VANCOUVER, BC / ACCESSWIRE / December 2, 2024 / SouthGobi Resources Ltd. (TSX-V:SGQ)(HK:1878) (" SouthGobi " or the " Company ") is pleased to announce the filing of new independent technical reports, each prepared by BAW Mineral Partners Limited (" BAW "), in accordance with the requirements of National Instrument 43-101 - Standards of Disclosure for Mineral Projects (" NI 43-101 ") under applicable Canadian securities laws in respect of its Ovoot Tolgoi Coal Mine and its Soumber Coal Project.

溫哥華, BC / ACCESSWIRE / 2024年12月2日 / 南戈壁資源有限公司 (tsx-v:sgq)(hk:1878) ("南戈壁"或"公司") 很高興地宣佈,根據國家儀器43-101 - 礦業項目披露標準 ("ni 43-101") 的要求,已提交新的獨立技術報告,均由BAW礦業合作伙伴有限公司 ("BAW") 編制,符合適用的加拿大證券法,涉及其Ovoot Tolgoi煤礦和Soumber煤項目。

The Ovoot Tolgoi technical report is entitled "NI 43-101 Technical Report - Ovoot Tolgoi Coal Mine, South Gobi Province, Mongolia" with an effective date of December 31, 2023 and dated December 2, 2024 (the " Ovoot Tolgoi Technical Report "). The Soumber technical report is entitled "NI 43- 101 Technical Report - Soumber Coal Project, South Gobi Province, Mongolia" with an effective date of December 31, 2023 and dated December 2, 2024 (the " Soumber Technical Report ," and together with the Ovoot Tolgoi Technical Report, the " Technical Reports ").

Ovoot Tolgoi技術報告的標題爲"NI 43-101技術報告 - Ovoot Tolgoi煤礦,南戈壁省,蒙古",有效日期爲2023年12月31日,日期爲2024年12月2日("Ovoot Tolgoi技術報告")。Soumber技術報告的標題爲"NI 43-101技術報告 - Soumber煤項目,南戈壁省,蒙古",有效日期爲2023年12月31日,日期爲2024年12月2日("Soumber技術報告",與Ovoot Tolgoi技術報告合稱爲"技術報告")。

The primary objectives of the Technical Reports are to provide updated estimates of mineral resources (" Resources ") and mineral reserves (" Reserves "), as such terms are defined under NI 43-101, for each of the Ovoot Tolgoi Coal Mine and the Soumber Coal Project. The Company is pleased to present its first Resource estimates for the B Field Prospect at the Ovoot Tolgoi Coal Mine, as further discussed below, and its first Reserve estimates for the Soumber Coal Project.

技術報告的主要目標是爲Ovoot Tolgoi煤礦和Soumber煤項目提供更新的礦產資源("資源")和礦產儲量("儲量")估計,如NI 43-101中定義的術語。公司很高興地介紹其在Ovoot Tolgoi煤礦b區前景的首次資源估計,如下文進一步討論的內容,以及其對Soumber煤項目的首次儲量估計。

Selected summary information from the Technical Reports is presented below. Readers are cautioned that the summary information set out in this press release is subject to important qualifications, assumptions, and exclusions, all of which are detailed in the Technical Reports. To fully understand the summary information set out below, the Technical Reports should be read in their entirety, and are available under the Company's profile on SEDAR+ at and on the Company's website at .

以下是來自技術報告的精選摘要信息。讀者需謹慎,這份新聞稿中所列出的摘要信息受到重要的資格、假設和排除條款的影響,所有這些在技術報告中都有詳細說明。爲了充分理解下面列出的摘要信息,應該完整閱讀技術報告,並可在公司的SEDAR+檔案及公司的官方網站上查閱。

OVOOT TOLGOI TECHNICAL REPORT

OVOOt TOLGOI 技術報告

Background

背景

The Ovoot Tolgoi Mine is the Company's flagship asset, and is comprised of the Sunrise Pit, Sunset Pit, B Field Prospect, and C Field Prospect. The Ovoot Tolgoi Coal Mine is situated in the southwestern corner of the Umnugobi Aimag (South Gobi Province) of Mongolia, within the administrative territory of Gurvantes Soum. It is located approximately 320 km southwest of the provincial capital, Dalanzadgad, and approximately 45 km north of the Mongolia-China border at the Ceke border crossing. Ceke, located on the Chinese side of the Shiveekhuren Border Crossing, is a major coal distribution terminal with rail connections to key coal markets in China, and serves as the primary distribution center for coal produced from the Ovoot Tolgoi Mine.

Ovoot Tolgoi 煤礦是公司的旗艦資產,包含日出礦坑、日落礦坑億田勘探和C田勘探。Ovoot Tolgoi 煤礦位於蒙古南戈壁省的烏姆努戈比地區的西南角,在古爾萬特蘇木的行政領土內。礦區距離省會達蘭扎德嘎德約320公里,距離中國邊境的塞克口岸約45公里。塞克位於西維克烏倫口岸的中國一側,是一個主要的煤炭分配終端,擁有通往中國主要煤炭市場的鐵路連接,是Ovoot Tolgoi 煤礦生產的煤炭的主要分配中心。

The Company commenced mining at the Ovoot Tolgoi Mine in 2008. The Company sells a portion of its coal at the mine-gate to Chinese customers, while the remaining coal inventory is transported to China and sold through its Chinese subsidiaries at the stockyards in Ceke or certain designated locations in China as requested by customers. Saleable products from the Ovoot Tolgoi Mine primarily consist of SouthGobi standard and SouthGobi premium semi-soft coking coal products. Some higher ash content product is processed and sold as semi-soft coking coal product while some of the unwashed products are sold as a thermal coal product when the market allows.

公司於2008年開始在Ovoot Tolgoi 煤礦進行採礦。公司將其部分煤炭在礦口出售給中國客戶,剩餘的煤炭庫存則運輸到中國,通過其在塞克或中國某些指定地點的子公司出售,具體取決於客戶的需求。Ovoot Tolgoi 煤礦可銷售的產品主要包括南戈壁標準和南戈壁優質半軟焦練煤產品。一些高灰分的產品被加工並作爲半軟焦練煤產品出售,而部分未洗滌的產品在市場允許時被作爲動力煤產品出售。

Highlights

亮點

Highlights of the updated Ovoot Tolgoi Technical Report include:

更新的Ovoot Tolgoi 技術報告的亮點包括:

  • Measured and Indicated Resources for the Sunrise Pit increased by approximately 9.8% from 121.70 million tonnes (Mt) as of December 31, 2016 to 133.60 Mt as of December 31, 2023.

  • Measured and Indicated Resources for the Sunset Pit decreased by approximately 3.2% from 180.50 Mt as of December 31, 2016 to 174.71 Mt as of December 31, 2023.

  • Measured and Indicated Resources for the B Field Prospect is 14.29 Mt as of December 31, 2023.

  • 日出礦坑的已探明和指示資源從2016年12月31日的12170萬噸(Mt)增加約9.8%,截至2023年12月31日達到133.60 Mt。

  • 日落礦坑的已探明和指示資源從2016年12月31日的180.50 Mt減少約3.2%,截至2023年12月31日達到174.71 Mt。

  • 截至2023年12月31日,b區域前景的可測量和指示資源爲14.29百萬噸。

Reserve Estimate

儲量估計

The following is a table summarizing the Reserves of the Ovoot Tolgoi Coal Mine as of December 31, 2023, for the Sunrise Pit and the Sunset Pit.

以下是截至2023年12月31日Ovoot Tolgoi 煤礦在日出坑和日落坑的儲量彙總表。

Coalfield

Proven (Mt)

Probable (Mt)

Total (Mt)

Sunrise Pit

27.90

11.69

39.59

Sunset Pit

41.56

1.12

42.68

Total

69.46

12.81

82.26

煤田

已探明(百萬噸)

可能(百萬噸)

總量(Mt)

日出坑

27.90

11.69

39.59

日落坑

41.56

1.12

42.68

總計

69.46

12.81

82.26

Notes:

注:

  1. Coal price adopted in the Reserve estimates is US $90/t.

  2. Reserves do not include any Inferred Resources.

  3. Totals may not add up due to rounding.

  1. 在儲量估算中採用的煤價爲每噸90美元。

  2. 儲量不包括任何推測資源。

  3. 由於四捨五入,總數可能不匹配。

Resource Estimate

資源估算

The following is a table summarizing the Resources of the Ovoot Tolgoi Coal Mine as of December 31, 2023, divided into Surface and Underground Resources for the Sunrise Pit, the Sunset Pit, and the B Field Prospect.

以下是截至2023年12月31日的Ovoot Tolgoi煤礦資源總覽表,分爲陽光坑、夕陽坑和b場探礦的地表和地下資源。

Coalfield

Measured

(Mt)

Indicated

(Mt)

Measured + Indicated

(Mt)

Inferred

(Mt)

Sunrise Pit

Surface

54.98

42.96

97.94

37.90

Underground

10.46

25.20

35.66

49.19

Sunset Pit

Surface

77.08

11.86

88.94

2.99

Underground

70.03

15.74

85.77

10.75

B Field Prospect

Surface

2.48

7.96

10.44

21.48

Underground

0.00

3.85

3.85

3.89

Total

215.03

107.57

322.60

126.20

煤田

測量

(兆噸)

指示資源

(兆噸)

已知和指示資源總計

(兆噸)

詳見2024年4月3日新聞稿

(兆噸)

日出坑

表面

54.98

42.96

97.94

37.90

Underground

10.46

25.20

35.66

49.19

日落坑

表面

77.08

11.86

88.94

2.99

Underground

70.03

15.74

85.77

10.75

b 場勘探

表面

2.48

7.96

10.44

21.48

Underground

0.00

3.85

3.85

3.89

總計

215.03

107.57

322.60

126.20

Notes:

注:

  1. Resources are inclusive of Reserves.

  2. Resources that are not Reserves and may not demonstrate economic viability.

  3. Surface Resources are constrained to a depth of 300 m below surface.

  4. Underground Resources are constrained to a depth of 300 m - 500 m below surface.

  5. Totals may not add up due to rounding.

  1. 資源包括儲備。

  2. 不屬於儲備的資源,可能無法證明其經濟可行性。

  3. 地表資源限制在表面以下30000萬的深度。

  4. 地下資源限制在表面以下30000萬 - 50000萬的深度。

  5. 由於四捨五入,總數可能不匹配。

Economic Analysis

經濟分析

For further information regarding the economic analysis and life of mine plan of the Ovoot Tolgoi Mine, please refer to the full text of the Ovoot Tolgoi Technical Report.

有關Ovoot Tolgoi礦的經濟分析和礦山生命週期計劃的更多信息,請參考Ovoot Tolgoi技術報告的完整文本。

SOUMBER TECHNICAL REPORT

索姆貝技術報告

Background

背景

The Soumber Coal Project is located in the southwestern part of Umnugobi Aimag, within the Uvuljuu Uul area of Gurvantes Soum. It is bordered by Dundogovi and Dornogovi Aimags to the northeast and southeast, respectively, and by Uvurkhangai and Bayankhongor Aimags to the northwest and southwest, respectively. It is located approximately 20 km east of the Ovoot Tolgoi Coal Mine and approximately 50 km north of the Mongolia-China border at the Ceke border crossing. The Soumber Coal Project consists of four concessions: Central Soumber, East Soumber, Biluut and Jargalant.

索姆貝煤炭項目位於烏姆努戈比省的西南部,位於古爾萬特蘇姆的烏烏爾地區。其東北和東南分別與東戈維和南戈維省接壤,西北和西南則分別與烏爾洪蓋和巴彥洪戈爾省接壤。項目距離奧沃托爾戈伊煤礦大約20公里,距離中國與蒙古的邊界(切克邊界口岸)大約50公里。索姆貝煤炭項目由四個特許經營區組成:中央索姆貝、東索姆貝、比呂特和賈爾嘎朗。

Highlights

亮點

Highlights of the updated Soumber Technical Report include:

更新的索姆貝技術報告的亮點包括:

  • Proven and Probable Reserves for the Soumber Coal Project of 25.14 Mt in aggregate as of December 31, 2023.

  • Measured and Indicated Resources for the Biluut concession increased by approximately 72.7% from 67.90 Mt as of January 10, 2013 to 117.24 Mt as of December 31, 2023.

  • Measured and Indicated Resources for the Jargalant concession decreased by approximately 7.1% from 25.70 Mt as of January 10, 2013 to 23.88 Mt as of December 31, 2023.

  • Measured and Indicated Resources for the East Soumber concession decreased by approximately 14.4% from 32.00 Mt as of January 10, 2013 to 27.40 Mt as of December 31, 2023.

  • 截至2023年12月31日,索姆貝煤炭項目的已探明和可探明儲量合計爲2514萬噸。

  • 截至2023年12月31日,比呂特特許經營區的探明和指示資源從2013年1月10日的6790萬噸增加約72.7%,達到1172.4萬噸。

  • 截至2023年12月31日,賈爾嘎朗特許經營區的探明和指示資源從2013年1月10日的2570萬噸減少約7.1%,降至2388萬噸。

  • 東蘇木伯特許權的可測量和表徵資源從2013年1月10日的32.00萬噸減少約14.4%,截至2023年12月31日爲27.40萬噸。

Reserve Estimate

儲量估計

The following is a table summarizing the Reserves of the Soumber Coal Project as of December 31, 2023, for the Biluut, Jargalant and East Soumber concessions.

以下是截至2023年12月31日Soumber煤炭項目的儲量總結表,涉及比魯特、賈爾嘎蘭特和東蘇木伯特許權。

Concession

Proven (Mt)

Probable (Mt)

Total (Mt)

Biluut

16.62

2.39

19.02

Jargalant

1.52

1.36

2.89

East Soumber

2.99

0.24

3.24

Total

21.14

4.00

25.14

讓利

已探明(百萬噸)

可能(百萬噸)

總量(Mt)

比魯特

16.62

2.39

19.02

賈爾嘎朗特

1.52

1.36

2.89

東蘇木別爾

2.99

0.24

3.24

總計

21.14

4.00

25.14

Notes:

注:

  1. Coal price adopted in the Reserve estimates is US $90/t.

  2. Reserves do not include any Inferred Resources.

  3. Totals may not add up due to rounding.

  1. 在儲量估算中採用的煤價爲每噸90美元。

  2. 儲量不包括任何推測資源。

  3. 由於四捨五入,總數可能不匹配。

Resources Estimate

資源估算

The following is a table summarizing the Resources of the Soumber Coal Project as of December 31, 2023, divided into Surface and Underground Resources for the Biluut, Jargalant and East Soumber concessions.

以下是截至2023年12月31日,對於Soumber煤礦項目的資源進行總結的表格,分爲Biluut、Jargalant和East Soumber特許權的地面和地下資源。

Concession

Measured

(Mt)

Indicated

(Mt)

Measured + Indicated

(Mt)

Inferred

(Mt)

Biluut

Surface

61.99

33.17

95.16

8.67

Underground

3.40

18.68

22.08

16.07

Jargalant

Surface

9.91

13.76

23.68

5.64

Underground

0.14

0.06

0.20

0.33

East Soumber

Surface

15.19

10.48

25.67

1.68

Underground

0.20

1.53

1.73

1.53

Total

90.83

77.68

168.52

33.92

讓利

測量

(兆噸)

指示資源

(兆噸)

已知和指示資源總計

(兆噸)

詳見2024年4月3日新聞稿

(兆噸)

比魯特

表面

61.99

33.17

95.16

8.67

Underground

3.40

18.68

22.08

16.07

賈爾嘎朗特

表面

9.91

13.76

23.68

5.64

Underground

0.14

0.06

0.20

0.33

東蘇木別爾

表面

15.19

10.48

25.67

1.68

Underground

0.20

1.53

1.73

1.53

總計

90.83

77.68

168.52

33.92

Notes:

注:

  1. Resources are inclusive of Reserves.

  2. Resources that are not Reserves and may not demonstrate economic viability.

  3. Surface Resources are constrained to a depth of 300 m below surface.

  4. Underground Resources are constrained to a depth of 300 m - 500 m below surface.

  5. Totals may not add up due to rounding.

  6. The authors of the Soumber Technical Report have opted to not include a Resource estimate for the Central Soumber concession in the Soumber Technical Report because the special protected area status which prohibits mining activities within the Central Soumber concession remains effective until December 3, 2025. The Soumber Technical Report states that Resources can be estimated and classified in the future once the protected area status is resolved.

  1. 資源包括儲備。

  2. 不屬於儲備的資源,可能無法證明其經濟可行性。

  3. 地表資源限制在表面以下30000萬的深度。

  4. 地下資源限制在表面以下30000萬 - 50000萬的深度。

  5. 由於四捨五入,總數可能不匹配。

  6. Soumber技術報告的作者選擇不爲Central Soumber特許權包含資源估算,因爲該特許權內禁止採礦活動的特殊保護區狀態在2025年12月3日之前持續有效。Soumber技術報告指出,一旦保護區狀態得到解決,未來可以對資源進行估算和分類。

QUALIFIED PERSONS

合格人員

The technical information contained in this press release has been reviewed and approved by Jaydee Ammugauan (MAIG) and Tao Xu (P. Eng), who are "qualified persons" and "independent" of the Company, as such terms are defined under NI 43-101.

本新聞稿所包含的技術信息已由Jaydee Ammugauan (MAIG) 和Tao Xu (P. Eng) 審查並批准,他們是根據NI 43-101定義的「合格人員」和與公司「獨立」的。

About SouthGobi

關於南戈壁

SouthGobi, listed on the Hong Kong Stock Exchange and the TSX Venture Exchange, owns and operates its flagship Ovoot Tolgoi coal mine in Mongolia. It also holds the mining licences of its other metallurgical and thermal coal deposits in South Gobi region of Mongolia. SouthGobi produces and sells coal to customers in China.

南戈壁在香港聯合交易所和tsx創業公司上市,擁有並經營其在蒙古的旗艦Ovoot Tolgoi煤礦。它還持有其在蒙古南戈壁地區的其他冶金煤和動力煤礦的採礦許可證。南戈壁向中國客戶生產和銷售煤。

Contact:

Investor Relations
Email: info@southgobi.com

Mr. Ruibin Xu
Chief Executive Officer

Office: +1 604 762 6783 (Canada)

+852 2156 1438 (Hong Kong)

聯繫方式:

投資者關係
電子郵件:info@southgobi.com

徐瑞斌先生
首席執行官

電話:+1 604 762 6783(加拿大)

+852 2156 1438(香港)

FORWARD LOOKING STATEMENTS

前瞻性聲明

Except for statements of fact relating to SouthGobi and its subsidiaries, certain information contained herein constitutes forward-looking statements within the meaning of applicable securities laws (collectively referred to herein as "forward-looking statements") and such forward-looking statements are based on expectations, estimates, and projects as of the date of this press release. Forward-looking statements are frequently characterized by words such as "plan", "expect", "project", "intend", "believe", "anticipate", "could", "should", "seek", "likely", "estimate" and other similar words or statements that certain events or conditions "may" or "will" occur.

除與南戈壁及其子公司相關的事實陳述外,本文所含的某些信息構成根據適用證券法的前瞻性陳述(以下統稱爲「前瞻性陳述」),該前瞻性陳述基於本新聞稿發佈之日的預期、估計和項目。前瞻性陳述常常以諸如「計劃」、「期望」、「項目」、「打算」、「相信」、「預期」、「可以」、「應該」、「尋求」、「可能」、「估計」以及其他類似的詞語或聲明特徵,表明某些事件或條件「可能」或「將」發生。

Forward-looking statements in this press release include, but are not limited to, statements regarding the estimates of Reserves and Resources for the Ovoot Tolgoi Coal Mine and Soumber Coal Project and the realization of such estimates; estimated coal prices; statements regarding the life of mine plan and the realization of such plan, and other statements that are not historical facts.

本新聞稿中的前瞻性聲明包括但不限於關於Ovoot Tolgoi 煤礦和Soumber 煤項目的儲量和資源估計以及這些估計的實現;估算的 煤 價格;關於礦山生命週期計劃及其實現的聲明,以及其他不是歷史事實的聲明。

The Company cautions the reader that forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by the Company, are inherently subject to significant business, financial, operational, and other risks, uncertainties, contingencies, and other factors, including those described below, which could cause actual results, performance, or achievements of the Company to be materially different from results, performance, or achievements expressed or implied by such forward-looking statements and, as such, undue reliance must not be placed on them.

公司提醒讀者,前瞻性聲明必然基於多項估計和假設,雖然公司認爲這些假設是合理的,但本質上受到重大商業、財務、運營和其他風險、不確定性、突發事件及其他因素的影響,包括下面所述的因素,這些因素可能導致公司實際結果、業績或成就與這些前瞻性聲明所表達或暗示的結果、業績或成就存在重大差異,因此不應過度依賴這些聲明。

Forward-looking statements are also based on numerous material factors and assumptions, including as described in this press release: the Company's present and future business strategies; operations performance within expected ranges; anticipated future production and cash flows; local and global economic conditions and the environments in which the Company will operate in the future; the price of coal; projected grades of coal; international exchange rates; anticipated capital and operating costs; the availability and timing of governmental, and other approvals for the construction of the Company's projects.

前瞻性聲明還基於衆多至關重要的因素和假設,包括本新聞稿中所述的:公司的當前和未來業務戰略;在預期範圍內的運營表現;預期未來的生產和現金流;未來公司將運營的地方和 全球貨幣 經濟條件和環境; 煤 價格; 煤 的預測品級;國際 匯率;預期的資本和運營成本;以及公司項目施工所需的政府及其他批准的可用性和時間。

Risks and uncertainties, including as described in this press release, include but are not limited to: risks that the actual production or sales will be less than projected or expected; liabilities inherent in coal mine production; mining and processing technical problems; inability to obtain required mine licences, mine permits, and regulatory approvals or renewals required in connection with the mining and processing of coal; risks that the Company's coal preparation plant will not operate at production capacity during the relevant period; unexpected changes in coal quality and specification; variations in the coal mine or coal preparation plant recovery rates; dependence on third party coal transportation systems; changes in commodity prices and exchange rates; the effects of competition and pricing pressures in the coal market; the oversupply of, or lack of demand for, coal; inability of management to secure coal sales or third party purchase contracts; labour stoppages and severe weather conditions; the demand for and availability of port and other transportation services; and management's ability to anticipate and manage the foregoing factors and risks. This list is not exhaustive of the factors that may affect any of the Company's forward- looking statements. Due to the risks and uncertainties identified above and elsewhere in this press release, actual events may differ materially from current expectations. The Company uses forward- looking statements because it believes such statements provide useful information with respect to the currently expected future operations and financial performance of the Company, and cautions readers that the information may not be appropriate for other purposes. Except as required by law, the Company undertakes no obligation to update forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on the forward-looking statements, which speak only as of the date of this press release; they should not rely upon this information as of any other date.

風險和不確定性,包括本新聞稿中所述的,包括但不限於:實際生產或銷售將低於預測或預期的風險; 煤 礦生產固有的責任;採礦和加工技術問題;無法獲得與 煤 的開採和加工相關的必要採礦許可證、礦山許可和監管批准或續期;公司 煤 準備廠在相關期間無法在生產能力下運行的風險; 煤 的質量和規格的意外變化; 煤 礦或 煤 準備廠的回收率變化;依賴第三方 煤 運輸系統;商品價格和 匯率 變化; 煤 市場的競爭和價格壓力的影響; 煤 的過剩或缺乏需求;管理層無法確保 煤 銷售或第三方採購合同;勞動停工和惡劣天氣條件;港口和其他 運輸 服務的需求和可用性;以及管理層預測和應對上述因素和風險的能力。這份清單並不詳盡列出可能影響公司任何前瞻性聲明的因素。由於上述和其他地方識別的風險和不確定性,實際事件可能與當前期望存在重大差異。公司使用前瞻性聲明是因爲它相信這些聲明提供了有關公司當前預期未來運營和財務表現的有用信息,並提醒讀者這些信息可能不適用於其他目的。除法律要求外,公司沒有義務在情況或管理層的估計或意見發生變化時更新前瞻性聲明。提醒讀者不要過度依賴這些前瞻性聲明,這些聲明僅在本新聞稿發佈日期有效;他們不應將該信息視爲任何其他日期的信息。

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX創業公司交易所或其監管服務提供商(如TSX創業公司政策中定義的那樣)不對本公告的充分性或準確性負責。

SOURCE: SouthGobi Resources Ltd.

資料來源:南戈壁資源有限公司。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論