share_log

Benz Mining: Ruby Hill West Discovery Returns 26.4m At 1.01% Li2O From 7.4M Including 3.7m At 2.7% Li2O

Benz Mining: Ruby Hill West Discovery Returns 26.4m At 1.01% Li2O From 7.4M Including 3.7m At 2.7% Li2O

奔馳礦業:Ruby Hill West Discovery的回報率為2640萬歐元,回報率為1.01%,而之前的回報率為740萬歐元,其中370萬歐元的回報率為2.7%
newsfile ·  2022/08/02 19:25

HIGHLIGHTS

高光

  • High grade intercept from near surface in last drillhole of the April 2022 campaign
  • Assays for RHW22-006 returned:
    • 26.4m at 1.01% Li2O, 355ppm Ta2O5, 980ppm Cs, 1601ppm Rb2O from 7.4m;
    • including 12.7m at 1.29% Li2O, 423ppm Ta2O5, 1160ppm Rb2O, 600ppm Cs; and
    • 3.7m at 2.61% Li2O, 579ppm Ta2O5, 1061ppm Rb2O, 441ppm Cs
  • Very high-grade (+2.5% Li2O) with tantalum, rubidium and caesium association
  • RHW22-001, 002, 003 and 005 show lithium caesium tantalum (LCT) signatures confirming the presence of multiple dyke systems in the area
  • Hole RHW22-006 was collared directly into weathered pegmatite
  • Multiple newly identified outcrops surround the RHW22-006 collar
  • RHW22-006 potentially not collared optimally to fully test the pegmatite intrusion
  • Historical 2008 core discovered at the Eastmain site shows unsampled pegmatite intervals mistakenly referenced as granite up to 80m thick
  • 2022年4月戰役最後一次鑽孔近地表高品位攔截
  • RHW22-006的檢測結果如下:
    • 2640萬英鎊,利率1.01%理想汽車2O,355ppm Ta2O5,980ppm Cs,1601ppm Rb2O由7.4m起;
    • 其中理想汽車1270萬元,利率1.29%2O,423ppm Ta2O5,1160ppm Rb2O,600ppm Cs;以及
    • 370萬,利率2.61%理想汽車2O,579ppm Ta2O5,1061ppm Rb2O,441ppm Cs
  • 極高品級(+2.5%)理想汽車2O)與Ta、Rb和Cs締合
  • RHW22-001、002、003和005顯示了鋰銫鉭(LCT)特徵,證實了該地區存在多個堤壩系統
  • RHW22-006井直接套入風化偉晶巖中
  • RHW22-006項圈周圍有多個新發現的露頭
  • RHW22-006可能不是完全測試偉晶巖侵入的最佳套圈
  • 在Eastmain遺址發現的2008年曆史巖芯顯示,未採樣的偉晶巖區間被錯誤地稱為厚達80米的花崗巖

Toronto, Ontario--(Newsfile Corp. - August 2, 2022) - Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) (the Company or Benz) is pleased to provide an update on its lithium exploration activities. Assays for the 6 holes drilled in April 2022 at Ruby Hill West as part of Benz's maiden lithium drilling have been received and confirm thick high-grade pegmatite as well as the presence of multiple dykes system in the area.

安大略省多倫多-(Newsfile Corp.-2022年8月2日)-奔馳礦業公司(TSXV:BZ)(澳大利亞證券交易所代碼:BNZ)(公司奔馳)很高興提供其鋰勘探活動的最新情況。作為奔馳首次鋰鑽探的一部分,2022年4月在Ruby Hill West鑽出的6個孔的化驗報告已經收到,證實該地區存在厚厚的高品位偉晶巖以及多個巖牆系統。


Figure 1: Spodumene bearing pegmatite in core, Ruby Hill West drilling RHW22-006. The interval returned 26.4m at 1.01% LiI2O from 7.4m including 3.7m at 2.7% Li2O.


圖1:紅寶石山西部鑽井RHW22-006巖心中含鋰輝石偉晶巖。該區間以1.01%的LII收益率為26.4 M2O來自740萬,包括370萬,2.7%理想汽車2O.

CEO, Xavier Braud, commented:

首席執行官澤維爾·布勞德評論道:

"These results prove that the Ruby Hill West pegmatite we drilled this year carries both grade and thickness. We are currently in the field at Ruby Hill West and Windy Mountain identifying more pegmatite outcrops and stripping the outcrops near last winter's drilling.

這些結果證明,我們今年鑽探的紅寶石山西偉晶巖既有品位也有厚度。我們目前正在紅寶石山西部和風山的野外尋找更多的偉晶巖露頭,並在去年冬天鑽探附近剝離露頭。

"We have seen some pretty spectacular spodumene mineralisation in outcrop near RHW22-006 collar with single spodumene crystals up to 50cm long.

我們在RHW22-006地圈附近的露頭看到了一些相當壯觀的鋰輝石礦化,鋰輝石晶體長達50釐米。

"This region has been underexplored and we believe we can find more of those lithium bearing pegmatites, turning Ruby Hill West into a lithium camp for the benefit of Benz shareholders.

這一地區一直未得到充分勘探,我們相信我們可以找到更多含鋰偉晶巖,將魯比山西變成一個鋰陣營,造福於奔馳的股東。

"Every campaign we have conducted has been successful and returned high grade gold and now high-grade lithium mineralisation. We will keep exploring and making discoveries in the Upper Eastmain Greenstone Belt, a new frontier area that Benz is bringing to the world's attention.

我們進行的每一次活動都取得了成功,並返回了高品位黃金,現在是高品位鋰礦化。我們將繼續在上東主綠石帶勘探和發現,這是奔馳正在引起世界關注的一個新的前沿地區。

"Finding core from holes drilled in 2008 which has unsampled pegmatites is a welcome discovery. This pegmatite shows high rubidium and niobium content on a hand held XRF indicating probable fertility. Sometimes, discoveries are made in the core yard unearthing historical core and looking at it with a fresh eye."

“從2008年鑽探的含有未取樣偉晶巖的孔中找到巖心是一項可喜的發現。這種偉晶巖在手持XRF上顯示出高的Rb和Nb含量,表明可能具有丰度。有時,在巖心院子裏發現了出土的歷史巖心,並以新的眼光看待它。”


Figure 2: Ruby Hill West pegmatite, outcrop with 50cm long spodumene crystal


圖2:紅寶石山西偉晶巖,露頭有50釐米長的鋰輝石晶體

Ruby Hill West Lithium Drilling Results

紅寶石山西鋰鑽探結果

The Ruby Hill West Lithium Project is a surface occurrence of spodumene bearing LCT pegmatite within the Ruby Hill West Project, located 50km due west of the Eastmain exploration camp. The occurrence was first sampled in 2016 by Eastmain Resources and then by Quebec government geologists in 2018. Only limited sampling was conducted by both groups.

紅寶石山西鋰項目是紅寶石山西項目內含鋰輝石偉晶巖的地表產狀,位於Eastmain勘探營地正西50公里處。Eastmain Resources於2016年首次對這種情況進行了採樣,然後魁北克政府的地質學家於2018年對其進行了採樣。兩組都只進行了有限的抽樣。

In the summer of 2021, a team of consultants working for Benz sampled the outcrop without sufficiently attempting to scrape the moss and other vegetation covering the underlying rocks.

2021年夏天,為奔馳工作的一組顧問在沒有充分嘗試颳去覆蓋在下面巖石上的苔蘚和其他植被的情況下,對露頭進行了採樣。

The samples collected returned best assay values of:

收集的樣本返回的最佳測定值為:

  • 2.59% Li2O, 1970ppm Rb, 1030 ppm Ta, 7530 ppm Cs
  • 1.9% Li2O, 3160ppm Rb, 3820 ppm Cs, 274ppm Ta
  • 2.59%理想汽車2O,1970ppm Rb,1030ppm Ta,7530ppm Cs
  • 1.9%理想汽車2O,3160ppm Rb,3820ppm Cs,274ppm Ta


Figure 3: Spodumene rich part of RHW22-006 intercept, this part is from the 3.7m at 2.70% Li2O


圖3:富鋰輝石RHW22-006截距段,此段距3.7米處佔2.70%理想汽車2O

In March 2022, Benz conducted a drilling program at the Ruby Hill West lithium pegmatite prospect and reported a 31.2m interval of visible pegmatite with zones of visible spodumene in the drilling (ASX & TSX-V releases dated 29 April 2022 "Multiple spodumene pegmatites intersected at Ruby Hill West").

2022年3月,奔馳在Ruby Hill West鋰偉晶巖礦進行了鑽探計劃,在鑽探中報告了31.2米的可見偉晶巖帶(ASX&TSX-V新聞稿,日期為2022年4月29日“多塊鋰輝石偉晶巖在Ruby Hill West相交”)。

Drillholes RHW22-001, RHW22-002, RHW22-003 and RHW22-005 were drilled 100m apart from each other and targeted the geology at depth under lithium bearing pegmatite outcrop and sub-crop sampled in 2021.

RHW22-001、RHW22-002、RHW22-003和RHW22-005 4個鑽孔相距100m,目標是2021年採集的含鋰偉晶巖露頭和次露頭下的深部地質。

The limited time spent on the outcrop during the 2021 campaign had not allowed for detailed exploration and the structural directions guiding drilling direction were inferred from historical airborne magnetics data. Those holes were located north west of the outcrop and drilled towards 155° azimuth.

2021年戰役期間在露頭上花費的有限時間無法進行詳細勘探,指導鑽井方向的構造方向是從歷史航空磁學數據推斷出來的。這些洞位於露頭的西北部,朝155°方位鑽。

Benz's best hole of the 2022 drilling campaign was RHW22-006 which returned 31.1m of pegmatite from near surface.

奔馳在2022年鑽探活動中最好的洞是RHW22-006,它從近地表返回了31.1米的偉晶巖。

Assays for this hole returned:

對這個洞的化驗結果如下:

  • 31.1m at 0.9% Li2O, 323ppm Ta2O5, 1093ppm Cs, 1558ppm Rb2O from 2.6m including:
    • 26.4m at 1.01% Li2O, 355ppm Ta2O5, 980ppm Cs, 1601ppm Rb2O from 7.35m
    • 12.7m at 1.29% Li2O, 423ppm Ta2O5, 600ppm Cs, 1156ppm Rb2O from 21m
    • 3.7m at 2.61% Li2O, 579ppm Ta2O5, 441ppm Cs, 1057ppm Rb2O from 30m
  • 3,110萬,利率為0.9%理想汽車2O,323ppm Ta2O5,1093ppm Cs,1558ppm Rb2O 260萬歐元,包括:
    • 2640萬英鎊,利率1.01%理想汽車2O,355ppm Ta2O5,980ppm Cs,1601ppm Rb2O從7.35米開始
    • 1270萬英鎊,利率1.29%理想汽車2O,423ppm Ta2O5,600ppm Cs,1156ppm Rb2O來自2100萬
    • 370萬,利率2.61%理想汽車2O,579ppm Ta2O5,441ppm Cs,1057ppm Rb2O從30米開始

Hole RHW22-006, drilled only 4.0m away from hole RHW22-004 was collared directly into weathered pegmatite. Multiple newly identified outcrops surround the collar and it now looks like the hole was not collared optimally to fully test the intrusive pegmatite body.

距離RHW22-004孔僅4.0m的RHW22-006孔被直接套入風化偉晶巖中。多個新發現的露頭圍繞着項圈,現在看起來這個洞沒有被優化的項圈,以充分測試侵入性偉晶巖身體。

Benz will have to reassess the geometry of the system as the pegmatite is potentially thicker than what was intercepted in hole RHW22-006.

奔馳將不得不重新評估系統的幾何形狀,因為偉晶巖可能比在RHW22-006孔截獲的厚度更厚。


Figure 4: Schematic cross section with Benz's best result from RHW 2022 drilling campaign. Note, drillholes RWH22-003 and 004 are interpreted to be drilled below a pegmatite body dipping toward the reader and sub parallel to the section.


圖4:RHW 2022鑽探活動中奔馳最佳效果的橫截面示意圖。注意,鑽孔RWH22-003和004被解釋為在向閲讀器傾斜的偉晶巖體下方鑽入,並與該部分平行。

Drillhole RHW22-004 was unfortunately collared in the host basalt 2m from the pegmatite/basalt contact and is believed to have been drilled continuously above the contact for the whole length of the hole.

令人遺憾的是,RHW22-004鑽孔被套在距離偉晶巖/玄武巖接觸面2米處的寄主玄武巖中,據信整個鑽孔都是在接觸點上方連續鑽探的。

Field observation conducted following extensive vegetation removal from the outcrops shows that there are two main bodies of spodumene bearing pegmatites and secondary dykes of lower size and importance. The current interpretation is that drillholes RWH22-001, 002, 003 and 005 were drilled at angles which could not adequately test the main body of pegmatite now at outcrop.

野外觀測表明,露頭植被大量去除後,有兩個主體含鋰輝石偉晶巖和較小規模和重要性的次生巖牆。目前的解釋是,RWH22-001、002、003和005孔的鑽孔角度不能充分測試現在露頭的偉晶巖主體。


Figure 5: April 2022 drilling with simplified drillhole geology over satellite image.


圖5:2022年4月在衞星圖像上使用簡化的鑽孔地質進行鑽探。


Figure 6: Schematic section of RHW22-005 with assays results.


圖6:RHW22-005的原理圖部分和分析結果。


Figure 7: Schematic section of RHW22-001. The hole may have been drilled below the main pegmatite intrusion body. The geometry of the main outcropping pegmatite body seems to be dipping towards the reader and be parallel to the current section with RHW22-001 having only intercepted small secondary cross cutting dykes.


圖7:RHW22-001的原理圖。這個洞可能是在主要偉晶巖侵入體的下方鑽出的。主要露頭偉晶巖體的幾何形狀似乎向讀者傾斜,並與RHW22-001的當前剖面平行,只有截斷的小的次生橫切巖脈。


Figure 8: Schematic section of RHW22-002 with assay results. The geometry of the main outcropping pegmatite body seems to be dipping towards the reader and be parallel to the current section with RHW22-002 having only intercepted small secondary cross cutting dykes.


圖8:帶有分析結果的RHW22-002示意圖部分。主要露頭偉晶巖體的幾何形狀似乎向讀者傾斜,並與RHW22-002的當前剖面平行,只有截斷的小的次生橫切巖脈。


Figure 9: Ruby Hill West, Summer 2022 - uncovering spodumene pegmatite.


圖9:紅寶石山西部,2022年夏天--發現鋰輝石偉晶巖。


Figure 10: RHW main pegmatite outcrop, removing cover allowed identification of a basalt/pegmatite contact (under the geologist's feet and allowed for the discovery of very large (+50cm euhedral and subhedral spodumene crystals) as shown by the geologist.


圖10:RHW主要偉晶巖露頭,去掉蓋子,可以識別出玄武巖/偉晶巖接觸點(在地質學家的腳下,並允許發現非常大的(+50釐米正面體和亞面體鋰輝石晶體),如地質學家所示。


Figure 11: Uncovering RHW main pegmatite outcrop, located between drillholes RHW22-001,003 and 004 and potentially dipping parallel to the drillholes.


圖11:發現RHW主要偉晶巖露頭,位於鑽孔RHW22-001,003和004之間,可能平行於鑽孔傾斜。

Historical Drilling:

歷史鑽探:

During a site inspection in late June 2022, core from a 2008 drilling campaign at Ruby Hill West was discovered in the core racks at the Eastmain mine site. Three holes had pegmatite core in the racks.

在2022年6月下旬的一次現場檢查中,在Eastmain礦場的巖心架上發現了2008年Ruby Hill West鑽探活動的巖芯。有三個洞的架子上有偉晶巖的核心。


Figure 12: Racks with core from the 2008 drill campaign at Ruby Hill West - Note: Eastmain Decline in the background


圖12:2008年Ruby Hill West鑽探活動中的帶核心機架-注:背景中的Eastmain下降


Figure 13: RHW-08-003 core displaying pegmatite (80m of cumulative length).


圖13:RHW-08-003巖心顯示偉晶巖(累計長度80m)。

The 2008 drilling campaign led by Eastmain Resources at Ruby Hill West was targeting VTEM targets, interpreted from a 2005 airborne survey. A limited number of intervals were sampled and analysed for a suite of elements in the search for gold mineralisation.

2008年,由Eastmain Resources在Ruby Hill West領導的鑽探活動的目標是VTEM目標,這是從2005年的一次航空調查中解讀出來的。在尋找金礦化的過程中,對一組元素進行了有限數量的採樣和分析。

In total, 3 holes (RH-08-002, RH-08-003, and RH-08-014) showed intervals of pegmatites in the core.

總共有3個孔(RH-08-002、RH-08-003和RH-08-014)顯示了巖芯中的偉晶巖間隔。

The core was never sampled or assayed for any other commodity and there is potential for the pegmatites in those three holes to be part of a system prospective for lithium and associated tantalum, caesium and rubidium.

巖心從未被取樣或化驗過任何其他商品,這三個洞中的偉晶巖有可能成為一個系統的一部分,有望獲得鋰及其伴生的鉭、銫和Rb。

Benz is currently cutting the core and samples will be submitted in due course to ALS Laboratories in Montreal for analysis by a suitable method.

奔馳目前正在切割巖芯,樣品將在適當的時候提交給蒙特利爾的ALS實驗室,用合適的方法進行分析。

Eastmain Gold Project

Eastmain金礦項目

The Eastmain Gold Project, situated on the Upper Eastmain Greenstone Belt in Quebec, Canada, currently hosts a NI 43-101 and JORC (2012) compliant resource of 376,000oz at 7.9gpt gold (Indicated: 236,500oz at 8.2gpt gold, Inferred: 139,300oz at 7.5gpt gold). The existing gold mineralisation is associated with 15-20% semi-massive to massive pyrrhotite, pyrite and chalcopyrite in highly deformed and altered rocks making it amenable to detection using electromagnetic techniques. Multiple gold occurrences have been identified by previous explorers over a 12km long zone along strike from the Eastmain Mine with very limited but highly encouraging testing outside the existing resource area.

Eastmain金礦項目位於加拿大魁北克省的上Eastmain綠巖地帶,目前擁有376,000盎司7.9gpt黃金的符合NI 43-101和JORC(2012)的資源(指示:236,500盎司8.2 gpt黃金,推斷:139,300盎司7.5 gpt黃金)。現有的金礦化與高度變形和蝕變巖石中15-20%的半塊狀至塊狀磁黃鐵礦、黃鐵礦和黃銅礦有關,因此適合利用電磁技術進行探測。以前的勘探者已經在Eastmain礦沿走向的12公里長的區域內發現了多個金礦牀,在現有資源區以外進行了非常有限但非常令人鼓舞的測試。


Figure 14: Benz's tenure over Upper Eastmain Greenstone Belt simplified geology.


圖14:奔馳在上東區綠石地帶的任期簡化了地質學。

This release was prepared under supervision and approved by Dr. Danielle Giovenazzo, P.Geo, acting as Benz's qualified person under National Instrument 43-101 for the reporting of exploration and drilling results.

本新聞稿是在監督下編寫的,並得到了P.Geo的Danielle Giovenazzo博士的批准,他是奔馳根據National Instrument 43-101報告勘探和鑽探結果的合格人員。

This release was prepared under supervision and approved by Dr. Marat Abzalov, PGeo, holder of an OGQ temporary permit, acting as Benz's qualified person under National Instrument 43-101 for the purposes of exploration target compilation and calculation.

本新聞稿是在監督下編寫的,並由持有OGQ臨時許可證的PGeo Marat Abzalov博士批准,他是Benz根據National Instrument 43-101為勘探目標彙編和計算目的而擔任的合格人員。

This release was prepared under supervision and approved by Mr Xavier Braud, PGeo, holder of an OGQ temporary permit, acting as Benz's qualified person under National Instrument 43-101 for the purposes of exploration results and field observations.

本新聞稿是在監督下準備的,並由持有OGQ臨時許可證的PGeo先生批准,他根據National Instrument 43-101擔任奔馳的合格人員,用於勘探結果和現場觀察。

About Benz Mining Corp.

關於奔馳礦業公司

Benz Mining Corp. (TSXV: BZ) (ASX: BNZ) brings together an experienced team of geoscientists and finance professionals with a focused strategy to unlock the immense mineral potential of the Upper Eastmain Greenstone Belt in Northern Quebec, which is prospective for gold, lithium, nickel, copper and other high-value minerals. Benz is earning a 100% interest in the former producing high grade Eastmain gold mine, Ruby Hill West and Ruby Hill East Projects in Quebec and owns 100% of the Windy Mountain Project.

奔馳礦業公司(多倫多證券交易所股票代碼:BZ)(多倫多證券交易所股票代碼:BNZ)彙集了一支經驗豐富的地球科學家和金融專業人士團隊,他們的重點戰略是發掘魁北克北部上Eastmain綠巖帶巨大的礦產潛力,該帶有望開採金、鋰、鎳、銅和其他高價值礦產。奔馳在原生產高品位Eastmain金礦、魁北克Ruby Hill West和Ruby Hill East項目中獲得100%權益,並擁有Windy Mountain項目100%。

At the Eastmain Gold Project, Benz has identified a combination of over 380 modelled in-hole and off-hole DHEM conductors over a strike length of 6km which is open in all directions (final interpretation of some of the conductors still pending).

在Eastmain Gold Project,奔馳已經確定了380多個井內和井下DHEM模型導線的組合,走向長度為6公里,向所有方向開放(一些導線的最終解釋仍未完成)。

In 2021, Benz confirmed the presence of visible spodumene in a pegmatite at the Ruby Hill West Project, indicating lithium mineralisation which Benz intends to further explore in 2022.

2021年,奔馳證實在Ruby Hill West項目的偉晶巖中存在可見的鋰輝石,這表明鋰礦化是奔馳打算在2022年進一步勘探的。

This announcement has been approved for release by the Board of Directors of Benz Mining Corp.

本公告經奔馳礦業公司董事會批准發佈。

For more information please contact:

如需更多信息,請聯繫:

Paul Fowler
Head of Corporate Development (Canada)
Benz Mining Corp.
Telephone: +1 416 356 8165
Email: info@benzmining.com

保羅·福勒
企業發展負責人(加拿大)
奔馳礦業公司
電話:+1 416 356 8165
電子郵件:info@enzmining.com

Xavier Braud
CEO, Head of Corporate Development (Aus)
Benz Mining Corp.
Telephone +61 8 6143 6702 
email: info@benzmining.com

澤維爾·布勞德
首席執行官、企業發展主管(澳大利亞)
奔馳礦業公司
電話:+61 8 6143 6702
電子郵件:info@enzmining.com

Forward-Looking Information: Certain statements contained in this news release may constitute "forward-looking information" as such term is used in applicable Canadian securities laws. Forward-looking information is based on plans, expectations and estimates of management at the date the information is provided and is subject to certain factors and assumptions, including, that the Company's financial condition and development plans do not change as a result of unforeseen events and that the Company obtains regulatory approval. Forward-looking information is subject to a variety of risks and uncertainties and other factors that could cause plans, estimates and actual results to vary materially from those projected in such forward-looking information. Factors that could cause the forward-looking information in this news release to change or to be inaccurate include, but are not limited to, the risk that any of the assumptions referred to prove not to be valid or reliable, that occurrences such as those referred to above are realized and result in delays, or cessation in planned work, that the Company's financial condition and development plans change, and delays in regulatory approval, as well as the other risks and uncertainties applicable to the Company as set forth in the Company's continuous disclosure filings filed under the Company's profile at . The Company undertakes no obligation to update these forward-looking statements, other than as required by applicable law.

前瞻性信息:本新聞稿中包含的某些陳述可能構成“前瞻性信息”,因為這一術語在適用的加拿大證券法中使用。前瞻性信息以提供信息之日管理層的計劃、預期和估計為基礎,受到某些因素和假設的制約,包括公司的財務狀況和發展計劃不會因不可預見的事件而發生變化,以及公司獲得監管部門的批准。前瞻性信息受各種風險、不確定因素和其他因素的影響,這些因素可能導致計劃、估計和實際結果與這些前瞻性信息中預測的大不相同。可能導致本新聞稿中的前瞻性信息發生變化或不準確的因素包括,但不限於,任何提及的假設被證明是無效或可靠的風險,上述情況發生並導致公司財務狀況和發展計劃變化的延遲或停止,公司財務狀況和發展計劃變化的風險,監管批准的延遲,以及公司提交給公司的持續披露文件中陳述的其他風險和不確定性。除適用法律要求外,公司不承擔更新這些前瞻性陳述的義務。

NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ACCURACY OR ADEQUACY OF THIS RELEASE.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所創業板交易所的政策中定義)均不對本新聞稿的準確性或充分性承擔責任。

Competent Person's Statements: The information in this report that relates to Exploration Results is based on and fairly represents information and supporting information compiled by Mr Xavier Braud, who is a member of the Australian Institute of Geoscientists (AIG membership ID:6963). Mr Braud is a consultant to the Company and has sufficient experience in the style of mineralisation and type of deposits under consideration and qualifies as a Competent Person as defined in the 2012 edition of the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Braud holds securities in Benz Mining Corp and consents to the inclusion of all technical statements based on his information in the form and context in which they appear.

合資格人士的陳述:本報告中與勘探結果有關的信息基於澳大利亞地球科學學會(AIG成員ID:6963)成員Xavier Braud先生彙編的信息和輔助信息。Braud先生是本公司的顧問,在所考慮的礦化類型及類型方面擁有足夠經驗,並符合2012年版“澳大拉西亞勘探結果、礦產資源及礦石儲量報告守則”所界定的稱職人士資格。布勞德持有奔馳礦業公司(Benz Mining Corp)的證券,並同意根據他的信息以其出現的形式和背景包含所有技術聲明。

The information in this announcement that relates to the Inferred Mineral Resource was first reported under the JORC Code by the Company in its prospectus released to the ASX on 21 December 2020. The Company confirms that it is not aware of any new information or data that materially affects the information included in the original market announcement and confirms that all material assumptions and technical parameters underpinning the estimate continue to apply and have not materially changed. The Company confirms that the form and context in which the Competent Person's findings are presented have not been materially modified from the original market announcement

本公告中有關推斷礦產資源的資料由本公司於二零二零年十二月二十一日向澳交所發佈的招股説明書中根據JORC規則首次申報。本公司確認,其並不知悉有任何新資料或數據對原始市場公告所載資料有重大影響,並確認支持該估計的所有重大假設及技術參數繼續適用,且並未有重大改變。本公司確認,與最初的市場公告相比,提交合格人士調查結果的形式和背景沒有重大修改

Appendix 1: Drilling data to date - Eastmain Mine

附錄1:迄今的鑽探數據-Eastmain礦

Table 1: Collar data from Ruby Hill West Pegmatite Drilling

表1:魯比山西部偉晶巖鑽探的巖領數據


DDH ID
Area X-NAD83-
Z18N
Y- NAD83-
Z18N
Elevation Azimuth Dip Final
Depth
RHW22-001 Ruby Hill West Pegmatite 658490 5796350 540 155 -50 170
RHW22-002 Ruby Hill West Pegmatite 658445 5796330 544 155 -50 200
RHW22-003 Ruby Hill West Pegmatite 658525 5796455 534 155 -50 250
RHW22-004 Ruby Hill West Pegmatite 658614 5796219 546 335 -50 200
RHW22-005 Ruby Hill West Pegmatite 658330 5796335 554 155 -50 200
RHW22-006 Ruby Hill West Pegmatite 658614 5796219 546 155 -50 200

DDH ID
面積 X-NAD83-
Z18N
Y-NAD83-
Z18N
高程 方位角 浸漬 最終
水深
RHW22-001 紅寶石山西偉晶巖 658490 5796350 540 155 -50 170
RHW22-002 紅寶石山西偉晶巖 658445 5796330 544 155 -50 200
RHW22-003 紅寶石山西偉晶巖 658525 5796455 534 155 -50 250
RHW22-004 紅寶石山西偉晶巖 658614 5796219 546 335 -50 200
RHW22-005 紅寶石山西偉晶巖 658330 5796335 554 155 -50 200
RHW22-006 紅寶石山西偉晶巖 658614 5796219 546 155 -50 200

Table 2: Ruby Hill West Lithium Assays

表2:紅寶石山西鋰化驗

DDH ID From To Length Li2O % Ta2O5 (ppm) Cs (ppm) Rb (ppm)
RHW22-001 72.00 72.97 1.00 0.08 2 65 377
RHW22-001 72.97 73.90 0.90 0.24 156 1350 686
RHW22-001 73.90 74.80 0.90 0.23 117 1330 655
RHW22-001 74.80 75.77 1.00 0.66 196 1540 1135
RHW22-001 75.77 76.60 0.80 0.16 96 1060 1345
RHW22-001 76.60 77.45 0.90 0.22 133 1050 565
RHW22-001 77.45 78.55 1.10 0.07 1 84 431
RHW22-001 78.55 80.00 1.50 0.15 119 361 558
RHW22-001 80.00 81.00 1.00 0.07 26 53 547
RHW22-001 89.30 90.30 1.00 0.05 0 12 199
RHW22-001 90.30 90.97 0.70 0.06 47 11 85
RHW22-001 90.97 92.10 1.10 0.12 7 13 10
RHW22-001 92.10 93.35 1.30 0.06 124 11 3
RHW22-001 93.35 95.35 2.00 0.06 199 8 109
RHW22-001 95.35 97.42 2.10 0.09 4 5 47
RHW22-001 97.42 98.45 1.00 0.01 109 4 3
RHW22-001 98.45 100.00 1.60 0.08 5 8 79
RHW22-002 66.33 67.33 1.00 0.10 1 54 209
RHW22-002 67.33 68.33 1.00 0.11 160 137 196
RHW22-002 68.33 69.90 1.60 0.17 3 431 454
RHW22-002 69.90 71.00 1.10 0.66 203 387 886
RHW22-002 71.00 72.00 1.00 0.42 197 587 1265
RHW22-002 72.00 73.10 1.10 0.76 300 832 940
RHW22-002 73.10 74.00 0.90 0.29 37 2510 1925
RHW22-002 84.00 85.00 1.00 0.09 14 103 629
RHW22-002 85.00 86.00 1.00 0.12 165 286 639
RHW22-002 86.00 87.00 1.00 0.11 13 213 475
RHW22-002 87.00 88.60 1.60 0.15 7 214 455
RHW22-002 88.60 89.33 0.70 0.08 215 247 308
RHW22-002 89.33 89.73 0.40 0.23 6 2010 2880
RHW22-002 89.73 91.00 1.30 0.18 182 1970 1790
RHW22-002 91.00 92.00 1.00 0.04 72 678 5620
RHW22-002 92.00 93.00 1.00 0.50 329 463 2030
RHW22-003 155.00 156.50 1.50 0.01 71 4 3
RHW22-003 172.50 173.00 0.50 0.04 87 14 175
RHW22-003 173.80 174.30 0.50 0.05 74 22 175
RHW22-005 83.00 83.50 0.50 0.00 203 360 224
RHW22-005 111.90 112.80 0.90 0.00 90 165 473
RHW22-005 114.6 115.1 0.5 0.03 103 740 695
RHW22-005 118 118.5 0.5 0.00 80 913 1155
RHW22-005 119.1 120.7 1.6 0.00 90 409 316
RHW22-005 124.4 124.9 0.5 0.04 71 1260 1680
RHW22-005 127.4 128 0.6 0.14 116 1125 966
RHW22-005 128 128.6 0.6 0.11 112 984 280
RHW22-005 142.55 143.5 1 0.24 41 405 1060
RHW22-005 143.5 144.65 1.2 0.16 115 393 3910
RHW22-006 2.6 3.4 0.80 0.24 35 254 526
RHW22-006 3.4 4.5 1.10 0.40 237 2540 1785
RHW22-006 4.5 6 1.50 0.31 142 1545 1115
RHW22-006 6 7.35 1.40 0.25 149 2100 1240
RHW22-006 7.35 9 1.70 1.23 215 1285 2370
RHW22-006 9 10.5 1.50 0.33 216 484 1895
RHW22-006 10.5 11.9 1.40 1.41 214 969 1315
RHW22-006 11.9 12.66 0.80 1.43 195 1250 1340
RHW22-006 12.66 13.65 1.00 0.25 185 345 1135
RHW22-006 13.65 14.6 1.00 0.23 190 1575 1925
RHW22-006 14.6 15.6 1.00 0.77 201 922 1280
RHW22-006 15.6 17 1.40 1.04 259 1355 1635
RHW22-006 17 18.5 1.50 0.43 487 1615 1930
RHW22-006 18.5 20.2 1.70 0.56 495 2780 2510
RHW22-006 20.2 21 0.80 0.38 434 1560 2440
RHW22-006 21 22.8 1.80 1.16 709 846 1075
RHW22-006 22.8 24 1.20 1.08 395 1570 980
RHW22-006 24 25.5 1.50 0.55 213 633 902
RHW22-006 25.5 27 1.50 0.08 354 264 770
RHW22-006 27 28.5 1.50 0.86 196 495 1865
RHW22-006 28.5 30 1.50 0.72 223 331 974
RHW22-006 30 31 1.00 2.38 521 451 986
RHW22-006 31 32.5 1.50 2.63 526 522 1080
RHW22-006 32.5 33.7 1.20 2.76 694 331 819
RHW22-006 33.7 34.7 1.00 0.04 738 218 1180
DDH ID 從… 長度 2O % 標籤2O5 (百萬分之三) CS(Ppm) Rb(Ppm)
RHW22-001 72.00 72.97 1.00 0.08 2 65 377
RHW22-001 72.97 73.90 0.90 0.24 156 1350 686
RHW22-001 73.90 74.80 0.90 0.23 117 1330 655
RHW22-001 74.80 75.77 1.00 0.66 196 1540 1135
RHW22-001 75.77 76.60 0.80 0.16 96 1060 1345
RHW22-001 76.60 77.45 0.90 0.22 133 1050 565
RHW22-001 77.45 78.55 1.10 0.07 1 84 431
RHW22-001 78.55 80.00 1.50 0.15 119 361 558
RHW22-001 80.00 81.00 1.00 0.07 26 53 547
RHW22-001 89.30 90.30 1.00 0.05 0 12 199
RHW22-001 90.30 90.97 0.70 0.06 47 11 85
RHW22-001 90.97 92.10 1.10 0.12 7 13 10
RHW22-001 92.10 93.35 1.30 0.06 124 11 3
RHW22-001 93.35 95.35 2.00 0.06 199 8 109
RHW22-001 95.35 97.42 2.10 0.09 4 5 47
RHW22-001 97.42 98.45 1.00 0.01 109 4 3
RHW22-001 98.45 100.00 1.60 0.08 5 8 79
RHW22-002 66.33 67.33 1.00 0.10 1 54 209
RHW22-002 67.33 68.33 1.00 0.11 160 137 196
RHW22-002 68.33 69.90 1.60 0.17 3 431 454
RHW22-002 69.90 71.00 1.10 0.66 203 387 886
RHW22-002 71.00 72.00 1.00 0.42 197 587 1265
RHW22-002 72.00 73.10 1.10 0.76 300 832 940
RHW22-002 73.10 74.00 0.90 0.29 37 2510 1925
RHW22-002 84.00 85.00 1.00 0.09 14 103 629
RHW22-002 85.00 86.00 1.00 0.12 165 286 639
RHW22-002 86.00 87.00 1.00 0.11 13 213 475
RHW22-002 87.00 88.60 1.60 0.15 7 214 455
RHW22-002 88.60 89.33 0.70 0.08 215 247 308
RHW22-002 89.33 89.73 0.40 0.23 6 2010 2880
RHW22-002 89.73 91.00 1.30 0.18 182 1970 1790
RHW22-002 91.00 92.00 1.00 0.04 72 678 5620
RHW22-002 92.00 93.00 1.00 0.50 329 463 2030
RHW22-003 155.00 156.50 1.50 0.01 71 4 3
RHW22-003 172.50 173.00 0.50 0.04 87 14 175
RHW22-003 173.80 174.30 0.50 0.05 74 22 175
RHW22-005 83.00 83.50 0.50 0.00 203 360 224
RHW22-005 111.90 112.80 0.90 0.00 90 165 473
RHW22-005 114.6 115.1 0.5 0.03 103 740 695
RHW22-005 118 118.5 0.5 0.00 80 913 1155
RHW22-005 119.1 120.7 1.6 0.00 90 409 316
RHW22-005 124.4 124.9 0.5 0.04 71 1260 1680
RHW22-005 127.4 128 0.6 0.14 116 1125 966
RHW22-005 128 128.6 0.6 0.11 112 984 280
RHW22-005 142.55 143.5 1 0.24 41 405 1060
RHW22-005 143.5 144.65 1.2 0.16 115 393 3910
RHW22-006 2.6 3.4 0.80 0.24 35 254 526
RHW22-006 3.4 4.5 1.10 0.40 237 2540 1785
RHW22-006 4.5 6 1.50 0.31 142 1545 1115
RHW22-006 6 7.35 1.40 0.25 149 2100 1240
RHW22-006 7.35 9 1.70 1.23 215 1285 2370
RHW22-006 9 10.5 1.50 0.33 216 484 1895
RHW22-006 10.5 11.9 1.40 1.41 214 969 1315
RHW22-006 11.9 12.66 0.80 1.43 195 1250 1340
RHW22-006 12.66 13.65 1.00 0.25 185 345 1135
RHW22-006 13.65 14.6 1.00 0.23 190 1575 1925
RHW22-006 14.6 15.6 1.00 0.77 201 922 1280
RHW22-006 15.6 17 1.40 1.04 259 1355 1635
RHW22-006 17 18.5 1.50 0.43 487 1615 1930
RHW22-006 18.5 20.2 1.70 0.56 495 2780 2510
RHW22-006 20.2 21 0.80 0.38 434 1560 2440
RHW22-006 21 22.8 1.80 1.16 709 846 1075
RHW22-006 22.8 24 1.20 1.08 395 1570 980
RHW22-006 24 25.5 1.50 0.55 213 633 902
RHW22-006 25.5 27 1.50 0.08 354 264 770
RHW22-006 27 28.5 1.50 0.86 196 495 1865
RHW22-006 28.5 30 1.50 0.72 223 331 974
RHW22-006 30 31 1.00 2.38 521 451 986
RHW22-006 31 32.5 1.50 2.63 526 522 1080
RHW22-006 32.5 33.7 1.20 2.76 694 331 819
RHW22-006 33.7 34.7 1.00 0.04 738 218 1180

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論