share_log

Guanajuato Silver Completes Shares for Debt

Guanajuato Silver Completes Shares for Debt

Guanajuato白銀完成股份兌換債務
Accesswire ·  06/21 06:02

VANCOUVER, BC / ACCESSWIRE / June 20, 2024 / Guanajuato Silver Company Ltd. (the "Company" or "GSilver") (TSXV:GSVR)(OTCQX:GSVRF) confirms that, as previously announced on May 31, 2024, (See GSilver News Release dated May 31, 2024 - "Guanajuato Silver Announces Date of General Meeting of the Shareholders") the Company has settled $805,000 in outstanding liabilities of the Company by the issuance of 2,683,333 common shares in the capital of the Company at a deemed price of $0.30 per share (the "Debt Settlement"). The shares issued for the Debt Settlement are subject to a four-month hold period that expires on October 21, 2024.

Guanajuato銀公司確認,按照先前於2024年5月31日公佈的(請參見GSilver新聞稿,日期爲2024年5月31日 -“Guanajuato Silver Announces Date of General Meeting of the Shareholders”),公司通過發行公司股本中的2,683,333股普通股以0.30美元的認定價格結算了公司的805,000美元的未償債務(“債務結算”)。進行債務規避的股票將受到四個月的凍結期限,該期限於2024年10月21日到期。

Corporate Update
The Company also announces the upcoming event: June 27, 2pm Pacific - Mining Operations Update Presentation. Hernan Dorado Smith, Guanajuato Silver's Chief Strategy Officer, will provide an update and take questions about the Company's operations and plans for the remainder of 2024. The presentation will be held in Vancouver at the offices of Ventum Financial Corp, located at 733 Seymour Street, 25th Floor. Space will be limited; if you would like to attend, please respond to jjj@gsilver.com

公司更新。
該公司還宣佈即將舉行的活動:6月27日,太平洋標準時間下午2點 - 礦業運營更新展示。Guanajuato Silver的首席策略官Hernan Dorado Smith將介紹公司的運營情況和2024年剩餘計劃,並回答相關問題。演講將在溫哥華Ventum Financial Corp的辦公室舉行,地址爲733 Seymour Street, 25層。座位有限,如果您想參加,請回復jjj@gsilver.comth關於Guanajuato銀

About Guanajuato Silver
GSilver is a precious metals producer engaged in reactivating past producing silver and gold mines in central Mexico. The Company produces silver and gold concentrates from the El Cubo Mines Complex, Valenciana Mines Complex, and the San Ignacio mine; all three mines are located within the state of Guanajuato, which has an established 480-year mining history. Additionally, the Company produces silver, gold, lead, and zinc concentrates from the Topia mine in northwestern Durango. With four operating mines and three processing facilities, Guanajuato Silver is one of the fastest growing silver producers in Mexico.

Gsilver是一家寶貴金屬生產商,致力於重新激活墨西哥中部的銀和金礦。該公司從El Cubo Mines Complex、Valenciana Mines Complex和San Ignacio mine三個礦山生產銀和金精礦;這三個礦都位於有着480年採礦歷史的Guanajuato州內。此外,該公司還從Durango州西北部的Topia礦產生銀、金、鉛和鋅精礦。憑藉四個運營礦山和三個加工設施,Guanajuato Silver是墨西哥增長最快的銀生產商之一。
GSilver是一家貴金屬生產商,致力於恢復墨西哥中部曾經生產白銀和黃金礦的礦山。該公司從埃爾庫博礦區、瓦倫西亞礦區和聖伊格納西奧礦山生產白銀和黃金濃縮物;這三座礦山均位於歷史悠久的礦業州瓜納華託。此外,該公司還從位於杜蘭戈州西北部託皮亞礦山生產白銀、黃金、鉛和鋅濃縮物。擁有四座運營礦山和三家加工設施,Guanajuato Silver是墨西哥增長最快的白銀生產商之一。

ON BEHALF OF THE BOARD OF DIRECTORS
"James Anderson"
Chairman and CEO

董事會代表
"詹姆斯·安德森"
董事長兼首席執行官

For further information regarding Guanajuato Silver Company Ltd., please contact:

有關Guanajuato Silver Company Ltd.的更多信息,請聯繫:

JJ Jennex, Gerente de Comunicaciones, T: 604 723 1433
E: jjj@GSilver.com
Gsilver.com

JJ Jennex,通信經理,電話:604 723 1433
電子郵件:jjj@GSilver.com
Gsilver.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

tsxv的監管服務提供商(在其政策中定義該術語)對本公告的充分性或準確性不承擔責任。

Forward-Looking Statements

前瞻性聲明

This news release contains certain forward-looking statements and information, which relate to future events or future performance including, but not limited to the Company's status as one of the fastest growing silver producers in Mexico.

這條新聞發佈包含某些前瞻性聲明和信息,它們涉及未來事件或未來表現,包括但不限於該公司作爲墨西哥增長最快的銀生產商的地位。

Such forward-looking statements and information reflect management's current beliefs and expectations and are based on information currently available to and assumptions made by the Company; which assumptions, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: our estimates of mineralized material at El Cubo and San Ignacio and the assumptions upon which they are based, including geotechnical and metallurgical characteristics of rock conforming to sampled results and metallurgical performance; available tonnage of mineralized material to be mined and processed; resource grades and recoveries; assumptions and discount rates being appropriately applied to production estimates; the ability of the Company to ramp up processing of mineralized material at Cata at the projected rates and source sufficient high grade mineralized material to fill such processing capacity; prices for silver, gold and other metals remaining as estimated; currency exchange rates remaining as estimated; availability of funds for the Company's projects and to satisfy current liabilities and obligations including debt repayments; capital cost estimates; decommissioning and reclamation estimates; prices for energy inputs, labour, materials, supplies and services (including transportation) and inflation rates remaining as estimated; no labour-related disruptions; no unplanned delays or interruptions in scheduled construction and production; all necessary permits, licenses and regulatory approvals are received in a timely manner; and the ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive.

這些前瞻性聲明和信息反映了管理層當前的信念和期望,基於公司目前可獲得的信息和假設;雖然公司認爲這些假設是合理的,但它們本質上承擔着重大的運營、業務、經濟和監管不確定性和風險。這些假設包括:我們對El Cubo和San Ignacio礦山的礦化物估計,以及它們基於的假設,包括符合樣本結果的岩石地質和冶金特性以及冶金表現;可開採礦石和加工的可獲得噸位;資源品位和回收率;適當應用於生產估計的假設和折扣率;公司能夠把Cata的礦化物加工能力按預計速率提高並獲得足夠的高品位礦化物填補這種加工能力;白銀、黃金和其他金屬的價格保持預計;貨幣兌換率保持預計;爲公司的項目和滿足當前負債和義務(包括償還債務)提供資金;資本成本估計;退役和復原估計;能源輸入價格、勞動力、材料、供應和服務(包括運輸)和通貨膨脹率保持預計;沒有勞工相關的干擾;沒有計劃外的延遲或打斷預定的建設和生產;所有必要的許可、執照和監管批准及時獲得;並且能夠遵守環境、健康和安全法律。上述假設清單並不詳盡。

Readers are cautioned that such forward-looking statements and information are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results, level of activity, production levels, performance or achievements of GSilver to differ materially from those expected including, but not limited to, market conditions, availability of financing, future prices of gold, silver and other metals, currency rate fluctuations, rising inflation and interest rates, actual results of production, exploration and development activities, actual resource grades and recoveries of silver, gold and other metals, availability of third party mineralized material for processing, unanticipated geological or structural formations and characteristics, geopolitical conflicts including wars, environmental risks, operating risks, accidents, labor issues, equipment or personnel delays, delays in obtaining governmental or regulatory approvals and permits, inadequate insurance, and other risks in the mining industry. There are no assurances that GSilver will be able to successfully discover and mine sufficient quantities of high grade mineralized material at El Cubo, VMC, San Ignacio and Topia for processing at its existing mills to increase production, tonnage milled and recoveries rates of gold, silver, and other metals in the amounts, grades, recoveries, costs and timetable anticipated. In addition, GSilver's decision to process mineralized material from El Cubo, VMC, San Ignacio, Topia and its other mines is not based on a feasibility study of mineral reserves demonstrating economic and technical viability and therefore is subject to increased uncertainty and risk of failure, both economically and technically. Mineral resources and mineralized material that are not Mineral Reserves do not have demonstrated economic viability, are considered too speculative geologically to have the economic considerations applied to them, and may be materially affected by environmental, permitting, legal, title, socio-political, marketing, and other relevant issues. There are no assurances that the Company's projected production of silver, gold and other metals will be realized. In addition, there are no assurances that the Company will meet its production forecasts or generate the anticipated cash flows from operations to satisfy its scheduled debt payments or other liabilities when due or meet financial covenants to which the Company is subject or to fund its exploration programs and corporate initiatives as planned. There is also uncertainty about any resurgence of COVID-19, the ongoing war in Ukraine and conflict in Gaza and higher inflation and interest rates and the impact they will have on the Company's operations, supply chains, ability to access mining projects or procure equipment, supplies, contractors and other personnel on a timely basis or at all and economic activity in general. Accordingly, readers should not place undue reliance on forward-looking statements or information. All forward-looking statements and information made in this news release are qualified by these cautionary statements and those in our continuous disclosure filings available on SEDAR at including the Company's most recently filed annual information form . These forward-looking statements and information are made as of the date hereof and the Company does not assume any obligation to update or revise them to reflect new events or circumstances save as required by law.

讀者應該注意,這些前瞻性聲明和信息既不是承諾,也不是保證,它們受到風險和不確定性的影響,這將導致Gsilver未來結果、活動水平、生產水平、表現或成就與預期的差異,包括但不限於市場條件、融資可得性、未來金、銀和其他金屬價格、貨幣匯率波動、通脹和利率上升實際生產、勘探和開發活動的實際結果、銀、金和其他金屬資源品位和回收率的實際情況、可用於加工的第三方礦石的可用性、未預期的地質或結構形成和特性、包括戰爭的地緣政治衝突、環境風險、運營風險、事故、勞工問題、設備或人員延遲、未及時獲得政府或監管機構的批准和許可、不充分的保險和礦業的其他風險。沒有保證GSilver能夠成功地發現和開採El Cubo、VMC、San Ignacio和Topia的足夠數量的高品位礦化物,以在其現有磨機中增加生產、加工噸位和金、銀和其他金屬的回收率,以預計的數量、品位、回收率、成本和時間表實現。此外,GSilver決定處理El Cubo、VMC、San Ignacio、Topia和其它礦業的礦化物不是基於證明其經濟和技術可行性的礦產儲量的可行性研究,因此它受到了更高的不確定性和失敗的風險,無論從經濟上還是技術上。不具備證明經濟可行性的礦產資源和礦化物不具備地質上的經濟考慮,因此可能受到環境、許可、法律、所有權、社會政治、營銷和其他相關問題的影響。沒有保證公司的預計白銀、金以及其他金屬產量能夠實現。此外,沒有保證公司能夠達到其生產預測或產生預期的經營現金流來滿足其到期的債務支付或其他負債或滿足公司計劃的勘探計劃和公司倡議的金融契約。對於COVID-19的任何復甦、烏克蘭戰爭和加沙衝突的任何復甦以及較高的通貨膨脹和利率,以及它們對公司的運營、供應鏈、訪問採礦項目或及時獲得或全部獲得設備、用品、承包商和其他人員以及一般經濟活動的影響都存在不確定性。因此,讀者不應過分依賴前瞻性聲明或信息。所有在本新聞稿中做出的前瞻性聲明和信息均受到這些警示聲明的約束,並且在我們的SEDAR繼續披露文件中均提供。這些前瞻性聲明和信息是自本文發佈之日起作出的,該公司不承擔任何更新或修訂它們以反映新事件或新情況的責任,除非法律要求。

SOURCE: Guanajuato Silver Company Ltd.

來源:Guanajuato銀公司有限公司。


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論