share_log

Spark Energy Extends Newly Identified Pegmatite Corridor to 7.2km of Strike, Defines New Targets Across Its Arapaima Lithium Project in Brazil's Lithium Valley and Provides Corporate Update

Spark Energy Extends Newly Identified Pegmatite Corridor to 7.2km of Strike, Defines New Targets Across Its Arapaima Lithium Project in Brazil's Lithium Valley and Provides Corporate Update

Spark Energy 將新識別的鋰礦岩脈延伸至7.2公里,並在巴西鋰礦谷的Arapaima鋰礦項目中確定新的目標,同時提供公司更新。
newsfile ·  12/14 06:44

Vancouver, British Columbia--(Newsfile Corp. - December 13, 2024) - Spark Energy Minerals Inc. (CSE: SPRK) (OTC Pink: SPARF) (FSE: 8PC) ("Spark" or the "Company") an exploration Company focused on the discovery of battery metals in Brazil's prestigious Lithium Valley, is pleased to provide an update from the second week of exploration at the Company's 64,359-hectare Arapaima Lithium project located in Lithium Valley, Minas Gerais, Brazil.

溫哥華,不列顛哥倫比亞省--(資訊公司 - 2024年12月13日)- Spark Energy Minerals Inc.(CSE: SPRK)(場外交易:SPARF)(FSE: 8PC)("Spark"或"公司")是一家專注於發現巴西著名鋰礦區電池金屬的勘探公司,很高興提供位於巴西米納斯吉拉斯鋰礦區的64,359公頃Arapaima鋰項目第二週勘探的最新情況。

Arapaima Lithium Project Exploration Highlights:

阿拉帕伊瑪鋰礦項目勘探亮點:

  • Recent work (Targets 1, 2 and 3) completed by teams 1 and 2 has identified two new pegmatite bearing corridors through a large erosional window in lateritic cover sequences both to the northeast and southeast of the ~1.7km corridor segment first identified in early December and adding an additional 5.5km of strike. (Figure 2).
  • When combined with these new corridors the total prospective targets in the north (now encompassing targets 1, 2 and 3) extends over ~7.2 km of strike and remains open.
  • Geologically the areas can be described as saprolite comprising deeply weathered (kaolinized) - two mica granites with remnant quartz - black tourmaline aggregates hosting numerous pegmatite veins and dykes.
  • The third team has recently focused on more regional traverses over the broad target areas 4 and 5 in the west-central sector of the tenement package.
  • Work here continues to identify, map and sample various pegmatite exposures hosted by granite. Prominent structural trends that are coincident with geophysical responses including magnetic and radiometric signatures (especially thorium) are starting to appear as occurrence and sampling points begin to populate the geological maps.
  • The first batch of nearly 100 samples (rock chip, stream sediment, channel and soil) is being prepared for submission to the accredited SGS laboratory in Belo Horizonte on the 15th of December with results expected to be reported by mid January.
  • 近期工作(目標1、2和3)由團隊1和2完成,鑑定出兩個新的含斜長石的走廊,穿越了大規模的風化窗口,位於~1.7公里的走廊段的東北和東南,首次識別於12月初,並增加了5.5公里的走廊。 (圖2)。
  • 與這些新走廊結合的北部總潛在目標(現在包括目標1、2和3)延伸超過~7.2公里,且仍然開放。
  • 從地質上看,這些區域可以描述爲深度風化的(高嶺土化的)- 兩種雲母花崗岩,殘餘石英 - 黑色電氣石聚集物,包含大量的斜長石脈和岩脈。
  • 第三個團隊最近專注於在地租包的西中部區域的廣泛目標區域4和5進行更區域性的穿越調查。
  • 這裏的工作繼續識別、繪製和取樣被花崗岩包圍的各種斜長石暴露。與地球物理響應(包括磁性和放射性特徵,尤其是釷)一致的顯著結構趨勢開始出現,隨着發生和取樣點開始填充地質圖。
  • 第一批近100份樣品(岩石碎片、河流沉澱物、通道和土壤)正在準備於12月15日提交給位於貝洛哈里桑特的SGS認證實驗室,預計結果將於1月中旬報告。

Figure 1: Figure showing location of geological data points and samples collected to date relative to the priority target areas over the Arapaima Lithium project tenements

圖1:顯示至今收集的地質數據點和樣本位置與Arapaima鋰礦項目優先目標區域的關係的圖

Spark's exploration continued with field reconnaissance mapping and sampling with two teams now focusing on further evaluation of and definition of extensions to the prominent, pegmatite corridor, recently identified (see PR dated December 3rd, 2024, here). The third team continued the more regional focused first pass reconnaissance mapping and stream sediment sampling. To date exploration has covered approximately 10-15% of Spark's extensive tenement package in the region defining five priority target areas. A total of 130 geological points have been described and 89 samples have been collected (Figure 1).

Spark的勘探工作繼續進行,現場偵測、繪圖和採樣有兩個團隊現正專注於進一步評估和定義最近識別的顯著的鈉長石走廊的擴展(參見2024年12月3日的新聞稿,網址在此)。第三個團隊繼續進行更具區域性重點的初步偵測繪圖和溪流沉積採樣。至今,勘探已覆蓋Spark在該區域的廣泛礦權包的約10-15%,定義了五個優先目標區域。已描述130個地質點,收集了89個樣本(見圖1)。

Figure 2: Recently identified and mapped pegmatite corridors with a combined strike extent of 7.2km in the northern half of the Arapaima Lithium project tenements

圖2:最近識別並繪製的鈉長石走廊,Arapaima鋰礦項目礦權北部的總延伸長度爲7.2公里

Continued exploration in this important newly defined target area will focus on detailed mapping and sampling of the highly weathered pegmatite exposures with the aim of positively identifying potential lithium bearing minerals such as spodumene (ref 1 & 2) that have been previously cited in government reports. This provides the team with a challenge in this region where the tropical weathering processes is expected to have largely converted spodumene to smectite clay which at times may still exhibit pseudomorphs of the original crystalline form of spodumene but only retaining low levels of Lithium in sample analyses.

在這個重要的新定義目標區域內,持續的勘探將專注於高度風化的鈉長石暴露處的詳細繪圖和採樣,旨在積極識別潛在的鋰含礦礦物,如輝石(參考1 & 2),這些在政府報告中曾被引用。這給團隊帶來了挑戰,因爲熱帶風化過程預計會在很大程度上將輝石轉化爲膨潤土黏土,在某些時候可能仍會表現出輝石原晶體形式的假象,但在樣本分析中僅保留較低水平的鋰。

Jon Hill, Director of Spark Energy Minerals, commented: "Exploration findings to date have been particularly encouraging, the team has successfully identified and confirmed metasomatized two mica granites intruded by pegmatites in the initial priority areas targeted by the program, where they are exposed through regolith and tertiary cover. Importantly the team has been able to further delineate and extend the footprint of these occurrences over a significant, combined 7.2 km strike length to date. The presence of old excavations intercepting these pegmatites has been an important find from drone reconnaissance and these will be accessed for mapping and sampling once this is safe to do so. Geophysical data also strongly suggests extensions to the zone of interest beneath the cover is probable. Based on work completed over the past two weeks it now seems likely we have identified several potential source pegmatites for the lithium bearing minerals like spodumene and lepidolite reported by the government heavy mineral -stream sediment samples."

Spark Energy Minerals的董事Jon Hill評論道:"至今的勘探發現特別鼓舞人心,團隊成功地識別並確認了由鈉長石侵入的兩種雲母花崗岩在程序初始優先區域的變質作用曝光,經過風化層和第三紀覆蓋層暴露的重要性。團隊還能進一步劃定和擴展這些發現的足跡,迄今爲止累計長度達7.2公里。老的挖掘工地攔截這些鈉長石的發現是無人機偵測的重要發現,待安全後將進行映射和採樣。地球物理數據也強烈表明,在覆蓋層下延伸的興趣區是可能的。根據過去兩週的工作,現在看來我們已識別出幾處鋰含礦物的潛在源鈉長石,如政府重礦物溪流沉積樣本中報告的輝石和鋰輝石。"

Target Generation Program: Planning remainder of exploration in December 2024

目標產生計劃:規劃2024年12月剩餘的勘探工作

  • Submit first sample batches to SGS Laboratory in Belo Horizonte
  • Team 1 and 2 continue to map and sample the combined target comprising the three pegmatite trends (1, 2 and 3) with the aim of accessing the old workings identified by the drone overflight.
  • Team 3 to evaluate extension of Si6 area into Spark tenement and commence traverses over the southern tenement blocks to determine an appropriate stream sampling strategy.
  • 將首批樣品送至貝洛哈里藏特的SGS實驗室
  • 第一組和第二組繼續繪製和取樣合併目標,包括三條偉晶岩趨勢(1、2和3),旨在進入無人機航拍識別的舊作業區。
  • 第三組將評估Si6區域擴展到Spark礦區,並開始在南部礦區塊上進行橫斷調查,以判斷合適的溪流取樣策略。

Eugene Hodgson, CEO of Spark Energy Minerals, stated: "The extension of our pegmatite corridor to 7.2km of strike at the Arapaima Lithium Project is a significant milestone for Spark Energy. The identification of these new targets, reinforces our belief in the project's potential within Brazil's Lithium Valley. Our exploration teams have made remarkable progress in a short time, and we're excited about the prospects these findings."

Spark Energy Minerals的首席執行官尤金·霍奇森表示:"我們在阿拉派馬鋰礦項目中將偉晶岩走廊擴展到7.2公里的走向是Spark Energy的重要里程碑。識別出這些新目標,強化了我們對該項目在巴西鋰谷潛力的信心。我們的勘探團隊在短時間內取得了顯著進展,我們對這些發現的前景感到興奮。"

Extension of Marketing Agreement

市場協議的延長

Additionally, Spark announces that it has extended its previously announced (see the Company's August 8, 2024, news release) engagement with bullVestor Medien GmbH ("bullVestor") and its General Manager, Helmut Pollinger, to provide certain strategic planning services to the Company, which services may include investor relations activities within the meaning of applicable securities laws and the policies of the Canadian Securities Exchange.

此外,Spark宣佈已將其先前宣佈的(參見公司2024年8月8日的新聞稿)與bullVestor Medien GmbH("bullVestor")及其總經理海爾穆特·波林格的合作關係延長,以向公司提供某些戰略規劃服務,這些服務可能包括符合適用證券法和加拿大證券交易所政策的投資者關係活動。

The Company has extended the engagement with bullVestor for an additional term of three months ending on April 30, 2025, in consideration for the Company making a cash payment of $200,000. bullVestor and its principal are at arm's length to the Company and, to the knowledge of the Company, bullVestor does not own, control, or direct any securities of the Company. (bullVestor Medien GmbH; Address: Gutenhofen 4 - 4300 St. Valentin; Email: kontakt@bullvestor.at; Tel: +43 (0) 7435-44077)

公司已將與bullVeSTor的合作關係延長了額外三個月,至2025年4月30日,作爲公司支付20萬美元現金的對價。bullVeSTor及其主要人員與公司處於獨立關係,至公司所知,bullVeSTor不擁有、控制或指揮公司的任何證券。(bullVeSTor Medien GmbH; 地址:Gutenhofen 4 - 4300 ST. Valentin; 電子郵件:kontakt@bullveSTor.at; 電話:+43 (0) 7435-44077)

Qualified Person:

合格人士:

The scientific and technical information disclosed in this document has been reviewed and approved by Jonathan Victor Hill BSc Hons, FAUSIMM, a Qualified Person consistent with NI 43-101.

本文件中披露的科學和技術信息已由合格人士喬納森·維克托·希爾審查和批准,喬納森·維克托·希爾具有學士學位榮譽,FAUSIMm,其資格符合NI 43-101標準。

  1. Source: ''Evaluation of the Lithium Potential in Brasil`` - Mid - Jequitinhonha River, North -East Minas Gerais`` ministry of Mines and Energy, Secretary of Geology, Mines and Development, the Geological Survey of Brazil promoting mineral research. Technical Report - 2016
  2. Source: ''Lithium Potential Assessment Project in Brasil`` in the Eastern Pegmatite Province of Brasil: the Geological Survey of Brazil promoting mineral research. Technical Report 19 - August 2023 DOI: 10.29396/ITCPRM.2023.19
  1. 來源:''巴西鋰礦潛力評估`` - 中部 - 傑基廷霍尼亞河,東北米納斯吉拉斯`` 礦業和能源部,地質、礦業和發展秘書處,巴西地質調查侷促進礦產研究。技術報告 - 2016
  2. 來源:''巴西鋰礦潛力評估項目`` 在巴西東部偉晶岩省:巴西地質調查侷促進礦產研究。技術報告19 - 2023年8月 DOI: 10.29396/ITCPRm.2023.19

About Spark Energy Minerals Inc.

Spark Energy Minerals,Inc.,是一家加拿大公司,專注於追求電池金屬和礦物資產,擁有在巴西和加拿大新獲得的利益。該公司已經在一些全球最富有的礦業法域中獲得了資產,包括巴西日益增長的鋰和金屬板塊以及在紐芬蘭加拿大地域板塊,後者正在被認爲是鋰和稀土元素勘探的全球熱點之一。

Spark Energy Minerals, Inc. is a Canadian company focused on the acquisition, exploration, and development of battery metals and mineral assets, with a particular emphasis on its substantial interests in Brazil. The Company's flagship project is the Arapaima Lithium project spanning 64,359 hectares in Brazil's renowned Lithium Valley, one of the most prolific mining regions in the world. This region is rapidly gaining global recognition for its vast deposits of lithium and rare earth minerals, positioning Brazil as a critical player in the global energy transition.

Spark Energy Minerals, Inc.是一家專注於鋰礦和礦產資產的收購、勘探和開發的加拿大公司,特別注重其在巴西的重大投資。公司的旗艦項目是阿拉帕伊馬鋰礦項目,位於巴西著名的鋰谷,面積達64,359公頃,這是全球最富有的採礦地區之一。該地區正迅速在全球範圍內獲得認可,以其豐富的鋰和稀土礦產儲量,使巴西在全球能源轉型中成爲關鍵角色。

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

加拿大證券交易所及其監管服務提供者(如該術語在加拿大證券交易所政策中所定義)均不對本公告的充分性或準確性承擔任何責任。

FOR ADDITIONAL INFORMATION, SEE THE COMPANY'S WEBSITE AT
Email to info@sparkenergyminerals.com
Contact: Eugene Hodgson, CEO, Tel. +1-778-744-0742

如需更多信息,請訪問公司的官方網站
電子郵件至 info@sparkenergyminerals.com
聯繫人:尤金·霍奇森,首席執行官,電話:+1-778-744-0742

Forward-Looking Statement Disclaimer

前瞻性聲明免責聲明

Certain statements contained in this release may constitute "forward-looking statements" or "forward-looking information" (collectively "forward-looking information") as those terms are used in the Private Securities Litigation Reform Act of 1995 and similar Canadian laws. These statements relate to future events or future performance. The use of any of the words "could," "intend," "expect," "believe," "will," "projected," "estimated", "anticipates" and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on the Company's current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. In particular, this release contains forward-looking information relating to the business of the Company, the Property, financing and certain corporate changes. The forward-looking information contained in this release is made as of the date hereof, and the Company is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.

本公告中包含的某些聲明可能構成"前瞻性聲明"或"前瞻性信息"(統稱"前瞻性信息"),如1995年《私人證券訴訟改革法案》及類似的加拿大法律中所使用的這些術語。這些聲明涉及未來事件或未來表現。使用"可能"、"打算"、"期望"、"相信"、"將"、"預測"、"估計"、"預期"以及類似表達和與非歷史事實有關的聲明,旨在識別前瞻性信息,並基於公司對未來事件的結果和時間的當前信念或假設。實際的未來結果可能會有重大差異。特別是,本公告包含與公司的業務、資產、融資及某些公司變更相關的前瞻性信息。本公告中包含的前瞻性信息是基於本日期作出的,公司沒有義務更新或修訂任何前瞻性信息,無論是由於新信息、未來事件還是其他原因,除非適用的證券法律要求這樣做。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論