share_log

Eos Energy Receives First Loan Advance From Department Of Energy's Loan Programs Office In The Amount Of $68.3M

Eos Energy Receives First Loan Advance From Department Of Energy's Loan Programs Office In The Amount Of $68.3M

Eos Energy 收到來自能源部貸款項目辦公室的第一筆貸款預付款,金額爲6830萬美元。
Benzinga ·  12/20 05:43

The loan advance, which covers 80% of eligible costs incurred to date on the Mon Valley Works expansion project, represents the maximum allowable amount under the program at this time.

此次貸款預付款覆蓋了當前在Mon Valley Works擴建項目中發生的80%的合格費用,代表了該計劃下此時允許的最大金額。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論