share_log

Reported Earlier, Woodside's Scarborough LNG Project Reaches New Heights With Delivery Of Final Pluto Train 2 Components

Reported Earlier, Woodside's Scarborough LNG Project Reaches New Heights With Delivery Of Final Pluto Train 2 Components

早前報道,伍德賽德的斯卡伯勒液化天然氣項目在最後一列普魯託列車2元件交付上達到了新的高度。
Benzinga ·  12/23 15:33

The Scarborough Energy Project has passed another significant milestone with the final Pluto Train 2 modules arriving at the Pluto LNG facility in Karratha, Western Australia.

斯卡伯勒能源項目在位於澳洲卡拉莎的普魯託液化天然氣設施成功迎來了最後的普魯託2號模塊,達成了另一個重要里程碑。

The successful completion of the Pluto Train 2 module program advances the Scarborough Energy Project towards the targeted delivery of first LNG in 2026.

普魯託2號模塊計劃的成功完成使斯卡伯勒能源項目向2026年首次液化天然氣的目標交付邁進了一步。

Since February 2024, a total of 51 modules, weighing a combined 56,000 metric tonnes, have been shipped to Karratha from the module yard in Batam, Indonesia, where they were built.

自2024年2月以來,共有51個模塊,總重56,000公噸,已從印度尼西亞巴淡島的模塊場運送到卡拉莎,在那裏建造。

Expanding the Pluto LNG facility to include a second LNG processing train provides an efficient way to process gas from the offshore Scarborough field.

擴建普魯託液化天然氣設施以包括第二條液化天然氣加工列車,爲處理來自離岸斯卡伯勒油田的燃料幣提供了一種高效的方式。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論