Falcon Oil & Gas Ltd. - Spudding of the Second Well in the Shenandoah South Pilot Project, Shenandoah S2-4H
Falcon Oil & Gas Ltd. - Spudding of the Second Well in the Shenandoah South Pilot Project, Shenandoah S2-4H
Falcon Oil & Gas Ltd.
("Falcon" or "Company")
油氣股份有限公司
(「Falcon」或「公司」)
Spudding of the second well in the Shenandoah South Pilot Project, Shenandoah S2-4H
沉甸甸南試點項目的第二口井SpSpudding,Shenandoah S2-4H
25 November 2024 – Falcon Oil & Gas Ltd. (TSXV: FO, AIM: FOG) is pleased to announce the spudding of the Shenandoah S2-4H ("SS4H") horizontal well (previously referred to as the SS3H well) in exploration permit 98 in the Beetaloo Sub-basin, Northern Territory, Australia with Falcon Oil & Gas Australia Limited's ("Falcon Australia") joint venture partner, Tamboran (B2) Pty Limited ("Tamboran B2").
2024年11月25日 - tsxv獵鷹石油和天然氣有限公司(FO, AIM: FOG)高興地宣佈,在澳大利亞北領地比塔盧次盆地98號勘探許可證中,由獵鷹石油和氣體澳大利亞有限公司(「獵鷹澳大利亞」)與合資夥伴Tamboran (B2)私人有限公司(「Tamboran B2」)聯合開發,在探索之旅中,選擇鑽SS4H(即SS3H井)水平井。
SS4H is the second well of the Shenandoah South Pilot Project and will be drilled from the same well pad as the Shenandoah S2-2H ST1 sidetrack well ("SS2H ST1") using the H&P super-spec FlexRig Flex 3 Rig.
SS4H是Shenandoah南試點項目的第二口井,將使用H&P超級特殊FlexRig Flex 3 Rig從與Shenandoah S2-2H ST1支線井(SS2H ST1)相同的井墊鑽探。
The SS4H well is estimated to be drilled to a total measured depth of 20,669 feet (6,300 metres) including a horizontal section of approximately 10,000 feet, (3,000 metres), targeting the Amungee Member B-shale.
SS4H井的預計鑽井總測深爲20,669英尺(6,300米),包括一個約10,000英尺(3,000米)的水平段,目標是Amungee Member b-頁岩。
Following the drilling of the SS4H well, Liberty Energy will complete the stimulation of the SS2H ST1 and SS4H wells, with 34 and 60 stages planned at the respective wells. Stimulation of both wells is expected to commence in Q1 2025 with 30 day initial production flow rates expected in the same period.
在鑽完SS4H井後,liberty energy將完成對SS2H ST1和SS4H井的刺激作業,計劃在各自井中進行34和60個階段。兩口井的刺激作業預計將於2025年第一季度開始,同期預計初期生產流量將持續30天。
Falcon Australia will continue its participation in the Shenandoah South Pilot Project at its elected participating interest of 5%.
Falcon澳大利亞將繼續以其選定的5%的參與權參與Shenandoah South Pilot項目。
Philip O'Quigley, CEO of Falcon commented:
"The spudding of the SS4H horizontal well is an exciting next step in the development of the Beetaloo Sub-basin and we will look forward to updating the market as operations progress."
Falcon首席執行官Philip O'Quigley表示:
SS4H水平井的開鑽是比塔盧亞次盆地發展中一個令人興奮的下一步,期待隨着作業進展更新市場。
Ends.
完
CONTACT DETAILS:
聯繫詳情:
Falcon Oil & Gas Ltd. | +353 1 676 8702 |
Philip O'Quigley, CEO | +353 87 814 7042 |
Anne Flynn, CFO | +353 1 676 9162 |
Cavendish Capital Markets Limited (NOMAD & Broker) | |
Neil McDonald / Adam Rae | +44 131 220 9771 |
獵鷹燃料股份有限公司。 | +353 1 676 8702 |
Philip O'Quigley,首席執行官 | +353 87 814 7042 |
Anne Flynn,首席財務官 | +353 1 676 9162 |
坎文迪許資本市場有限公司(NOMAD和經紀商) | |
Neil McDonald / Adam Rae | +44 131 220 9771 |
This announcement has been reviewed by Dr. Gábor Bada, Falcon Oil & Gas Ltd's Technical Advisor. Dr. Bada obtained his geology degree at the Eötvös L. University in Budapest, Hungary and his PhD at the Vrije Universiteit Amsterdam, the Netherlands. He is a member of AAPG.
此公告已由先鋒石油和天然氣有限公司的技術顧問Gábor Bada博士審閱。Bada博士在匈牙利布達佩斯的Eötvös L.大學獲得地質學學位,並在荷蘭阿姆斯特丹自由大學獲得博士學位。他是AAPG的會員。
About Falcon Oil & Gas Ltd.
Falcon Oil & Gas Ltd is an international oil & gas company engaged in the exploration and development of unconventional oil and gas assets, with the current portfolio focused in Australia. Falcon Oil & Gas Ltd is incorporated in British Columbia, Canada and headquartered in Dublin, Ireland.
關於先鋒石油和天然氣有限公司。
Falcon Oil & Gas Ltd是一家國際油氣公司,致力於勘探和開發非常規油氣資產,目前主要在澳大利亞進行。Falcon Oil & Gas Ltd註冊於加拿大不列顛哥倫比亞省,總部設在愛爾蘭都柏林。
Falcon Oil & Gas Australia Limited is a c. 98% subsidiary of Falcon Oil & Gas Ltd.
Falcon Oil & Gas Australia Limited是Falcon Oil & Gas Ltd的約98%子公司。
For further information on Falcon Oil & Gas Ltd. Please visit
有關Falcon Oil & Gas Ltd的更多信息,請訪問
About Beetaloo Joint Venture (EP 76, 98 and 117)
關於Beetaloo聯合創業公司(EP 76, 98和117)
Company | Interest |
Falcon Oil & Gas Australia Limited (Falcon Australia) | 22.5% |
Tamboran (B2) Pty Limited | 77.5% |
Total | 100.0% |
公司 | 利息 |
Falcon Oil&Gas Australia Limited(Falcon Australia) | 22.5% |
Tamboran(B2)Pty Limited | 77.5% |
總計 | 100.0% |
Shenandoah South Pilot Project -2 Drilling Space Units – 46,080 acres1
沃特世南林凱南工程-2鑽削空間單位-46,080英畝
Company | Interest |
Falcon Oil & Gas Australia Limited (Falcon Australia) | 5.0% |
Tamboran (B2) Pty Limited | 95.0% |
Total | 100.0% |
公司 | 利息 |
Falcon Oil&Gas Australia Limited(Falcon Australia) | 5.0% |
Tamboran(B2)Pty Limited | 95.0% |
總計 | 100.0% |
1Subject to the completion of the SS2H ST1 and SS4H wells on the Shenandoah South pad 2.
在沙南多南二號井場SS2H ST1和SS4H井完成後。
About Tamboran (B2) Pty Limited
Tamboran (B1) Pty Limited ("Tamboran B1") is the 100% holder of Tamboran (B2) Pty Limited, with Tamboran B1 being a 50:50 joint venture between Tamboran Resources Limited and Daly Waters Energy, LP.
關於Tamboran(B2)有限公司
Tamboran(B1)有限公司(「Tamboran B1」)是Tamboran(B2)有限公司的100%持有者,Tamboran B1是Tamboran Resources有限公司和Daly Waters Energy, LP之間的50:50合資企業。
Tamboran Resources Limited, is a natural gas company listed on the ASX (TBN) and U.S. OTC markets (TBNNY). Tamboran is focused on playing a constructive role in the global energy transition towards a lower carbon future, by developing the significant low CO2 gas resource within the Beetaloo Basin through cutting-edge drilling and completion design technology as well as management's experience in successfully commercialising unconventional shale in North America.
Tamboran Resources Limited是一家天然氣公司, 在ASX(TBN)和美國OTC市場(TBNNY)上市。 Tamboran專注於在全球能源轉型中扮演建設性角色,通過先進的鑽井和完井設計技術以及管理團隊在商業化北美非常規頁岩方面的經驗,開發比塔盧盆地內重要的低CO2氣體資源。
Bryan Sheffield of Daly Waters Energy, LP is a highly successful investor and has made significant returns in the US unconventional energy sector in the past. He was Founder of Parsley Energy Inc. ("PE"), an independent unconventional oil and gas producer in the Permian Basin, Texas and previously served as its Chairman and CEO. PE was acquired for over US$7 billion by Pioneer Natural Resources Company.
達利沃特世沃特斯能源有限合夥人Bryan Sheffield是一位非常成功的投資者,在過去的美國非常規能源領域取得了顯著回報。他是Parsley Energy Inc.(「PE」)的創始人,這是德克薩斯州伯明翰盆地的一家獨立非常規油氣生產商,曾擔任其主席和首席執行官。PE被先鋒自然資源公司以超過70億美元收購。
Advisory regarding forward-looking statements
Certain information in this press release may constitute forward-looking information. Any statements that are contained in this news release that are not statements of historical fact may be deemed to be forward-looking information. Forward-looking information typically contains statements with words such as "may", "will", "should", "expect", "intend", "plan", "anticipate", "believe", "estimate", "projects", "dependent", "consider" "potential", "scheduled", "forecast", "outlook", "budget", "hope", "suggest", "support" "planned", "approximately", "potential" or the negative of those terms or similar words suggesting future outcomes. In particular, forward-looking information in this press release includes, but is not limited to, information relating to the drilling the SS4H well to a total measured depth of 6,300 metres and the planned 10,000 foot (3,000 metre) horizontal section, the stimulation program following the drilling of the SS4H well, targeting the Amungee Member B-shale; the wells being stimulated with wells with a planned 34 and 60 stages t the respective wells utilising the Liberty Energy modern frac fleet, stimulation of both wells is expected to commence in Q1 2025 with 30 day initial production flow rates expected in the same period.
關於前瞻性聲明的諮詢
本新聞稿中的某些信息可能構成前瞻性信息。本新聞稿中包含的非歷史事實聲明可能被視爲前瞻性信息。前瞻性信息通常包含具有"可能"、"將"、"應該"、"期望"、"打算"、"計劃"、"預期"、"相信"、"估計"、"項目"、"依賴"、"考慮"、"潛力"、"預定"、"展望"、"預算"、"希望"、"建議"、"支持"、"計劃"、"大約"、"潛力"或這些術語的否定形式或類似詞彙的聲明,暗示未來結果。特別是,本新聞稿中的前瞻性信息包括但不限於有關將SS4H井鑽至總測量深度爲6,300米和計劃的10,000英尺(3,000米)水平段的信息,SS4H井鑽完後的刺激計劃,以Amungee Member b-頁岩爲目標;使用自由能源現代壓裂艦隊刺激井,計劃刺激的兩口井分別爲34和60級,預計兩口井的刺激將於2025年第一季度開始,30天內預計產量流量在同一時期產生。
This information is based on current expectations that are subject to significant risks and uncertainties that are difficult to predict. The risks, assumptions and other factors that could influence actual results include risks associated with fluctuations in market prices for shale gas; risks related to the exploration, development and production of shale gas reserves; general economic, market and business conditions; substantial capital requirements; uncertainties inherent in estimating quantities of reserves and resources; extent of, and cost of compliance with, government laws and regulations and the effect of changes in such laws and regulations; the need to obtain regulatory approvals before development commences; environmental risks and hazards and the cost of compliance with environmental regulations; aboriginal claims; inherent risks and hazards with operations such as mechanical or pipe failure, cratering and other dangerous conditions; potential cost overruns, drilling wells is speculative, often involving significant costs that may be more than estimated and may not result in any discoveries; variations in foreign exchange rates; competition for capital, equipment, new leases, pipeline capacity and skilled personnel; the failure of the holder of licenses, leases and permits to meet requirements of such; changes in royalty regimes; failure to accurately estimate abandonment and reclamation costs; inaccurate estimates and assumptions by management and their joint venture partners; effectiveness of internal controls; the potential lack of available drilling equipment; failure to obtain or keep key personnel; title deficiencies; geo-political risks; and risk of litigation.
這些信息基於當前預期,面臨着難以預測的重大風險和不確定性。可能影響實際結果的風險、假設和其他因素包括與頁岩氣市場價格波動相關的風險;與頁岩氣儲量勘探、開發和生產相關的風險;一般經濟、市場和業務條件;巨大的資本需求;估算儲量和資源數量存在的不確定性;以及合規性要求範圍及其遵守成本;在開發開始之前獲得監管批准的需要;環境風險和危害以及符合環境法規的成本;土著索賠;操作中存在的機械或管道故障、塌陷和其他危險條件;潛在的成本超支,鑽井具有投機性,往往涉及可能超出估計的重大成本,並可能不會導致任何發現;外匯匯率的波動;爲資本、設備、新租約、管道容量和熟練人員的競爭;許可證、租約和許可證持有人未能符合要求的風險;特許經營合作伙伴,管理層及其合資企業夥伴的估算和假設的有效性;內部控制的有效性;可能缺乏可用鑽井設備;未能獲得或保留關鍵人員;產權缺陷;地緣政治風險;以及訴訟風險。
Readers are cautioned that the foregoing list of important factors is not exhaustive and that these factors and risks are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Falcon assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the forward-looking statements unless and until required by securities laws applicable to Falcon. Additional information identifying risks and uncertainties is contained in Falcon's filings with the Canadian securities regulators, which filings are available at , including under "Risk Factors" in the Annual Information Form.
請注意,上述重要因素清單並不詳盡,並且這些因素和風險難以預測。實際結果可能與任何前瞻性陳述中暗示的結果有重大差異。Falcon 不承擔更新前瞻性陳述的義務,或更新實際結果可能與前瞻性陳述所反映的結果不同的原因,除非並且直到適用於Falcon的證券法律要求的時間。有關風險和不確定性的更多信息包含在Falcon提交給加拿大證券監管機構的文件中,這些文件可在,包括年度信息表中的"風險因素"欄目下。
Any references in this news release to initial production rates are useful in confirming the presence of hydrocarbons; however, such rates are not determinative of the rates at which such wells will continue production and decline thereafter and are not necessarily indicative of long-term performance or ultimate recovery. While encouraging, readers are cautioned not to place reliance on such rates in calculating the aggregate production for Falcon. Such rates are based on field estimates and may be based on limited data available at this time.
新聞發佈中對初始產量的參考對確認碳氫化合物的存在是有用的;然而,這些產量並不確定井口將持續生產和衰減的速率,並且也不一定能反映長期表現或終極回收情況。儘管令人鼓舞,讀者們被告知不要依賴這些速率來計算獵鷹的總產量。這些速率基於現場估算,可能基於目前可用的有限數據。
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX Venture交易所和其監管服務提供商(如該交易所的政策中所定義的)均不接受此新聞稿的充分性或準確性的責任。
譯文內容由第三人軟體翻譯。