Trans Canada Gold Corp. Completes Its Tenth Full Month of Steady Oil Production for July 2024 and Prepares for Drilling Its Second Multilateral Well, Targeting 8,000 Meters of GP Oil Reservoir
Trans Canada Gold Corp. Completes Its Tenth Full Month of Steady Oil Production for July 2024 and Prepares for Drilling Its Second Multilateral Well, Targeting 8,000 Meters of GP Oil Reservoir
• Tenth Month of Steady Oil Production: Trans Canada Gold Corp. has completed its tenth consecutive month of robust oil production for July 2024, with oil sales to Altex and Cenovus Energy Ltd.
• 堅定的油田產量第十個月: Trans Canada Gold Corp.已連續第十個月完成了2024年7月的強勁油田產量,向Altex和Cenovus Energy Ltd.出售石油。
• Successful Multilateral Well Production: Since its inception in October 2023, the Croverro 7HZ Well, featuring seven multilateral legs, has produced over 60,000 barrels of oil.
• 成功的多管井生產: 自2023年10月成立以來,Croverro 7HZ井已生產了超過60000桶油。
• Upcoming Drilling of Second Multilateral Well: Trans Canada is preparing to drill its second multilateral horizontal well targeting the General Petroleum (GP) Zone
• 即將鑽探第二口多管井: Trans Canada正在準備鑽探第二口面向GP區的多管水平井。
VANCOUVER, BC / ACCESSWIRE / August 9, 2024 / Trans Canada Gold Corp. (TSX-V:TTG)(OTCQB:TTGXF) ("Trans Canada" or the "Company") is pleased to announce that the Company has now completed its tenth full month of robust steady oil production for the month of July 2024, with trucking and oil sales to Altex and Cenovus Energy Ltd. The Company will release the June numbers in the coming days, once finalized. In October 2023, the Company successfully drilled and completed seven (7) multi-lateral legs of the Company's first multilateral well. The Company encountered oil throughout the entire 2675 meters of lateral oil pay in the Sparky Formation. Since drilling inception, the Croverro 7HZ Well has now produced over 60,000 barrels of consistent steady oil production. Croverro Energy Ltd. under the terms of the agreement, is the Operator.
溫哥華,卑詩省,ACCESSWIRE,2024年8月9日 / Trans Canada Gold Corp. (TSX-V:TTG) (OTCQB:TTGXF) ("Trans Canada"或"公司")很高興宣佈,公司已完成了2024年7月穩健油田產量的第十個完整月,利用公路運輸方式和出售石油給Altex和Cenovus Energy Ltd。一旦確定,公司將在未來幾天內公佈6月數據。2023年10月,公司成功鑽探和完成了公司第一口多管水平井的7條多管油層。公司在Sparky Formation的2675米橫向油層付款期間遇到了石油。自鑽探開始以來,Croverro 7HZ井現已生產了超過60000桶一致穩定的油田產量。根據協議,Croverro Energy Ltd是運營商。
The lands for the well are currently controlled by a partnership led by Croverro, with the company holding 18.75% interest. This second multi-lateral horizontal well is based on similar wells drilled in the GP oil formation using surrounding well control combined with recently processed seismic lines. The new multilateral well is expected to contact over 8000 m of GP oil reservoir. Surface preparations are now in progress, with lease construction expected to be completed by Aug 10th, 2024. The well is scheduled to be drilled in mid-August.
該井的土地目前由由Croverro領導的合作伙伴控制,該公司持有18.75%的利益。這口第二個多管水平井基於使用周圍的井控結合最近處理的地震線鑽探的GP油區類似井。預計新的多管腔將接觸800000萬GP油儲層。土地準備工作正在進行中,租賃施工預計將於2024年8月10日之前完成。該井計劃於8月中旬鑽探。
The Company has acquired additional lands inside the AMI, which will allow the drilling of up to 4 additional multilateral wells. The 320-acre parcel offset our existing lands to the north were acquired from Canpar (CN Pension Fund), Freehold Royalties and Rife Resources. The newly acquired lands, together combined with our existing lands, give access to oil resource potential in both the Sparky and General Petroleum (GP) producing zones.
該公司已收購在AMI內的其他土地,這將允許鑽探多達4個額外的多管井。從Canpar(CN Pension Fund),Freehold Royalties和Rife Resources收購的320英畝地塊抵消了我們現有土地的北部。新獲得的土地與我們的現有土地結合起來,爲Sparky和General Petroleum(GP)生產區域的油資源潛力提供了通路。
Commented President & CEO Tim Coupland, "We have now hit the tenth-month of steady oil production and now exceeded over 60,000 barrels, showcasing production expertise in the Sparky reservoir in Lloydminster area. With oil prices remaining high, we are excited to be soon releasing our July production rates, once the final oil production numbers have been finalized with Croverro, and confirmed by Altex and Cenovus Energy Ltd. With the completion of the recent land acquisition, we expect to be drilling our second well on or about Aug 19-22. With global oil prices remaining steady, and the new TMX pipeline now fully operational, oil prices are forecasted to remain high, which will allow the Company to pursue additional drilling opportunities and new property acquisitions."
蒂姆·卡普蘭德(Tim Coupland),總裁兼首席執行官評論說:「我們已經達到了穩定油田產量的第十個月,超過了60000桶,展示了Lloydminster地區Sparky油藏的生產專業技能。隨着油價保持高位,我們很高興能夠在確定由Croverro確認並獲得Altex和Cenovus Energy Ltd確認的最終石油生產數據後儘快發佈7月的產量數據。隨着最近土地收購的完成,我們預計將於8月19-22日左右鑽探第二口井。隨着全球油價保持穩定,新的TMX管道現已全面投入運營,預計油價將保持高位,這將使公司能夠追求更多的鑽探機會和新的土地收購。」
"With the recent strategic land and lease acquisitions, together with well control and recently obtained and processed seismic data, the upcoming drill program in the General Petroleum Sand has been de-risked as much as possible. This well will further strengthen our strategic growth position with increased oil production and increased revenue. Multilateral wells offer the best potential for high initial production rates, modest decline rates, resulting in a more stable and sustained production level over time, which enhances our overall production growth strategy." commented Director Chris Timmins.
"最近的戰略土地和租賃收購,再加上井控和最近獲得和處理的地震數據,爲將要在General Petroleum Sand中進行的鑽井計劃儘可能降低風險。這口井將通過提高石油產量和增加收入進一步加強我們的戰略增長地位。多側鑽井是實現高初始產量、適度的衰減率、從而在一段時間內提供更穩定、持續的產量水平的最佳潛力,這有助於增強我們的總體生產增長策略。"董事克里斯·蒂明斯(Chris Timmins)說。
ABOUT TRANS CANADA GOLD CORP. - OIL AND GAS PRODUCTION/REVENUE PRODUCING WELLS
關於Trans Canada Gold Corp. - 石油和天然氣生產/收入產量的井。
The Company is a discovery focused Oil & Gas Resource Development and Mineral Exploration Company that is currently focused on developing and drilling its' production of conventional heavy oil exploration properties, increasing production capabilities, and increasing future oil production revenues through responsible exploration. The Company identifies, acquires and finances with its working interest partners, the ongoing development of oil and gas assets primarily situated in Alberta Canada. The Company has qualified Senior exploration management and Geological teams of professionals, seasoned in exploration production, field exploration and drilling. The Company currently works with Croverro Energy Ltd., who has demonstrated proficiency, expected of an experienced oil and gas technical team that has proven oil production, and revenue success with large multi-lateral wells currently under their supervision. The Company has the necessary manpower in place to develop its natural resource properties and manage its production properties. The Company is committed to minimizing risk through selective property acquisitions, and responsible exploration drilling, and maximizing long term petroleum and natural gas resource assets.
該公司是一家發現重點油氣資源開發和礦產勘探公司,目前專注於開發和鑽探其傳統重油勘探項目,並通過負責任的勘探以增加生產能力和未來的油氣生產收入。該公司確定、收購併與其工作利益夥伴共同融資油氣資產的持續開發,主要位於加拿大阿爾伯塔省。該公司擁有資深的探勘管理和地質團隊,經驗豐富且熟練掌握勘探生產、現場勘探和鑽井的技術。該公司目前與Croverro Energy Ltd.合作,後者表現出具備資深油氣技術團隊所期望的能力,正在其監督下開採大型多側向井的油氣生產和營收成功。公司已擁有開發其天然資源項目以及管理其生產項目所必需的人力資源。該公司致力於通過選擇性物業收購和負責任的勘探鑽探以儘量降低風險,並最大限度地開發長期的石油和天然氣資源資產。
FOR FURTHER INFORMATION, PLEASE CONTACT:
如需更多信息,請聯繫:
Tim Coupland, President and CEO
Trans Canada Gold Corp.
Tel: (604) 681-3131
astar@telus.com
Tim Coupland,總裁兼首席執行官
加拿大黃金公司。
電話:(604)681-3131
astar@泰勒斯.com
or
或者
Christian Timmins, Director
Trans Canada Gold Corp.
Tel: (403) 597-3410
董事Christian Timmins
加拿大黃金公司。
電話:(403)597-3410
Neither the TSX Venture Exchange nor its Regulation Services Provider, (as the term is defined in the Policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX Venture Exchange及其監管服務提供商(如TSX Venture Exchange政策中的術語所定義)對本發行的充足性或準確性不承擔責任。
Contact Information
聯繫信息
Chris Timmins
Director
ctimmins29@gmail.com
403-597-3410
克里斯·蒂米爾斯(Chris Timmins)
董事
ctimmins29@gmail.com
403-597-3410
SOURCE: Trans Canada Gold Corp.
來源:加拿大黃金公司。
譯文內容由第三人軟體翻譯。