share_log

Orestone Defines Large Gold Copper Porphyry Target at Captain Property

Orestone Defines Large Gold Copper Porphyry Target at Captain Property

礦石定義了船長地產的大型金銅斑巖目標
newsfile ·  2022/10/18 19:36

Vancouver, British Columbia--(Newsfile Corp. - October 18, 2022) - Orestone Mining Corp. (TSXV: ORS) (OTC Pink: ORESF) (FSE: O2R1) (WKN: O2R1) is pleased to report that results of a recently completed Airborne MagnetoTellurics (MobileMT) survey at the Captain Property which confirms and better defines the large gold dominant porphyry T1 target that is the subject of ongoing exploration by the Company. The T1 target is one of three distinct low resistivity-high conductivity zones within a prominent five kilometre long trend outlined at the Captain Project located near Fort St. James, North Central British Columbia. The MobileMT survey was very successful in defining the outline of the T1 low resistivity zone associated with the sulphide related gold-copper mineralization initially identified by Induced Polarization (IP) surveys, magnetic geophysical surveys and drilling. The T1 target is a large, well defined drill ready dominate gold porphyry opportunity in a company with a low market capitalization. Planning for the next phase of drilling is underway.

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年10月18日)-Orestone礦業公司(多倫多證券交易所代碼:ORS) (場外粉色:ORESF) (FSE:O2R1)(WKN:O2R1)我很高興地報告,最近完成的機載大地電磁(MobileMT)勘測結果證實並更好地確定了大型金礦主斑巖T1目標,該目標是公司正在進行的勘探目標。T1目標是位於不列顛哥倫比亞省中北部聖詹姆斯堡附近的船長項目勾勒出的顯著五公里長趨勢內三個不同的低電阻率-高導電率區域之一。MobileMT測量非常成功地圈定了與硫化物相關的金銅礦化有關的T1低阻帶的輪廓,最初是通過激電(IP)測量、磁地球物理測量和鑽探確定的。T1的目標是一個大型的、定義明確的鑽探,準備在一家市值較低的公司主宰金礦機會。下一階段的鑽探計劃正在進行中。

GOLD DOMINANT PORPHYRY TARGET

金礦主控斑巖靶區

The central portion of the low resistivity-high conductivity zone known as the T1 target is untested by drilling to date and lies in the centre of a large scale alteration halo measuring 2000 by 2000 metres. The core of the T1 resistivity anomaly measures 500 x 1000 metres at a depth of 900 metres below surface increasing in size to 1500 x 1500 metres over a 1000 metre vertical profile and remains open to depth below 1900 metres.

被稱為T1目標的低電阻率-高電導率帶的中心部分迄今未經鑽井測試,它位於一個2000米乘2000米的大型蝕變暈的中心。T1電阻率異常的核心在地表以下900米的深度處測量500×1000米,在1000米的垂直剖面上增大到1500×1500米,並在1900米以下保持開放。

The alteration and gold-copper mineralization defined to date at T1 is interpreted to be related to a sulphide rich intrusive body at depth which was responsible for the sericite-potassium feldspar (kspar) alteration and the extensive fine-grained sulphides with gold-copper mineralization intersected in previous wide spaced drill holes. Seven fringing drill holes have outlined the zone by defining a 200-500 metre thick tabular zone of phyllic alteration hosting zones of sericite-kspar alteration containing gold-copper mineralization from 20-160 metres thick grading 0.20 to 0.84 g/t gold and 0.05-0.11 percent (500-1100 ppm) copper (see table below). This mineralization is interpreted to have been emplaced by upward moving hydrothermal and epithermal solutions driven by a large porphyry system directly below.

到目前為止在T1確定的蝕變和金銅礦化被解釋為與深部富硫化物侵入體有關,該侵入體是絹雲母-鉀長石(鉀石)蝕變的罪魁禍首,以及在以前的大間距鑽孔中相交的廣泛的細粒硫化物和金銅礦化。七個邊緣鑽孔圈定了該區,劃定了200-500米厚的葉狀蝕變帶,含金-銅礦化的絹雲母-鉀石蝕變賦存帶厚20-160米,品位從0.20到0.84g/t金和0.05-0.11%(500-1100ppm)銅(見下表)。據解釋,這種礦化是由正下方大型斑巖系統驅動的向上移動的熱液和淺成熱液侵位的。

Figure 1

圖1

"The results of the MobileMT survey are highly encouraging showing better definition of the large T1 gold dominant porphyry target. With definition of an area of approximately one cubic kilometre (1km³) in size there is more than enough room to encounter some considerable tonnage. The next drill program is being planned for winter 22/23," states David Hottman, CEO and Director of Orestone Mining Corp

Orestone Mining Corp首席執行官兼董事首席執行官大衞·霍特曼表示:“MobileMT的調查結果非常令人鼓舞,顯示出對大型T1金礦斑巖靶區的更好定義。定義的面積約為1立方公里(1 KM),有足夠的空間遇到一些相當大的噸位。下一次鑽探計劃將在22/23年冬季進行

FIVE KM LOW RESISTIVITY TREND

五公里低阻趨勢

The T1 target is one of three distinct MobileMT low resistivity-high conductivity targets outlined over a five kilometre strike length along a prominent north/south trending inferred regional fault. This trend remains open in both directions on Orestone claims. The T1 low resistivity target is co-incident with strong induced polarization (IP) chargeability highs and magnetic lows. The other two low resistivity targets along the trend are co-incident with magnetic lows however no IP has been conducted in these areas.

T1目標是三個不同的MobileMT低電阻率-高電導率目標之一,沿着一個明顯的南北方向推斷的區域斷層,概述了一個超過5公里的走向長度。這一趨勢在兩個方向上仍然是開放的。T1低阻靶與強激電(IP)帶電能力高和磁低同時存在。沿趨勢的另外兩個低阻目標與磁低同時存在,但在這些地區沒有進行激電探測。


Figure 2


圖2

"The fact that three large distinct low resistivity-high conductivity MobileMT anomalies are lined up as they are indicates potential association with a prominent, deep seated crustal fault which is an ideal environment to explore for porphyry's. Examples of large buried porphyry deposits associated with strong resistivity lows are the Resolution Mine in Arizona, Collahuasi and El Salvador mines in Chile and the Pebble deposit in Alaska," states David Hottman, CEO and Director of Orestone Mining Corp

Orestone礦業公司首席執行官兼董事首席執行官大衞·霍特曼表示:“三個截然不同的低電阻率-高電導率移動異常按原樣排列這一事實表明,它們可能與一個突出的深部地殼斷層有關,這是勘探斑巖的理想環境。與強電阻率低相關的大型埋藏斑巖礦牀的例子有亞利桑那州的Resolve礦、智利的Collahuasi和薩爾瓦多礦以及阿拉斯加的鵝卵石礦。”

FUTURE EXPLORATION FOLLOWS PREVIOUS RESULTS

在先前結果的基礎上進行未來的勘探

Orestone has an approved Amended Notice of Work in place with 61 drill locations permitted. Planning for the next phase of drilling on the T1 porphyry target is in progress. At shallower depths on the fringes of this target drilling has intersected alkaline and calc-alkaline style gold-copper mineralization on three sides. The MobileMT low resistivity anomaly lying along strike to the south of T1 is also a high priority for drill testing.

Orestone已批准修訂工作通知,允許61個鑽探地點。T1斑巖目標的下一階段鑽探計劃正在進行中。在目標鑽探邊緣的較淺深度,鹼性和鈣鹼性類型的金銅礦化在三面相交。位於T1以南走向的MobileMT低電阻率異常也是鑽井測試的重點。


Figure 3


圖3

The gold-copper drill intercepts to date vary from longer intersections of lower grade to higher grade over shorter sections (see table below of previously released results).

到目前為止,金銅鑽頭截距從較長的低品位交叉口到較短區段的較高品位交叉口不等(見下表先前公佈的結果)。

Drill Hole From To Interval m g/t gold % copper
C09-05 134.1 137.2 3.1 0.35 0.16
C11-01 127.0 214.0 87.0 0.23 0.03
incl 127.0 170.0 43.0 0.30 0.09
C12-03 179.5 246.5 67.0 0.13 0.06
C12-05 88.1 206.9 118.8 0.65 0.06
(1) 88.1 206.9 118.8 0.30 0.06
incl 152.1 161.2 9.1 6.46 0.27
C12-05 377.6 542.2 164.6 0.41 0.07
(1) 377.6 542.2 164.6 0.32 0.07
incl 499.5 505.6 6.1 4.45 0.51
C13-02 32.4 66.4 34.0 0.20 0.07
C13-02 121.3 170.1 48.8 0.35 0.06
C13-03 204.9 207.9 3.0 1.90 0.23
C19-03 271.0 295.0 24.0 0.27 0.09
C19-07 112.0 203.3 91.0 0.26 0.07
incl 178.9 203.3 24.0 0.56 0.11
C20-03 (2) 247.0 329.0 82.0 0.23 0.11
incl (2) 309.0 329.0 20.0 0.50 0.19
incl 325.0 327.0 2.0 7.05 0.26
C20-03 394.0 408.0 14.0 0.84 0.17
C21-01 541.0 577.0 36.0 0.26 0.05

656.7 742.4 85.7 0.37 0.06
C21-02 223.0 313.0 90.0 0.20 0.01

414.0 436.0 22.0 0.70 0.01
鑽孔 從… 間隔m 克/噸黃金 %銅
C09-05 134.1 137.2 3.1 0.35 0.16
C11-01 127.0 214.0 87.0 0.23 0.03
包括 127.0 170.0 43.0 0.30 0.09
C12-03 179.5 246.5 67.0 0.13 0.06
C12-05 88.1 206.9 118.8 0.65 0.06
(1) 88.1 206.9 118.8 0.30 0.06
包括 152.1 161.2 9.1 6.46 0.27
C12-05 377.6 542.2 164.6 0.41 0.07
(1) 377.6 542.2 164.6 0.32 0.07
包括 499.5 505.6 6.1 4.45 0.51
C13-02 32.4 66.4 34.0 0.20 0.07
C13-02 121.3 170.1 48.8 0.35 0.06
C13-03 204.9 207.9 3.0 1.90 0.23
C19-03 271.0 295.0 24.0 0.27 0.09
C19-07 112.0 203.3 91.0 0.26 0.07
包括 178.9 203.3 24.0 0.56 0.11
C20-03 (2) 247.0 329.0 82.0 0.23 0.11
包括(2) 309.0 329.0 20.0 0.50 0.19
包括 325.0 327.0 2.0 7.05 0.26
C20-03 394.0 408.0 14.0 0.84 0.17
C21-01 541.0 577.0 36.0 0.26 0.05

656.7 742.4 85.7 0.37 0.06
C21-02 223.0 313.0 90.0 0.20 0.01

414.0 436.0 22.0 0.70 0.01

(1) High gold values cut to 1.16 g/t gold
(2) Assay interval of 7.05 g/t gold cut to 1.80 g/t gold

(1)高金價降至1.16克/噸黃金
(2)分析區間7.05克/噸黃金降至1.80克/噸黃金

In summary, the T1 target is one of three large anomalies along the five km strike length of the low resistivity trend on the Captain property and based on previous drilling T1 is a gold dominant porphyry target. The outline of T1 in the MobileMT low resistivity-high conductivity area of approximately one cubic kilometre (1km³) in size indicates that there is more than enough room to encounter some considerable tonnage. Planning for the next phase of drilling on the T1 porphyry target is in progress. This is a robust opportunity to create shareowner wealth through successful exploration.

綜上所述,T1目標是沿5公里走向的三個大異常之一,呈低電阻率趨勢,根據以往的鑽探,T1是一個以金為主的斑巖目標。在MobileMT低電阻率-高導電率區域,T1的輪廓大小約為1立方千米(1 KM),表明有足夠的空間遇到一些相當大的噸位。T1斑巖目標的下一階段鑽探計劃正在進行中。這是一個通過成功勘探創造股東財富的大好機會。

MOBILE MT SURVEY PARAMETERS
The Airborne MagnetoTellurics (MobileMT) survey was flown collecting electromagnetic (EM) and magnetic data with precise positioning. The survey was completed over a 40 square kilometre area by Expert Geophysics Limited of Aurora, Ontario consisting of a total of 215-line kilometres flown over 26 east-west lines of 7000 metres each spaced at 200 metre intervals and 4 north-south tie lines spaced at 2000 metres. Data received by the Company covers 13 EM frequencies from 26 Hz to 17099 Hz. The EM data were inverted to obtain the distribution of resistivity with depth over a depth range of two kilometres.

移動大地電磁測深參數
機載大地電磁(MobileMT)調查收集了精確定位的電磁(EM)和磁數據。這項調查由安大略省奧羅拉的Expert地球物理有限公司在40平方公里的區域內完成,包括總共215條線路公里,跨越26條東西7000米的線路,每條線路間隔200米,以及4條南北連接線路,間隔2000米。該公司收到的數據涵蓋了從26赫茲到17099赫茲的13個EM頻率。對EM數據進行了反演,得到了兩公里深度範圍內的電阻率隨深度的分佈。

Quality assurance/quality control procedures
Orestone Mining has implemented a rigorous quality assurance/quality control program to ensure best practices in work programs by the company and contractors including sampling and analysis of diamond drill core as well as geophysical surveys and other work conducted on the property.

質量保證/質量控制程序
Orestone Mining實施了嚴格的質量保證/質量控制計劃,以確保公司和承包商在工作計劃中採取最佳做法,包括對鑽石鑽芯進行採樣和分析,以及在該礦區進行地球物理測量和其他工作。

Gary Nordin, P.Geo, a Director of the Company, is a qualified person as defined by National Instrument 43-101. Mr. Nordin has reviewed and approved the technical information in this press release.

加里·諾丁,P.Geo,公司董事的一員,是National Instrument 43-101所定義的合格人員。諾丁先生已經審查並批准了本新聞稿中的技術信息。

The 100 percent owned Captain gold-copper Project encompasses 105 square kilometres and hosts a large gold dominate porphyry system located 41 kilometres north of Fort St. James and 30 kilometres south of the Mt. Milligan copper-gold mine in North Central British Columbia. The Captain Project features relatively flat terrain, moderate tree cover, and an extensive network of logging and Forest Service roads suitable for exploration year round. To stay informed of Orestone's latest activities please click here to provide consent and receive news and updates. For more information, please visit Orestone's website at:

100%擁有的金銅船長項目佔地105平方公里,擁有一個大型的以黃金為主的斑巖系統,位於聖詹姆斯堡以北41公里,聖詹姆斯山以南30公里。不列顛哥倫比亞省中北部的米利根銅金礦。船長項目的特點是地形相對平坦,樹木覆蓋率適中,以及適合全年勘探的廣泛的伐木和林業局道路網絡。要隨時瞭解Orestone的最新活動,請單擊此處提供同意並獲取新聞和最新消息。欲瞭解更多信息,請訪問Orestone公司的網站:

ON BEHALF OF ORESTONE MINING CORP.

代表ORESTONE礦業公司。

David Hottman

大衞·霍特曼

CEO

首席執行官

For further information contact: David Hottman at 604-629-1929 | info@orestone.ca

詳情查詢,請聯繫:戴維·霍特曼,電話:604-629-1929|info@orestone.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this News Release. This news release has been prepared by management and no regulatory authority has approved or disapproved the information contained herein.

多倫多證券交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。本新聞稿由管理層準備,沒有任何監管機構批准或不批准本新聞稿中包含的信息。

Forward-Looking Statements
This news release contains certain forward-looking statements, which relate to future events or future performance and reflect management's current expectations and assumptions. Such forward-looking statements reflect management's current beliefs and are based on assumptions made by and information currently available to the Company. Readers are cautioned that these forward-looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected including, but not limited to, market conditions, availability of financing, currency rate fluctuations, actual results of exploration and development activities, environmental risks, future prices of copper, gold, silver and other metals, operating risks, accidents, labor issues, delays in obtaining governmental or regulatory approvals and permits, and other risks in the mining industry. In addition, there is uncertainty about the spread of the COVID-19 virus and the impact it will have on the Company's operations, global supply chains and economic activity in general. All the forward-looking statements made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at . These forward-looking statements are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by applicable law

前瞻性陳述
本新聞稿包含一些與未來事件或未來業績有關的前瞻性陳述,反映了管理層'目前的預期和假設。這樣的前瞻性陳述反映了管理層'的當前信念,並基於公司所做的假設和目前可獲得的信息。敬請讀者注意,這些前瞻性表述既不是承諾,也不是擔保,會受到風險和不確定性的影響,這些風險和不確定性可能會導致未來結果與預期產生重大差異,這些風險和不確定性包括但不限於市場條件、融資渠道、匯率波動、勘探和開發活動的實際結果、環境風險、銅、金、銀和其他金屬的未來價格、經營風險、事故、勞工問題、在獲得政府或監管部門批准和許可方面的延誤以及採礦業的其他風險。此外,新冠肺炎病毒的傳播及其將對公司運營、全球供應鏈和總體經濟活動產生的影響存在不確定性。本新聞稿中的所有前瞻性陳述均受這些警告性聲明和我們在SEDAR上提供的持續披露文件中的警告性聲明所限制,網址為. 這些前瞻性表述是自本新聞稿發佈之日起作出的,除適用法律要求外,公司不承擔任何更新或修訂這些表述以反映新事件或新情況的義務

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論