share_log

Mayo Lake Minerals Closes Flow Through Private Placement

Mayo Lake Minerals Closes Flow Through Private Placement

梅奧湖礦業通過私募關閉流通股
newsfile ·  2022/08/31 20:10

Property Acquisition

物業收購

Ottawa, Ontario--(Newsfile Corp. - August 31, 2022) - Mayo Lake Minerals Inc. (CSE: MLKM) ('Mayo Lake' or the 'Company') is pleased to report the closing of its previously announced adjunct private placement in the amount of 1,433,340 flow through Units ('FT Units') for a total of $215,001, slightly over the maximum limit of $200,000 originally set by the Company. Each FT Unit was priced at $0.15 and consisted of one common share qualifying as a flow through share under the Income Tax Act (Canada); and one half of a warrant. Each whole warrant is exercisable into one common share at a price of $0.20 for a period of three years from closing.

渥太華,安大略省-(Newsfile Corp.-2022年8月31日)-Mayo Lake Minerals Inc.(CSE:百萬公里) ('梅奧湖‘或’公司‘)高興地報告,其先前宣佈的附屬私募已完成,流經單位的資金為1,433,340美元(’《金融時報》單位)共215,001美元,略高於該公司原先設定的200,000美元的最高限額。每個FT單位的定價為0.15美元,包括一股符合流通股資格的普通股《所得税法》(加拿大);和一半的逮捕令。每份完整的認股權證可在成交後三年內以0.20美元的價格轉換為一股普通股。

Dr. Vern Rampton, President & CEO, commented, "The closing of this limited placement will facilitate the completion of critical exploration work on our 46 square kilometre Carlin-Roop Silver Project in the Keno Hill Silver District, Yukon. Assays are expected on the drill core in approximately two months time.

總裁首席執行官Vern Rampton博士表示:“完成這一有限的安置將有助於完成我們位於育空地區基諾山銀區的46平方公里卡林-魯普白銀項目的關鍵勘探工作。預計在大約兩個月內對鑽芯進行分析。

The funds will also give us the opportunity to add new targets to our drill ready properties, namely our primary 130 square kilometre Anderson-Davidson gold property and our highly prospective 46 square kilometre Trail-Minto property. The latter lies in proximity to Banyan Gold's promising Aur-Mac property in the Tombstone Plutonic Belt."

這筆資金還將使我們有機會為我們的可鑽探物業增加新的目標,即我們主要的130平方公里的Anderson-Davidson金礦和我們極具前景的46平方公里的Trail-Minto物業。後者位於Banyan Gold公司前景看好的墓碑深水地帶Aur-Mac地產附近。“

Property Acquisitions
The Company also announced that it has staked an additional 40 claims totaling 8.3 sq.km. adjacent to Carlin-Roop and 44 claims totaling 8.9 sq. km. adjacent to its Trail- Minto property.

物業收購
該公司還宣佈,它已經另外提出了40項索賠,總計8.3平方公里。毗鄰Carlin-Roop和44個索賠,總面積為8.9平方英尺。公里。毗鄰其Trail-Minto物業。

-30-

-30-

NOT FOR DISTRIBUTION IN THE UNITED STATES

不在美國發行

For additional information contact:
Vern Rampton, President & CEO; vrampton@mayolakeminerals.com
Tyrell Sutherland, M.Sc., P. Geo., VP Exploration; tsutherland@mayolakeminerals.com
Darrell Munro, BB.A, LL.B Corporate Administrator; dmunro@mayolakeminerals.com

如需更多信息,請聯繫:
總裁首席執行官弗恩·蘭普頓;電子郵件:vrampton@mayolakemineals.com
Tyrell Sutherland,M.Sc.,P.Geo,勘探副總裁;tsutherland@mayolakemineals.com
達雷爾·芒羅,BB.A,LL.B公司管理員;dmunro@mayolakemineals.com

Mayo Lake Minerals Inc. ('Mayo') is actively engaged in the exploration and development of five precious metal projects in the Tombstone Plutonic Belt of the Tintina Gold Province. The properties cover 240 square kilometres in the Yukon's Mayo Mining District and lie within the traditional territory of the Na-Cho Nyäk Dun First Nation. The Company is presently focused on its flagship Carlin-Roop Silver Project (45.8km sq.) lying within the Keno Hill Silver District and two of its gold properties; Anderson-Davidson covering 129.4 square kilometres and Trail-Minto covering 46 square kilometres. The eastern sector of the Silver District has recently been the site of numerous silver discoveries by Metallic Minerals and Mayo. Two active mines; Victoria Gold's Eagle Gold Mine and Alexco Resources' Keno Silver mines also lie near-by Mayo's properties in the Mayo Mining district.

梅奧湖礦業公司(Mayo Lake Minerals Inc.)積極從事廷提納金礦省墓碑深成帶五個貴金屬項目的勘探開發工作。這些地產位於育空地區的梅奧礦區,佔地240平方公里,位於納喬尼頓第一民族的傳統領地內。該公司目前專注於其旗艦項目卡林-魯普白銀項目(45.8平方公里)位於基諾山銀區及其兩處金礦內;安德森-戴維森,佔地129.4平方公里;小徑-明託,佔地46平方公里。銀區東段最近是Metals Minerals和Mayo發現大量白銀的地方。維多利亞黃金的Eagle金礦和Alexo Resources的Keno銀礦這兩個活躍的礦山也位於Mayo礦區的Mayo礦區附近。

Cautionary statement: This news release contains certain forward-looking statements, which are based on the opinions and estimates of management at the date the statements are made and are subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those projected. There can be no guarantee that Mayo Lake will be able to obtain a public listing as scheduled in this document. Mayo Lake undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on forward-looking statements.

警示性聲明:本新聞稿包含一些前瞻性陳述,這些陳述基於管理層在陳述發表之日的意見和估計,受各種風險、不確定因素和其他因素的影響,這些因素可能會導致實際事件或結果與預期的大不相同。不能保證梅奧湖能夠如期在本文件中公開上市。如果情況或管理層的估計或意見發生變化,梅奧湖不承擔更新前瞻性陳述的義務。告誡讀者不要過度依賴前瞻性陳述。.

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論