This announcement is a separate document:
恆富控股:聯合公佈 延長寄發於建泉融資有限公司為及代表要約人就收購恒富控股有限公司全部已發行股份(要約人及╱或與其一致行動人士已擁有及╱或同意將予收購者除外)提出強制性無條件現金要約之綜合要約及回應文件之時間
CARRY WEALTH: JOINT ANNOUNCEMENT EXTENSION OF TIME FOR DESPATCH OF THE COMPOSITE OFFER AND RESPONSE DOCUMENT IN RESPECT OF THE MANDATORY UNCONDITIONAL CASH OFFER BY VBG CAPITAL LIMITED FOR AND ON BEHALF OF THE OFFEROR TO ACQUIRE ALL THE ISSUED SHARES OF CA
The translation is provided by third-party software.
The above content is for informational or educational purposes only and does not constitute any investment advice related to Futu. Although we strive to ensure the truthfulness, accuracy, and originality of all such content, we cannot guarantee it.