share_log

Press Release: Liberty Gold Reports Q3 2018 Financial and Operating Results

Press Release: Liberty Gold Reports Q3 2018 Financial and Operating Results

新聞稿:Liberty Gold Reports 2018年第三季度財務和運營業績
道琼斯 ·  2018/11/14 07:33

Press Release: Liberty Gold Reports Q3 2018 Financial and Operating Results

新聞稿:Liberty Gold Reports 2018年第三季度財務和運營業績

Liberty Gold Reports Q3 2018 Financial and Operating Results

Liberty Gold報告2018年第三季度財務和運營業績

VANCOUVER, British Columbia, Nov. 13, 2018 (GLOBE NEWSWIRE) -- Liberty Gold Corp. (LGD - TSX) ("Liberty Gold" or the "Company"), is pleased to announce its financial and operating results for the nine months ended September 30, 2018. All amounts are presented in United States dollars unless otherwise stated.

加拿大不列顛哥倫比亞省温哥華,2018年11月13日(Global Newswire)--Liberty Gold Corp.(LGD-TSX)(以下簡稱“Liberty Gold”或“公司”)高興地宣佈了截至2018年9月30日的9個月的財務和經營業績。除非另有説明,所有金額均以美元列示。

Liberty Gold continues to focus on discovering, exploring and de-risking Carlin Style gold deposits in the Great Basin, USA. Our focus is driven by a proven track record of multiple discoveries and a Company decision to focus our efforts in the mining-friendly jurisdictions of Utah, Idaho and Nevada. The Goldstrike Project in Utah has been advanced from an exploration property to a project with a Preliminary Economic Assessment ("PEA").

Liberty Gold繼續專注於發現、勘探和降低美國大盆地卡林式金礦的風險。我們的關注點來自於多個發現的可靠記錄,以及公司決定將我們的努力集中在猶他州、愛達荷州和內華達州等礦業友好型司法管轄區。猶他州的GoldStrike項目已經從一個勘探項目推進到一個經過初步經濟評估(“PEA”)的項目。

The Black Pine Project in Idaho follows Goldstrike in terms of advancement and is being prepared for its first extensive RC drill program since historical mine closure in 1997. Liberty Gold continues to drill test the Kinsley project in Nevada, targeting deeper, high-grade, Carlin style targets.

愛達荷州的黑松項目在進步方面緊隨GoldStrike之後,正在準備自1997年曆史性關閉礦山以來的第一個大規模RC鑽探計劃。Liberty Gold繼續在內華達州對Kinsley項目進行鑽探測試,目標是更深層次、高檔次、卡林式的目標。

Recent Highlights:

最新亮點:

Bought-Deal Financing(1)

收購交易融資(1)

-- Completed a bought deal financing, including the exercise of the overallotment in full, of C$11.56 million, (the "2018 Fall Bought-Deal") on October 2, 2018.

-2018年10月2日,完成了一筆1156萬加元的收購交易融資,包括全部行使超額配售(2018年秋季收購交易)。

Goldstrike

金牌大罷工

-- Announced results from the Reverse Circulation ("RC") drill program designed to expand the current resource, and from drill testing of the historic heap leach pads and an area of historic mine waste backfill. Highlights include(2) :

--宣佈了旨在擴大現有資源的反向循環(“RC”)鑽探計劃的結果,以及對歷史堆浸墊和一個歷史礦山廢物回填區的鑽探測試結果。亮點包括(2):


-- Beaver Tail- 0.72 grams per tonne gold (g/t Au) over 76.2 metres (m)
including 1.26 g/t Au over 6.1 m in PGS591- 0.98 g/t Au over 15.2 m and
0.81 g/t Au over 27.4 m in PGS594

-- Peg Leg:- 1.17 grams per tonne gold (g/t Au) over 67.1 metres (m)
including 2.21 g/t Au over 25.9 m in PGS630;- 0.44 g/t Au over 32.0 m and
1.14 g/t Au over 42.7 m including 2.00 g/t Au over 18.3 m in PGS579
(starting from surface);- 0.99 g/t Au over 51.8 m including 2.45 g/t Au
over 10.7 m and 1.84 g/t Au over 4.6 m in PGS631;- 1.63 g/t Au over 9.1 m
and 1.59 g/t Au over 21.3 m in PGS636 (starting from surface);

-- Drilling of surficial materials and underlying bedrock in areas of
historical operations:- Leach Pad: 0.57 g/t Au over 32.0 m in PGS526;
0.62 g/t Au over 15.2 m in PGS536;- Back Fill: 0.58 g/t Au over 16.7 m
in PGS538; 0.69 g/t Au over 6.1 m in PGS 551;- Bedrock (under leach pad):
1.42 g/t Au over 13.7 m in PGS556; 0.85 g/t Au over 39.6 m in PGS533

-海狸尾巴-76.2米(米)以上每噸黃金0.72克(g/t Au)包括PGS591中6.1米以上的1.26克/噸Au-15.2米以上的0.98g/t AuPGS594中27.4米以上的Au為0.81g/t-釘腿:67.1米(米)以上每噸黃金(g/t Au)-1.17克包括PGS630中25.9米以上的Au 2.21 g/t,32.0 m以上的-0.44 g/t Au在PGS579中,超過42.7米的Au為1.14克/噸,其中超過18.3米的Au為2.00克/噸(從地表開始);51.8米以上-0.99克/噸金,包括2.45克/噸金PGS631中4.6米以上的Au超過10.7米,1.84克/噸Au;9.1米以上的Au-1.63 g/t AuPGS636中21.3m以上的Au含量為1.59g/t(從地表開始);--在地表材料和下伏基巖地區鑽探歷史操作:-PGS526浸出墊:32.0m以上0.57g/t Au;PGS536中超過15.2米的Au為0.62g/t;-回填:超過16.7米的Au為0.58g/t在PGS538中;在PGS551中超過6.1米的Au為0.69g/t;-基巖(在浸出墊下):PGS556中超過13.7m的Au超過1.42g/t;PGS533中超過39.6m的Au超過0.85g/t

-- Announced assay results from metallurgical core drilling with the following highlights(2) :

--公佈冶金巖心鑽探的化驗結果,重點如下(2):


-- 0.59 g/t Au over 8.7 m and 0.79 g/t Au over 69.6 m including 2.46 g/t Au
over 7.6 m in PGS483C;

-- 1.41 g/t Au over 36.9 m in PGS486C;

-- 0.71 g/t Au over 45.6 m in PGS487C;

-- 0.70 g/t Au over 47.4 m in PGS484C;

-8.7米以上0.59g/t Au和69.6米以上0.79g/t Au,其中2.46g/t AuPGS483C在7.6m以上;-PGS486C中超過36.9m的Au為1.41g/t;-PGS487C中超過45.6m的Au含量為0.71g/t;-PGS484C中超過47.4m的Au含量為0.70g/t;

-- Announced completion of a PEA(3) , with an after-tax Net Present Value at a 5% discount rate and Internal Rate of Return, of $129.5 million and 29.4% respectively, and with a 2.3 year payback of initial capital.

--宣佈完成PEA(3),税後淨現值折現率為5%,內部回報率為29.4%,分別為1.295億美元和29.4%,初始資本有2.3年的回報。

Moira Smith, Ph.D., P.Geo., Vice President Exploration and Geosciences, Liberty Gold, is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101, Standards of Disclosure for Mineral Projects ("NI 43-101") and has reviewed and validated that the scientific and technical information contained in this release is accurate.

Liberty Gold勘探和地球科學副總裁Moira Smith,Ph.D.,P.Geo是公司根據National Instrument 43-101,礦產項目披露標準(“NI 43-101”)的含義指定的本新聞稿的合格人員,並已審核和驗證本新聞稿中包含的科學和技術信息是準確的。

Goldstrike, Kinsley and Black Pine are early stage exploration projects; the potential quantities and grades disclosed herein are conceptual in nature and, except for the mineral resource estimate at Goldstrike and Kinsley, there has been insufficient exploration to define a mineral resource for other targets disclosed herein. It is uncertain if further exploration will result in these targets being delineated as a mineral resource.

GoldStrike、Kinsley及Black Pine為早期勘探項目;本文所披露的潛在數量及品位屬概念性項目,除GoldStrike及Kinsley的礦產資源評估外,一直未有足夠的勘探來界定本文所披露的其他目標的礦產資源。目前還不確定進一步勘探是否會導致這些目標被劃定為礦產資源。

SELECTED FINANCIAL DATA

選定的財務數據

The following selected financial data is derived from our unaudited condensed interim consolidated financial statements and related notes thereto (the "Interim Financial Statements") for the nine months ended September 30, 2018 as prepared in accordance with International Accounting Standard 34, Interim Financial Reporting. A copy of the Interim Financial Statements is available on the Company's website at www.libertygold.ca or on SEDAR at www.sedar.com.

以下精選財務數據摘自我們根據國際會計準則第34號中期財務報告編制的截至2018年9月30日止九個月的未經審核簡明中期綜合財務報表及其相關附註(“中期財務報表”)。中期財務報表可在公司網站www.Libertygold.ca或SEDAR網站www.sedar.com上查閲。

The information in the tables below is presented in $000s except per share data:

下表中的信息以000美元為單位(每股數據除外):



Three months ended Nine months ended
September 30, September 30,
2018 2017 2018 2017
Attributable
to
shareholders:
Loss for the
period $ 3,488 $ 3,505 $ 9,145 $ 9,070
Loss and
comprehensive
loss for the
period $ 3,467 $ 3,278 $ 9,614 $ 8,419
Basic and
diluted loss
per share $ 0.02 $ 0.02 $ 0.05 $ 0.06


As at September 30, As at December 31,
2018 2017
Cash and short-term investments $ 2,175 $ 2,266
Working capital $ 1,479 $ 1,510
Total assets $ 29,453 $ 30,009
Current liabilities $ 922 $ 972
Non-current liabilities $ 1,862 $ 703
Shareholders' equity $ 18,042 $ 19,006

截至三個月截至九個月九月三十號,九月三十號, 2018 2017 2018 2017 可歸因性至股東:損失的原因是期間$3,488$3,505$9,145$9,070損失和全面損失的原因是期間$3,467$3,278$9,614$8,419基本和稀釋損失每股$0.02$0.02$0.05$0.06截至9月30日,截至12月31日, 2018 2017 現金和短期投資2,175美元2,266美元營運資金$1,479$1,510總資產$29,453$30,009流動負債$922$972非流動負債1,862美元703美元股東權益$18,042$19,006

ABOUT LIBERTY GOLD

關於Liberty Gold

Liberty Gold is focused on exploring the Great Basin of the United States, home to large-scale gold projects that are ideal for open-pit mining. This region is one of the most prolific gold producing regions in the world and stretches across Nevada and into Idaho and Utah. We know the Great Basin and are driven to discover and advance big gold deposits that can be mined profitably in open-pit scenarios. Our flagship projects are Goldstrike, Black Pine and Kinsley Mountain, all of which are past producing open-pit mines, where previous operators only scratched the surface.

Liberty Gold專注於探索美國的大盆地,那裏有大型黃金項目,非常適合露天開採。這一地區是世界上最多產黃金的地區之一,橫跨內華達州,一直延伸到愛達荷州和猶他州。我們瞭解大盆地,並被驅使發現和推進大型金礦,這些金礦可以在露天開採方案中有利可圖地開採。我們的旗艦項目是GoldStrike、黑松和金斯利山,所有這些都是過去生產露天礦的項目,以前的運營商只觸及了皮毛。

For more information, visit www.libertygold.ca or contact:

如需更多信息,請訪問www.Libertygold.ca或聯繫:

Susie Bell, Manager, Investor Relations

投資者關係部經理蘇西·貝爾(Susie Bell)

Phone: 604-632-4677 or Toll Free 1-877-632-4677

電話:604-632-4677或免費電話:1-877-632-4677

info@libertygold.ca

郵箱:info@Libertygold.ca

All statements in this press release, other than statements of historical fact, are "forward-looking information" with respect to Liberty Gold within the meaning of applicable securities laws, including statements that address potential quantity and/or grade of minerals, potential size and expansion of a mineralized zone, proposed timing of exploration and development plans, expected capital costs at Goldstrike, expected gold and silver recoveries from the Goldstrike mineralized material, potential additions to the resource through additional drill testing, potential upgrade of inferred mineral resources to measured and indicated mineral resources, the potential for silver resources at Goldstrike and intentions to pursue a silver resource study and beliefs regarding gold resources being contained within a larger property area. Forward-looking information is often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "planned", "expect", "project", "predict", "potential", "targeting", "intends", "believe", "potential", and similar expressions, or describes a "goal", or variation of such words and phrases or state that certain actions, events or results "may", "should", "could", "would", "might" or "will" be taken, occur or be achieved. Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management at the date the statements are made including, among others, assumptions about future prices of gold, and other metal prices, currency exchange rates and interest rates, favourable operating conditions, political stability, obtaining governmental approvals and financing on time, obtaining renewals for existing licenses and permits and obtaining required licenses and permits, labour stability, stability in market conditions, availability of equipment, accuracy of any mineral resources, the availability of drill rigs, the accuracy of a preliminary economic assessment, successful resolution of disputes and anticipated costs and expenditures. Many assumptions are based on factors and events that are not within the control of Liberty Gold and there is no assurance they will prove to be correct.

除有關歷史事實的陳述外,本新聞稿中的所有陳述均屬適用證券法所指的有關Liberty Gold的“前瞻性信息”,包括涉及礦物潛在數量和/或等級、礦化區潛在大小和擴大、勘探和開發計劃的擬議時間、GoldStrike的預期資本成本、從GoldStrike礦化材料中預期的金銀回收率、通過額外的鑽探測試增加資源的可能性、推斷礦產資源向已測量和指示礦產資源的潛在升級的聲明。GoldStrike的白銀資源潛力及進行白銀資源研究的意向,以及有關黃金資源被包含在較大物業範圍內的信念。前瞻性信息通常(但不總是)通過使用諸如“尋求”、“預期”、“計劃”、“繼續”、“計劃”、“預期”、“項目”、“預測”、“潛在”、“瞄準”、“打算”、“相信”、“潛在”和類似的表達來識別,或者描述“目標”,或者這些詞語和短語的變體,或者陳述某些行動、事件或結果“可能”、“應該”、“可能”,“將”、“可能”或“將”被採取、發生或實現。前瞻性信息並不是對未來業績的保證,而是基於發表聲明之日管理層的一系列估計和假設,其中包括對未來黃金和其他金屬價格、貨幣匯率和利率、有利的經營條件、政治穩定、按時獲得政府批准和融資、獲得現有執照和許可證的續簽和獲得所需執照和許可證、勞動力穩定性、市場條件的穩定性、設備的可用性、任何礦產資源的準確性等方面的假設。, 鑽井平台的可獲得性、初步經濟評估的準確性、爭端的成功解決以及預期的成本和支出。許多假設都是基於不在Liberty Gold控制範圍內的因素和事件,也不能保證它們會被證明是正確的。

Such forward-looking information, involves known and unknown risks, which may cause the actual results to be materially different from any future results expressed or implied by such forward-looking information, including, risks related to the interpretation of results and/or the reliance on technical information provided by third parties as related to the Company's mineral property interests; changes in project parameters as plans continue to be refined; current economic conditions; future prices of commodities; possible variations in grade or recovery rates; the costs and timing of the development of new deposits; failure of equipment or processes to operate as anticipated; the failure of contracted parties to perform; the timing and success of exploration activities generally; delays in permitting; possible claims against the Company; labour disputes and other risks of the mining industry; delays in obtaining governmental approvals, financing or in the completion of exploration as well as those factors discussed in the Annual Information Form of the Company dated March 26, 2018 in the section entitled "Risk Factors", under Liberty Gold's SEDAR profile at www.sedar.com.

這類前瞻性信息涉及已知和未知風險,可能導致實際結果與此類前瞻性信息明示或暗示的任何未來結果大不相同,這些風險包括:與解釋結果和/或依賴第三方提供的與公司礦產產權權益有關的技術信息有關的風險;隨着計劃的不斷完善,項目參數的變化;當前的經濟狀況;商品的未來價格;品位或回收率的可能變化;新礦藏的開發成本和時機;設備或流程未能按預期運行;一般勘探活動的時機和成功;許可的延誤;可能對公司提出的索賠;採礦業的勞資糾紛和其他風險;獲得政府批准、融資或勘探完成的延誤,以及在Liberty Gold於www.sedar.com的SEDAR簡介中以“風險因素”為標題的公司於2018年3月26日提交的年度信息表中討論的因素。

(MORE TO FOLLOW) Dow Jones Newswires

(更多後續報道)道瓊斯通訊社

November 13, 2018 18:33 ET (23:33 GMT)

2018年11月13日美國東部時間18:33(格林尼治標準時間23:33)

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論