share_log

Amarc and Freeport Commence Extensive Drilling a Joy Copper-Gold District, British Columbia

Amarc and Freeport Commence Extensive Drilling a Joy Copper-Gold District, British Columbia

Amarc和Freeport開始在英屬哥倫比亞省Joy銅黃金區進行廣泛鑽探。
Accesswire ·  07/11 19:45

VANCOUVER, BC / ACCESSWIRE / July 11, 2024 / Amarc Resources Ltd. ("Amarc" or the "Company") (TSXV:AHR)(OTCQB:AXREF) is pleased to announce that extensive core drilling has commenced at its 100% owned JOY Copper-Gold ("Cu-Au") District (or "JOY" or the "District") in north-central British Columbia ("BC"). The program's goal is the discovery of porphyry Cu-Au deposits by wide-spaced drilling over eight large drill-ready sulphide mineralized systems clustered along a number of emerging mineralized trends (Figure 1). These trends resemble the 4 km-long northeast mineralized trend in the Kemess Mining District, located immediately adjacent to the south of the JOY tenure. Owned by Centerra Gold, the Kemess Mining District includes the Kemess North, Kemess Underground and Kemess East porphyry Cu-Au deposits.

位於不列顛哥倫比亞省中北部的Amarc Resources Ltd.(“Amarc”或“公司”)(TSXV:AHR)(OTCQB:AXREF)很高興宣佈,其100%擁有的JOY Copper-Gold(“Cu-Au”)地區(或“JOY”或“該地區”)的廣泛核心鑽探已經開始。該計劃的目標是通過沿一些新興的礦化趨勢(圖1)聚集的八個大型可鑽硫化物礦化體系裏的廣泛鑽探來發現斑岩型Cu-Au礦牀。這些趨勢類似於位於JOY所有權南端立即相鄰的Kemess Mining District的4公里長的東北礦化趨勢。Kemess Mining District由Centerra Gold擁有,包括Kemess North、Kemess Underground和Kemess East斑岩型Cu-Au存儲。

The current program is fully funded by Freeport-McMoRan Mineral Properties Canada Inc. ("Freeport"), which is earning-in to the JOY Project. Amarc continues as operator.

本次項目由Freeport-McMoRan Mineral Properties Canada Inc.(“Freeport”)完全資助併合作開展。Amarc繼續擔任運營商。

"We are very excited that the 2024 drilling program is fully underway at the JOY Cu-Au District with two drill rigs," said President and CEO Dr. Diane Nicolson. "Our drilling and District-wide geological, geophysical and geochemical programs at JOY over the past two years are culminating in this discovery focused drilling program, which was designed in collaboration with the Freeport team.

“我們非常高興,2024年的鑽探計劃在JOY Cu-Au地區已全面展開,共有兩臺鑽機,”總裁兼首席執行官Diane Nicolson博士說。“我們在過去兩年中在JOY進行的鑽探和區域性地質、地球物理和地球化學方面的工作將在這次針對探礦的鑽探計劃中達到高潮,這次計劃是與Freeport團隊合作設計的。”

Figure 1: Large Scale Mineral System Trends Occur at JOY that Host the PINE, Canyon, Twins & Other Developing Targets

圖1:JOY區域內大規模礦化趨勢趨勢,託管了PINE,Canyon,Twins和其他正在開發的目標

Key Deposit Scale Drill Targets

關鍵礦牀規模鑽探目標

  • Northwest Gossan ("NWG"). Is a new and exciting porphyry Cu-Au target that has never been drill tested. NWG is located at the northwest extremity of a possible 15 km mineralized trend that extends southeast toward the Gap and SWT Targets (Figure 1). NWG is characterized by several layers of intriguing technical evidence that indicate proximity to a porphyry Cu-Au system (see Amarc release May 2, 2024). The targeted sulphide system is outlined by a substantial 3.7 km 2 Induced Polarization ("IP") anomaly (>14mV/V) with coincident Cu, Au, Mo and Ag anomalies outlined in soils and rocks (Figure 2). Initial drill testing of NWG will focus primarily on a 1,500 m long and 500 m wide internal zone of higher (>20 mV/V) IP chargeability.

  • Northwest Gossan(“NWG”)是一個新的、令人興奮的斑岩型Cu-Au靶區,從未進行過鑽探測試。NWG位於可能延伸到Gap和SWt靶區的可礦化趨勢的西北端(圖1)。NWG的特徵是幾個令人感到困惑的技術證據層,表明接近斑岩型Cu-Au系統(請參見2024年5月Amarc發佈的內容)。目標硫化物系統由大量的3.7平方公里的誘導極化(“IP”)異常(> 14mV / V)定義,並在土壤和岩石中勾勒出與Cu、Au、Mo和Ag異常相重合的礦化體系(圖2)。NWG的初始鑽探將主要集中在一個150,000米長和50,000米寬的區域,該區域具有更高的(> 20 mV / V)IP電荷能力。

Figure 2: Extensive NWG Porphyry Cu-Au Deposit Target is Ready to Drill Test

圖2:廣泛的NWG斑岩型Cu-Au礦牀靶區已準備好進行鑽探測試。

  • PINE Trend. Drilling is also planned to advance important scale sulphide mineralized targets along this northeast striking 15 km trend, including at the at the PINE Deposit (6 km 2 ), Canyon Discovery (5 km 2 ), Twins Deposit Target (7 km 2 ) and SWT Target (3 km 2 ) as defined by Induced Polarization ("IP") chargeability anomalies (Figure 1).

  • PINE Deposit Target. Is characterized by a strike extension of Cu-Au mineralization of over 1,700 m, encountered from near surface to depth. This extent will be further tested this season laterally and to depth, following up on drilling intercepts such as 204 m of 0.42% CuEQ* (0.18% Cu, 0.41 g/t Au and 2.3 g/t Ag) and 105 m of 0.40% CuEQ (0.13% Cu, 0.47 g/t Au and 2.3 g/t Ag) (see Amarc release March 2, 2023).

  • Canyon Deposit Target. Is where Amarc's initial drilling discovered significant new porphyry Cu-Au mineralization. Extensions to the mineralization at this largely overburden covered target are currently being drill tested (Figure 3). Discovery drill hole intercepts included, for example, 96 m of 0.51% CuEQ* (0.39% Cu, 0.18 g/t Au and 2.6 g/t Ag), within 296 m of 0.39% CuEQ (0.30% Cu, 0.14 g/t Au and 1.7 g/t Ag) (see Amarc release March 2, 2023).

  • PINE趨勢。計劃鑽探也將推進沿着這個東北走向的15公里礦化趨勢的重要比例硫化物礦化靶區,包括PINE存儲區(6平方公里)、Canyon Discovery(5平方公里)、Twins存儲靶區(7平方公里)和SWt靶位(3平方公里),如誘導極化(“IP”)電荷能力異常所定義(圖1)。

  • PINE存儲靶區。具有超過170,000米的Cu-Au礦化延伸,從近地表到深部遇到。本賽季還將在水平和垂直方向上進一步測試這個範圍,跟進18,400萬的0.42%CuEQ *(0.18%Cu、0.41克/噸Au和2.3克/噸Ag)和10,500萬的0.40%CuEQ(0.13%Cu,0.47克/噸Au和2.3克/噸Ag)的鑽探攔截(請參見2023年3月Amarc發佈的內容)。

  • Canyon存儲靶區。這裏是Amarc最初發現重要的斑岩型Cu-Au礦化的地方。目前正在對這個主要被覆蓋的靶區的礦化體系進行擴展的鑽探測試(見圖3)。發現的鑽孔攔截包括,例如,0.51%CuEQ *(0.39%Cu、0.18克/噸Au和2.6克/噸Ag)的鑽探攔截,其中包括0.39%CuEQ(0.30%Cu、0.14克/噸Au和1.7克/噸Ag)的29,600萬(請參見2023年3月Amarc發佈的內容)。

Figure 3: Canyon Cu-Au Discovery Mineralization

  • Twins Deposit Target. Initial widely-spaced exploration drilling completed by Amarc at this prospectiv e target encountered widespread porphyry Cu-Au mineralization in drill holes, including 27 m of 0.29% CuEQ* (0.12% Cu, 0.30 g/t Au, 1.2 g/t Ag) and 204 m of 0.11% CuEQ (0.04% Cu, 0.14 g/t Au, 0.4 g/t Ag) (see Amarc release March 2, 2023). Further drilling is underway to test the significant exploration potential for another Cu-Au deposit discovery.

  • SWT Target. Drilling is planned at SWT to investigate the source of porphyry Au-Cu mineralization from six samples of near source float, five of which grade from 1.73 to 14.4 g/t Au with 0.07 to 0.24% Cu and the sixth sample grading 0.28 g/t Au and 0.02% Cu.

  • MEX Trend. Drilling is also planned at the South MEX and More MEX Targets within the north-northeast trending 6 km MEX Trend. South MEX is a >1.9 km 2 open target. Drilling will follow up on an initial hole that intersected anomalous concentrations of Ag-Au(-Cu) (see Amarc release March 2, 2023) in a geological environment similar to that hosting the Kemess District porphyry Cu-Au deposits.

  • Twins存儲靶區。Amarc最初在這個有前途的靶區進行的廣泛間隔性勘探鑽探在鑽井中遇到了廣泛的斑岩型Cu-Au礦化,包括2700萬的0.29%CuEQ *(0.12%Cu、0.30克 /噸Au、1.2克/噸Ag)和20400萬的0.11%CuEQ(0.04%Cu、0.14克/噸Au,0.4克/噸Ag)的攔截(請參見2023年3月Amarc發佈的內容)。現在正在進行進一步的鑽探,以測試另一個Cu-Au礦牀發現的重要勘探潛力。

  • SWt靶位。計劃在SWt進行鑽探,以調查靠近源頭浮選礦的Cu-Au礦化。其中有六個樣品的Au含量爲1.73至14.4克/噸,Cu含量爲0.07至0.24%,第六個樣品的Au含量爲0.28克/噸,Cu含量爲0.02%。

  • MEX趨勢。計劃在北東向延伸的6公里MEX趨勢內對南MEX和More MEX靶位進行鑽探。南MEX是一個> 1.9平方公里的開放式靶區。鑽探將跟進一個初始鑽孔,該鑽孔在與Kemess地區斑岩型Cu-Au礦牀類似的地質環境中遇到了Ag-Au(-Cu)的異常濃度,(請參見2023年3月Amarc發佈的內容)。

* Copper equivalent (CuEQ) calculations use metal prices of: Cu US$4.00/lb, Au US$1,800.00/oz, Ag US$24.00/oz and conceptual recoveries of: Cu 85%, Au 72% and 67% Ag.

*銅當量(CuEQ)計算使用的金屬價格爲:Cu爲4.00美元/磅,Au爲1,800.00美元/盎司,Ag爲24.00美元/盎司,理論回收率爲:Cu 85%,Au 72%和67%Ag。

In addition to the many deposit scale targets noted above, the JOY District also hosts a high-quality pipeline of seven other Cu-Au targets located across the District where additional survey work is required to bring them up to a drill-ready status.

除了上面提到的許多存儲規模的靶區之外,JOY區還擁有七個其他Cu-Au靶位的高質量管道,這些靶位分佈在整個區域,還需要進行更多的調查工作,以將它們提升到可鑽夠的狀態。

About Amarc Resources Ltd.
Amarc is a mineral exploration and development company with an experienced and successful management team focused on developing a new generation of long-life, high-value porphyry Cu-Au mines in BC. By combining high-demand projects with dynamic management, Amarc has created a solid platform to create value from its exploration and development-stage assets.

關於Amarc Resources Ltd.
Amarc是一家礦產勘探和開發公司,擁有經驗豐富且成果卓著的管理團隊,專注於在不列顛哥倫比亞省開發新一代長壽命、高價值的斑岩型Cu-Au礦山。通過將高需求項目與充滿活力的管理相結合,Amarc已經創建了一個穩定的平台,從其勘探和開發階段的資產中創造價值。

Amarc is advancing its 100%-owned IKE, DUKE and JOY porphyry Cu±Au Districts located in different prolific porphyry regions of southern, central and northern BC, respectively. Each District represents significant potential for the development of multiple and important-scale, porphyry Cu±Au deposits. Importantly, each of the three districts are located in proximity to industrial infrastructure - including power, highways and rail.

Amarc正在推進其位於不同富礦斑岩區的南部、中部和北部的100%擁有的IKE、DUKE和JOY斑岩型Cu ± Au區,每個區域都具有多個重要規模的斑岩型Cu ± Au礦牀的開發潛力。重要的是,這三個區域都位於工業基礎設施附近-包括電力、公路和鐵路。

Freeport-McMoRan Mineral Properties Canada Inc. ("Freeport"), a wholly owned subsidiary of Freeport-McMoRan Inc. at JOY and Boliden Mineral Canada Ltd. ("Boliden"), an entity within the Boliden Group of companies at DUKE, can earn up to a 70% interest in each District through staged investments of $110 million and $90 million, respectively. Together this provides Amarc with potentially up to $200 million in non-share dilutive staged funding for these Districts. In addition, Amarc intends to solo drill the higher grade Empress Deposit in the IKE District allocating funds from its successful 2023 financing. Amarc is the operator of all programs.

Freeport-McMoRan Mineral Properties Canada Inc.("Freeport")是Freeport-McMoRan Inc.的全資子公司,位於JOY,Boliden Mineral Canada Ltd.("Boliden")是位於DUKE的Boliden Group of companies的實體,在每個區塊中可以通過階段性投資分別獲得70%的股權,分別爲1.1億美元和0.9億美元。總共提供給Amarc最多2億美元的非股權攤薄分期資金。此外,Amarc打算獨立鑽探IKE區的高品位Empress存款,從其成功的2023年融資中分配資金。Amarc是所有項目的運營商。

Amarc is associated with HDI, a diversified, global mining company with a 35-year history of porphyry Cu deposit discovery and development success. Previous and current HDI projects include some of BC's and the world's most important porphyry deposits - such as Pebble, Mount Milligan, Southern Star, Kemess South, Kemess North, Gibraltar, Prosperity, Xietongmen, Newtongmen, Florence, Casino, Sisson, Maggie, IKE, PINE and DUKE. From its head office in Vancouver, Canada, HDI applies its unique strengths and capabilities to acquire, develop, operate and monetize mineral projects.

Amarc與HDI有關,後者是一家多元化的全球礦業公司,擁有35年的斑岩型Cu礦牀發現和開發成功歷史。前HDI項目和目前的HDI項目包括一些BC和世界上最重要的斑岩型礦牀,例如Pebble、Mount Milligan、Southern Star、Kemess South、Kemess North、Gibraltar、Prosperity、Xietongmen、Newtongmen、Florence、Casino、Sisson、Maggie、IKE、PINE和DUKE。HDI在加拿大溫哥華設有總部,並應用其獨特的優勢和能力來獲取、開發、經營和變現礦業項目。

Amarc works closely with local governments, Indigenous groups and stakeholders in order to advance its mineral projects responsibly, and in a manner that contributes to sustainable community and economic development. We pursue early and meaningful engagement to ensure our mineral exploration and development activities are well coordinated and broadly supported, address local priorities and concerns, and optimize opportunities for collaboration. In particular, we seek to establish mutually beneficial partnerships with Indigenous groups within whose traditional territories our projects are located, through the provision of jobs, training programs, contract opportunities, capacity funding agreements and sponsorship of community events. All Amarc work programs are carefully planned to achieve high levels of environmental and social performance.

Amarc與當地政府、土著團體和利益相關者密切合作,以負責任的方式推進礦業項目,並促進可持續的社區和經濟發展。我們早期和有意義的參與,以確保我們的礦產勘探和開發活動得到良好的協調和廣泛的支持,解決當地的優先事項和關切,優化合作機會。特別是,我們尋求與在其傳統領土上位於我們項目的土著群體建立互利的夥伴關係,通過提供就業機會、培訓計劃、合同機會、資金協議和社區活動贊助。所有Amarc工作計劃都經過精心計劃,以實現高水平的環境和社會績效。

Qualified Person
Mark Rebagliati, P.Eng, a Qualified Person ("QP") as defined by National Instrument 43-101, has reviewed and approved all technical and scientific information related to the JOY Project contained in this news release. Mr. Rebagliati is not independent of the Company.

合格人士
Mark Rebagliati, P.Eng作爲《National Instrument 43-101》定義的符合資格人(“QP”),已審查和批准本新聞稿中所有與JOY項目有關的技術和科學信息。Rebagliati先生不獨立於公司。

Quality Assurance/Quality Control Program
Amarc drilled mostly NQ size core in 2022, except in the PINE Deposit area where the holes were drilled HQ core size and then reduced to NQ, typically around 200 m depth, to hole completion. Overall, 12% of the 2022 core drilled was HQ size. All drill core was logged, photographed, and cut in half with a diamond saw. Half core samples from JOY along with surface rock samples were sent to Activation Laboratories Ltd. (Actlabs), Kamloops, Canada facility for preparation and analysis. During peak periods, samples were also prepared at Actlabs laboratories located in Timmins and Ancaster, Ontario.

質量保證/質量控制程序
Amarc在2022年主要鑽探NQ尺寸的巖芯,除了在PINE Deposit區域,其鑽孔爲HQ核心尺寸,然後縮小爲NQ,通常在20000萬深度,以完成鑽孔。總體而言,2022年鑽探的鑽芯中有12%爲HQ尺寸。 按半徑鋸切開所有鑽芯,進行記錄、拍照並分成兩半。 JOY的半芯和表面岩石樣品連同地表岩石樣品一起被送往 加拿大坎盧普斯(Kamloops)的Activation Laboratories Ltd.(Actlabs)分析和準備,尖峯期間,樣品也會被送往安大略省Timmins和Ancaster的Actlabs實驗室進行處理。

At the preparation laboratory, the entire sample was dried, crushed to 80% passing 2 mm size, mechanically split (by riffle) to obtain a representative sample and then pulverized to at least 95% minus 105 microns (μm) (method RX1). The pulverized fraction was analyzed for Au at either the Actlabs, Kamloops, Timmins or Ancaster laboratory by fire assay fusion of a 30 g sub-sample with an ICP-OES finish (method 1A2-ICP). All samples were also analyzed with a multi-element ICP finish. For core, Cu, Ag and 58 additional elements were determined by 4-acid digestion of a 0.25 sub-sample followed by an ICP-OES and ICP-MS finish (method UT6) and for surface rocks, a 36 element, 4-acid digestion and ICP-OES finish method was used (method 1F2-Assay). Samples >10,000 ppm Cu by UT6 were also analyzed by assay grade 4-acid digestion ICP-OES. All multi-element and Cu ICP analysis was done at the Ancaster facility.

在準備實驗室,整個樣品被幹燥、破碎至80%通過2毫米的尺寸,通過振動器進行機械分裂以獲得代表性樣品,然後粉碎至至少95%低於105微米(μm)(方法RX1)。通過火法熔融測定法(方法1A2-ICP)分析Au含量,使用ICP-OES完成對Actlabs,Kamloops,Timmins或Ancaster實驗室的子樣品進行分析。所有樣品還進行了多元素ICP完成分析。對於成核,銅,銀和其他58種元素,採用0.25子樣品的4-酸消化法接着採用ICP-OES和ICP-MS完成(方法UT6),對於表層岩石,採用36種元素,4-酸消化和ICP-OES完成法(方法1F2-Assay)。對於UT6濃度超過10,000 ppm的樣品,還進行了化驗級4-酸消化ICP-OES分析。所有多元素和Cu ICP分析都在Ancaster實驗室完成。

The three Actlabs facilities are ISO/IEC 17025 accredited. As part of a comprehensive Quality Assurance/Quality Control ("QAQC") program, Amarc control samples were inserted in each analytical batch at the following rates for core: standards one in 20 regular samples, coarse reject duplicate splits one in 20 samples and blanks one in 80 regular samples, or once per drill hole. For surface rocks, a standard was inserted at a rate of one in 20 regular samples. The control sample results were then checked to ensure proper QAQC.

三家Actlabs實驗室均通過了ISO/IEC 17025認證。作爲全面的質量保證/質量控制(“QAQC”)計劃的一部分,在下列核心分析批次中插入了Amarc控制樣品:標準:20個常規樣品中1個,粗粒度拒絕重複分裂:20個樣品中1個,空白:80個常規樣品中1個,或者每個鑽孔一次。對於表面岩石,將標準插入20個常規樣品中1個。然後檢查控制樣品結果以確保適當的QAQC。

For further details on Amarc Resources Ltd., please visit the Company's website at or contact Dr. Diane Nicolson, President and CEO, at (604) 684-6365 or within North America at 1-800-667-2114, or Kin Communications, at (604) 684-6730, Email: AHR@kincommunications.com.

有關Amarc Resources Ltd.的更多詳細信息,請訪問公司的網站或聯繫Diane Nicolson博士,總裁兼首席執行官,電話:(604) 684-6365或北美範圍內的1-800-667-2114,或與Kin Communications聯繫,電話:(604) 684-6730,電子郵件:AHR@kincommunications.com。

ON BEHALF OF THE BOARD OF DIRECTORS OF AMARC RESOURCES LTD.

董事會謹此代表本公司董事會。

Dr. Diane Nicolson
President and CEO

Diane Nicolson博士
總裁和首席執行官

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

TSX Venture Exchange及其監管服務提供者(如TSX Venture Exchange的政策中所定義的那樣)均不對本發佈的充分性或準確性承擔責任。

Forward-Looking and other Cautionary Information
This news release includes certain statements that may be deemed "forward-looking statements". All such statements, other than statements of historical facts that address exploration plans and plans for enhanced relationships are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward-looking statements. Assumptions used by the Company to develop forward-looking statements include the following: Amarc's projects will obtain all required environmental and other permits and all land use and other licenses, studies and exploration of Amarc's projects will continue to be positive, and no geological or technical problems will occur. Factors that could cause actual results to differ materially from those in forward-looking statements include market prices, potential environmental issues or liabilities associated with exploration, development and mining activities, exploitation and exploration successes, continuity of mineralization, uncertainties related to the ability to obtain necessary permits, licenses and tenure and delays due to third party opposition, changes in and the effect of government policies regarding mining and natural resource exploration and exploitation, exploration and development of properties located within Aboriginal groups asserted territories may affect or be perceived to affect asserted aboriginal rights and title, which may cause permitting delays or opposition by Aboriginal groups, continued availability of capital and financing, and general economic, market or business conditions. Investors are cautioned that any such statements are not guarantees of future performance and actual results or developments may differ materially from those projected in the forward-looking statements. For more information on Amarc Resources Ltd., investors should review Amarc's annual Form 20-F filing with the United States Securities and Exchange Commission at www.sec.gov and its home jurisdiction filings that are available at .

前瞻性和其他警示信息
本新聞稿包括一些可能被認爲是"前瞻性聲明"的聲明。所有這些聲明,除了闡明勘探計劃和改善關係計劃的歷史事實之外,都屬於前瞻性聲明。儘管公司認爲這些前瞻性聲明所表達的期望是基於合理的假設,但這些聲明並不是對未來績效的保證,實際結果或發展可能會與前瞻性聲明中的結果或發展有所不同。公司用於開發前瞻性聲明的假設包括:Amarc的項目將獲得所有必要的環境及其他許可證、土地使用及其他許可證和探索研究將繼續保持積極,無地質或技術問題將發生。可能導致實際結果與前瞻性聲明不同的因素包括市場價格、與勘探、開發和採礦活動相關的潛在環境問題或責任、開採和勘探成功、礦化的連續性、與獲得必要的許可證、許可證和所有權以及第三方反對而導致的延誤、政府有關採礦和自然資源勘探開發的政策的變化和影響,位於土著團體聲稱的領土內的屬性開發和勘探可能會影響或被認爲影響土著權利和所有權,這可能會導致土著團體反對,資本和融資的持續可用性和一般經濟、市場或商業條件。投資者應該注意,任何這樣的聲明都不能保證未來績效,實際結果或發展可能與前瞻性聲明中描繪的有所不同。有關Amarc Resources Ltd.的更多信息,請查閱其在美國證券交易委員會網站(www.sec.gov)上的年度20-F備案以及在其所屬司法管轄區的備案文件。

Figure 1: Large Scale Mineral System Trends Occur at JOY that Host the PINE, Canyon,

圖1:特拉華州喬伊(JOY)存在大規模礦產系統趨勢,其中包含PINE,Canyon,Twins和其他開發目標

Twins & Other Developing Targets

圖2:大規模NWG斑岩Cu-Au礦牀目標已準備就緒進行鑽探測試

Figure 2: Extensive NWG Porphyry Cu-Au Deposit Target is Ready to Drill Test

圖2:廣泛的NWG斑岩型Cu-Au礦牀靶區已準備好進行鑽探測試。

Figure 3: Canyon Cu-Au Discovery Mineralization

SOURCE: Amarc Resources Ltd.

資料來源:Amarc資源有限公司。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論