share_log

BMEX Gold Reviews Dunlop Bay Ground EM Survey Results and Begins Field Campaign

BMEX Gold Reviews Dunlop Bay Ground EM Survey Results and Begins Field Campaign

BMEX Gold審查鄧洛普灣地面電磁調查結果並開始實地活動
newsfile ·  2022/07/07 19:10

Vancouver, British Columbia--(Newsfile Corp. - July 7, 2022) - BMEX Gold Inc. (TSXV: BMEX) (OTCQB: MRIRF) (FSE: 8M0) ("BMEX" or the "Company") is pleased to announce the final interpretation of a ground EM survey (Fixed Loop Transient Electro-Magnetic survey or FL-TDEM) performed over the Dunlop Bay Property ('Dunlop Bay" or the "Property") in the Abitibi region, Québec, Canada. This survey aimed to define drilling targets in the vicinity of the Dunlop Bay Ouest showing (also known as Ghislau showing). Three conductivity anomalies (ANO1, ANO2 and ANO3) were identified, forming an East-North-East trending conductive corridor (Figure 1).

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年7月7日)-BMEX Gold Inc.(TSXV:BMEX)(OTCQB:MRIRF)(FSE:8M0)(“BMEX" "公司“)我很高興宣佈對加拿大魁北克省Abitibi地區Dunlop Bay物業(“Dunlop Bay”或“該物業”)進行的地面電磁測量(固定環路瞬變電磁測量或FL-TDEM)的最終解釋。這項調查旨在確定Dunlop Bay西部顯示(也稱為Ghislau顯示)附近的鑽探目標。發現了三個電導率異常(ANO1、ANO2和AN03),形成了一條向東-東北方向的導電走廊(圖1)。

Robert Pryde, President of BMEX Gold, commented: "The results from the FL-TDEM survey are very encouraging as they suggest the continuity of the known Dunlop Bay Ouest showing westward. Amongst the three anomalies, ANO1 and ANO2 are strong from early to late time channels and have modelled plates with high conductance which might reflect the presence of massive sulphide bodies. Also, ANO1 was never tested by drilling. I am pleased to announce that this zone will be further investigated during our field program starting in the next few weeks. In addition to these areas, our previous data compilation and analysis of historical work has identified several high-grade gold targets as well as gold rich massive sulphide targets on the Dunlop Property."

BMEX Gold的羅伯特·普萊德評論説:“FL-TDEM調查的結果非常令人鼓舞,因為它們表明已知的鄧洛普灣西部向西移動的連續性。在三個異常中,ANO1和ANO2從早到晚的時間通道都很強,並具有高電導的模型板,這可能反映了塊狀硫化物的存在。此外,ANO1從未經過鑽井測試。我很高興地宣佈,我們將在未來幾周開始的實地計劃中進一步調查這一區域。除了這些地區,我們之前的數據彙編和歷史工作分析已經確定了鄧洛普礦藏上的幾個高品位金礦目標以及富含金的塊狀硫化物目標。

The Company has engaged Laurentia Exploration to complete a field program over Dunlop Bay Property. This program will be starting in July, aiming to 1) find the continuity of existing mineralization, 2) enhance the understanding of the various structural and geological controls over the known occurrences and 3) discover new showings. Recent data compilation work has defined several structural trends related to the known Dunlop Bay showing, that need to be confirmed on the field.

該公司已聘請勞倫蒂亞勘探公司完成鄧洛普灣地產的實地考察項目。該計劃將於7月開始,旨在1)尋找現有礦化的連續性,2)加強對已知礦點的各種構造和地質控制的瞭解,3)發現新的顯示。最近的數據彙編工作確定了與已知的鄧洛普灣顯示有關的幾個結構趨勢,這些趨勢需要在實地得到證實。

The field program will focus on confirming, locating and understanding the systems in order to generate drill targets that will be tested by a 3,000 meters program scheduled for Fall 2022 (see April 26th news release). Data compilation to date also identified high grade surface gold mineralization including the Bella (historical grab samples returned up to 273.71 g/t Au) and Omela veins (historical grab samples returned up to 14.48 g/t Au) (Figure 1, GM16102). Minimal historical work has been completed on these targets and they have not been drilled.

現場計劃將專注於確認、定位和了解這些系統,以生成將由計劃於2022年秋季進行的3000米計劃測試的鑽探目標(見4月26日的新聞稿)。迄今為止的數據彙編還發現了高品位地表金礦化,包括Bella(歷史抓取樣品返回至273.71 g/t Au)和Omela脈(歷史抓取樣品返回14.48g/t Au)(圖1,GM16102)。在這些目標上只完成了最低限度的歷史工作,而且還沒有進行鑽探。

In addition, the Mont Laurier Est showing extension on BMEX ground will also be investigated during this field work season. Indeed, a recent re-interpretation of historical prospection maps and recent detailed imagery has revealed that Cu-Au-Ag rich massive sulphides can be found in this area. Finally, systematic outcrop description and mineralization sampling will be undertaken on the rest of the property, and especially around the Baie Dunlop showing to confirm the above-mentioned structural model.

此外,勞裏爾山EST在BMEX地面上的延伸也將在本野外工作季節進行調查。事實上,最近對歷史勘探地圖和最近詳細圖像的重新解釋表明,在該地區可以找到富含銅-金-銀的塊狀硫化物。最後,將對其餘部分進行系統的露頭描述和礦化採樣,特別是在拜伊鄧洛普顯示周圍進行系統的露頭描述和礦化採樣,以證實上述構造模式。

The King Tut Project also received an adjusted geological and structural interpretation (Figure 2), based on the late 2021 drilling campaign (see April 26th news release) and the detailed drone-born magnetic data. A major fold hinge seems to control the location of the heart of Tut gold system; this hinge has not been drilled to the west of the known showing. Several other potential fold axis' were also interpreted on King Tut Project. Confirming these structural theories will require follow up field work, to begin late this summer.

根據2021年底的鑽探活動(見4月26日新聞稿)和詳細的無人機出生磁性數據,圖坦卡蒙項目還收到了調整後的地質和構造解釋(圖2)。一個主要的褶皺鉸鏈似乎控制着圖坦卡蒙金礦系統心臟的位置;這個鉸鏈還沒有在已知顯示的西側被鑽探。其他幾個潛在的褶皺軸也在圖坦卡蒙項目中得到了解釋。要證實這些結構理論,將需要在今年夏末開始後續的實地工作。

Qualified Person

有資格的人

Maxime Bouchard, Geo, M.Sc. (OGQ #1752), an independent Qualified Person as defined by Canadian NI 43-101 standards, has reviewed and approved the geological information reported in this news release. The drilling campaign and the quality control program have been planned and supervised by Maxime Bouchard. Core logging and sampling were completed by Laurentia Exploration. The quality assurance and quality control protocol include insertion of one blank and one standard every 20 samples, in addition to the regular insertion of blank, duplicate, and standard samples accredited by ALS Canada Ltd. during the analytical process. Gold values are estimated by fire assay with finish by atomic absorption. The Qualified Person has not completed sufficient work to verify the historic information on the Property, particularly in regards to historical drill results. However, the Qualified Person believes that drilling and analytical results were completed to industry standard practices. The information provides an indication of the exploration potential of the Property but may not be representative of expected results.

馬克西姆·布查德,Geo,M.Sc.(OGQ#1752)是加拿大NI 43-101標準定義的獨立合格人員,已審查並批准了本新聞稿中報道的地質信息。鑽探活動和質量控制程序已由馬克西姆·布查德計劃和監督。巖心測井和取樣由LaurentiaExplore完成。除了在分析過程中定期插入ALS加拿大有限公司認可的空白、複製和標準樣品外,質量保證和質量控制協議還包括每20個樣品插入一個空白和一個標準樣品。金價用火焰試金法測定,用原子吸收光潔度測定值。合格人員沒有完成足夠的工作來核實財產的歷史信息,特別是關於歷史鑽探結果的信息。然而,這位有資質的人士認為,鑽探和分析結果是按照行業標準做法完成的。這些信息提供了對該物業勘探潛力的指示,但可能不代表預期結果。

About BMEX Gold Inc.

BMEX Gold Inc.簡介

BMEX Gold Inc. is a junior Canadian mining exploration company with the primary objective to acquire, explore, and develop viable gold and base metal projects in the mining-friendly jurisdiction of Quebec, Canada. BMEX is currently fully focused on their 100% interest in the two projects, both located in the prolific Abitibi greenstone belt:

BMEX Gold Inc.是一家加拿大初級礦業勘探公司,主要目標是收購、勘探和開發加拿大魁北克省礦業友好轄區內可行的黃金和賤金屬項目。BMEX目前完全專注於他們在這兩個項目中的100%權益,這兩個項目都位於多產的阿比蒂比綠巖帶:

  • King Tut Project consists of 120 contiguous claims on 5,206 hectares
  • Dunlop Bay Project consists of 76 mineral claims that cover 4,226 hectares
  • 圖坦卡蒙國王項目由5,206公頃上的120個相鄰主張組成
  • 鄧洛普灣項目由佔地4,226公頃的76個礦藏組成

BMEX common shares trade under the symbol "BMEX" on the TSX-V and under the symbol 8M0 on the Frankfurt Exchange.

BMEX普通股在多倫多證券交易所的交易代碼為“BMEX”,在法蘭克福交易所的交易代碼為8M0。

For further information please contact:

欲瞭解更多信息,請聯繫:

BMEX Gold Inc.

BMEX Gold Inc.

Robert Pryde, President
Tel: +1 (403) 478 6042
Email: robert@bmexgold.com

羅伯特·普萊德,總裁
電話:+1(403)4786042
電子郵件:Robert@bmexGold.com

Dylan Sidoo, Business Development
Tel: +1 (604) 423 4499
Email: info@bmexgold.com

Dylan Sidoo,業務發展
電話:+1(604)4234499
電子郵件:info@bmexGold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。任何證券交易所、證券委員會或其他監管機構均未批准或不批准本報告所載信息。

This news release contains "forward-looking statements" and "forward-looking information" (as defined under applicable securities laws), based on management's best estimates, assumptions, and current expectations. Such statements include but are not limited to, statements with respect to the plans for future exploration and development of the King Tut and Dunlop Bay properties and the acquisition of additional exploration projects. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" , "anticipates" "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those expressed or implied by such statements, including but not limited to: risks related to the King Tut and Dunlop Bay projects; risks related to general economic conditions, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; increases in market prices of mining consumables, possible variations in resource estimates, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of exploration, development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in areas in which the Company operates. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward-looking information are made as of the date hereof and are qualified in their entirety by this cautionary statement. The Company disclaims any obligation to revise or update any such factors or to publicly announce the result of any revisions to any forward-looking statements or forward-looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, readers should not place undue reliance on forward-looking statements and information. Please refer to the Company's most recent filings under its profile at for further information respecting the risks affecting the Company and its business.

本新聞稿包含基於管理層的最佳估計、假設和當前預期的“前瞻性陳述”和“前瞻性信息”(根據適用的證券法的定義)。此類陳述包括但不限於關於King Tut和Dunlop Bay物業未來勘探和開發計劃以及收購更多勘探項目的陳述。一般而言,這些前瞻性表述可以通過使用前瞻性術語來識別,如“預期”、“預期”、“預算”、“預測”、“預期”、“計劃”、“相信”、“打算”、“估計”、“項目”、“目標”、“潛在”、“目標”、“目標”、“預期”以及類似的表述,或者事件或條件“將”、“將”、“可能”、“可能”、“可以”。“可能”或“應該”發生。這些聲明不應被解讀為對未來業績或結果的保證。這類陳述涉及已知和未知的風險、不確定因素和其他因素,可能導致實際結果、業績或成就與這類陳述明示或暗示的大不相同,包括但不限於:與圖坦卡蒙和鄧洛普灣項目有關的風險;與一般經濟條件有關的風險、當前勘探活動的實際結果、意想不到的開墾費用;隨着計劃的不斷完善,項目參數的變化;包括黃金在內的金屬價格的波動;採礦耗材市場價格的上漲;資源估計、品位或回收率可能的變化;工廠、設備或工藝未能按預期運行;事故、勞資糾紛、所有權糾紛、對保險範圍的索賠和限制以及採礦業的其他風險;勘探、開發或建築活動遲遲未完成, 國家和地方政府對採礦作業的監管、税收規則和法規以及公司所在地區的政治和經濟發展的變化。儘管公司試圖確定可能導致實際結果與前瞻性陳述中包含的結果大不相同的重要因素,但可能還有其他因素導致結果與預期、估計或預期的不同。不能保證這些陳述將被證明是準確的,因為實際結果和未來事件可能與這些陳述中預期的大不相同。前瞻性陳述和前瞻性信息是截至本新聞稿發佈之日作出的,其全部內容均受本警示聲明的限制。除法律要求外,公司沒有義務修改或更新任何此類因素,或公開宣佈對本文中包含的任何前瞻性陳述或前瞻性信息進行任何修改的結果,以反映未來的結果、事件或發展。因此,讀者不應過分依賴前瞻性陳述和信息。有關影響本公司及其業務的風險的進一步資料,請參閲本公司的最新文件。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論