share_log

Pacton Announces 10,000 m Winter Drill Program at Red Lake, Ontario

Pacton Announces 10,000 m Winter Drill Program at Red Lake, Ontario

帕克頓在安大略省紅湖宣佈1萬米冬季演練計劃
Accesswire ·  2021/12/02 21:06

VANCOUVER, BC / ACCESSWIRE / December 2, 2021 / Pacton Gold Inc. (TSXV:PAC)(OTC PINK:PACXF)(FSE:2NKN) (the "Company" or "Pacton") is pleased to announce a fully funded 10,000 m winter drill program at the Red Lake Gold Project. The program will focus on targets generated during the 2021 surface program, completed in September 2021, and reconnaissance drilling carried out during 2020/21. Targets include the newly identified Claremont gold system (see Pacton news release dated October 28, 2021), where Pacton discovered a 2 km long mineralized gold trend. Drilling is expected to commence by February 2022.

温哥華,BC/ACCESSWIRE/2021年12月2日/Pacton Gold Inc.(多倫多證券交易所股票代碼:PAC)(場外交易代碼:PINK:PACXF)(證券交易所代碼:2NKN)(“公司“或”Pacton“)很高興宣佈紅湖黃金項目10,000米冬季鑽探計劃。該計劃將重點關注2021年9月完成的2021年地表計劃期間產生的目標,以及2020/21年期間進行的勘察鑽探。目標包括新發現的克萊蒙特金礦系統(參見2021年10月28日的Pacton新聞稿),Pacton在那裏發現了2公里長的礦化金礦趨勢。鑽探預計將於2022年2月開始。

News Highlights

新聞亮點

  • Fully Funded 10,000 m Exploration Drill Program. Proceeds from Pacton's recent flow-through financing will be used towards a 10,000 m drill campaign at the Red Lake Gold Project. Permitting is underway and drilling is expected to begin in early 2022.
  • New, Drill Ready Target Areas. Detailed targeting for the new drill program is in the final stages. The campaign will test various new targets including the new Claremont gold system, follow up on previous successful drilling at the Faulkenham gold trend (see Pacton news release dated September 22, 2021), and test new target areas identified from the 2021 surface program (Figure 1).
  • Target Generation Continues with Incoming Data. Pacton recently completed an extensive soil sampling campaign, including more than 7,300 samples over 9,400 ha. Analytical data from this large surface program continues to be received from the lab. This data, along with other previous work completed by Pacton, is being evaluated to further refine drill targets. Preliminary analysis from this program highlights multiple areas of interest at the property, including Claremont and Carricona. Additional details of high-priority target areas will be provided when finalized by the Company's technical team.
  • 全額資助10,000米勘探鑽探計劃。Pacton最近的直通融資所得將用於紅湖黃金項目的10,000米鑽探活動。許可正在進行中,鑽探預計將於2022年初開始。
  • 新的,鑽探就緒目標區域。新演習計劃的詳細目標已進入最後階段。此次活動將測試各種新的目標,包括新的克萊蒙特金礦系統,跟進之前在福爾肯納姆金礦趨勢的成功鑽探(參見2021年9月22日的Pacton新聞稿),並測試從2021年地面計劃中確定的新目標區域(圖1)。
  • 目標生成繼續處理傳入數據。帕克頓最近完成了一項廣泛的土壤採樣活動,包括超過9400公頃的7300多個樣本。來自這個大型表面計劃的分析數據繼續從實驗室接收。這些數據以及帕克頓之前完成的其他工作正在進行評估,以進一步細化鑽探目標。該項目的初步分析突出了該物業的多個感興趣的領域,包括克萊蒙特和卡里科納。當公司的技術團隊最終確定後,將提供高優先級目標區域的更多詳細信息。

Nav Dhaliwal, Interim President and CEO for Pacton, commented, "During the last eighteen months, Pacton's Red Lake Project has seen extensive early-stage exploration work, including a huge ground prospecting program, seismic and high-resolution magnetic surveys, and reconnaissance drilling. As a result, we are heading into this new drill program guided by comprehensive data and focused on a series of exciting, high-priority target areas."

Pacton的臨時總裁兼首席執行官NAV Dhaliwal評論説:“在過去的18個月裏,帕克頓的紅湖項目經歷了廣泛的早期勘探工作,包括大規模的地面勘探計劃、地震和高分辨率磁力調查以及偵察鑽探。因此,我們將在全面數據的指導下進入這一新的演習計劃,並將重點放在一系列令人興奮的、高度優先的目標領域。“

Update on Sidace: Following the successful two-phase drill program at Sidace - the Company's advanced exploration project in the Red Lake region - Pacton and joint venture partner, Evolution Mining, are in advanced discussions regarding the next phase of exploration and advancement.

Sidace的最新消息:繼公司在紅湖地區的高級勘探項目Sidace的兩階段鑽探項目獲得成功後,Pacton與合資夥伴Evolution Mining正在就下一階段的勘探和推進進行深入討論。

Figure 1. Pacton's Red Lake property showing high-priority target areas to be tested in the upcoming winter drill program.

圖1. 帕克頓的紅湖地產顯示了在即將到來的冬季演習計劃中需要測試的高度優先的目標區域。

About the Red Lake Gold Project

關於紅湖黃金項目

The Red Lake Gold Project, located in Red Lake, Ontario, comprises 28,000 ha. The project is adjacent and proximal to past, current and near-term production mines, and is also adjacent and on trend to Great Bear's Dixie discovery. Exploration to date includes successful 1st pass sampling, surveys and drilling. High-grade surface samples include 126.5 g/t Au and 23.3 g/t Au. 1st pass reconnaissance drilling has hit 17.5 g/t Au over a 0.5 m interval. The project also includes regional properties such as Gullrock, Pakwash, Dixie, Golden Loon, and Swain.

紅湖黃金項目位於安大略省紅湖,佔地2.8萬公頃。該項目毗鄰過去、現在和近期的生產礦,也與大熊的Dixie發現相鄰並有發展趨勢。到目前為止,勘探包括成功的第一次取樣、調查和鑽探。高級表面樣品包括126.5克/噸Au23.3g/噸Au。第一道偵察鑽探已命中0.5米內17.5克/噸Au間隔時間。該項目還包括一些地區性物業,如Gullrock、Pakwash、Dixie、Golden Loon和Swain。

About Pacton Gold

關於Pacton Gold

Pacton Gold is a Canadian exploration company with key strategic partners focused on the exploration and development of high-grade gold properties located in the Red Lake gold rush in Ontario, Canada. The Company also owns a strategic portfolio of prospective projects in the district-scale Pilbara gold rush in Western Australia.

Pacton Gold是一家加拿大勘探公司,擁有主要戰略合作伙伴,專注於勘探和開發位於加拿大安大略省紅湖淘金熱的高品位金礦。該公司還擁有西澳大利亞州皮爾巴拉淘金熱地區規模的潛在項目的戰略投資組合。

QA/QC

QA/QC

Drill core is logged and sampled at a secure core processing facility in Red Lake, Ontario. Core samples from the drill program are cut in half using a diamond cutting saw with half sent for assay at SGS Mineral Services lab in Red Lake, Ontario. The other half is secured and retained at a secure storage facility. All samples are analyzed for gold using standard Fire Assay-AA techniques. Samples returning greater than 10.0 g/t gold are analyzed utilizing standard Fire Assay-Gravimetric methods. Certified reference materials, blanks and duplicates are routinely inserted into the sample stream as part of Pacton's quality control/quality assurance program.

鑽井巖芯在安大略省紅湖的一個安全巖芯處理設施進行記錄和取樣。鑽探項目的巖心樣本用鑽石切割鋸切成兩半,一半送往安大略省紅湖的SGS礦產服務實驗室進行化驗。另一半是安全的,保存在安全的存儲設施中。所有樣品都使用標準的火焰分析-AA技術進行了金的分析。返回量大於10.0g/t金的樣品採用標準火試重法進行分析。作為Pacton質量控制/質量保證計劃的一部分,經過認證的標準物質、空白和複製品通常會插入樣品流中。

The technical content of this news release has been reviewed and approved by Dale Ginn, P.Geo., Executive Chairman and a director, and Karly Oliver, P.Geo., Vice President Exploration and a director of the Company, who are both Qualified Persons pursuant to National Instrument 43-101.

本新聞稿的技術內容已由執行主席兼董事Dale Ginn和勘探副總裁兼公司董事Karly Oliver審核和批准,他們都是符合National Instrument 43-101標準的合格人員。

On Behalf of the Board of Pacton Gold Inc.

我代表Pacton Gold Inc.董事會。

Nav Dhaliwal
Interim President and CEO

NAV Dhaliwal
臨時總裁兼首席執行官

For more information, please contact 1-(855)-584-0258 or info@pactongold.com.

欲瞭解更多信息,請聯繫1-(855)-584-0258,電子郵件:info@pactoold.com。

This news release may contain or refer to forward-looking information based on current expectations, including, but not limited to the Company achieving success in exploring its properties and the impact on the Company of these events, including the effect on its share price. Forward-looking information is subject to significant risks and uncertainties, as actual results may differ materially from forecasted results. Forward-looking information is provided as of the date hereof and we assume no responsibility to update or revise such information to reflect new events or circumstances. References to other issuers with nearby projects is for information purposes only and there are no assurances the Company will achieve similar results.

本新聞稿可能包含或提及基於當前預期的前瞻性信息,包括但不限於該公司成功勘探其資產以及這些事件對公司的影響,包括對其股價的影響。前瞻性信息受到重大風險和不確定因素的影響,因為實際結果可能與預測結果大不相同。截至本文發佈之日,我們提供的是前瞻性信息,我們不承擔更新或修改此類信息以反映新事件或新情況的責任。對附近項目的其他發行人的引用僅供參考,不能保證公司將取得類似的結果。

Neither TSX Venture Exchange, the Toronto Stock Exchange nor their Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所、多倫多證券交易所及其監管服務提供商(該術語在多倫多證券交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

SOURCE: Pacton Gold Inc.

資料來源:Pacton Gold Inc.


View source version on accesswire.com:
在accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論