share_log

Triumph Gold Drills 80.50 Metres of 1.96 g/t AuEq from the WAu Zone at the Freegold Mountain Project, Yukon

Triumph Gold Drills 80.50 Metres of 1.96 g/t AuEq from the WAu Zone at the Freegold Mountain Project, Yukon

凱旋金礦從育空弗裏戈德山項目的瓦烏區開採80.50米1.96g/t AuEq
GlobeNewswire ·  2021/11/24 18:06

Table 1

表1

2021 Drilling Highlights
2021年鑽探亮點

Table 2

表2

2021 Drill Hole Summary (Coordinates in UTM NAD83 Zone 9N)
2021年鑽孔總結(UTM NAD83區9N中的座標)

Table 3

表3

Reinterpretation of Historical WAu Zone Intercepts
對歷史窪地截獲資料的重新解讀

Figure 1.

圖1.

2021 Drilling Areas on the Freegold Mountain Project.
2021年弗裏戈德山項目鑽探區域。

Figure 2.

圖2。

Plan View and Long Section of the WAu Zone and Blue Sky Zone within the $1500/ounce ("oz") Au pit shell of the 2020 mineral resource estimate at the Revenue Deposit (PR#20-02).Significant intercepts in the four drill holes of this release are listed in Table 1 and depicted by red (WAu Zone) and cyan bars (porphyry-style mineralization). Historical WAu Zone intercepts are depicted by yellow bars and are listed in Table 3. Wireframes were generated using Micromine's implicit modeling tools.
在收入礦藏(PR#20-02)2020年礦產資源量估算的1500美元/盎司(“盎司”)金礦坑殼內,Wau區和藍天區的平面圖和長剖面圖。本新聞稿的四個鑽孔中的重要截距見表1,紅色(Wau區)和青色條(斑巖型礦化)描繪。歷史Wau區截獲由黃色條描述,列在表3中。線框是使用Micromine的隱式建模工具生成的。

Figure 3.

圖3.

WAu Zone, coarse chalcopyrite and scheelite mineralization from RVD21-03 at 411.50 metres. The 1.5-metre sample interval from 411 metres returned 0.63 g/t Au, 3.70 g/t Ag, 0.18% Cu, 0.012% Mo, and 0.005% W.
Wau帶,粗黃銅礦和白鎢礦化,採自RVD21-03,海拔411.50米。採自411m的1.5m樣品,金0.63g/t,銀3.70g/t,銅0.18%,鉬0.012%,鎢0.005%。

Figure 4.

圖4。

Chalcopyrite, pyrite, molybdenite porphyry-style mineralization, hosted within a quartz-carbonate vein in RVD21-01. This 1.08-metre sample from 80.11 metres returned 0.12 g/t Au, 7.80 g/t Ag, 0.33% Cu, 0.020% Mo, and 0.001% W.
黃銅礦、黃鐵礦、輝鉬礦斑巖型礦化,賦存於RVD21-01的石英-碳酸鹽礦脈中。這個1.08m的樣品從80.11m處返回0.12g/t Au,7.80g/t Ag,0.33%Cu,0.020%Mo和0.001%W。

Figure 5.

圖5。

Chalcopyrite, pyrite, molybdenite porphyry-style veinlet mineralization, hosted within strongly silicified granodiorite RVD21-01. This 1.90-metre sample from 78.21 metres returned 0.30 g/t Au, 4.80 g/t Ag, 0.25% Cu, 0.016% Mo, and 0.001% W.
黃銅礦、黃鐵礦、輝鉬礦斑巖型細脈礦化,賦存於強硅化花崗閃長巖RVD21-01中。這個1.90m的樣品從78.21m處返回0.30g/t Au,4.80g/t Ag,0.25%Cu,0.016%Mo和0.001%W。

Figure 6.

圖6。

Visible gold (VG) from RVD21-03 at 121.20 metres returned 3.77g/t Au over 0.6m. Mineralization is hosted within quartz + bismuthinite (Bis) veinlet in SCC altered granodiorite.
RVD21-03在121.20米處的可見金(VG)在0.6米以上返回3.77g/t金。礦化賦存於SCC蝕變花崗閃長巖中的石英+鉍礦(Bis)細脈中。

Table 4.

表4。

2021 Significant Intercepts (Highlighted Intercepts are reported in Table 1)
2021個重要截獲(表1中報告了突出顯示的截獲)

Table 4.

表4。

2021 Significant Intercepts (Highlighted Intercepts are reported in Table 1)
2021個重要截獲(表1中報告了突出顯示的截獲)

Table 4.

表4。

2021 Significant Intercepts (Highlighted Intercepts are reported in Table 1)
2021個重要截獲(表1中報告了突出顯示的截獲)

Table 4.

表4。

2021 Significant Intercepts (Highlighted Intercepts are reported in Table 1)
2021個重要截獲(表1中報告了突出顯示的截獲)

VANCOUVER, British Columbia, Nov. 24, 2021 (GLOBE NEWSWIRE) -- Triumph Gold Corp. (TSX-V: TIG | OTCMKTS: TIGCF | Frankfurt: 8N61) ("Triumph Gold" or "the Company") is pleased to announce results from 2,154 metres ("m") of diamond drilling in four holes from the WAu Zone within the Revenue Deposit at the Freegold Mountain Project (Figure 1), highlighted by 80.5 metres of 1.96 grams per tonne ("g/t") gold equivalent1 ("AuEq") in RVD21-03 (Table 1).

温哥華,不列顛哥倫比亞省,2021年11月24日(環球通訊社)凱旋黃金公司(Triumph Gold Corp.)(多倫多證券交易所-V:TIG|OTCMKTS:TIGCF|法蘭克福:8N61)(“凱旋黃金”或“本公司”)高興地宣佈,在該地區4個孔中鑽探2,154米(“m”)鑽石的結果。瓦烏區收入保證金在弗裏戈德山項目(圖1),突出顯示為每噸1.96克黃金當量(“g/t”)80.5米1(“AuEq”),見RVD21-03(表1)。

Highlights:

重點:

  • Intersection of multiple styles of mineralization including epithermal veins, porphyry-style stockwork veins, disseminated sulphides, and sulphide breccias
  • Expansion of the WAu Zone 70 metres along strike in an east-west orientation
    • 80.50 metres of 1.96 g/t AuEq from 370 metres in RVD21-03
      • Containing 1.52 g/t gold ("Au"), 3.74 g/t silver ("Ag"), 0.18% copper ("Cu"), 0.011% molybdenum ("Mo"), and 0.007% tungsten ("W")
  • 多種礦化類型的交匯,包括淺成熱液礦脈、斑巖型網脈、浸染型硫化物和硫化物角礫巖。
  • 擴展了瓦烏區東西走向,長70米
    • 80.50米,1.96克/噸AuEq,自370米RVD21-03
      • 含金(Au)1.52g/t、銀(Ag)3.74g/t、銅(Cu)0.18%、鉬(Mo)0.011%、鎢(W)0.007%
  • 35.00 metres of 0.33 g/t AuEq from 325.0 metres in RVD21-02
    • Containing 0.17 g/t Au, 1.04 g/t Ag, 0.05% Cu, 0.008% Mo, and 0.004% W
  • 8.25 metres of 0.40 g/t AuEq from 164.00 metres in RVD21-04
    • Containing 0.28 g/t Au, 0.29 g/t Ag, 0.02% Cu, 0.001% Mo, and 0.017% W
  • 6.00 metres of 0.65 g/t AuEq from 179.00 metres in RVD21-04
    • Containing 0.54 g/t Au, 0.83 g/t Ag, 0.06% Cu, 0.001% Mo, and 0.002% W
  • 35.00米,0.33g/t AuEq,自325.0米起RVD21-02
    • 含0.17g/t Au、1.04g/t Ag、0.05%Cu、0.008%Mo和0.004%W
  • 8.25米,0.40g/噸AuEq,自164.00米起RVD21-04
    • 含0.28g/t Au、0.29g/t Ag、0.02%Cu、0.001%Mo和0.017%W
  • 6.00米0.65克/噸AUEQ,由179.00米升至RVD21-04
    • 含0.54g/t Au、0.83g/t Ag、0.06%Cu、0.001%Mo和0.002%W
  • Intersection of near-surface porphyry-style mineralization with 108.65 metres of 0.40 g/t AuEq from 36.35 metres in RVD21-01
    • Containing 0.18 g/t Au, 1.95 g/t Ag, 0.10% Cu, 0.005% Mo, and 0.002% W
  • Additional intersection of porphyry-style mineralization further downhole in RVD21-01 with 60.50 metres of 0.51 g/t AuEq from 162 metres
    • Containing 0.18 g/t Au, 2.11 g/t Ag, 0.10% Cu, 0.022% Mo, and 0.002% W
  • 近地表斑巖型礦化與108.65米0.40g/t AuEq的交匯點RVD21-01
    • 含0.18g/t Au、1.95g/t Ag、0.10%Cu、0.005%Mo和0.002%W
  • 進一步在井下的斑巖型礦化的額外交匯點RVD21-0160.50米,0.51g/t AuEq從162米
    • 含0.18g/t Au、2.11g/t Ag、0.10%Cu、0.022%Mo和0.002%W

The WAu Zone is defined by 18 drill holes: four new holes from the 2021 program (Tables 1 and 2) and 14 historical holes (Table 3). The WAu Zone is a steep south-dipping structurally controlled body of Au-Cu-Ag-Mo-W epithermal mineralization within the Revenue Deposit. The Revenue Deposit is made up of the WAu Zone, Blue Sky Zone, and zones of Cu-Mo-Au porphyry-style mineralization.

這個瓦烏區由18個鑽孔定義:2021年計劃中的4個新孔(表1和表2)和14個歷史孔(表3)。這個瓦烏區是該礦區內Au-Cu-Ag-Mo-W淺成熱液礦化的陡峭南傾構造控制體。這個收入保證金是由瓦烏區, 藍天地帶和Cu-Mo-Au斑巖型礦化帶。

The strike length of the WAu Zone was expanded 70 metres and is now 75 metres away from the Blue Sky Zone (Figure 2). The WAu Zone now has a modeled strike length of 250 metres, an average width of 50 metres, and a depth extending 525 metres below surface. All four holes intercepted porphyry-style and epithermal mineralization and each hole had intervals greater than 1 g/t gold.

礦體的走向長度瓦烏區擴大了70米,現在距離藍天地帶(圖2)。這個瓦烏區現在的模型走向長度為250米,平均寬度為50米,深度在地表以下延伸525米。4個孔均截留斑巖型和淺成熱液礦化,各孔間距大於1g/t金。

Table 1. 2021 Drilling Highlights

表1.2021年鑽井亮點

https://www.globenewswire.com/NewsRoom/AttachmentNg/e6f13386-ad74-4bce-a94e-1811665df7ee

Https://www.globenewswire.com/NewsRoom/AttachmentNg/e6f13386-ad74-4bce-a94e-1811665df7ee

1Refer to the Reference and Disclosure section below for compositing techniques and AuEq calculations.

1有關合成技術和AuEq計算,請參閲下面的參考和披露部分。

Table 2. 2021 Drill Hole Summary (Coordinates in UTM NAD83 Zone 9N)

表2.2021鑽孔摘要(UTM NAD83區9N中的座標)

https://www.globenewswire.com/NewsRoom/AttachmentNg/d7fc033c-977f-4f97-ac40-c1e72e4be59e

Https://www.globenewswire.com/NewsRoom/AttachmentNg/d7fc033c-977f-4f97-ac40-c1e72e4be59e

"We are excited about the 2021 drill hole assays to date, which support the current resource and geological reinterpretation at the WAu Zone and within the Revenue Deposit. We are eagerly awaiting the remainder of the 2021 drill hole assays testing the upper portion of the Blue Sky Zone within the Revenue Deposit, the Nucleus Deposit, the Big Creek South Fault Zone, and the Orbit Zone," stated Brian May, President, Triumph Gold Corp.

到目前為止,我們對2021年的鑽孔測試感到興奮,這些測試支持了目前的資源和地質重新解釋。瓦烏區並且在收入保證金。我們正在熱切地等待2021年剩餘的鑽孔測試,測試上半部分的藍天地帶收入保證金vt.的.核沉積、大溪南斷裂帶和軌道帶,“凱旋黃金公司(Triumph Gold Corp.)總裁布萊恩·梅(Brian May)説。

Table 3. Reinterpretation of Historical WAu Zone Intercepts

表3.對歷史的重新解讀瓦烏區攔截

https://www.globenewswire.com/NewsRoom/AttachmentNg/380c3bf1-21be-4f56-baac-b11964958c59

Https://www.globenewswire.com/NewsRoom/AttachmentNg/380c3bf1-21be-4f56-baac-b11964958c59

2Refer to the Reference and Disclosure section below for interpretation method and AuEq calculations.

2有關解釋方法和AuEq計算,請參閲下面的參考和披露部分。

Detailed Interpretation and Geology

詳解與地質

RVD21-03 intercepted the WAu Zone and returned 80.50 metres of 1.96 g/t AuEq from 370 metres (Figure 2). This intercept is located 35 metres east of RVD19-02, which had an intercept of 400.48 metres grading 1.21 g/t AuEq3 (PR#19-16). RVD21-04 stepped out 50 metres eastward from RVD21-03 and intercepted the WAu Zone 130 metres above RVD21-03.

RVD21-03截獲瓦烏區並從370米返回80.50米1.96g/t AuEq(圖2)。該截止點位於RVD19-02以東35米處,截距為400.48米,等級為1.21g/t AuEq3(公告號19-16)。RVD21-04在RVD21-03以東50米處下車,攔截瓦烏區在RVD21-03上空130米。

The updated expression of the WAu Zone is now modeled to be 75 metres from the Blue Sky Zone, suggesting there may be a link between the two zones in a NE orientation (Figure 2).

的更新表達式瓦烏區現在模擬為距離藍天區域75米,這表明兩個區域之間可能存在東北方向的連接(圖2)。

The WAu Zone structure strikes east and dips steeply to the south. This structure hosts milled, jigsaw and crackle breccia textures, and local stockwork veining. Epithermal mineralization is hosted by quartz-carbonate (calcite, ankerite, dolomite) hydrothermal infill containing polymetallic sulphide mineralization (pyrite, pyrrhotite, chalcopyrite, molybdenite, arsenopyrite, scheelite, sphalerite, galena, and bismuthinite) and associated fine grained native gold (Figure 3).

這個瓦烏區結構向東傾斜,向南陡峭傾斜。這個結構包含磨碎的、拼圖的和裂開的角礫巖結構,以及當地的網紋。淺成熱液礦化賦存於石英-碳酸鹽(方解石、鐵閃石、白雲石)熱液充填中,其中含有多金屬硫化物礦化(黃鐵礦、磁黃鐵礦、黃銅礦、輝鉬礦、毒砂、白鎢礦、閃鋅礦、方鉛礦和鉍礦)和伴生的細粒自然金(圖3)。

Strong silica +/- biotite alteration is associated with mineralization and has subsequently been overprinted by argillic (kaolinite), SCC (sericite + clay + chlorite), and phyllic (sericite +/- pyrite) alteration confirmed in previous drilling through drillhole spectral data (PR#21-05).

強烈的二氧化硅+/黑雲母蝕變與礦化有關,隨後被泥質(高嶺石)、鱗片狀鈣鈦礦(絹雲母+粘土+綠泥石)和千枚巖(絹雲母+/-黃鐵礦)蝕變疊加,這些蝕變在以前的鑽孔光譜數據中得到證實(PR#21-05)。

Porphyry-style mineralization consists of sulphide +/- quartz veinlets and local stockwork veining with broad zones of disseminated sulphide mineralization surrounding vein clusters and local fine grained native gold (Figures 4, 5, and 6).

斑巖型礦化由硫化物+/-石英細脈和局部網脈組成,脈羣周圍有寬闊的浸染狀硫化物礦化帶和局部細粒自然金(圖4、5和6)。

Sulphide mineralization (chalcopyrite +/- molybdenite +/- pyrite +/- pyrrhotite and local bismuthinite) is associated with silica +/- biotite +/- argillic alteration.

硫化物礦化(黃銅礦+/-輝鉬礦+/-黃鐵礦+/-磁黃鐵礦和局部鉍礦)與二氧化硅+/-黑雲母+/-泥質蝕變有關。

https://www.globenewswire.com/NewsRoom/AttachmentNg/0e119e99-217e-48b9-9d93-69463cefd216

Https://www.globenewswire.com/NewsRoom/AttachmentNg/0e119e99-217e-48b9-9d93-69463cefd216

Figure 1. 2021 Drilling Areas on the Freegold Mountain Project.

圖1.2021年弗裏戈德山項目鑽探區域。

https://www.globenewswire.com/NewsRoom/AttachmentNg/2f44433a-4d90-4335-be2a-6d8f73e2c113

Https://www.globenewswire.com/NewsRoom/AttachmentNg/2f44433a-4d90-4335-be2a-6d8f73e2c113

Figure 2. Plan View and Long Section of the WAu Zone and Blue Sky Zone within the $1500/ounce ("oz") Au pit shell of the 2020 mineral resource estimate at the Revenue Deposit (PR#20-02). Significant intercepts in the four drill holes of this release are listed in Table 1 and depicted by red (WAu Zone) and cyan bars (porphyry-style mineralization). Historical WAu Zone intercepts are depicted by yellow bars and are listed in Table 3. Wireframes were generated using Micromine's implicit modeling tools.

圖2.的平面圖和長剖面瓦烏區藍天 分帶在2020年礦產資源量估計的1500美元/盎司(“盎司”)的範圍內收入保證金(公關編號20-02)。表1列出了本新聞稿中四個鑽孔的重要截獲情況,並用紅色(瓦烏區)和青色條帶(斑巖型礦化)。歷史瓦烏區截距用黃條表示,如表3所示。線框是使用Micromine的隱式建模工具生成的。

https://www.globenewswire.com/NewsRoom/AttachmentNg/05494586-593a-4d1b-9842-ee6bac3c4a58

Https://www.globenewswire.com/NewsRoom/AttachmentNg/05494586-593a-4d1b-9842-ee6bac3c4a58

Figure 3. WAu Zone, coarse chalcopyrite and scheelite mineralization from RVD21-03 at 411.50 metres. The 1.5-metre sample interval from 411 metres returned 0.63 g/t Au, 3.70 g/t Ag, 0.18% Cu, 0.012% Mo, and 0.005% W.

圖3.瓦烏區,粗黃銅礦和白鎢礦礦化採自RVD21-03,海拔411.50米。採自411m的1.5m樣品,金0.63g/t,銀3.70g/t,銅0.18%,鉬0.012%,鎢0.005%。

https://www.globenewswire.com/NewsRoom/AttachmentNg/50fe7162-fccf-4c1a-a06f-f549e09cb95b

Https://www.globenewswire.com/NewsRoom/AttachmentNg/50fe7162-fccf-4c1a-a06f-f549e09cb95b

Figure 4. Chalcopyrite, pyrite, molybdenite porphyry-style mineralization, hosted within a quartz-carbonate vein in RVD21-01. This 1.08-metre sample from 80.11 metres returned 0.12 g/t Au, 7.80 g/t Ag, 0.33% Cu, 0.020% Mo, and 0.001% W.

圖4.產於RVD21-01石英-碳酸鹽礦脈中的黃銅礦、黃鐵礦、輝鉬礦斑巖型礦化。這個1.08m的樣品從80.11m處返回0.12g/t Au,7.80g/t Ag,0.33%Cu,0.020%Mo和0.001%W。

https://www.globenewswire.com/NewsRoom/AttachmentNg/9fe455ae-5660-4f53-bb6c-4a4ee254d8df

Https://www.globenewswire.com/NewsRoom/AttachmentNg/9fe455ae-5660-4f53-bb6c-4a4ee254d8df

Figure 5. Chalcopyrite, pyrite, molybdenite porphyry-style veinlet mineralization, hosted within strongly silicified granodiorite RVD21-01. This 1.90-metre sample from 78.21 metres returned 0.30 g/t Au, 4.80 g/t Ag, 0.25% Cu, 0.016% Mo, and 0.001% W.

圖5。產於強烈硅化花崗閃長巖RVD21-01中的黃銅礦、黃鐵礦、輝鉬礦斑巖型細脈礦化。這個1.90m的樣品從78.21m處返回0.30g/t Au,4.80g/t Ag,0.25%Cu,0.016%Mo和0.001%W。

https://www.globenewswire.com/NewsRoom/AttachmentNg/36421b15-2729-4474-b947-87808edc3743

Https://www.globenewswire.com/NewsRoom/AttachmentNg/36421b15-2729-4474-b947-87808edc3743

Figure 6. Visible gold (VG) from RVD21-03 at 121.20 metres returned 3.77g/t Au over 0.6m. Mineralization is hosted within quartz + bismuthinite (Bis) veinlet in SCC altered granodiorite.

圖6.RVD21-03在121.20米高空的可見金(VG)在0.6米以上返回3.77g/噸Au。礦化賦存於SCC蝕變花崗閃長巖中的石英+鉍礦(Bis)細脈中。

Table 4. 2021 Significant Intercepts (Highlighted Intercepts are reported in Table 1)

表4.2021重要截獲(突出顯示的截獲見表1)

https://www.globenewswire.com/NewsRoom/AttachmentNg/732089e0-aa78-4325-9835-9ea907d360db

Https://www.globenewswire.com/NewsRoom/AttachmentNg/732089e0-aa78-4325-9835-9ea907d360db

https://www.globenewswire.com/NewsRoom/AttachmentNg/eb05b4e8-e6ce-4ab6-97ef-e0b3629adb18

Https://www.globenewswire.com/NewsRoom/AttachmentNg/eb05b4e8-e6ce-4ab6-97ef-e0b3629adb18

https://www.globenewswire.com/NewsRoom/AttachmentNg/c4addfca-1777-447e-b16c-fbe315b128be

Https://www.globenewswire.com/NewsRoom/AttachmentNg/c4addfca-1777-447e-b16c-fbe315b128be

https://www.globenewswire.com/NewsRoom/AttachmentNg/4f091cca-a022-4072-8321-4c186e3d4c9b

Https://www.globenewswire.com/NewsRoom/AttachmentNg/4f091cca-a022-4072-8321-4c186e3d4c9b

References and Disclosures

參考資料及披露

1 Gold equivalent [AuEq] is used for illustrative purposes, to express the combined value of gold, silver, copper, molybdenum, and tungsten as a percentage of gold. No allowances have been made for recovery losses that would occur in a mining scenario. AuEq is calculated using US$1750.00 per troy ounce of gold, US$24.00 per troy ounce of silver, US$4.00 per pound of copper, US$15.00 per pound of molybdenum, and US$13.00 per pound of tungsten.

1黃金當量[AUEQ]用於説明目的,用來表示金、銀、銅、鉬和鎢的合計價值,以佔金的百分比表示。沒有對採礦方案中可能發生的恢復損失給予任何補償。AUEQ的計算方法是:每金衡盎司黃金1750.00美元,白銀每金衡盎司24美元,銅每磅4美元,鉬每磅15美元,鎢每磅13美元。

AuEq = Au g/t + (Ag g/t X $24.00 / $1750.00) + (Cu% X $4.00 X 22.0462) / ($1750.00 / 31.10) + (Mo% X $15.00 X 22.0462) / ($1750.00 / 31.10) + (W% X $13.0 X 22.0462) / ($1750.00 X 31.10)

AUEQ=Au g/t+(Ag g/t X$24.00/$1750.00)+(Cu%X$4.00X 22.0462)/($1750.00/31.10)+(Mo%X$15.00X 22.0462)/($1750.00/31.10)+(W%X$13.0X 22.0462)/($1750.00 X 31.10)

Reported assay intervals are calculated using Micromine's grade composite tool with a >0.25g/t AuEq cutoff, constrained by <6 metres of consecutive dilution. High-grade intervals are reported using >1.0g/t AuEq cutoff with no dilution.

報告的分析間隔是使用Micromine的等級複合工具計算的,其AuEq截止值>0.25g/t,受1.0g/t AuEq截止值限制,且不稀釋。

Reported assays are uncut weighted averages and represent drilled core lengths. The true width of reported mineralization is unknown.

報道的化驗是未經切割的加權平均值,代表鑽探的巖心長度。報道的礦化的真實寬度是未知的。

2 Reinterpretation of the WAu Zone was completed by reviewing historical drill holes along trend. Geological data (core logs, assays, and core photos) were inspected for structural and geochemical signatures that match characteristics of the Wau Zone. AuEq values are reported using current metal prices for both historical and newly identified intercepts.

2通過沿勢回顧歷史鑽孔,完成了對瓦烏地區的重新解釋。對地質數據(巖心測井、化驗和巖心照片)進行了檢查,以尋找與瓦烏地區特徵相匹配的結構和地球化學特徵。AuEq值是使用歷史和新發現的截獲的當前金屬價格報告的。

3 AuEq reported in PR19-06 is calculated using US$1,510 per troy ounce of gold, US$17.00 per troy ounce of silver, US$2.5 per pound of copper and US$12.7 per pound of molybdenum AuEq = ($1510.00 X Au [g/t] / 31.10 + $17.00 X Ag [g/t] / 31.10 + $2.50 X Cu [%] /100 X 2204.63 + $12.70 X Mo [%] / 100 X 2204.63) / $1510.00 X 31.10).

3PR19-06年度報告的AuEq是按照每金衡盎司黃金1,510美元、每金衡盎司白銀17.00美元、每磅銅2.5美元和每磅鉬12.7美元計算的AUEQ=($1510.00 X Au[克/噸]/31.10+$17.00 X Ag[克/噸]/31.10+$2.50 X Cu[%]/100X 2204.63+12.70X MO[%]/100X 2204.63)/$1510.00 X 31.10).

Sample Preparation and QAQC

樣品製備與QAQC

Diamond drill holes at the Freegold Mountain Project are drilled using HTW and NTW core sizes (70.92 millimetres and 56.00 millimetres diameter respectively). Drill core samples average 1.63 metres in length with a minimum length of 0.50 metres and a maximum length of 2.80 metres. Drill core is cut along the long axis of the core over the entire length of the drill hole. Sample intervals are defined by mineralization, lithology, structure, and alteration boundaries.

弗裏戈德山項目的鑽石鑽孔採用HTW和NTW巖芯尺寸(直徑分別為70.92毫米和56.00毫米)。鑽芯樣本平均長度為1.63米,最小長度為0.50米,最大長度為2.80米。在整個鑽孔長度上沿鑽芯的長軸切割鑽芯。採樣間隔由礦化、巖性、構造和蝕變邊界確定。

Sample preparation is completed at ALS Whitehorse with sample pulps shipped to ALS Vancouver for analyses. Samples are dried and crushed to 70% less than 2 millimetres with a 250-gram riffle-split and pulverized to better than 85% passing 75 microns (PREP-31).

樣品準備在ALS Whitehorse完成,樣品紙漿運往ALS温哥華進行分析。樣品乾燥後,用250克Rifle-Split將其粉碎至70%,粒徑小於2毫米,粉碎至85%以上,超過75微米(PREP-31)。

A 50-gram sample from the pulp is analyzed for gold using fire assay techniques and atomic absorption spectroscopy with detection limits of 0.005-10 parts per million ("ppm") (Au-AA24). Gold overlimit values are re-analyzed using a gravimetric finish with an upper detection limit of 10,000 ppm (Au-GRA22). A 0.25 gram sample from the pulp is analyzed with multi-element geochemistry (ME-ICP-61) using a 4-acid near total digestion and induced coupled plasma atomic emission spectroscopy (ICP-AES) providing 33 element output (Ag, Al, As, Ba, Be, Bi, Ca, Cd, Co, Cr, Cu, Fe, Ga, K, La, Mg, Mn, Mo, Na, Ni, P, Pb, S, Sb, Sc, Sr, Th, Ti, Tl, U, V, W, Zn).

用火焰分析技術和原子吸收光譜法對50克紙漿樣品中的金進行分析,檢測下限為百萬分之0.005-10ppm(Au-AA24)。用10000ppm(Au-GRA22)的重量法重新分析了金的超限值。對0.25g礦漿樣品進行了多元素地球化學(ME-ICP-61)分析,採用4酸近全消解和感應耦合等離子體原子發射光譜(ICP-AES),得到33種元素(Ag、Al、As、Ba、Be、Bi、Ca、Cd、Co、Cr、Cu、Fe、Ga、K、La、Mg、Mn、Mo、Na、Ni、P、Pb、S、Sb、Sc、Sr、Th、Ti、Tl、U、V、W、Zn)。

Sample Quality Assurance/Quality Control ("QAQC") measures include unmarked certified reference materials (CRMs), rock blanks, and field duplicates are inserted into the sample sequence and make up 5% of the samples submitted to the lab for holes reported in this release. Additional QAQC checks are ongoing in accordance with 43-101 standards.

樣品質量保證/質量控制(“QAQC”)措施包括在樣品序列中插入未標記的認證標準物質(CRM)、巖石空白和現場複製品,佔本新聞稿中報告的孔洞提交給實驗室的樣品的5%。根據43-101標準,其他QAQC檢查正在進行中。

Qualified Person

合格人員

The technical content of this news release has been reviewed and approved by Brian May, P.Geo., President of the Company and qualified person as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects.

本新聞稿的技術內容經公司總裁Brian May,P.Geo,National Instrument 43-101-礦產項目披露標準規定的合格人員審核和批准。

About Triumph Gold Corp.

凱旋黃金公司簡介

Triumph Gold Corp. is a Canadian based, growth-oriented exploration and development company with a district scale land package in mining friendly Yukon. The Company's 100% owned, road accessible, flagship Freegold Mountain Project in the Dawson Range Au-Cu Belt is host to three NI 43-101 Mineral Deposits (Nucleus, Revenue, and Tinta Hill). The Project is 200 square kilometres and covers an extensive section of the Big Creek Fault zone, a structure directly related to epithermal gold and silver mineralization as well as gold-rich porphyry copper mineralization.

凱旋黃金公司(Triumph Gold Corp.)是一家總部設在加拿大、以增長為導向的勘探和開發公司,在礦業友好的育空地區擁有區域規模的土地包。該公司位於道森山脈Au-Cu帶的100%擁有、道路便利的旗艦項目Freegold Mountain項目擁有三個NI 43-101礦藏(Nucleus、Revenue和Tinta Hill)。該項目佔地200平方公里,覆蓋了大溪斷裂帶的大片區域,該斷裂帶是與淺成熱液金銀礦化以及富含金斑巖銅礦直接相關的構造。

Led by an experienced management and technical team, Triumph Gold is focused on actively advancing the Freegold Mountain Project using multidiscipline exploration and evaluation techniques.

在經驗豐富的管理和技術團隊的帶領下,凱旋黃金致力於利用多學科勘探和評估技術積極推進弗裏戈德山項目。

The Company owns 100% of the Big Creek and Tad/Toro copper-gold properties situated along strike of the Freegold Mountain Project within the Dawson Range.

該公司擁有位於道森山脈內弗裏戈德山項目的Strike沿線的Big Creek和Tad/Toro銅金礦產的100%權益。

The Company also owns 100% of the Andalusite Peak copper-gold property, situated 36 km southeast of Dease Lake within the Stikine Range in British Columbia.

該公司還擁有位於不列顛哥倫比亞省斯蒂金山脈內迪斯湖東南36公里處的紅柱石峯銅金礦的100%權益。

For more information, please visit triumphgoldcorp.com.

欲瞭解更多信息,請訪問Triumphgoldcorp.com。

On behalf of the Board of Directors

我謹代表董事會

Signed "John Anderson"

署名“約翰·安德森”

John Anderson, Executive Chairman

約翰·安德森(John Anderson),執行主席

For further information about Triumph Gold Please contact:

欲獲知更多有關凱旋黃金公司的信息,請聯繫:

John Anderson, Executive Chairman
Triumph Gold Corp.
(604) 218-7400
janderson@triumphgoldcorp.com

約翰·安德森(John Anderson),執行主席
凱旋黃金公司(Triumph Gold Corp.)
(604) 218-7400
郵箱:janderson@triumphgoldcorp.com

Nancy Massicotte
IR Pro Communications Inc.
(604) 507-3377
nancy@irprocommunications.com

南希·馬西科特
IR Pro Communications Inc.
(604) 507-3377
郵箱:nancy@irproCommunations.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所創業板交易所及其監管服務提供商(該術語在多倫多證券交易所創業板政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

This news release contains forward-looking information, which involves known and unknown risks, uncertainties and other factors that may cause actual events to differ materially from current expectation. Important factors - including the availability of funds, the results of financing efforts, the completion of due diligence and the results of exploration activities - that could cause actual results to differ materially from the Company's expectations are disclosed in the Company's documents filed from time to time on SEDAR (see www.sedar.com). Readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date of this press release. The company disclaims any intention or obligation, except to the extent required by law, to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise.

本新聞稿包含前瞻性信息,涉及已知和未知的風險、不確定性和其他可能導致實際事件與當前預期大不相同的因素。可能導致實際結果與公司預期大不相同的重要因素-包括資金的可獲得性、融資努力的結果、盡職調查的完成情況以及勘探活動的結果-在公司不時提交給SEDAR的文件中披露(見Www.sedar.com)。告誡讀者不要過度依賴這些前瞻性陳述,這些陳述僅在本新聞稿發佈之日發表。除法律要求的範圍外,該公司沒有任何意圖或義務來更新或修改任何前瞻性陳述,無論是由於新信息、未來事件或其他原因。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論