過伐木公路網連接。擁有道路和步道通道將使公司能夠保持較低的勘探成本,同時與遠程直升機支持的勘探計劃相比,有效地覆蓋更多的地面。此外,位於安大略省西北部的該項目將為目前處於規劃階段的地區鋰加工中心提供通道。

The 6,267-hectare property consists of 17 mineral claims within the Thunder Bay Mining Division and is located ~70 km east of Rock Tech Lithium's advanced-stage Georgia Lake property which hosts a 10.60 MT @ 0.88% Li2O Indicated Resource and a 4.22 MT @ 1.00% Li2O Inferred Resource with production targeted for H2 - 2024.

這處佔地6267公頃的礦藏由雷灣礦業事業部內的17個礦藏組成,位於巖石技術鋰公司高級階段的喬治亞湖礦藏以東約70公里處,該礦藏擁有10.60 MT@0.88%Li2指示資源和4.22 MT@1.00%Li2O推斷的資源,生產目標為H2-2024年。

Mapping in the Big Bang area in 1939 identified several instances of 'granite' pegmatite. However, mapping during this era did not recognize, or document, various other 'types' of pegmatites which contain important mineralogical information. Of importance is that there are pegmatite dyke-like features mapped on the Property within muscovite-bearing granites and intruding metasediments.

1939年在大爆炸地區的測繪發現了幾個花崗巖偉晶巖的例子。然而,這一時期的測繪沒有識別或記錄包含重要礦物學信息的各種其他類型的偉晶巖。重要的是,在含有白雲母的花崗巖和侵入的變質巖中,有偉晶巖牆狀的特徵被繪製在財產上。

Agreement Details

協議詳細信息

Pursuant to the Agreement, the Company was granted the option to acquire a 100% interest in the Property (the "Option") by making aggregate cash payments of $103,000 ($25,000 paid) and a one-time issuance of 225,000 common shares of the Company (completed). Upon exercise of the Option, the Company will grant the Vendors a 1.5% net smelter royalty, 0.5% of which may be re-purchased by the Company for $500,000.

根據該協議,本公司獲授予收購該物業100%權益的選擇權(“選擇權“)支付合共103,000元現金(已支付25,000美元)及一次性發行225,000股本公司普通股(已完成)。於行使購股權後,本公司將向賣方授予1.5%的冶煉廠特許權使用費淨額,其中0.5%可由本公司以500,000美元回購。

About High Tide

關於High Tide

High Tide is focused on and committed to the development of advanced-stage mineral projects in Canada using industry best practices combined with a strong social license from local communities. High Tide owns a 100% interest in the Labrador West Iron Project located adjacent to the Carol Lake Mine in Labrador City, NL and owns a 100% interest in the Lac Pegma copper-nickel-cobalt deposit located 50 kilometres southeast of Fermont, Quebec and is earning a 100% interest in the Clearcut Lithium Project located ~75 kilometres southwest of Val d'Or, Quebec. Majority shareholder Avidian Gold (TSX.V: AVG) controls approximately 30% of High Tide's outstanding shares.

High Tide專注於並致力於利用行業最佳實踐和當地社區頒發的強有力的社會許可證,在加拿大開發高級階段的礦產項目。High Tide擁有位於西北地區拉布拉多市Carol Lake礦山附近的拉布拉多西鐵項目100%的股份,擁有位於魁北克省費爾蒙特東南50公里處的Lac PegMa銅鎳鈷礦牀100%的股份,還擁有位於魁北克省Val d‘Or西南約75公里處的ClearCut鋰項目100%的股份。大股東Avidian Gold(多倫多證券交易所股票代碼:AVG)控制着High Tide約30%的流通股。

Further details on the Company, including a NI 43-101 technical report on the Labrador West Iron property can be found on the Company's website at .

有關公司的更多細節,包括關於拉布拉多西鐵資產的NI 43-101技術報告,可在公司網站上找到。

Qualified Person

有資格的人

The technical information contained in this news release has been approved by Steve Roebuck,

本新聞稿中包含的技術信息已得到史蒂夫·羅巴克的批准,

P.Geo., Director, President and Interim CEO of High Tide, who is a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for Mineral Projects."

P·Geo、董事、總裁和High Tide臨時首席執行官,他是“國家儀器43-101,礦產項目披露標準”中定義的合格人員。

For further information, please contact:

如需更多信息,請聯繫:

Steve Roebuck
Director, President & Interim CEO
Mobile: (905) 741-5458
Email: sroebuck@hightideresources.com

史蒂夫·羅巴克
董事,總裁兼臨時首席執行官
手機:(905)741-5458
電子郵件:sroebuck@Hightideresources.com

Neither Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this news release.

加拿大證券交易所及其監管服務提供商(該術語在加拿大證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Forward looking information

前瞻性信息

This news release includes certain "forward-looking statements" which are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, closing of the Agreement, exercising the Option, the acquisition of low cost and potentially high reward lithium projects, the ability to keep exploration costs low, expected access to regional lithium processing hubs, the Company's objectives, goals or future plans, statements, exploration results, potential mineralization, the estimation of mineral resources, exploration and mine development plans, timing of the commencement of operations and estimates of market conditions. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to: the ability to anticipate and counteract the effects of COVID-19 pandemic on the business of the Company, including without limitation the effects of COVID-19 on the capital markets, commodity prices supply chain disruptions, restrictions on labour and workplace attendance and local and international travel, failure to receive requisite approvals in respect of the foregoing, failure to identify mineral resources, failure to convert estimated mineral resources to reserves, the inability to complete a feasibility study which recommends a production decision, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, political risks, inability to fulfill the duty to accommodate First Nations and other indigenous peoples, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in exchange rates, fluctuations in commodity prices, delays in the development of projects, capital and operating costs varying significantly from estimates and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

本新聞稿包括一些不包含歷史事實的“前瞻性陳述”。前瞻性陳述包括描述公司未來計劃、目標或目標的估計和陳述,包括公司或管理層預期將出現的情況或結果的表述。前瞻性陳述可以用“相信”、“預期”、“預期”、“估計”、“可能”、“將”或“計劃”等術語來識別。由於前瞻性陳述以假設為基礎,涉及未來的事件和情況,因此它們本身就具有內在的風險和不確定性。雖然這些陳述是基於公司目前掌握的信息,但公司不能保證實際結果將符合管理層的期望。前瞻性信息涉及的風險、不確定性和其他因素可能導致實際事件、結果、業績、前景和機會與此類前瞻性信息明示或暗示的情況大不相同。本新聞稿中的前瞻性信息包括但不限於協議的完成、期權的行使、低成本和潛在高回報鋰項目的收購、將勘探成本保持在低水平的能力、獲得區域鋰加工中心的預期機會、公司的目標、目標或未來計劃、聲明、勘探結果、潛在礦化、礦產資源的估計、勘探和礦山開發計劃、開始運營的時間和對市場狀況的估計。可能導致實際結果與此類前瞻性信息大不相同的因素包括但不限於:預測和抵消新冠肺炎疫情對公司業務影響的能力, 包括但不限於:新冠肺炎對資本市場的影響、商品價格、供應鏈中斷、對勞動力和工作場所出勤以及當地和國際旅行的限制、未能就上述事項獲得必要的批准、未能查明礦產資源、未能將估計的礦產資源轉化為儲量、未能完成建議生產決定的可行性研究、冶金測試結果的初步性質、延誤獲得或未能獲得所需的政府、環境或其他項目批准、政治風險、無法履行容納原住民和其他土著人民的職責。與未來所需融資的可獲得性和成本有關的不確定性,股票市場的變化,通貨膨脹,匯率變化,大宗商品價格的波動,項目開發的延遲,資本和運營成本與估計的巨大差異,以及礦產勘探和開發行業涉及的其他風險,以及公司提交給SEDAR的公開文件中列出的那些風險。儘管本公司認為在準備本新聞稿中的前瞻性信息時使用的假設和因素是合理的,但不應過度依賴這些信息,因為這些信息僅適用於本新聞稿發佈之日,並且不能保證此類事件將在披露的時間框架內發生或根本不會發生。除法律要求外,公司沒有任何更新或修改任何前瞻性信息的意圖或義務,無論是由於新信息、未來事件或其他原因。

Figure 1: Big Bang Lithium Project location map in NW Ontario, Canada
圖1:加拿大安大略省西北部的大爆炸鋰項目位置圖
Figure 2: Northwest Ontario Regional Map with select lithium projects and Big Bang Lithium Project
圖2:包含精選鋰項目和大爆炸鋰項目的安大略省西北部區域地圖
Figure 3: Location and roads to Big Bang Lithium Project
圖3:通往大爆炸鋰項目的位置和道路
Figure 4: Big Bang Lithium Project local geology and structure
圖4:大爆炸鋰項目當地地質和構造

SOURCE: High Tide Resources Corp.

資料來源:High Tide資源公司


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論