share_log

BMEX Gold Discovers Luxor Gold Zone at King Tut and Announces its 2022 Exploration Program for King Tut and Dunlop Bay Properties

BMEX Gold Discovers Luxor Gold Zone at King Tut and Announces its 2022 Exploration Program for King Tut and Dunlop Bay Properties

BMEX Gold在圖坦卡蒙發現盧克索金礦帶並宣佈其2022年圖坦卡蒙和鄧洛普灣勘探計劃
newsfile ·  2022/04/26 18:28

Vancouver, British Columbia--(Newsfile Corp. - April 26, 2022) - BMEX Gold Inc. (TSXV: BMEX) (OTCQB: MRIRF) (FSE: 8M0) ("BMEX" or the "Company") is pleased to announce the results of its Fall 2021 drilling campaign at King Tut Gold Project ('King Tut" or the "Project") in the Abitibi region, Québec, Canada. Significant grades include 7.07 g/t Au over 1.00 m from drill hole TUT-21-032 in a newly discovered gold zone (the Luxor Gold Zone) and 7.61 g/t g/t Au over 0.75 m within the known mineralized area from drill hole TUT-21-023. All assays from the Fall 2021 drill campaign at King Tut have been received and reported. Figure 1 shows the location of the discussed drill holes with their significant intersects. Composited gold grades are resumed in Table 1. Collar coordinates and drill holes information are listed in Table 2.

温哥華,不列顛哥倫比亞省-(Newsfile Corp.-2022年4月26日)-BMEX Gold Inc.(TSXV:BMEX)(OTCQB:MRIRF)(FSE:8M0)(“BMEX" "公司“)加拿大魁北克省Abitibi地區的King Tut Gold Project(“King Tut”或“Project”)很高興宣佈其2021年秋季鑽探活動的結果。重要品位包括新發現金礦帶(盧克索金礦帶)的TUT-21-032號鑽孔1.00米以上的7.07克/噸Au和TUT-21-023號鑽孔已知礦化區內0.75米以上的7.61克/噸Au。來自國王圖坦卡蒙2021年秋季演習活動的所有分析都已收到並報告。圖1顯示了所討論的鑽孔及其重要交點的位置。複合黃金等級在#年恢復表1。中列出了接箍座標和鑽孔信息表2.

TUT-21-032, which returned the above-mentioned promising grades of the campaign, is located 700 m South-West from the King Tut showing, along the Main King Tut trend (Figure 1). This drill hole is isolated and thus defines a new gold zone (Luxor Zone) on its own. Gold in TUT-21-032 is associated to a silicified tourmaline-carbonate-pyrite brecciated zone which marks the contact between relatively ductile tuffs and more competent andesite unit (Figure 2). Fall 2021 drill holes in the heart of the known King Tut showing delivered several similar gold-bearing geological conditions to TUT-21-032. Every drill hole along the Main King Tut Trend intersected evidence of an intense deformation corridor: intensely sheared zones, complex folding of S1 and pervasive sericite-carbonate-silica alterations. As shown on Figure 1, TUT-21-032 also cuts a West-South-West lineament interpreted from the magnetic susceptibility maps. Hence, this drill hole, being isolated but potentially cross-cutting two major structures and exhibiting typical gold-bearing hydrothermal mineralization known in greenstone belts, represents a highly prospective discovery for the Company.

TUT-21-032恢復了上述戰役的前景等級,位於圖坦卡蒙國王展示區西南700米處,沿着主要的圖坦卡蒙趨勢(圖1)。這個鑽孔是孤立的,因此它本身就定義了一個新的金礦帶(盧克索帶)。TUT-21-032中的金與硅化電氣石-碳酸鹽-黃鐵礦角礫巖帶共生,標誌着相對韌性較強的凝灰巖與更具競爭力的安山巖單元(圖2)。2021年秋季,已知的圖坦卡蒙國王遺址中心的鑽孔提供了幾個與圖坦卡蒙-21-032類似的含金地質條件。沿着主要的圖坦卡蒙趨勢的每個鑽孔都與強烈變形走廊的證據相交:強烈剪切帶、S1複雜褶皺和普遍存在的絹雲母-碳酸鹽-硅質蝕變。如圖1所示,TUT-21-032還切割了從磁化率圖解釋的西-西南-西線。因此,該鑽孔雖然孤立,但可能橫穿兩個主要構造,並顯示了綠巖帶中已知的典型含金熱液礦化,代表着本公司的一項極具前瞻性的發現。

Figure 1 : Fall 2021 drill holes and significant assays results

圖1:2021年秋季鑽孔和重要分析結果

Figure 2 : TUT-21-032 intersection

圖2:TUT-21-032交叉口

In addition to TUT-21-032's Luxor zone, gold grades were also found in TUT-21-030 which targeted the Audet-Ouest showing vicinity. TUT-21-030 intercepted 1.68 g/t Au over 1.50 m and 0.32 g/t Au over 7.50 m at 150 m East of the known surface occurrences from Audet-Ouest showing. These intersections and the historical surface gold values from the showing are aligned along a West-South-West lineament interpreted from the magnetic susceptibility maps (Figure 1). This lineament, from now mentioned as the Audet-Ouest trend, is unexplored and TUT-21-030 gold grades are the first drilling results over it. The rest of the Fall 2021 drilling results are located within the known King Tut showing.

除了圖坦卡蒙-21-032的盧克索帶外,在圖坦卡蒙-21-030中也發現了黃金品位,目標是在Audet-Ouest附近顯示。TUT-21-030在Audet-West顯示的已知地表產狀以東150米處截獲1.68 g/t Au和0.32 g/t Au。這些交叉點和顯示的歷史地表金礦值沿着從磁化率圖(圖1)。這條線,從現在被稱為Audet-Ouest趨勢,是未經勘探的,TUT-21-030黃金等級是在它上面的第一個鑽探結果。2021年秋季鑽探結果的其餘部分位於已知的圖坦卡蒙國王展覽範圍內。

Drill hole From (m) To (m) Core length (m)  Au (g/t) Ag (g/t) GxT
TUT-21-032 56.50 57.50 1.00 7.07 0.80 7.07
88.00 89.00 1.00 0.40 0.10 0.40
61.50 64.50 3.00 0.30 0.10 0.90
TUT-21-023 102.55 103.30 0.75 7.61 0.50 5.71
63.00 66.00 3.00 0.82 0.20 2.45
127.50 137.00 9.50 0.50 0.12 4.78
Including 127.50 130.10 2.60 0.93 0.12 2.42
TUT-21-021 41.00 45.00 4.00 0.99 0.22 3.95
52.50 53.80 1.30 1.21 0.10 1.57
TUT-21-033 116.00 121.00 5.00 0.64 0.24 3.18
TUT-21-024 382.40 383.90 1.50 1.86 0.40 2.79
240.00 243.00 3.00 0.33 0.15 1.00
154.30 155.80 1.50 0.58 0.30 0.87
247.00 249.00 2.00 0.40 0.27 0.80
TUT-21-030 192.00 193.50 1.50 1.68 0.20 2.51
147.00 154.50 7.50 0.32 0.04 2.41
95.00 96.00 1.00 0.49 0.30 0.49
TUT-21-031 69.50 78.20 8.70 0.24 0.16 2.05
TUT-21-022 80.20 89.05 8.85 0.28 0.16 2.46
Including 80.20 85.50 5.30 0.42 0.19 2.22
Including 82.70 85.50 2.80 0.63 0.19 1.77
TUT-21-029 238.30 238.80 0.50 3.56 0.30 1.78
43.45 47.60 4.15 0.29 0.11 1.20
211.10 213.50 2.40 0.34 0.10 0.82
241.20 243.00 1.80 0.28 0.16 0.51
TUT-21-027 33.50 38.00 4.50 0.35 0.14 1.56
58.95 61.00 2.05 0.31 0.10 0.63
鑽孔 發件人(M) 至(M) 核心長度(M) Au(克/噸) 銀(克/噸) GXT
TUT-21-032 56.50 57.50 1.00 7.07 0.80 7.07
88.00 89.00 1.00 0.40 0.10 0.40
61.50 64.50 3.00 0.30 0.10 0.90
TUT-21-023 102.55 103.30 0.75 7.61 0.50 5.71
63.00 66.00 3.00 0.82 0.20 2.45
127.50 137.00 9.50 0.50 0.12 4.78
包括 127.50 130.10 2.60 0.93 0.12 2.42
TUT-21-021 41.00 45.00 4.00 0.99 0.22 3.95
52.50 53.80 1.30 1.21 0.10 1.57
TUT-21-033 116.00 121.00 5.00 0.64 0.24 3.18
TUT-21-024 382.40 383.90 1.50 1.86 0.40 2.79
240.00 243.00 3.00 0.33 0.15 1.00
154.30 155.80 1.50 0.58 0.30 0.87
247.00 249.00 2.00 0.40 0.27 0.80
TUT-21-030 192.00 193.50 1.50 1.68 0.20 2.51
147.00 154.50 7.50 0.32 0.04 2.41
95.00 96.00 1.00 0.49 0.30 0.49
TUT-21-031 69.50 78.20 8.70 0.24 0.16 2.05
TUT-21-022 80.20 89.05 8.85 0.28 0.16 2.46
包括 80.20 85.50 5.30 0.42 0.19 2.22
包括 82.70 85.50 2.80 0.63 0.19 1.77
TUT-21-029 238.30 238.80 0.50 3.56 0.30 1.78
43.45 47.60 4.15 0.29 0.11 1.20
211.10 213.50 2.40 0.34 0.10 0.82
241.20 243.00 1.80 0.28 0.16 0.51
TUT-21-027 33.50 38.00 4.50 0.35 0.14 1.56
58.95 61.00 2.05 0.31 0.10 0.63

Table 1 : Fall 2021 drilling results

表1:2021年秋季鑽探結果

Drill hole Azimut Dip Final length (m) UTM NAD83 EAST UTM NAD83 NORTH Elevation
TUT-21-020 145 -45 171 680206 5427223 321
TUT-21-021 145 -45 175 679599 5426879 321
TUT-21-022 145 -45 144 679912 5427035 321
TUT-21-023 145 -45 113 680225 5427191 321
TUT-21-024 145 -45 82 680539 5427347 321
TUT-21-025 145 -45 51 680852 5427502 321
TUT-21-026 145 -45 20 681166 5427658 321
TUT-21-027 145 -45 -11 681479 5427814 321
TUT-21-028 145 -45 -42 681793 5427970 321
TUT-21-029 145 -45 -73 682106 5428126 321
TUT-21-030 145 -45 -104 682419 5428281 321
TUT-21-031 145 -45 -135 682733 5428437 321
TUT-21-032 145 -45 -166 683046 5428593 321
TUT-21-033 145 -45 -197 683360 5428749 321
TUT-21-034 145 -45 -228 683673 5428905 321
TUT-21-035 145 -45 -259 683986 5429061 321
TUT-21-036 145 -45 -290 684300 5429216 321
鑽孔 方位角 浸出 最終長度(米) UTM NAD83 EAST UTM NAD83北 高程
TUT-21-020 145 -45 171 680206 5427223 321
TUT-21-021 145 -45 175 679599 5426879 321
TUT-21-022 145 -45 144 679912 5427035 321
TUT-21-023 145 -45 113 680225 5427191 321
TUT-21-024 145 -45 82 680539 5427347 321
TUT-21-025 145 -45 51 680852 5427502 321
TUT-21-026 145 -45 20 681166 5427658 321
TUT-21-027 145 -45 -11 681479 5427814 321
TUT-21-028 145 -45 -42 681793 5427970 321
TUT-21-029 145 -45 -73 682106 5428126 321
TUT-21-030 145 -45 -104 682419 5428281 321
TUT-21-031 145 -45 -135 682733 5428437 321
TUT-21-032 145 -45 -166 683046 5428593 321
TUT-21-033 145 -45 -197 683360 5428749 321
TUT-21-034 145 -45 -228 683673 5428905 321
TUT-21-035 145 -45 -259 683986 5429061 321
TUT-21-036 145 -45 -290 684300 5429216 321

Table 2 : Fall 2021 drill holes information

表2:2021年秋季鑽孔信息

Robert Pryde, President of BMEX Gold, commented: "Overall, the results from the Fall 2021 drilling campaign are promising especially when one considers the Luxor gold zone is a new gold discovery on the property and the geology of this zone warrants follow up work. Each of the holes in the 2021 drill campaign at King Tut intersected gold values which is a very important indication of the potential for a regional scale system on the property and demonstrates potential for additional gold discoveries. Our technical team is building a strong understanding of the gold occurrence and emplacement over the known and newly discovered assets at King Tut. Accordingly, we are going back to King Tut in 2022, starting with a field prospecting and mapping survey during Summer followed by a drilling campaign during Fall 2022. We also intend to launch an exploration program on the Dunlop Bay Property this year."

BMEX Gold總裁Robert Pryde表示:“總體而言,2021年秋季鑽探活動的結果令人振奮,特別是考慮到盧克索金礦帶是該礦區的新金礦發現,而且該帶的地質情況需要後續工作。2021年圖坦卡蒙鑽探活動中的每個洞都與黃金價值相交,這是一個非常重要的跡象,表明了該礦區建立區域規模系統的潛力,並展示了發現更多黃金的潛力。我們的技術團隊正在建立對圖坦卡蒙已知和新發現的資產上的黃金賦存狀態和侵位的深刻理解。因此,我們將在2022年回到圖坦卡蒙,首先在夏季進行野外勘探和測繪,然後在2022年秋季進行鑽探活動。我們還打算今年在鄧洛普灣地產上啟動一個勘探計劃。

Following the compilation work over the Dunlop Bay Property (Mattagami region, Quebec, Canada) the BMEX technical team has identified several base and precious metal trends that are summarized in (Figure 3).

在對Dunlop Bay Property(加拿大魁北克Mattagami地區)進行編輯工作後,BMEX技術團隊確定了幾個賤金屬和貴金屬趨勢,概述於(圖3).

The Dunlop Bay exploration program started in April with a surface MAG-EM survey over Dunlop Bay-Ouest and interpretation. Surface prospecting, mapping and sampling is planned over the balance of the property during summer 2022, with a focus on the 'Baie Dunlop' showing and 'Mont Laurier Est' extension. The results from these two steps will be used to target a 3,000 metres drilling campaign that is planned for Fall 2022.

鄧洛普灣勘探計劃於4月份開始,在鄧洛普灣上空進行了一次表面MAG-EM調查-西部和解釋。計劃在2022年夏季對該地產的其餘部分進行地面勘探、測繪和取樣,重點是‘Baie Dunlop’展示和‘Mont Laurier Est’擴建。這兩個步驟的結果將被用於計劃於2022年秋季進行的3000米鑽探活動。

Figure 3 : Dunlop Bay Property 2022 prospecting and mapping goals

圖3:鄧洛普灣地產2022年勘探和測繪目標

Qualified Person

有資格的人

Maxime Bouchard, Geo, M.Sc. (OGQ #1752), an independent Qualified Person as defined by Canadian NI 43-101 standards, has reviewed and approved the geological information reported in this news release. The drilling campaign and the quality control program have been planned and supervised by Maxime Bouchard. Core logging and sampling were completed by Laurentia Exploration. The quality assurance and quality control protocol include insertion of one blank and one standard every 20 samples, in addition to the regular insertion of blank, duplicate, and standard samples accredited by ALS Canada Ltd. during the analytical process. Gold values are estimated by fire assay with finish by atomic absorption. The Qualified Person has not completed sufficient work to verify the historic information on the Property, particularly in regards to historical drill results. However, the Qualified Person believes that drilling and analytical results were completed to industry standard practices. The information provides an indication of the exploration potential of the Property but may not be representative of expected results.

馬克西姆·布查德,Geo,M.Sc.(OGQ#1752)是加拿大NI 43-101標準定義的獨立合格人員,已審查並批准了本新聞稿中報道的地質信息。鑽探活動和質量控制程序已由馬克西姆·布查德計劃和監督。巖心測井和取樣由LaurentiaExplore完成。除了在分析過程中定期插入ALS加拿大有限公司認可的空白、複製和標準樣品外,質量保證和質量控制協議還包括每20個樣品插入一個空白和一個標準樣品。金價用火焰試金法測定,用原子吸收光潔度測定值。合格人員沒有完成足夠的工作來核實財產的歷史信息,特別是關於歷史鑽探結果的信息。然而,這位有資質的人士認為,鑽探和分析結果是按照行業標準做法完成的。這些信息提供了對該物業勘探潛力的指示,但可能不代表預期結果。

About BMEX Gold Inc.

BMEX Gold Inc.簡介

BMEX Gold Inc. is a junior Canadian mining exploration company with the primary objective to acquire, explore, and develop viable gold and base metal projects in the mining-friendly jurisdiction of Quebec, Canada. BMEX is currently fully focused on earning 100% interest in its two projects, both located in the prolific Abitibi greenstone belt:

BMEX Gold Inc.是一家加拿大初級礦業勘探公司,主要目標是收購、勘探和開發加拿大魁北克省礦業友好轄區內可行的黃金和賤金屬項目。BMEX目前完全專注於在其兩個項目中賺取100%的權益,這兩個項目都位於多產的阿比蒂比綠巖地帶:

  • King Tut Project consists of 120 contiguous claims on 5,206 hectares
  • Dunlop Bay Project consists of 76 mineral claims that cover 4,226 hectares
  • 圖坦卡蒙國王項目由5,206公頃上的120個相鄰主張組成
  • 鄧洛普灣項目由佔地4,226公頃的76個礦藏組成

BMEX common shares trade under the symbol "BMEX" on the TSX-V and under the symbol 8M0 on the Frankfurt Exchange.

BMEX普通股在多倫多證券交易所的交易代碼為“BMEX”,在法蘭克福交易所的交易代碼為8M0。

For further information please contact:

欲瞭解更多信息,請聯繫:

BMEX Gold Inc.

BMEX Gold Inc.

Robert Pryde, President
Tel: +1 (403) 478 6042
Email: robert@bmexgold.com

羅伯特·普萊德,總統
電話:+1(403)4786042
電子郵件:Robert@bmexGold.com

Dylan Sidoo, Business Development
Tel: +1 (604) 423 4499
Email: info@bmexgold.com

Dylan Sidoo,業務發展
電話:+1(604)4234499
電子郵件:info@bmexGold.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。任何證券交易所、證券委員會或其他監管機構均未批准或不批准本報告所載信息。

This news release contains "forward-looking statements" and "forward looking information" (as defined under applicable securities laws), based on management's best estimates, assumptions, and current expectations. Such statements include but are not limited to, statements with respect to the plans for future exploration and development of the King Tut and Dunlop Bay properties and the acquisition of additional exploration projects. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as "expects", "expected", "budgeted", "forecasts" , "anticipates" "plans", "anticipates", "believes", "intends", "estimates", "projects", "aims", "potential", "goal", "objective", "prospective", and similar expressions, or that events or conditions "will", "would", "may", "can", "could" or "should" occur. These statements should not be read as guarantees of future performance or results. Such statements involve known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to be materially different from those expressed or implied by such statements, including but not limited to: risks related to the King Tut and Dunlop Bay projects; risks related to general economic conditions, actual results of current exploration activities, unanticipated reclamation expenses; changes in project parameters as plans continue to be refined; fluctuations in prices of metals including gold; increases in market prices of mining consumables, possible variations in resource estimates, grade or recovery rates; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes, title disputes, claims and limitations on insurance coverage and other risks of the mining industry; delays in the completion of exploration, development or construction activities, changes in national and local government regulation of mining operations, tax rules and regulations, and political and economic developments in areas in which the Company operates. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The forward-looking statements and forward looking information are made as of the date hereof and are qualified in their entirety by this cautionary statement. The Company disclaims any obligation to revise or update any such factors or to publicly announce the result of any revisions to any forward-looking statements or forward looking information contained herein to reflect future results, events or developments, except as require by law. Accordingly, readers should not place undue reliance on forward looking statements and information. Please refer to the Company's most recent filings under its profile at for further information respecting the risks affecting the Company and its business.

本新聞稿包含基於管理層的最佳估計、假設和當前預期的“前瞻性陳述”和“前瞻性信息”(根據適用的證券法定義)。此類陳述包括但不限於關於King Tut和Dunlop Bay物業未來勘探和開發計劃以及收購更多勘探項目的陳述。一般而言,這些前瞻性表述可以通過使用前瞻性術語來識別,如“預期”、“預期”、“預算”、“預測”、“預期”、“計劃”、“相信”、“打算”、“估計”、“項目”、“目標”、“潛在”、“目標”、“目標”、“預期”以及類似的表述,或者事件或條件“將”、“將”、“可能”、“可能”、“可以”。“可能”或“應該”發生。這些聲明不應被解讀為對未來業績或結果的保證。這類陳述涉及已知和未知的風險、不確定因素和其他因素,可能導致實際結果、業績或成就與這類陳述明示或暗示的大不相同,包括但不限於:與圖坦卡蒙和鄧洛普灣項目有關的風險;與一般經濟條件有關的風險、當前勘探活動的實際結果、意想不到的開墾費用;隨着計劃的不斷完善,項目參數的變化;包括黃金在內的金屬價格的波動;採礦耗材市場價格的上漲;資源估計、品位或回收率可能的變化;工廠、設備或工藝未能按預期運行;事故、勞資糾紛、所有權糾紛、對保險範圍的索賠和限制以及採礦業的其他風險;勘探、開發或建築活動遲遲未完成, 國家和地方政府對採礦作業的監管、税收規則和法規以及公司所在地區的政治和經濟發展的變化。儘管公司試圖確定可能導致實際結果與前瞻性陳述中包含的結果大不相同的重要因素,但可能還有其他因素導致結果與預期、估計或預期的不同。不能保證這些陳述將被證明是準確的,因為實際結果和未來事件可能與這些陳述中預期的大不相同。前瞻性陳述和前瞻性信息是截至本新聞稿發佈之日作出的,其全部內容均受本警示聲明的限制。除法律要求外,公司沒有義務修改或更新任何此類因素,或公開宣佈對本文中包含的任何前瞻性陳述或前瞻性信息進行任何修改的結果,以反映未來的結果、事件或發展。因此,讀者不應過分依賴前瞻性陳述和信息。有關影響本公司及其業務的風險的進一步資料,請參閲本公司的最新文件。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論