share_log

Arya Resources Ltd. Drills 136 M 0.34% Ni, 0.18% Cu, and 175 G/t Co at Dunlop in Saskatchewan

Arya Resources Ltd. Drills 136 M 0.34% Ni, 0.18% Cu, and 175 G/t Co at Dunlop in Saskatchewan

阿里亞資源有限公司在薩斯喀徹溫鄧洛普區進行鑽探,獲得了13600萬噸0.34%的鎳、0.18%的銅和每噸含175克鈷的結果。
newsfile ·  07/24 10:00

Vancouver, British Columbia--(Newsfile Corp. - July 24, 2024) - Arya Resources Ltd. (TSXV: RBZ) ("Arya" or the "Company") is pleased to announce an update on its Dunlop Nickel Copper project, near Nemeiben Lake, La Ronge, Saskatchewan, Canada. The company has received results all the drill holes from its drill program completed in December 2023.

加拿大不列顛哥倫比亞省溫哥華--(新聞稿 - 2024年7月24日)--Arya資源有限公司(TSXV: RBZ)(以下簡稱“Arya”或“公司”)很高興地宣佈其位於加拿大薩斯喀徹溫省La Ronge附近的Dunlop Nickel Copper項目的最新進展。公司已從其於2023年12月完成的鑽探計劃中收到所有的鑽孔結果。

Drill Hole AR 23-003 intercepted starting from 12 meters (m):

鑽孔AR 23-003,起始深度爲12米(m):

  • 136 m of 0.18% Copper (Cu), 0.34% Nickel (Ni), and 175 grams/tonne (g/t) Cobalt (Co) Including 0.23% Cu, 0.39% Ni and 188 g/t Co over 88.15 m.
  • 1.36億噸0.18%的銅(Cu),0.34%的鎳(Ni)和175克/噸(g/t)的鈷(Co),其中包括8815萬的0.23%Cu, 0.39%Ni和188克/噸的Co。

Drill Hole AR23-005 Intersected starting from 5 m:

鑽孔AR23-005,起始深度爲5米:

  • 67 m of 0.20% Cu, 0.39% Ni and 176 g/t of Co
  • 6700萬噸的0.20%的銅(Cu),0.39%的鎳(Ni)和176克/噸的Co。

Please note, the mineralized intervals are core length as true thickness has not yet been determined for the zone.

請注意,礦化區間爲實際長度,真實厚度尚未確定。

All of the eight diamond drill holes sampling has been received and summarized in table 1 below.

所有八個金剛石鑽孔的採樣結果均已收到並總結在下表1中。

The project is located 37km north of La Ronge via Provincial Highway 102 and then an 8km bush road heading west to Nemeiben Lake provides excellent access. A powerline runs along Provincial Highway 102 and would provide easy access to hydro for the project site. The Company has all the necessary permits to conduct exploration drilling on the Dunlop Nickel-Copper project.

該項目位於加拿大薩斯喀徹溫省La Ronge以北37公里,通過Provincial Highway 102再向西8公里的灌木路可提供出色的通行條件。Provincial Highway 102沿線有一條電力線路,可爲項目地點提供易於接入的電力。公司已經獲得了在Dunlop Nickel-Copper項目上進行勘探鑽探的所有必要許可證。

Previous drilling in 1960-1980 identified a historical mineralized zone totalling 18.11 million tonnes of Ni, and Cu mineralization of which 12.83 million tonnes were considered able to be mined as an open pit and the balance by underground mining. Grades ranged from 0.55% Ni - 1.46% Ni and 0.15% Cu - 0.39% Cu with assays of up to 0.35% Cr and 0.15% Co -Source Reference: SMDI#0749 Saskatchewan Mineral Database Identification Number.

1960-1980年的先前鑽孔確定了歷史上的礦化區,總量達1811萬噸Ni,在銅礦化中有1283萬噸被認爲能夠作爲露天礦或地下采礦。品位從0.55%Ni-1.46%Ni和0.15%Cu-0.39%Cu,化驗結果最高可達0.35%Cr和0.15%Co——參考來源:SMDI#0749 Saskatchewan Mineral Database Identification Number。

The drill program was designed to test favourable Nickel-Copper targets identified within the historic Dunlop Ni-Cu Zone by the company's technical team. The program concentrated on drilling targets identified at the East Zone. The program was successful in intersecting the mineralized pyroxenite in all holes. Visually, the mineralization appears to be of similar nature to the zone intersected in the historic drilling, 3-5% disseminated and blebby pyrrhotite with trace to 1% pentlandite and chalcopyrite. Locally, on a meter scale, sulphide content increases to 30%. Table 1 summarizes the assay results for holes AR 23-001 and AR 23-008.

鑽探計劃旨在測試公司技術團隊在歷史悠久的Dunlop Ni-Cu區域內確定的有利鎳銅目標。該計劃集中在東部地帶的鑽探目標。該計劃成功地在所有孔中都遇到了礦化的輝石巖。從目視上看,礦化物質與歷史鑽探中遇到的礦化物質的性質相似,爲3-5%的彌散和顆粒狀硫化物,含痕量至1%的輝鐵礦和黃銅礦。在局部的米級尺度上,硫化物含量增加到30%。表1總結了AR 23-001和AR 23-008孔的化驗結果。

Table 1: Assay Results

表1:化驗結果

From (m) To (m) Length (m) Cu (%) Ni (%) Co (ppm)
AR 23-001
128 143 15 0.13 0.19 129
AR 23-002
97.5 133.5 36.0 0.14% 0.22 135
Table 1: Assay Results (continued)
From (m) To (m) Length (m) Cu (%) Ni (%) Co (ppm)
AR 23-003
12 148 136 0.18% 0.34 175
Including:
59.85 148 88.15 0.23 0.39 188
AR 23-004
111 129 18 0.27% 0.37 138
AR 23-005
5 72 67 0.16 0.39 176
AR 23-006
63 84 21 0.20 0.31 140
AR 23-007 (Previously Released)
16.00 51.50 35.50 0.32 0.39 161
Including:
26.00 43.00 17.00 0.41 0.52 195
AR 23-008 (Previously Released)
18.50 55.00 36.50 0.35 0.62 247
Including:
33.00 42.70 9.70 0.64 1.35 518
從(m) 到(m) 長度(米) 銅(%) Ni(%) Co (ppm)
AR 23-001
128 143 15 0.13 0.19 129
AR 23-002
97.5 133.5 36.0 0.14% 0.22 135
表格1:化驗結果(續)
從(m) 到(m) 長度(米) 銅(%) Ni(%) Co (ppm)
AR 23-003
12 148 136 0.18% 0.34 175
包括:
59.85 148 88.15 0.23 0.39 188
AR 23-004
111 129 18 0.27% 0.37 138
AR 23-005
5 72 67 0.16 0.39 176
AR 23-006
63 84 21 0.20 0.31 140
AR 23-007(之前發佈)
16.00 51.50 35.50 0.32 0.39 161
包括:
26.00 43.00 17.00 0.41 0.52 195
AR 23-008 (之前發佈)
18.50 55.00 36.50 0.35 0.62 247
包括:
33.00 42.70 9.70 0.64 每股稀釋1.35美元 518

Table 2 summarizes the locations of each drill hole completed during the Winter2023 diamond drill program at Dunlop. See Also collar location map.

表2總結了冬季特斯拉-地圖杜洛普金剛石鑽探項目每個鑽孔的位置。請參閱鑽探鑽孔位置地圖。

Table 2: December 2023 Drill Program; Dunlop

表2:2023年12月冬季鑽探計劃;杜洛普

Hole # UTM E UTM N Elevation (m) Az TN Dip Final Depth (m)
AR23-001 489275 6130814 400.9 0.0 -50 200.0
AR23-002 489275 6130867 396.7 0.0 -50 155.0
AR23-003 489222 6130867 397.1 0.0 -55 164.0
AR23-004 489325 6130845 395.6 0.0 -50 140.0
AR23-005 489325 6130900 390.5 0.0 -50 119.0
AR23-006 489225 6130918 390.4 0.0 -55 125.0
AR23-007 489275 6130945 390.7 0.0 -55 65.0
AR23-008 489275 6130945 390.7 0.0 -70 74.0





Total Meters 1042.0
孔號 UTM東座標。 UTM北座標。 高度(米) Az TN 傾角 最終深度(m)
AR23-001 489275 6130814 400.9 0.0 -50 200.0資產組成
AR23-002 489275 6130867 396.7 0.0 -50 155.0
AR23-003 489222 6130867 397.1 0.0 -55 164.0
AR23-004 489325 6130845 395.6 0.0 -50 140.0
AR23-005 489325 6130900 390.5 0.0 -50 119.0
AR23-006 489225 6130918 390.4 0.0 -55 125.0
AR23-007 489275 6130945 390.7 0.0 -55 65.0
AR23-008 489275 6130945 390.7 0.0 -70 74.0





總計米數 1042.0

Key Lake Uranium Claims, Athabasca Basin and Wedge Lake Gold Project:

Key Lake鈾礦區和楔形湖黃金項目:

The company owns early-stage uranium claims in the Athabasca Basin of Saskatchewan: 20,625 acres in Key Lake Uranium Corridor less thank 50 km from a mill. Several Uranium mining companies are drilling the Key Lake Uranium Corridor. Projected strike of the P-2 Thrust fault which hosts the McArthur River uranium mine in the Athabasca basin, extends onto the property.

該公司擁有薩斯喀徹溫省Athabasca盆地早期階段的鈾礦權:在距離磨機不到50公里的20,625英畝的Key Lake鈾走廊上。幾家鈾採礦公司正在鑽探Key Lake鈾走廊。 預計P-2推覆斷層的打擊區位於Athabasca盆地的麥克阿瑟河鈾礦,延伸到該物業上。

Wedge Lake Gold mineralization is widespread with several zones / occurrences of gold having been identified and worked over the years on the Wedge Lake Property. There are 5 main zones of gold mineralization on the property: Twin and T20, T6, T-12 and Main. The gold mineralization is associated with either the iron formation, or quartz veins within shear zones in close proximity to the iron formations.

楔形湖黃金礦化廣泛,多個區域/事件的黃金已經在楔形湖物業上被識別和開採多年。物業上有5個主要的黃金礦化區:Twin和T20、T6億.12和Main。黃金礦化與該鐵礦或剪切帶內石英脈有關,這些石英脈靠近鐵礦區。

QUALITY ASSURANCE AND QUALITY CONTROL (QA/QC)

質量保證和質量控制(QA / QC)

ARYA Resources Ltd. maintains tight core sample security, quality assurance and quality control (QA/QC) for all aspects of its exploration program. All core samples from the Fall 2023 were logged, photographed and sampled at ARYA's secure core facility in La Ronge, Saskatchewan. Where possible, core samples are standardized at 1.0m down-hole intervals. The core samples are cut using a diamond core saw with half remaining in the core box for future reference. One-half is bagged and then placed in rice bags, secured with zip ties, and delivered to Manitoulin Transport in La Ronge, placed on a pallet and shrink wrapped (to ensure no sample bags are misplaced). The sample shipment is delivered to SRC Geoanalytical Labratories (Saskatchewan Research Council) an ISO/IEC 17025 accredited lab in Saskatoon, SK for preparation (crushing and pulverizing) and analyzed using ICP-OES package ICP4T 4-acid total digestion with specified limits and package Au5 for Au, Pt and Pd (method codes ICP4T and Au5 respectively). Company protocols include the insertion of quality control (QC) samples consisting of blind standards (Certified Reference Materials (CRMs)), blanks and sample duplicates into the sample stream at a rate of 1 in 30.

ARYA Resources Ltd. 對其所有勘探項目的所有方面保持着嚴格的巖芯樣品安全,質量保證和質量控制(QA/QC)。Fall 2023的所有巖芯樣品都在Saskatchewan的La Ronge上的ARYA安全的核心設施中記錄、拍照並取樣。在可能的情況下,巖芯樣品在100萬個井段間標準化。使用鑽石巖芯鋸切割巖芯樣品,有一半留在芯盒中供將來參考,另一半被裝袋,然後放在米袋中,在Rice bags袋中,用拉鍊封口並遞交給La Ronge的Manitoulin運輸公司,放在一個托盤上,縮緊(以確保沒有樣品袋丟失)。樣品裝運送到ISO/IEC 17025認證實驗室SRC Geoanalytical Labratories(Saskatchewan Research Council)進行準備(破碎和粉碎)並使用ICP-OES包ICP4億4酸性總消化進行分析,並指定限制和Au5包進行Au、Pt和Pd分析(方法代碼分別爲ICP4億和Au5)。公司協議包括將盲標準樣(認證參照材料(CRM))、空白樣品和樣品重複體插入樣品流中,以1比30的比例。

ARYA is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data referred to herein.

ARYA不知道有任何鑽探、取樣、回收或其他可能影響此處提到的數據的準確性或可靠性的因素。

Qualified Person:

本新聞稿所含的科學技術信息已由Serigne Dieng博士,M.Sc.評審並批准,他是國家43-101--礦產項目披露標準("NI 43-101")的資格人員,澳大利亞地質學家學會(AIG)會員(MAIG,# 8095),該公司獨立地質顧問。

Kevin Wells, P.Geo., a consulting geologist to the Company, is the independent qualified person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects for the Project has reviewed, verified, and approved the contents of this news release and has verified the data underlying the contents of this news release by review and supervision of, but not limited to, drilling procedures, chain of custody of core and samples, logging and sampling procedures and insertion of blind standards (CRM's), blanks and pulp duplicates into the sample stream.

該公司的獨立合格人員,國家43-101號規定的透露礦物項目的披露標準Kevin Wells,P.Geo.審核、核實和批准了本新聞稿的內容,並通過審核和監督,但不限於鑽探程序、岩心和樣品的嚴密監管、記錄和取樣程序以及將盲標準樣(CRM)、空白樣和樣品重複插入樣品流中來驗證本新聞稿的數據。

On behalf of the Board of Directors:
Rasool Mohammad, CEO
Email: rasool@aryaresourcesltd.com
Telephone: (604) 428-8966

董事會代表:
Rasool Mohammad,首席執行官
電子郵件: rasool@aryaresourcesltd.com
電話:(604)428-8966

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

TSX Venture Exchange及其監管服務提供商(根據TSX Venture Exchange的規定)均不對本新聞稿的充分性或準確性承擔責任。

This news release includes "forward looking statements" that are subject to assumptions, risks and uncertainties. Statements in this news release which are not purely historical are forward looking statements, including without limitation any statements concerning the Company's intentions, plans, estimates, expectations or beliefs. Although the Company believes that any forward-looking statements in this news release are reasonable, there can be no assurance that any such forward looking statements will prove to be accurate.

本新聞稿包含"前瞻性聲明",這些聲明受假設、風險和不確定性的影響。本新聞稿中不純的歷史性聲明屬於前瞻性聲明,包括無限制的任何有關本公司意圖、計劃、估計、期望或信仰的聲明。儘管本公司認爲本新聞稿中的任何前瞻性聲明都是合理的,但無法保證任何此類前瞻性聲明都是準確的。

Collar location map

點領域地圖

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論