Silver Tiger Intersects 50.7 Metres of 155.0 G/t Silver Equivalent in the Stockwork Zone Including 14.3 Metres of 334.3 G/t Silver Equivalent Within the High-Grade Keel Zone
Silver Tiger Intersects 50.7 Metres of 155.0 G/t Silver Equivalent in the Stockwork Zone Including 14.3 Metres of 334.3 G/t Silver Equivalent Within the High-Grade Keel Zone
HALIFAX, NS / ACCESSWIRE / July 30, 2024 / Silver Tiger Metals Inc. (TSXV:SLVR) and (OTCQX:SLVTF) ("Silver Tiger" or the "Company") is pleased to provide an update on the first 138 drill holes of the Company's Pre-Feasibility Study ("PFS") drilling program on its El Tigre Project in Sonora, Mexico. These new results are highlighting the expansion of stockwork mineralization in the Keel Zone, now projecting mineralization 100 metres below the PEA designed pit.
2024年7月30日,加拿大Halifax / ACCESSWIRE / Silver Tiger Metals Inc. (tsxv:slvr)和(otcqx:slvtf)(以下稱“Silver Tiger”或“公司”)很高興地宣佈了有關該公司El Tigre項目位於墨西哥Sonora的預可行性研究(“PFS”)鑽探計劃前138個鑽孔的更新。這些新的結果強調了Keel區域脈石礦化的擴展,現在的礦化已經投影到PEA設計的坑底以下100米。
Drill hole ET-24-609 has intersected significant mineralization in the HW Stockwork Zone, and the Keel Zone in both El Tigre and Seitz Kelly veins. The hole intersected 50.7 metres grading 155.0 g/t silver equivalent or 2.07 g/t gold equivalent, consisting of 0.17 g/t gold and 142.1 g/t silver, from 178.4 to 229.1 metres in the Keel Zone of the Seitz Kelly vein. The interval also includes 14.3 metres grading 334.3 g/t silver equivalent or 4.46 g/t gold equivalent from 198.4 to 212.7 metres, consisting of 0.20 g/t gold and 319.5 g/t silver. This hole highlights the high-grade Keel Zone in the Seitz Kelly Vein, some 100 metres below the PEA pit (Figure 1).
鑽探孔Et-24-609在El Tigre和Seitz Kelly礦脈的HW Stockwork區以及Keel區都出現了重要的礦化賦存。鑽探孔在Seitz Kelly礦脈的Keel區從178.4到229.1米處共遇到50.7米的礦化,品位爲155.0克/噸白銀當量或2.07克/噸黃金當量,包括0.17克/噸黃金和142.1克/噸白銀。該區間還包括198.4~212.7米段14.3米的礦化,品位爲334.3克/噸白銀當量或4.46克/噸黃金當量,包括0.20克/噸黃金和319.5克/噸白銀。這個鑽孔突出了Seitz Kelly Vein中高品位的Keel區域,距離PEA坑底以下100米(圖1)。
The hole also intersected 40.0 metres grading 80.7 g/t silver equivalent or 1.08 g/t gold equivalent, consisting of 0.09 g/t gold and 74.1 g/t silver, from 124.4 to 164.4 metres in the Keel Zone of the El Tigre vein some 50 metres below the PEA pit. The interval also includes 17.3 metres grading 143.8 g/t silver equivalent or 1.92 g/t gold equivalent from 145.1 to 162.4 metres, consisting of 0.12 g/t gold and 134.7 g/t silver (Figure 1).
該孔在El Tigre礦脈的Keel區從124.4米至164.4米共遇到40.0米的礦化,品位爲80.7克/噸白銀當量或1.08克/噸黃金當量,包括0.09克/噸黃金和74.1克/噸白銀。該區間還包括145.1~162.4米段17.3米的礦化,品位爲143.8克/噸白銀當量或1.92克/噸黃金當量,包括0.12克/噸黃金和134.7克/噸白銀(圖1) 。
In the Hanging Wall gold stockwork zone, the hole cut two significant zones of gold and silver mineralization including 24.2 metres from 3.7 to 27.9 metres grading 58.1 silver equivalent or 0.77 g/t gold equivalent, consisting of 0.76 g/t gold and 0.8 g/t silver, and 53.8 metres from 51.4 to 105.2 metres grading 44.7 silver equivalent or 0.60 g/t gold equivalent, consisting of 0.56 g/t gold and 2.8 g/t silver (Figure 1).
該孔在Hanging Wall gold stockwork區切割出兩個金銀礦化顯著帶,其中包括3.7到27.9米段的24.2米,品位爲58.1克/噸銀當量或0.77克/噸黃金當量,包括0.76克/噸黃金和0.8克/噸白銀,和51.4到105.2米段的53.8米,品位爲44.7克/噸銀當量或0.60克/噸黃金當量,包括0.56克/噸黃金和2.8克/噸白銀(圖1)。
Silver Tiger's CEO, Glenn Jessome, stated, "As we progress to a PFS release in September 2024 we continue to receive promising assay results, especially in the newly defined Keel Zone and high-grade El Tigre and Seitz Kelly veins" Mr. Jessome further stated, "These results further de-risk the project, as we increase the confidence and size of the new MRE as we are now discovering stockwork mineralization 100 meters below the PEA designed pit."
Silver Tiger的CEO Glenn Jessome表示:“隨着我們在2024年9月發佈PFS報告,我們繼續收到有希望的化驗結果,特別是在新定義的Keel區域和高品位的El Tigre和Seitz Kelly脈中。”Jessome先生進一步表示:“這些結果進一步降低了該項目的風險,因爲我們提高了新的MRE的信心和規模,現在我們發現了PEA設計坑底100米以下的脈石礦化。”
On May 20th, Silver Tiger has completed PFS Drilling, totalling 24,550 metres focused on expanding the Mineral Resource, upgrading the classification, completing metallurgical test work and geotechnical studies as it progresses from an exploration to a development project. The value-added PFS progress is on schedule for publication in H2-2024.
2021年5月20日,Silver Tiger完成了PFS鑽探,共計24550米,重點是擴大礦產資源、升級分類、完成冶金試驗和岩土工程研究,將其從勘探項目推進爲開發項目。添加價值的PFS進展時間表爲2024年下半年進行發佈。
Silver Tiger Attends the 2024 Precious Metals Summit in Beaver Creek, Colorado
Silver Tiger參加2024年在科羅拉多州比弗克里克舉行的貴金屬峯會。
Silver Tiger is attending the 2024 Precious Metals Summit in Beaver Creek, Colorado on September 10 to 13, 2024. Glenn Jessome, Silver Tiger's CEO, will be delivering a presentation,
Silver Tiger將於2024年9月10日至13日參加在科羅拉多州比弗克里克舉行的2024年貴金屬峯會。Silver Tiger的CEO Glenn Jessome將進行演講。
Figure 1 : Stockwork Zone Cross Section 4200 N
圖1:4200 N網絡區橫截面。
Highlighted Intersections
突顯交叉口
New intersections through the Stockwork gold deposit, comprised of the Footwall, Hanging Wall and high-grade Keel Zones, are highlighted below, shown on Figure 2 and listed in Table 1.
下表列出了股份網絡金礦牀的新交叉點,包括足牆、掛牆和高品位肋骨區,如圖2所示:
Drill hole ET-24-600: 46.5 metres grading 0.83 g/t gold equivalent or 62.1 g/t silver equivalent from 19.5 to 66.0 metres, consisting of 0.37 g/t gold and 34.3 g/t silver INCLUDING 13.3 metres grading 1.90 g/t gold equivalent or 142.5 g/t silver equivalent from 19.5 to 32.8 metres consisting of 0.49 g/t gold and 105.6 g/t silver. The hole has expanded Hanging Wall Zone mineralization to the west 25 metres and confirms high-grade mineralization 500 metres to the north of the 'Starter Pit.'
Drill hole ET-24-602: 92.5 metres grading 0.66 g/t gold equivalent or 49.2 g/t silver equivalent from 49.5 to 142.0 metres, consisting of 0.45 g/t gold and 15.5 g/t silver INCLUDING 10.6 metres grading 1.72 g/t gold equivalent or 129.4 g/t silver equivalent from 130.4 to 141.0 metres consisting of 0.57 g/t gold and 86.6 g/t silver. The hole has expanded Hanging Wall Zone mineralization to the west 15 metres and confirms high-grade mineralization 200 metres to the south of the 'Starter Pit.'
Drill hole ET-24-607: 120.5 metres grading 0.69 g/t gold equivalent or 51.9 g/t silver equivalent from 7.9 to 128.4 metres, consisting of 0.58 g/t gold and 8.1 g/t silver INCLUDING 7.6 metres grading 1.67 g/t gold equivalent or 125.1 g/t silver equivalent from 87.8 to 95.4 metres consisting of 1.46 g/t gold and 15.4 g/t silver. This hole confirms near-surface, high-grade mineralization 100m south of the PEA 'Starter Pit.'
Drill hole ET-24-609: 24.2 metres grading 0.77 g/t gold equivalent or 58.1 g/t silver equivalent from 3.7 to 27.9 metres, consisting of 0.76 g/t gold and 0.8 g/t silver. A second interval of 53.8 metres grading 0.60 g/t gold equivalent or 44.7 g/t silver equivalent from 51.4 to 105.2 metres, consisting of 0.56 g/t gold and 2.8 g/t silver. Both these intersections are in the HW Stockwork Zone of the Starter Pit.
鑽孔Et-24-600:從19.5到66.0米段,共46.5米礦化品位爲0.83克/噸黃金當量或62.1克/噸白銀當量,包括0.37克/噸黃金和34.3克/噸白銀,包括從19.5到32.8米段的13.3米,品位爲1.90克/噸黃金當量或142.5克/噸白銀當量,包括0.49克/噸黃金和105.6克/噸白銀。這個鑽孔將Hanging Wall Zone礦化向西擴展25米,並確認了' Starter Pit'北側500米處的高品位礦化。
鑽孔Et-24-602:從49.5到142.0米段,共92.5米礦化品位爲0.66克/噸黃金當量或49.2克/噸白銀當量,包括0.45克/噸黃金和15.5克/噸白銀,包括從130.4到141.0米段的10.6米,品位爲1.72克/噸黃金當量或129.4克/噸白銀當量,包括0.57克/噸黃金和86.6克/噸白銀。這個鑽孔將Hanging Wall Zone礦化向西擴展15米,並確認了' Starter Pit'南側200米處的高品位礦化。
鑽探孔Et-24-607:從7.9到128.4米段,共120.5米,礦化品位爲0.69克/噸黃金當量或51.9克/噸白銀當量,包括0.58克/噸黃金和8.1克/噸白銀,包括從87.8到95.4米段的7.6米,品位爲1.67克/噸黃金當量或125.1克/噸白銀當量,包括1.46克/噸黃金和15.4克/噸白銀。該孔確認了靠近表層的高品位礦化,距離PEA' Starter Pit'南側10000萬。
鑽探孔Et-24-609:3.7到27.9米段長24.2米,品位爲0.77克/噸黃金當量或58.1克/噸白銀當量,包括0.76克/噸黃金和0.8克/噸白銀。51.4到105.2米段長53.8米,品位爲0.60克/噸黃金當量或44.7克/噸白銀當量,包括0.56克/噸黃金和2.8克/噸白銀。這兩個交叉帶均在'Starter Pit'的HW Stockwork區內。
Figure 2: Stockwork Zone - Plan View
圖2:岩石網狀礦化區-平面視圖
Highlights from the on-going Pre-Feasibility Study Drilling Program include the following:
進行中的預可行性研究鑽探方案的亮點包括:
Expanding known mineralization by 10 to 15%, to the footwall and hanging wall zones, as well as the higher-grade 'Keel' at PEA pit bottom associated with the El Tigre and SK Veins;
Converting first two to three years of mineralized material in the potential 'Starter Stockwork Zone' from Indicated Mineral Resource to Measured;
Converting a significant portion of the 2 km strike length 'ultimate' PEA pit-constrained Inferred Mineral Resource to Indicated;
Completion of enhanced PFS Metallurgical Drilling, with samples underway comminution and leach testing; and
Completion of enhanced PFS Geotechnical Drilling, with samples undergoing testing.
將已知的礦化作用從PEA露天礦坑底部的El Tigre和SK Veins的腳牆和頂牆區域擴大10%至15%,以及更高品位的“Keel”;
將潛在的“Starter Stockwork Zone”前兩三年類歸到確定的礦物資源範疇。
將兩公里長的“終極”PEA露天礦坑限制內的大部分2千萬噸推斷礦物資源轉化爲指明礦物資源。
PFS冶金鑽探的完工,樣品正在進行粉碎和浸出試驗;
PFS岩土鑽探的完成,樣品正在進行測試。
Mineral Resource Drilling
礦產資源鑽探
P&E Mining Consultants Inc. ("P&E") of Brampton, Ontario completed the initial MRE in 2017. On Oct 27, 2023, P&E released an updated El Tigre Project NI 43-101 and NI 43-01 F1 compliant MRE technical report titled "Technical Report and Updated Mineral Resource Estimate of the El Tigre Silver-Gold Project, Sonora, Mexico" authored by William Stone, Ph.D., P.Geo.,Yungang Wu, P.Geo., Fred H. Brown, P.Geo., Jarita Barry, P.Geo., David Burga, P.Geo., D. Grant Feasby, P.Eng., Eugene Puritch, P.Eng., FEC, CET and David Salari, P.Eng. The MRE has a pit-constrained Indicated Mineral Resource totaling 43.0 million tonnes containing 818 thousand ounces AuEq grading 0.59 g/t AuEq; and a pit-constrained Inferred Mineral Resource of 11.5 million tonnes containing 267 thousand ounces AuEq grading 0.72 g/t AuEq (see update MRE press release dated September 12th 2023).
Brampton, 安大略省的P&E Mining Consultants公司(以下簡稱P&E)在2017年完成了初步的MRE。2023年10月27日,P&E發佈了一份更新的《El Tigre項目NI 43-101和NI 43-01 F1合規的MRE技術報告,標題爲‘技術報告和更新的礦產資源估計-El Tigre銀-金項目,墨西哥Sonora’,作者爲William Stone、Ph.D.、P.Geo.、 Yungang Wu、P.Geo.、Fred H. Brown、P.Geo.、Jarita Barry、P.Geo.、David Burga、P.Geo.、D. Grant Feasby、P.Eng.、Eugene Puritch、P.Eng.、FEC、CEt和David Salari、P.Eng。MRE具有坑道約束的已指示礦產資源,總計4300萬噸,含81.8萬盎司AuEq,品位爲0.59克/噸AuEq;以及坑道限制的預測礦體,總計1150萬噸,含26.7萬盎司AuEq,品位爲0.72克/噸AuEq(請參見2023年9月12日的更新MRE新聞稿)。
PEA-level bench optimization of the pit-constrained Mineral Resource highlighted the higher-grade (~0.80 gpt AuEq), low strip ratio (~0.3) potential Starter Stockwork Zone (see PEA press release dated November 1st, 2023). Recommendations of the PEA-level study included increasing Mineral Resource confidence in potential 'Starter Stockwork Zone' and additional exploratory drilling to target the 1) Footwall, 2) Hanging Wall and 3) 'Keel' areas of the Stockwork Zone. P&E were again retained to lead the current El Tigre PFS-level study. Complete and final assay results are listed in Table 1.
對於坑道約束的礦產資源進行了PEA級別的檯面優化,突出了更高品位(約0.80gpt AuEq)、更低剝離比(約0.3)的“Starter Stockwork Zone”的潛力(請參見2023年11月1日的PEA新聞稿)。PEA級別研究的建議包括增加“Starter Stockwork Zone”礦產資源的信心度,並進行進一步的勘探鑽探,以針對礦脈區的1)足牆,2)頂板和3)“Quill”的目標。 P&E再次受聘領導目前的El Tigre PFS級別研究。完整的化驗結果列在表1中。
Below, highlighted intersections are enumerated with reference to the three (3) zones targeted (Figure 2):
如下所示,突出顯示了與三個(3)目標區域(圖2)相關的交叉點:
Drill hole ET-24-600: This hole has expanded Hanging Wall Zone mineralization to the west 25 metres and confirms high-grade mineralization 500 metres to the north of the 'Starter Pit.';
Drill hole ET-24-602: This hole has expanded Hanging Wall Zone mineralization to the west 15 metres and confirms high-grade mineralization 100 metres to the south of the 'Starter Pit.';
Drill hole ET-24-607: This hole confirms near-surface, high-grade mineralization 100m south of the PEA 'Starter Pit.'; and
Drill hole ET-24-609: This hole highlights the high-grade Keel Zone on the Seitz Kelly Vein some 100m beneath the floor of the PEA Starter Pit.
Et-24-600鑽孔:此孔向西擴展了25米的足層帶礦化,證實了500米北部的“起始坑”處存在高品位礦化。
Et-24-602鑽孔:此孔向西擴展了15米的足層帶礦化,證實了“起始坑”南側100米處存在高品位礦化。
Et-24-607鑽孔:此孔證實了PEA“起始坑”地下南側10000萬處存在近錶帶高品位礦化;且
Et-24-609鑽孔:此孔突出了Seitz Kelly脈Keel帶的高品位礦化,深達PEA起始坑地下10000萬處。
Table 1-Mineral Resource Drill Hole Results
表1-礦物資源鑽孔結果。
AuEq Total (2) |
AgEq Total (2) |
|||||||
Hole ID |
Comment |
From |
To |
Length(1) |
Gold |
Silver |
||
m |
m |
m |
g/t |
g/t |
g/t |
g/t |
||
ET-24-600 |
STOCKWORK ZONE |
19.5 |
66.0 |
46.5 |
0.37 |
34.3 |
0.83 |
62.1 |
including |
19.5 |
32.8 |
13.3 |
0.49 |
105.6 |
1.90 |
142.5 |
|
and |
107.0 |
111.0 |
4.0 |
0.21 |
207.0 |
2.97 |
222.6 |
|
and |
118.0 |
123.0 |
5.0 |
0.05 |
71.8 |
1.01 |
75.7 |
|
ET-24-601 |
STOCKWORK ZONE3 |
44.5 |
64.5 |
20.0 |
0.79 |
105.6 |
2.20 |
164.9 |
including3 |
48.2 |
59.5 |
11.3 |
1.30 |
193.6 |
3.88 |
290.9 |
|
STOCKWORK ZONE |
87.9 |
103.0 |
15.1 |
0.42 |
2.8 |
0.45 |
34.0 |
|
ET-24-602 |
STOCKWORK ZONE |
49.5 |
142.0 |
92.5 |
0.45 |
15.5 |
0.66 |
49.2 |
including |
78.0 |
103.0 |
25.0 |
0.88 |
15.9 |
1.09 |
82.1 |
|
including |
130.4 |
141.0 |
10.6 |
0.57 |
86.6 |
1.72 |
129.4 |
|
ET-24-603 |
STOCKWORK ZONE |
41.2 |
67.2 |
26.0 |
0.33 |
1.0 |
0.34 |
25.6 |
and |
133.1 |
134.8 |
1.7 |
1.76 |
3.1 |
1.80 |
135.1 |
|
and |
161.7 |
162.7 |
1.0 |
2.93 |
5.0 |
2.99 |
224.4 |
|
and |
175.2 |
184.9 |
9.7 |
0.85 |
5.8 |
0.93 |
69.6 |
|
ET-24-604 |
STOCKWORK ZONE |
10.8 |
17.1 |
6.3 |
0.03 |
19.8 |
0.30 |
22.3 |
STOCKWORK ZONE |
31.0 |
65.5 |
34.5 |
0.14 |
18.5 |
0.38 |
28.9 |
|
including |
31.0 |
37.0 |
6.0 |
0.09 |
68.4 |
1.00 |
74.9 |
|
STOCKWORK ZONE |
116.0 |
136.3 |
20.3 |
0.23 |
6.3 |
0.31 |
23.2 |
|
ET-24-605 |
STOCKWORK ZONE |
24.7 |
32.2 |
7.5 |
0.93 |
0.5 |
0.94 |
70.4 |
STOCKWORK ZONE |
84.2 |
103.0 |
18.8 |
0.16 |
23.9 |
0.48 |
35.8 |
|
STOCKWORK ZONE |
120.7 |
126.7 |
6.0 |
0.94 |
1.0 |
0.96 |
71.8 |
|
STOCKWORK ZONE4 |
203.2 |
223.2 |
20.0 |
0.31 |
4.0 |
0.36 |
27.1 |
|
including |
204.0 |
214.6 |
10.6 |
0.42 |
5.8 |
0.50 |
37.3 |
|
ET-24-606 |
STOCKWORK ZONE |
57.1 |
59.6 |
2.5 |
0.98 |
0.5 |
0.99 |
73.9 |
STOCKWORK ZONE |
110.2 |
114.0 |
3.8 |
0.34 |
0.8 |
0.35 |
26.2 |
|
STOCKWORK ZONE |
159.9 |
180.8 |
20.9 |
0.35 |
25.6 |
0.69 |
51.4 |
|
Mining VOID |
180.8 |
185.2 |
4.4 |
* |
* |
* |
* |
|
ET-24-607 |
STOCKWORK ZONE5 |
7.9 |
128.4 |
120.5 |
0.58 |
8.1 |
0.69 |
51.9 |
and |
87.8 |
95.4 |
7.6 |
1.46 |
15.4 |
1.67 |
125.1 |
|
ET-24-609 |
STOCKWORK ZONE |
3.7 |
27.9 |
24.2 |
0.76 |
0.8 |
0.77 |
58.1 |
STOCKWORK ZONE |
51.4 |
105.2 |
53.8 |
0.56 |
2.8 |
0.60 |
44.7 |
|
El Tigre Vein Keel |
124.4 |
164.4 |
40.0 |
0.09 |
74.1 |
1.08 |
80.7 |
|
including |
145.1 |
162.4 |
17.3 |
0.12 |
134.7 |
1.92 |
143.8 |
|
Seitz Kelly Vein Keel |
178.4 |
229.1 |
50.7 |
0.17 |
142.1 |
2.07 |
155.0 |
|
including |
198.4 |
212.7 |
14.3 |
0.20 |
319.5 |
4.46 |
334.3 |
AuEq總計(2) |
AgEq總量(2) |
|||||||
孔ID |
評論 |
起點 |
要 |
長度(1) |
黃金 |
白銀 |
||
m |
m |
m |
克/噸 |
克/噸 |
克/噸 |
克/噸 |
||
Et-24-600 |
STOCKWORK區 |
19.5 |
66.0 |
46.5 |
0.37 |
34.3 |
0.83 |
62.1 |
包括 |
19.5 |
32.8 |
13.3 |
0.49 |
105.6 |
1.90 |
142.5 |
|
和 |
107.0 |
111.0 |
4.0 |
0.21 |
207.0 |
2.97 |
222.6 |
|
和 |
118.0 |
123.0 |
5.0 |
0.05 |
71.8 |
1.01 |
75.7 |
|
Et-24-601 |
STOCKWORk第3礦帶 |
44.5 |
64.5 |
20.0 |
0.79 |
105.6 |
2.20 |
164.9 |
包括3個 |
48.2 |
59.5 |
11.3 |
1.30 |
193.6 |
3.88 |
290.9 |
|
STOCKWORK區 |
87.9 |
103.0 |
15.1 |
0.42 |
2.8 |
0.45 |
34.0 |
|
Et-24-602 |
STOCKWORK區 |
49.5 |
142.0 |
92.5 |
0.45 |
15.5 |
0.66 |
49.2 |
包括 |
78.0 |
103.0 |
25.0 |
0.88 |
15.9 |
1.09 |
82.1 |
|
包括 |
130.4 |
141.0 |
10.6 |
0.57 |
86.6 |
1.72 |
129.4 |
|
Et-24-603 |
STOCKWORK區 |
41.2 |
67.2 |
26.0 |
0.33 |
1.0 |
0.34 |
25.6開多 |
和 |
133.1 |
134.8 |
1.7 |
1.76 |
3.1 |
1.80 |
135.1 |
|
和 |
161.7 |
162.7 |
1.0 |
2.93 |
5.0 |
2.99 |
224.4 |
|
和 |
175.2 |
184.9 |
9.7 |
0.85 |
5.8 |
0.93 |
69.6 |
|
Et-24-604 |
STOCKWORK區 |
10.8 |
17.1 |
6.3 |
0.03 |
19.8 |
0.30 |
22.3 |
STOCKWORK區 |
31.0 |
65.5 |
34.5 |
0.14 |
18.5 |
0.38 |
28.9 |
|
包括 |
31.0 |
37.0 |
6.0 |
0.09 |
68.4 |
1.00 |
74.9 |
|
STOCKWORK區 |
116.0。 |
136.3 |
20.3 |
0.23 |
6.3 |
0.31 |
23.2 |
|
Et-24-605 |
STOCKWORK區 |
24.7 |
32.2 |
7.5 |
0.93 |
0.5 |
0.94 |
70.4 |
STOCKWORK區 |
84.2 |
103.0 |
18.8 |
0.16 |
23.9 |
0.48 |
35.8 |
|
STOCKWORK區 |
120.7 |
126.7 |
6.0 |
0.94 |
1.0 |
0.96 |
71.8 |
|
STOCKWORk第4礦帶 |
203.2 |
223.2 |
20.0 |
0.31 |
4.0 |
0.36 |
27.1 |
|
包括 |
204.0 |
214.6 |
10.6 |
0.42 |
5.8 |
0.50 |
37.3 |
|
Et-24-606 |
STOCKWORK區 |
57.1 |
59.6 |
2.5 |
0.98 |
0.5 |
0.99 |
73.9 |
STOCKWORK區 |
110.2 |
114.0 |
3.8 |
0.34 |
0.8 |
0.35 |
26.2 |
|
STOCKWORK區 |
159.9 |
180.8 |
20.9 |
0.35 |
25.6開多 |
0.69 |
5140 |
|
礦業VOID |
180.8 |
185.2 |
4.4 |
* |
* |
* |
* |
|
Et-24-607 |
STOCKWORk第5礦帶 |
7.9 |
128.4 |
120.5 |
0.58 |
8.1 |
0.69 |
51.9 |
和 |
87.8 |
95.4 |
7.6 |
1.46 |
15.4 |
1.67 |
125.1 |
|
Et-24-609 |
STOCKWORK區 |
3.7 |
27.9 |
24.2 |
0.76 |
0.8 |
0.77 |
58.1 |
STOCKWORK區 |
5140 |
105.2 |
53.8 |
0.56 |
2.8 |
0.60 |
44.7 |
|
El Tigre脈Keel帶 |
124.4 |
164.4 |
與Allist協議有關,在2021年12月,雙方還簽署了一份聯合臨床合作協議(“臨床合作”),規定了雙方合作和共同承擔全球臨床研究成本的框架。在2024年3月31日和2023年的三個月期間內,公司分別支出了1,200萬美元的成本補償金,這已在臨床協作協議下記爲研究和發展費用貸方。對於2024年3月31日和2023年的每個三個月期間,公司還有資格從Allist獲得1200萬美元的費用補償金,這已被記錄爲減少研究和開發費用。公司按照ASC 808《合作安排》進行了臨床合作評估。 |
0.09 |
74.1 |
1.08 |
80.7 |
|
包括 |
145.1 |
162.4 |
17.3 |
0.12 |
134.7 |
1.92 |
143.8 |
|
Seitz Kelly脈Keel帶 |
178.4 |
229.1 |
50.7 |
0.17 |
142.1 |
2.07 |
155.0 |
|
包括 |
198.4 |
212.7 |
14.3 |
0.20 |
319.5 |
4.46 |
334.3 |
Notes:
注意:
Not true width.
Silver Equivalent ("AgEq") ratios are based on a silver to gold price ratio of 75:1 (Au:Ag).
Excludes 1.10m of Mining void
Excludes 1.40m of Mining void
Excludes 2.50m of Mining void
寬度不正確。
白銀當量("AgEq")比率基於黃金與白銀價格比例爲75:1(Au:Ag)。
排除礦業空洞110萬
排除礦業空洞140萬
排除礦業空洞250萬
Drill holes ET-24-608, 610, 611 and 612 have no significant assays to report as the holes were exploration-oriented and located on periphery of mineralization.
鑽孔Et-24-608、610、611和612沒有重大發現,因爲這些鑽孔是探索性的,位於礦化帶的外圍。
Table 2-Drill Hole Locations
表2-鑽孔位置
Hole ID |
Easting |
Northing |
Elevation |
Azimuth |
Dip |
Length |
ET-24-600 |
671,010.6 |
3,384,850.0 |
1892.0 |
90 |
-65 |
137.0 |
ET-24-601 |
671,230.6 |
3,383,690.2 |
2000.2 |
90 |
-45 |
103.0 |
ET-24-602 |
671,165.9 |
3,383,689.4 |
1988.5 |
90 |
-45 |
181.5 |
ET-24-603 |
671,236.8 |
3,383,262.3 |
1931.7 |
90 |
-45 |
206.2 |
ET-24-604 |
670,960.7 |
3,385,047.8 |
1856.6 |
90 |
-45 |
183.0 |
ET-24-605 |
671,024.8 |
3,384,643.8 |
2076.8 |
90 |
-50 |
245.2 |
ET-24-606 |
671,023.6 |
3,384,643.8 |
2076.8 |
90 |
-75 |
222.0 |
ET-24-607 |
671,191.8 |
3,383,747.1 |
1956.2 |
90 |
-45 |
188.4 |
ET-24-608 |
671,225.2 |
3,384,150.5 |
2018.4 |
90 |
-45 |
111.0 |
ET-24-609 |
671,084.8 |
3,384,202.2 |
1932.1 |
90 |
-70 |
248.4 |
ET-24-610 |
671,209.3 |
3,385,147.0 |
1976.3 |
90 |
-45 |
50.4 |
ET-24-611 |
671,194.2 |
3,385,084.2 |
1953.5 |
90 |
-45 |
101.4 |
ET-24-612 |
671,128.6 |
3,385,043.7 |
1921.8 |
90 |
-45 |
50.4 |
孔ID |
東經(m) |
北緯(m) |
海拔高度(masl) |
方位角(度) |
傾角 |
長度 |
Et-24-600 |
671,010.6 |
3,384,850.0 |
1892.0 |
90 |
-65 |
137.0 |
Et-24-601 |
671,230.6 |
3,383,690.2 |
2000.2 |
90 |
-45 |
103.0 |
Et-24-602 |
671,165.9 |
3,383,689.4 |
1988.5 |
90 |
-45 |
181.5 |
Et-24-603 |
671,236.8 |
3,383,262.3 |
1931.7 |
90 |
-45 |
206.2 |
Et-24-604 |
670,960.7 |
3,385,047.8 |
1856.6 |
90 |
-45 |
183.0 |
Et-24-605 |
671,024.8 |
3,384,643.8 |
2076.8 |
90 |
-50 |
245.2 |
Et-24-606 |
671,023.6 |
3,384,643.8 |
2076.8 |
90 |
-75 |
222.0 |
Et-24-607 |
671,191.8 |
3,383,747.1 |
1956.2 |
90 |
-45 |
188.4 |
Et-24-608 |
671,225.2 |
3,384,150.5 |
2018.4 |
90 |
-45 |
111.0 |
Et-24-609 |
671,084.8 |
3,384,202.2 |
1932.1 |
90 |
-70 |
248.4 |
Et-24-610 |
671,209.3 |
3,385,147.0 |
1976.3 |
90 |
-45 |
5.04 |
Et-24-611 |
671,194.2 |
3,385,084.2 |
1953.5 |
90 |
-45 |
101.4 |
Et-24-612 |
671,128.6 |
3,385,043.7 |
1921.8 |
90 |
-45 |
5.04 |
Figure 3: El Tigre - Conceptual Cross-Section Showing Mineralization Styles
圖3:El Tigre –概念剖面圖展示礦化類型
About Silver Tiger and the El Tigre Historic Mine District
關於Silver Tiger和El Tigre歷史礦區 Silver Tiger Metals Inc.是一家加拿大公司,其管理層在墨西哥發現、融資和建造大型熱液銀礦項目方面擁有超過25年的經驗。Silver Tiger百分之百擁有的28,414公頃歷史悠久的El Tigre礦區位於墨西哥索諾拉州。環境、社會和治理方法是Silver Tiger的核心優先事項。
Silver Tiger Metals Inc. is a Canadian company whose management has more than 25 years' experience discovering, financing and building large hydrothermal silver projects in Mexico. Silver Tiger's 100% owned 28,414 hectare historic El Tigre Mining District is located in Sonora, Mexico. Principled environmental, social and governance practices are core priorities at Silver Tiger.
El Tigre歷史礦區位於墨西哥索諾拉州,位於Sierra Madre銀和金帶的北端,該帶有許多低溫銀和金礦牀,包括北端的Dolores、Santa Elena和Las Chispas。 1896年,黃金首次在Gold Hill地區發現,1903年開始採礦。很快,重點轉移到採礦區域的銀脈上,產量來自El Tigre Vein、Seitz Kelley Vein和Sooy Vein三個相互平行的礦脈。沿中心El Tigre Vein地下采礦沿着走向延伸了1,450米,共開採了14層,深度約爲450米。Seitz Kelley Vein沿走向開採了1公里,深約200米。Sooy Vein只沿走向採了250米,深約150米。當銀價在大蕭條的開端跌至不到20美分一盎司時,這三個礦脈的採礦立即停止了。到1930年礦山關閉時,據報道總共生產了353,000盎司黃金和67.4百萬盎司銀,從1.87百萬噸(Craig,2012)中採礦的平均品位超過2千克的銀當量每噸。
The El Tigre historic mine district is located in Sonora, Mexico and lies at the northern end of the Sierra Madre silver and gold belt which hosts many epithermal silver and gold deposits, including Dolores, Santa Elena and Las Chispas at the northern end. In 1896, gold was first discovered on the Property in the Gold Hill area and mining started with the Brown Shaft in 1903. The focus soon changed to mining silver veins in the area with production coming from 3 parallel veins the El Tigre Vein, the Seitz Kelley Vein and the Sooy Vein. Underground mining on the middle El Tigre Vein extended 1,450 metres along strike and was mined on 14 levels to a depth of approximately 450 metres. The Seitz Kelley Vein was mined along strike for 1 kilometre to a depth of approximately 200 metres. The Sooy Vein was only mined along strike for 250 metres to a depth of approximately 150 metres. Mining abruptly stopped on all three of these veins when the price of silver collapsed to less than US20¢ per ounce with the onset of the Great Depression. By the time the mine closed in 1930, it is reported to have produced a total of 353,000 ounces of gold and 67.4 million ounces of silver from 1.87 million tons (Craig, 2012). The average grade mined during this period was over 2 kilograms silver equivalent per ton.
El Tigre銀和金礦牀與一系列受北-南趨向構造控制的低溫銀脈有關,在Sierra Madre火山岩群的安山岩和流紋岩凝灰岩中形成了一個寬達150米的銀和金礦化的普羅菲利蒂克脅迫變質圍巖帶。這些礦脈向西傾斜,通常爲0.5米寬。然而,局部礦脈寬度可達5米。這些礦脈、構造和礦化帶露頭在地表,並在我們的範圍內沿走向追蹤了5.3公里。歷史上的採礦和勘探活動主要集中在地球的南端的1.6公里,主要是在El Tigre、Seitz Kelly和Sooy礦脈上。未經勘探的Caleigh、Benjamin、Protectora和Fundadora露出的礦脈向北延伸超過3公里。Silver Tiger已發佈其更新的NI 43-101符合的礦產資源估計和PEA,並正在進行鑽探以更新其礦產資源估計和發表PFS。
The El Tigre silver and gold deposit is related to a series of epithermal veins controlled by a north-south trending structure cutting across the andesitic and rhyolitic tuffs of the Sierra Madre Volcanic Complex within a broad silver and gold mineralized prophylitic alteration zone developed in the El Tigre Formation that can be up to 150 metres wide. The veins dip steeply to the west and are typically 0.5 metre wide; however, locally can be up to 5 metres in width. The veins, structures and mineralized zones outcrop on surface and have been traced for 5.3 kilometres along strike in our brownfield exploration area. Historical mining and exploration activities focused on a 1.6-kilometre portion of the southern end of the deposits, principally on the El Tigre, Seitz Kelly and Sooy veins. The under explored Caleigh, Benjamin, Protectora and the Fundadora exposed veins continue north for more than 3 kilometres. Silver Tiger has delivered its updated NI 43-101 compliant Mineral Resource Estimate and PEA and is currently drilling to update its Mineral Resource Estimate and publish a PFS.
El Tigre白銀和黃金礦牀與一系列正常熱礦脈有關,這些礦脈受一條從北到南的構造控制,穿過Sierra Madre火山複合體的安山岩和流紋岩火山熔岩,發展了一個寬度可達150米的銀和金礦化前應召變質蝕變帶。這些礦脈向西陡傾,通常爲0.5米寬;但地方上可達5米寬。這些礦脈、構造和礦化帶露頭,在我們的棕地勘探區內沿着走向跟蹤了5.3公里。歷史上的採礦和勘探活動主要集中在礦牀南端的1.6公里部分,主要是在El Tigre、Seitz Kelly和Sooy礦脈上。未開採的Caleigh、Benjamin、Protectora和Fundadora露出的礦脈一直向北延伸超過3公里。Silver Tiger已發佈其最新的符合NI 43-101標準的礦產資源評估和PEA,並正在進行鑽探,以更新其礦產資源評估併發布PFS。
VRIFY Slide Deck and 3D Presentation - Silver Tiger's El Tigre Project
在VRIFY上訪問Silver Tiger Metals Inc.公司簡介:
VRIFY is a platform being used by companies to communicate with investors using 360° virtual tours of remote mining assets, 3D models and interactive presentations. VRIFY can be accessed by website and with the VRIFY iOS and Android apps.
Silver Tiger Metals Inc.的VRIFY幻燈片和3D演示可以在 上查看,也可以在該公司的網站上查看
Access the Silver Tiger Metals Inc. Company Profile on VRIFY at:
在VRIFY上查看Silver Tiger Metals Inc.公司簡介:
The VRIFY Slide Deck and 3D Presentation for Silver Tiger Metals Inc. can be viewed at: and on the Corporation's website at: .
可以在這裏查看Silver Tiger Metals Inc.的VRIFY幻燈片和3D演示: 以及公司網站上:。
Procedure, Quality Assurance / Quality Control and Data Verification
流程、質量保證/質量控制和數據驗證
The diamond drill core (HQ size) is geologically logged, photographed and marked for sampling. When the sample lengths are determined, the full drill core is sawn with a diamond blade drill core saw with one half of the drill core being bagged and tagged for assay. The remaining half portion is returned to the drill core trays for storage and/or for metallurgical test work.
鑽孔巖芯(HQ規格)被地質記錄、拍照並標記採樣。當確定採樣長度後,整個鑽孔巖芯被使用一把金剛石鑽芯鋸切開,鑽孔巖芯的一半被裝在袋子裏標記以進行分析。其餘的一半放回鑽孔巖芯托盤裏儲存和/或進行冶金試驗。
The sealed and tagged drill core sample bags are transported to the Bureau Veritas facility in Hermosillo, Mexico. Bureau Veritas crushes the samples (Code PRP70-250) and prepares 200-300 gram pulp samples with ninety percent passing Tyler 200 mesh (Code PUL85). The pulps are assayed for gold using a 30-gram charge by fire assay (Code FA630) and over limits greater than 10 grams per tonne are re-assayed using a gravimetric finish (Code FA530). Silver and multi-element analysis is completed using total digestion (Code MA200 Total Digestion ICP). Over limits greater than 100 grams per tonne silver are re-assayed using a gravimetric finish (Code FA530).
密封和標記的鑽孔巖芯樣品袋被運往墨西哥埃莫西約的Bureau Veritas設施。Bureau Veritas(代號PRP70-250)粉碎樣品並準備200-300克的漿料樣品,九成粉末通過Tyler 200網(代號PUL85)。用30克藥劑量進行火試金測定金子,超過10克/噸的上限再進行重測重量法(代號FA530)。使用全消解(MA200全消化ICP代號)進行銀和多元素分析。超過每噸100克銀的上限再進行重測重量法(代號FA530)。
Quality assurance and quality control ("QA/QC") procedures monitor the chain-of-custody of the samples and includes the systematic insertion and monitoring of appropriate reference materials (certified reference materials, blanks and duplicates) into the sample strings. The results of the assaying of the QA/QC material included in each batch are tracked to ensure the integrity of the assay data. All results stated in this announcement have passed Silver Tiger's QA/QC protocols.
質量保證和質量控制("QA/QC")程序監控樣品的全程控制,並將適當的參考物質(認證參考物質、白樣和樣品副本)系統地插入樣品字符串中進行監測。每批QA/QC物質的檢測結果都進行跟蹤,以確保檢測數據的完整性。本公告中所述的所有結果都已經通過Silver Tiger的QA/QC協議。
Qualified Person
合格人士
David R. Duncan, P. Geo., V.P. Exploration of the Corporation, is the Qualified Person for Silver Tiger as defined under National Instrument 43-101. Mr. Duncan has reviewed and approved the scientific and technical information in this press release.
Corporation的勘探副總裁David R. Duncan, P. Geo.是根據《國家43-101號儀器》定義下的Silver Tiger的合格人員。 Duncan先生已經審查並批准了本新聞稿中的科學技術信息。
For further information, please contact:
Glenn Jessome
President and CEO}
902 492 0298
jessome@silvertigermetals.com
如需更多信息,請聯繫:
Glenn Jessome
總裁兼首席執行官}
902 492 0298
jessome@silvertigermetals.com
CAUTIONARY STATEMENT:
警示聲明:
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
TSX創業公司交易所及其監管服務提供方(該術語定義在TSX創業公司政策中)不對此發佈的充分性或準確性承擔任何責任。
This News Release includes certain "forward-looking statements". All statements other than statements of historical fact included in this release, including, without limitation, statements regarding potential mineralization, Mineral Resources and Mineral Reserves, the ability to convert Inferred Resources to Indicated Resources, the ability to complete future drilling programs and infill sampling, the ability to extend Mineral Resource blocks, the similarity of mineralization at El Tigre to Delores, Santa Elena and Chispas, exploration results, and future plans and objectives of Silver Tiger, are forward-looking statements that involve various risks and uncertainties. Forward-looking statements are frequently characterized by words such as "may", "is expected to", "anticipates", "estimates", "intends", "plans", "projection", "could", "vision", "goals", "objective" and "outlook" and other similar words. Although Silver Tiger believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, there can be no assurance that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from Silver Tiger's expectations include risks and uncertainties related to exploration, development, operations, commodity prices and global financial volatility, risk and uncertainties of operating in a foreign jurisdiction as well as additional risks described from time to time in the filings made by Silver Tiger with securities regulators.
本新聞稿包括某些“前瞻性聲明”。除了本發佈中所包含的歷史事實聲明之外,其他所有聲明,包括但不限於涉礦概念、礦物資源和礦物儲量的潛力,將被升級爲提示符,將來的鑽探計劃和補樣,將礦物資源塊延伸,將El Tigre的礦化程度與Delores、Santa Elena和Chispas相似,勘探結果和Silver Tiger的未來計劃和目標,都是包含風險和不確定性的前瞻性聲明。前瞻性聲明經常以“可能性”,“預計”,“預計”,“估計”,“打算”,“計劃”,“投影”,“可能性”,“目標”和“前景”等名稱爲特徵。雖然Silver Tiger認爲這些前瞻性聲明所表達的期望是基於合理的假設,但不能保證這些聲明將被證明是準確的,實際結果和未來事件可能會與這些聲明所預期的產生重大差異。可能導致Silver Tiger的預期結果與實際結果不同的重要因素包括涉及勘探、開發、運營、商品價格和全球金融動盪的風險和不確定性,以及在外國司法管轄區開展業務所面臨的附加風險,以及其他風險,這些風險不時被Silver Tiger向證券監管機構提交的文件中描述。
SOURCE: Silver Tiger Metals Inc.
信息來源:銀虎金屬公司。
譯文內容由第三人軟體翻譯。