share_log

Lithium Ionic Files NI 43-101 Technical Report for the Bandeira Lithium Project Feasibility Study

Lithium Ionic Files NI 43-101 Technical Report for the Bandeira Lithium Project Feasibility Study

Bandeira鋰礦可行性研究的43-101技術報告已提交離子鋰公司。
GlobeNewswire ·  07/11 19:22

TORONTO, July 11, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) reports that it has filed the independent NI 43-101 compliant technical report (the "Technical Report") for its Bandeira Lithium Project ("Bandeira" or the "Project") in Minas Gerais State, Brazil, supporting and validating the Feasibility Study ("FS") results press released on May 29, 2024.

鋰離子公司(tsxv:LTH;OTCQX:LTHCF;FSE:H3N)報告稱,其在巴西米納斯吉拉斯州的Bandeira鋰項目(“Bandeira”或“項目”)已提交獨立的NI 43-101合規技術報告(“技術報告”),支持並驗證了2024年5月29日發佈的可行性研究(“FS”)結果的新聞稿。

The Technical Report details a feasibility study that supports a robust project with strong economic viability, featuring a small footprint underground mine, an efficient and straightforward processing circuit, and a safe, sustainable dry stack tailings facility. Highlights of the FS are as follows:

技術報告詳細介紹了一項可行性研究,支持一個具有強大經濟可行性的強大項目,包括一個小型佔地面積的地下礦山,高效簡單的處理電路和一個安全、可持續的幹堆尾礦設施。FS的亮點如下:

  • 14-year mine life producing an average of 178,000tpa of spodumene concentrate (5.5% Li2O)
  • After-tax NPV8 of US$1.3B; IRR of 40% (using a long-term price of US$2,277/t SC5.5)
  • Industry-leading LOM operating costs of $444/t SC5.5
  • Low CAPEX of US$266 million
  • 14年的礦山壽命,年產178,000噸鋰輝石精礦(5.5% Li2O)
  • 稅後NPV8爲13億美元; IRR爲40% (使用長期價格2277美元/噸SC5.5)
  • 行業領先的LOm運營成本爲444美元/噸SC5.5
  • 低CAPEX爲26600萬美元

The Technical Report, titled "Bandeira Lithium Project Araçuaí-Itinga; NI 43-101 Feasibility Study Technical Report; Minas Gerais, Brazil" was prepared by Atkins Réalis, with support from GE21 Consultoria Mineral Ltda. ("GE21"), Planminas and L&M, in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and has an effective date of November 13, 2023.

技術報告的名稱爲“巴西米納斯吉拉斯州的Bandeira鋰項目Araçuaí-Itinga;NI 43-101可行性研究技術報告;Minas Gerais,Brazil”,由Atkins Réalis準備,並得到GE21 Consultoria Mineral Ltda。“(“GE21”),Planminas和L&m的支持,根據公示礦業項目的披露標準(“NI 43-101”)進行,並於2023年11月13日生效。

The Technical Report is available on SEDAR+ () under Lithium Ionic's issuer profile and on the Company's website at .

技術報告可以在Lithium Ionic的發行人資料中的SEDAR+()上和公司的網站()上獲取。

Stock Option Grant

股票期權授予

Lithium Ionic has granted 1,110,000 incentive stock options to various directors, officers, and consultants of the Company pursuant to its stock option plan. The options may be exercised at a price of $0.90 per option for a period of five years from the date of grant. The grant of options remains subject to the approval of the TSX Venture Exchange.

鋰離子授予公司的各個董事,高管和顧問110萬個激勵股票,根據股票期權計劃行使價格爲每份90美分,行使期限爲授予之日起5年。期權的授予仍然需要獲得tsxv的批准。

About Lithium Ionic Corp.

關於鋰離子公司

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its Itinga group of properties, which hosts its flagship Bandeira Lithium Project, as well as its Salinas group pf properties cover ~14,000 hectares in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Bandeira Project is situated in the same region as CBL's Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.'s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

鋰離子是一家加拿大礦業公司,正在探索和開發其在巴西的鋰礦物產業。其Itinga物業組,其中包括其旗艦Bandeira鋰項目的託管物業,以及其Salinas物業組,覆蓋了米納斯吉拉斯州東北部約14,000公頃,是一個礦業友好型管轄區,正在迅速崛起爲世界級的硬巖鋰地區。Bandeira項目位於與CBL的Cachoeira鋰礦相同的地區,後者已生產了30年的鋰礦,以及Sigma Lithium Corp.的Grota do Cirilo項目,後者擁有美洲最大的硬巖鋰礦牀。

Qualified Persons

合格人員

The FS is prepared by independent representatives of AtkinsRéalis, GE21, Planminas and L&M each of whom are Qualified Person as defined by NI 43-101 Standards of Disclosure for Mineral Projects. Each of the QPs are independent of Lithium Ionic and have reviewed and confirmed that this news release fairly and accurately reflects, in the form and context in which it appears, the information contained in the respective sections of the Bandeira Technical Report for which they are responsible. The affiliation and areas of responsibility for each QP involved in preparing the Bandeira FS are provided below.

獨立代表AtkinsRéalis,GE21,Planminas和L&m的各自是符合NI 43-101披露公示礦業項目的資格人員。每個QP都是Lithium Ionic的獨立人士,並已審核並確認此新聞稿公正準確地反映了他們負責的Bandeira技術報告的各個部分中的信息。涉及Bandeira FS準備的每個QP的附屬機構和職責如下。

Mineral Resource Estimate: Carlos José Evangelista, Geologist from GE21

礦產資源估計:GE21的地質學家Carlos José Evangelista

Underground mine studies: Engineer, Rubens Mendonça from Planminas

地下采礦研究:Planminas的工程師Rubens Mendonça

The mineral processing studies were consolidated and defined by Tony Lipiec, Process Engineer and Vice President Global, Minerals & Metals Processing at AtkinsRéalis

礦物加工研究由AtkinsRéalis的全球礦物和金屬加工副總裁,工藝工程師Tony Lipiec鞏固和定義

Environmental studies: Branca Horta from GE21

環境研究:GE21的Branca Horta

Tailings Disposal systems: Porfírio Cabaleiro from GE21

尾礦處理系統:GE21 Porfírio Cabaleiro

The economic and financial model was certified and validated by João Augusto Hilario de Souza from L&M Advisory, as the qualified professional.

經濟金融模型由L&m Advisory的合格專業人員João Augusto Hilario de Souza驗證和認證。

On behalf of the Board of Directors of Lithium Ionic Corp.

鋰離子公司董事會謹此代表。

Blake Hylands
Chief Executive Officer, Director

布萊克•海蘭茲
首席執行官,董事

Investor and Media Inquiries:
+1 647.316.2500
info@lithiumionic.com

投資者和媒體查詢:
+1 647.316.2500
info@lithiumionic.com

Cautionary Note Regarding Forward-Looking Statements

關於前瞻性聲明的警示

This press release contains statements that constitute "forward-statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Project, the economic viability of the Project, future spodumene prices, the Company's ability to obtain financing, the Company's ability to develop the Project, the Company's ability to obtain the requisite permits and approvals to develop the Project, the Company's exploration program and other mining projects and prospects thereof, stock option grants and the Company's future plans. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

本新聞稿包含構成“向前聲明”的論述。這種前瞻性聲明涉及已知和未知的風險、不確定性和其他因素,可能導致公司的實際結果、績效或成就或發展有所不同,並與預期的結果、績效或成就所表達或暗示的不同。雖然公司認爲,在其官員和董事的經驗、當前狀況和預期未來發展及其他已被認爲是適當的因素的情況下,本前瞻性信息所反映的期望是合理的,但不應過度依賴它們,因爲公司不能保證其將證明是正確的。

Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.

本新聞稿中有關其他礦產資源公司的信息和鏈接來自於其來源被信認爲可靠,但未經公司進行獨立驗證。

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

TSX Venture Exchange ("TSXV")和其監管服務供應商(根據TSXV政策的定義)均不對本新聞稿的充分性或準確性承擔責任。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論