share_log

BCM Updates on Phase 3 Drilling Program at the TK Greenfield Cu-Au Porphyry Project, Utah, USA

BCM Updates on Phase 3 Drilling Program at the TK Greenfield Cu-Au Porphyry Project, Utah, USA

澳門商業銀行有關美國猶他州 TK 格林菲爾德 CU-Au 斑岩項目的第三階段鑽探計劃的最新情況
Accesswire ·  2023/02/08 20:02

VANCOUVER, BC / ACCESSWIRE / February 8, 2023 / BCM Resources Corp ("B" or the "Company") would like to update its shareholders about the advances in its exploration drilling program at Thompson Knolls (TK) greenfield Cu-Au-Ag-Mo porphyry system in southwestern Utah, USA. Diamond drilling is successfully advancing drill testing of the deep porphyry and skarn targets previously described in the Company press release dated October 12, 2022. The greenfield TK Cu-Au-Ag-Mo porphyry project is located approximately 210 km southwest of Rio Tinto's giant Bingham Canyon porphyry copper-molybdenum-gold mine and smelter complex near Salt Lake City, Utah. It is accessed by a highway and then by a network of gravel roads.

不列顛哥倫比亞省温哥華/ACCESSWIRE/2023年2月8日/BCM Resources Corp(“B”或“公司”)希望向其股東通報其在美國猶他州西南部Thompson Knolls(TK)綠地銅-金-銀-鉬斑巖系統的勘探鑽探計劃的最新進展。鑽石鑽探正在成功地推進對深部斑巖和夕卡巖目標的鑽探測試,該公司於2022年10月12日發佈的新聞稿中曾對此進行過描述。綠地TK銅-金-銀-鉬斑巖項目位於力拓巨大的賓漢峽谷斑巖銅鉬金礦和冶煉綜合體西南約210公里處,靠近猶他州鹽湖城。它可以通過駭維金屬加工訪問,然後通過砂礫公路網訪問。

President Dr. Sergei Diakov stated "We continue advancing our Phase 3 drilling program with two drill holes recently completed and a third hole in progress. Drilling intercepted mineralization in the porphyry intrusion and surrounding skarns beneath the post-mineral cover. A significant skarn intercept in hole TK8, with a strong presence of sulfide mineralization, is very encouraging. We are looking forward to potentially exciting results from this drilling program."

總裁博士謝爾蓋·迪亞科夫説:我們繼續推進我們的第三階段鑽井計劃,最近完成了兩個鑽孔,第三個鑽孔正在進行中。鑽探截獲了斑巖侵入體和礦後蓋層下的夕卡巖周圍的礦化。在TK8孔有一個重要的夕卡巖截距,存在強烈的硫化物礦化,這是非常令人鼓舞的。我們期待着這一鑽探計劃可能帶來的令人興奮的結果。"

TK8 drill hole (completed, but failed to reach target depth). This hole was vertical (90 degrees) and located on the mineralized trend from drill holes TK1, TK3a & TK5 (Fig 2 in Exploration Drilling Update on BCM website BCM Resources Corp. | Presentations). Hole TK8 had a projected target depth of 4,000 ft (1,220m). The drill hole crossed a 1,484 ft-thick (452 m) post-mineral fanglomerate cover and then encountered a package of limestones, mudstones, and sandstones. Significantly, the limestones contain a well-developed diopside-marble skarn. The upper parts of this skarn are oxidized, then farther into the skarn drilling encountered a very intense sulfide-rich magnetite breccia in skarns stretching for over a 1,021.5 ft (313 m) interval. Locally, sulfide mineralization consists of pyrite (avg 10%)-pyrrhotite (avg 8%)-chalcopyrite (avg 5%) and is developed as clots/patches within massive magnetite breccias and in halos as disseminated mineralization. Unfortunately, after encountering a fault zone at depth of 3,021.5 ft (921 m) drillers lost the hole. The bottom of the hole was still in good skarn mineralization with its extension remaining open in all directions. The contact between the skarn and porphyry intrusion has not been tested and remains a compelling target.

TK8鑽孔(已完成,但未達到目標深度)。這個孔是垂直的(90度),位於TK1、TK3a和TK5孔的礦化趨勢上(圖2,BCM網站BCM Resources Corp.|Presentation上的勘探鑽探更新)。TK8洞的預計目標深度為4,000英尺(1,220米)。鑽孔穿過了1484英尺厚(452m)的礦物層,然後遇到了一包石灰巖、泥巖和砂巖。值得注意的是,石灰巖中含有發育良好的透輝石-大理石夕卡巖。這個夕卡巖的上部被氧化,然後在夕卡巖鑽探的更遠的地方,在延伸超過1021.5英尺(313米)的夕卡巖中遇到了非常強烈的富含硫化物的磁鐵礦角礫巖。局部硫化物礦化由黃鐵礦(平均10%)-磁黃鐵礦(平均8%)-黃銅礦(平均5%)組成,在塊狀磁鐵礦角礫巖中以塊狀/斑塊形式發育,在暈中以浸染狀礦化形式發育。不幸的是,在遇到3021.5英尺(921米)深的斷層帶後,鑽探者遺失了這個洞。洞底仍處於良好的夕卡巖成礦作用,其延伸部分仍向四面八方開放。夕卡巖和斑巖侵入體之間的接觸還沒有經過測試,仍然是一個引人注目的目標。

TK7 drill hole was also drilled vertically (90 degrees) through a 1,250 ft thick (381 m) post-mineral cover unit of semi-consolidated fanglomerates with numerous sandy horizons, which presented a significant drilling challenge. Below the fanglomerates, drilling intersected mineralized quartz-monzonite porphyry (QMP) intrusion until the end of the hole. The QMP unit has three alteration types: i) illite-chlorite (propylitic); ii) quartz-sericite-pyritic (QSP) alteration (phyllic), and; iii) patchy biotite-K feldspar (potassic). Mineralization is documented as poorly mineralized quartz-pyrite-chalcopyrite stockwork veining and disseminated mineralization. Drilling of TK7 was stopped in a fault zone at depth of 2,641 ft (804.98 m).

TK7鑽孔機還垂直(90度)鑽穿了厚1,250英尺(381米)的半固結多層砂巖覆蓋層單元,這對鑽探提出了重大挑戰。在方石下面,鑽探與礦化石英二長斑巖(QMP)侵入巖相交,直到洞的盡頭。QMP單元有三種蝕變類型:(1)伊利-綠泥石(丙泥巖);(2)石英-絹雲母-黃鐵礦(QSP)蝕變(葉狀);(3)斑片狀黑雲母-鉀長石(鉀質)。礦化記錄為礦化較差的石英-黃鐵礦-黃銅礦網脈和浸染型礦化。在2,641英尺(804.98米)深的斷裂帶停止了TK7的鑽探。

We are currently advancing TK9 drill hole, which is expected to test the possible eastern extension of well-mineralized skarn at TK6.

我們目前正在推進TK9鑽探,預計將測試TK6礦化良好的夕卡巖向東延伸的可能性。

Drill core with mineralization is being cut by a diamond saw and sample preparation for the mineralized intervals is underway. Assaying for standard ICP and gold fire assay package will be done at ALS Global.

具有礦化作用的鑽芯正在被金剛石鋸切割,礦化間隔的樣品準備工作正在進行中。將在ALS Global進行標準ICP和金色火焰分析套裝的分析。

The Company is planning to expand the scope of its exploration program at TK in 2023. To accommodate this larger program, we have prepared a Plan of Operation (PoO) and submitted the proposal to Utah BLM and the Utah Division of Oil, Gas, and Mining for their review and approval. The proposal was accepted by both the Utah government and BLM agencies. Approval of the Plan will allow the Company to significantly increase exploration drilling testing of the northern and southern portions of the TK property.

該公司計劃在2023年擴大其在TK的勘探計劃的範圍。為了適應這一更大的計劃,我們已經準備了一份運營計劃(POO),並將該提案提交給猶他州BLM和猶他州石油、天然氣和礦業部門進行審查和批准。猶他州政府和BLM機構都接受了這項提議。該計劃的批准將使公司能夠大幅增加對TK地產北部和南部的勘探鑽探測試。

Qualified Person

有資格的人

The Company's Director, Mr. Richard R. Redfern, M.Sc., and Certified Professional Geologist, a "qualified person" for the purposes of National Instrument 43-101, has verified and approved the information contained in this news release.

公司董事理查德·R·雷德費恩先生和註冊專業地質學家已核實並批准了本新聞稿中包含的信息。雷德費恩先生是美國國家儀器43-101的“合格人士”。

About BCM Resources Corporation

關於BCM Resources Corporation

BCM Resources Corporation is a diversified Canadian mineral exploration company focused on the continued exploration of the Thompson Knolls Porphyry Cu-Au-Mo project. BCM also controls prospective Copper, Gold, and Molybdenum exploration projects in British Columbia. BCM Resources is managed by experienced and successful board members and advisors. For further information, including area maps, sections, and photos, please visit our website at or contact us by e-mail at info@bcmresources.com.

BCM Resources Corporation是一家多元化的加拿大礦產勘探公司,專注於湯普森諾爾斯斑巖銅金鉬項目的持續勘探。BCM還控制着不列顛哥倫比亞省未來的銅、金和鉬勘探項目。BCM Resources由經驗豐富且成功的董事會成員和顧問管理。欲瞭解更多信息,包括區域地圖、橫斷面和照片,請訪問我們的網站或通過電子郵件與我們聯繫:info@bcmresource ces.com。

ON BEHALF OF BCM RESOURCES CORP.

代表BCM Resources Corp.

Dr. Sergei Diakov
President & Director
For further information, please contact:
Investor relations 604-646-0144 ext. 222
info@bcmresources.com

謝爾蓋·迪亞科夫博士
總裁與董事
如需更多信息,請聯繫:
投資者關係部604-646-0144轉222
郵箱:Info@bcmresource ces.com

Caution Concerning Forward-Looking Statements:

有關前瞻性陳述的注意事項:

This news release and related texts and images on BCM Resource Corporation's website contain certain "forward-looking statements" including, but not limited to, statements relating to interpretation of mineralization potential, drilling and assay results, future exploration work, and the anticipated results of this work. Forward-looking statements are statements that are not historical facts and are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metals prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical, governmental, social, or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the company's projects; uncertainties involved in the interpretation of sampling and drilling results and other tests; the possibility that required permits and access agreements may not be obtained in a timely manner; risk of accidents, equipment breakdowns or other unanticipated difficulties or interruptions, and; the possibility of cost overruns or unanticipated expenses in these exploration programs.

本新聞稿以及BCM資源公司網站上的相關文本和圖片包含某些“前瞻性陳述”,包括但不限於與成礦潛力解釋、鑽探和化驗結果、未來勘探工作以及這項工作的預期結果有關的陳述。前瞻性表述為非歷史事實的表述,受各種風險和不確定因素的影響,這些風險和不確定性可能導致實際事件或結果與前瞻性表述中反映的情況大不相同,包括但不限於:與金屬價格波動有關的風險;與及時以可接受的條件籌集足夠資金為計劃工作提供資金有關的不確定性;天氣、後勤、技術、政府、社會或其他因素導致計劃工作的變化;工作結果不能實現預期並實現公司項目的預期潛力的可能性;對採樣和鑽探結果及其他測試的解釋涉及的不確定性;可能無法及時獲得所需的許可和准入協議;發生事故、設備故障或其他意想不到的困難或中斷的風險;以及這些勘探計劃中可能出現的成本超支或意外費用。

SOURCE: BCM Resources Corporation

資料來源:BCM資源公司


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論