share_log

Strategic Metals Regains 100% Interest in the Hopper Copper-Gold Project and Converts NAD Property to NSR Royalty

Strategic Metals Regains 100% Interest in the Hopper Copper-Gold Project and Converts NAD Property to NSR Royalty

Strategic Metals收回了Hopper銅金項目的100%權益,並將NAD財產轉換爲NSR特許權使用費
Accesswire ·  05/16 20:00
  • Significant porphyry copper mineralization over a 2.3 km by 650 m area is largely untested by drilling; gold-enriched skarn mineralization remains open along strike and down-dip in multiple horizons
  • 2022 drill results of 1.87% copper and 1.04 g/t gold over 15.27 m from the Copper Castle skarn target and 0.22% copper over 114.38 m from the Hopkins North porphyry target
  • Road-accessible and permitted for a large drill program; the Hopper Project lies 22 km north of the Otter Falls hydroelectric generator and only 320 km from the deep sea port of Haines, Alaska
  • 在 2.3 km x 650 m 的區域內,大量斑岩銅礦化作用基本上沒有通過鑽探進行測試;富含金的錫卡巖礦化在走向和向下傾的多個層次上仍然是開放的
  • 2022年的鑽探結果顯示,距離銅城堡錫卡恩目標超過15.27米處有1.87%的銅和1.04克/噸的金,距離霍普金斯北部斑岩目標超過114.38米的0.22%的銅
  • 道路通行,允許進行大型鑽探項目;霍珀項目位於奧特福爾斯水力發電機以北 22 公里處,距離阿拉斯加海恩斯深海港僅 320 公里

VANCOUVER, BC / ACCESSWIRE / May 16, 2024 / Strategic Metals Ltd. (TSXV:SMD) ("Strategic") reports that it has terminated the Option Agreement (the "Agreement") on the Hopper copper-gold project ("Hopper" or the "Project") with Alpha Copper Corp. (CSE:ALCU). Upon termination, Strategic regains full ownership of the Project, without any underlying royalty interest.

不列顛哥倫比亞省溫哥華/ACCESSWIRE/2024年5月16日/Strategic Metals Ltd.(多倫多證券交易所股票代碼:SMD)(“戰略”)報告稱,它已終止與阿爾法銅業公司(CSE: ALCU)關於霍珀銅金項目(“Hopper” 或 “項目”)的期權協議(“協議”)。終止後,Strategic將重新獲得該項目的全部所有權,沒有任何潛在的特許權使用費利息。

The Project consists of 365 mineral claims covering a 74 km2 area in southern Yukon, within the Traditional Territory of the Champagne and Aishihik First Nations. Exploration targets at Hopper, which covers a copper-gold porphyry and skarn system, are fully permitted and accessible via a network of roads and trails.

該項目包括365項礦產索賠,覆蓋74千米2 育空地區南部,位於香檳和艾希希克原住民傳統領地內。Hopper 的勘探目標涵蓋銅金斑岩和硅卡巖系統,完全允許通過道路和步道網絡進入。

Hopper Highlights

Hopper 亮點

Hopper lies within the Dawson Range Gold Belt, a metallogenic province that hosts several major deposits, including Western Copper and Gold Corporation's Casino porphyry copper-gold deposit, located 190 km to the north-northwest (Figure 1). Mineral occurrences on the property, which collectively make up the Hopkins North porphyry target and the Copper Castle skarn target, are associated with a 4 by 6 km intrusion referred to as the Hopper Pluton (Figure 2). Dating of the pluton has yielded a Late Cretaceous age that is consistent with most mineralization along the belt, including the Casino deposit.

霍珀位於道森山脈金帶內,這是一個成礦省份,擁有多個主要礦牀,包括西北銅金公司的賭場斑岩銅金礦牀,位於西北偏北190公里處(圖1)。該地產上的礦物共同構成霍普金斯北部斑岩目標和銅城堡錫卡恩目標,與被稱爲 Hopper Pluton 的 4 x 6 千米入侵有關(圖 2)。巖體定年產生了白堊紀晚期,這與包括賭場礦牀在內的大多數礦化作用一致。

The Copper Castle target covers at least 10, stacked skarn horizons that are partially delineated along a 1,200 m strike length south of the Hopper Pluton. The mineralized horizon are layered throughout a known vertical section approximately 425 m thick. The skarns have been only partially delineated by trenching, percussion and diamond drilling, soil geochemistry and geophysical surveying, and remains open down dip and along strike to the south. Recent drill results from the Copper Castle target include 1.41% copper and 0.532 g/t gold over 22.28 m from HOP21-01 and 1.87% copper and 1.04 g/t gold over 15.27 m from HOP22-03. Additional drill highlights from the Copper Castle target are tabulated below.

銅城堡的目標覆蓋了至少 10 個堆疊的錫卡恩地平線,這些地平線是在 Hopper Pluton 以南 1,200 米的打擊長度上部分劃定的。礦化地平線分層分佈在已知的垂直部分中,厚度約爲 425 m。通過挖溝、衝擊和鑽石鑽探、土壤地球化學和地球物理勘測僅對錫卡巖進行了部分劃定,並且仍然是向下傾斜和向南走向的沿線開放的。銅城堡目標最近的鑽探結果包括來自 HOP21-01 的 1.41% 的銅和 0.532 克/噸的金,以及來自 HOP22-03 的 15.27 米以上的 1.87% 的銅和 1.04 克/噸的金。下表列出了銅城堡目標的其他鑽探亮點。

Drill Hole From (m) To (m) Interval* (m) Cu Au Ag Mo
(%) (g/t) (g/t) (ppm)
DDH-11-01 2.95 16.65 13.70 0.41 0.25 3.8 9
including9.69 12.02 2.33 1.24 0.87 13.0 2
and125.67 142.60 16.93 0.22 1.76 1.8 1
including125.67 133.17 7.50 0.43 3.35 3.6 1
DDH-11-03 58.28 66.78 8.50 1.62 0.54 9.3 1
and88.28 90.70 2.42 1.87 0.64 17.7 2
and130.00 132.45 2.45 0.72 0.18 6.8 3
DDH-11-04 57.39 62.53 5.15 0.95 0.84 5.6 2
and174.86 182.87 8.01 1.58 0.84 14.8 43
DDH-15-01 90.59 92.26 1.67 0.57 0.12 4.4 0
and284.29 286.94 2.65 0.95 12.25 5.5 3
DDH-15-02 82.07 91.09 9.02 0.24 0.12 1.6 32
and113.13 128.14 15.01 0.50 0.50 1.6 4
including121.70 128.14 6.44 1.00 1.01 3.9 4
and136.60 138.60 2.00 0.70 0.14 4.4 2
and150.85 151.85 1.00 0.45 1.00 2.1 6
and204.90 205.90 1.00 0.79 0.72 4.2 4
DDH-15-04 39.09 52.10 13.01 0.41 0.33 1.7 7
and196.97 211.40 14.43 0.60 1.11 2.9 184
including202.52 207.44 4.48 1.03 2.40 4.0 253
DDH-15-08° 336.66 337.66 1.00 0.06 43.60 1.1 53
and341.49 342.63 1.14 0.31 0.20 1.9 45
HOP21-01 38.60 40.75 2.15 0.38 0.14 3.4 1
and55.44 77.72 22.28 1.41 0.53 11.7 2
including62.00 66.72 4.72 5.34 1.44 45.7 7
HOP21-03 77.00 87.96 10.96 1.37 0.49 9.6 2
including83.95 87.96 4.01 2.72 1.01 20.1 4
HOP22-02 69.26 70.42 1.16 0.37 0.10 3.7 7
and99.40 100.69 1.29 1.27 0.71 9.9 3
and107.02 123.54 16.52 0.80 0.49 6.7 77
including109.46 114.62 5.16 1.86 0.83 11.4 102
and117.37 123.54 6.17 1.04 0.56 7.4 116
and137.70 141.70 4.00 0.24 0.12 2.9 251
HOP22-03 62.23 77.50 15.27 1.87 1.04 13.8 92
including63.85 70.00 6.15 3.93 2.20 28.8 71
and113.01 114.74 1.73 0.72 0.35 5.9 28
and166.81 168.00 1.19 0.96 0.22 8.4 4
and216.98 222.50 5.52 0.24 0.09 1.7 1,392
and234.65 237.18 2.53 0.37 0.14 2.2 7
鑽孔 從 (m) 到 (m) 間隔* (m) Au Ag Mo
(%) (g/t) (g/t) (ppm)
DDH-11-01 2.95 16.65 13.70 0.41 0.25 3.8 9
包括 9.69 12.02 2.33 1.24 0.87 13.0 2
和 125.67 142.60 16.93 0.22 1.76 1.8 1
包括 125.67 133.17 7.50 0.43 3.35 3.6 1
DDH-11-03 58.28 66.78 8.50 1.62 0.54 9.3 1
還有 88.28 90.70 2.42 1.87 0.64 17.7 2
還有 130.00 132.45 2.45 0.72 0.18 6.8 3
DDH-11-04 57.39 62.53 5.15 0.95 0.84 5.6 2
還有 174.86 182.87 8.01 1.58 0.84 14.8 43
DDH-15-01 90.59 92.26 1.67 0.57 0.12 4.4 0
和 284.29 286.94 2.65 0.95 12.25 5.5 3
DDH-15-02 82.07 91.09 9.02 0.24 0.12 1.6 32
和 113.13 128.14 15.01 0.50 0.50 1.6 4
包括 121.70 128.14 6.44 1.00 1.01 3.9 4
還有 136.60 138.60 2.00 0.70 0.14 4.4 2
還有 150.85 151.85 1.00 0.45 1.00 2.1 6
和 204.90 205.90 1.00 0.79 0.72 4.2 4
DDH-15-04 39.09 52.10 13.01 0.41 0.33 1.7 7
還有 196.97 211.40 14.43 0.60 1.11 2.9 184
包括 202.52 207.44 4.48 1.03 2.40 4.0 253
DDH-15-08° 336.66 337.66 1.00 0.06 43.60 1.1 53
還有 341.49 342.63 1.14 0.31 0.20 1.9 45
HOP21-01 38.60 40.75 2.15 0.38 0.14 3.4 1
還有 55.44 77.72 22.28 1.41 0.53 11.7 2
包括 62.00 66.72 4.72 5.34 1.44 45.7 7
HOP21-03 77.00 87.96 10.96 1.37 0.49 9.6 2
包括 83.95 87.96 4.01 2.72 1.01 20.1 4
HOP22-02 69.26 70.42 1.16 0.37 0.10 3.7 7
還有 99.40 100.69 1.29 1.27 0.71 9.9 3
還有 107.02 123.54 16.52 0.80 0.49 6.7 77
包括 109.46 114.62 5.16 1.86 0.83 11.4 102
和 117.37 123.54 6.17 1.04 0.56 7.4 116
還有 137.70 141.70 4.00 0.24 0.12 2.9 251
HOP22-03 62.23 77.50 15.27 1.87 1.04 13.8 92
包括 63.85 70.00 6.15 3.93 2.20 28.8 71
和 113.01 114.74 1.73 0.72 0.35 5.9 28
還有 166.81 168.00 1.19 0.96 0.22 8.4 4
和 216.98 222.50 5.52 0.24 0.09 1.7 1,392
和 234.65 237.18 2.53 0.37 0.14 2.2 7

*Interval represents the downhole intersection length; true widths are estimated to represent 70% to 100% of the interval, depending on the orientation of each hole
°Re-entered and deepened hole DDH-11-05

*間隔代表井下交叉點長度;實際寬度估計代表間隔的70%至100%,具體取決於每個孔的方向
°重新進入並加深了洞 DDH-11-05

The Hopkins North target covers porphyry-type copper-gold mineralization identified within a 650 by 2,300 m area, which is associated with late phases of the Hopper Pluton. Much of this prospective area is heavily vegetated and blanketed by various depths of overburden, and the target is largely untested. Historical chip sampling from trenches at the porphyry target reportedly yielded 0.24% over 45.72 m1. In 2011, a program of very short, widely spaced, vertical reverse-circulation drilling was performed over the overburden covered plateau. Notably, several of the holes bottomed in copper mineralization. In 2015, a single diamond drill hole tested Hopkins North and returned a weighted average grade of 0.17% copper over 162.85 m. A follow-up hole in 2021, collared 320 m to the southeast, yielded 0.22% copper over 114.38 m from surface (HOP21-06). A third hole, HOP22-07, directed at the same target, returned an intercept of 0.12% copper over 214 m. Additional drill highlights from the Hopkins North target are tabulated below.

霍普金斯北部的目標涵蓋了在 650 x 2,300 米的區域內發現的斑岩型銅金礦化,這與 Hopper Pluton 的後期階段有關。這個潛在區域的大部分地區植被茂密,被不同深度的覆蓋層所覆蓋,目標基本上沒有經過測試。據報道,從斑岩目標的戰溝中取出的歷史芯片採樣結果超過45.72米,採樣率爲0.24%1。2011年,在覆蓋的覆蓋高原上進行了一項非常短、間隔很大的垂直反循環鑽探計劃。值得注意的是,其中幾個孔在銅礦化中觸底。2015年,一個金剛石鑽孔對霍普金斯北部進行了測試,結果在162.85米處返回了0.17%的銅的加權平均品位。2021年,向東南鑽了320米的後續鑽孔,從地表開採出超過114.38米的銅含量爲0.22%(HOP21-06)。第三個鑽孔,即 HOP22-07,指向同一目標,在 214 米處返回了 0.12% 的銅截距。霍普金斯北部目標的其他鑽探亮點如下表所示。

Drill Hole From (m) To (m) Interval* (m) Cu Au Ag Mo
(%) (g/t) (g/t) (ppm)
PDH-11-19 19.81 28.96 9.15 0.36 0.01 2.3 N/A
PDH-11-23 42.67 44.19 1.52 0.33 0.01 0.7 N/A
PDH-11-39 0.00 EOH 39.62 0.24 0.06 1.4 N/A
including28.96 EOH 10.67 0.70 0.20 4.1 N/A
DDH-15-05 113.88 276.73 162.85 0.17 0.02 2.1 34
including149.74 150.74 1.00 5.00 0.26 17.1 2,730
and including275.73 276.73 1.00 2.40 0.06 17.5 61
HOP21-06 1.80 116.18 114.38 0.22 0.025 1.3 49
including16.50 36.39 19.89 0.27 0.043 1.1 43
and including69.98 83.67 13.69 0.40 0.032 2.6 209
and178.23 187.00 8.77 0.32 0.012 2.9 27
and233.35 241.00 7.65 0.23 0.033 1.8 130
HOP22-07 0.00 214.00 214.00 0.12 0.013 0.9 80
including0.00 58.15 58.15 0.23 0.011 1.6 90
and250.91 279.50 28.59 0.13 0.017 0.8 90
and310 313.25 3.25 0.41 0.059 1.9 80
鑽孔 從 (m) 到 (m) 間隔* (m) Au Ag Mo
(%) (g/t) (g/t) (ppm)
PDH-11-19 19.81 28.96 9.15 0.36 0.01 2.3 不適用
PDH-11-23 42.67 44.19 1.52 0.33 0.01 0.7 不適用
PDH-11-39 0.00 哎喲 39.62 0.24 0.06 1.4 不適用
包括 28.96 哎喲 10.67 0.70 0.20 4.1 不適用
DDH-15-05 113.88 276.73 162.85 0.17 0.02 2.1 34
包括 149.74 150.74 1.00 5.00 0.26 17.1 2,730
包括275.73 276.73 1.00 2.40 0.06 17.5 61
第 21-06 頁 1.80 116.18 114.38 0.22 0.025 1.3 49
包括 16.50 36.39 19.89 0.27 0.043 1.1 43
包括69.98 83.67 13.69 0.40 0.032 2.6 209
還有 178.23 187.00 8.77 0.32 0.012 2.9 27
還有 233.35 241.00 7.65 0.23 0.033 1.8 130
HOP22-07 0.00 214.00 214.00 0.12 0.013 0.9 80
包括 0.00 58.15 58.15 0.23 0.011 1.6 90
和 250.91 279.50 28.59 0.13 0.017 0.8 90
和 310 313.25 3.25 0.41 0.059 1.9 80

*Interval represents the downhole intersection length and true widths are unknown

*間隔代表井下交叉口長度,真實寬度未知

EOH is End of Hole; N/A is Not Available

EOH 是洞的盡頭;N/A 不可用

Mineralization within the porphyry consists of both vein-controlled and disseminated chalcopyrite, with lesser pyrite, pyrrhotite, magnetite and molybdenite. The best drill intersections to date comprise chlorite-altered monzonite and porphyry dykes, with zones of vein-controlled potassic alteration, indicating proximity to an untested, higher-temperature porphyry centre and the potential to discover stronger copper and gold grades. Several other targets on the property have seen minor work, including a complementary skarn target to Copper Castle on the northern side of the Hopper Pluton.

斑岩內的礦化由脈管控制的黃銅礦和浸染的黃銅礦組成,還有較少的黃鐵礦、鐵礦、磁鐵礦和輝鉬礦。迄今爲止最好的鑽探交叉點包括亞氯酸鹽蝕變的單子巖和斑岩岩脈,其鉀蝕變區域由脈管控制,這表明靠近未經測試、溫度更高的斑岩中心,有可能發現更強的銅和金品位。該物業的其他幾個目標也進行了小規模的改進,包括位於Hopper Pluton北側的銅城堡的補充錫卡恩目標。

Technical information in this news release has been approved by Strategic's Vice President Exploration, Jackson Morton, P.Geo., a qualified person as defined under the terms of National Instrument 43-101.

本新聞稿中的技術信息已獲得Strategic勘探副總裁傑克遜·莫頓的批准,根據美國國家儀器43-101的條款,他是合格人士。

1Trench results at the Hopkins North target are historical in nature and have been compiled from public sources believed to be accurate.

1霍普金斯北部目標的戰溝結果本質上是歷史性的,是根據據信準確的公共來源彙編而成的。

NAD Property Sale

NAD 房地產銷售

Strategic also announces the sale of its NAD Property to Senoa Gold Corp. a wholly owned subsidiary of Snowline Gold Corp. ("Snowline") for cash consideration of $50,000 and a 2% Net Smelter Return ("NSR") royalty with a buy-down to 1% for 1,000 ounces of gold or cash equivalent. The NAD 1-76 claims are contiguous with the northwestern portion of Snowline's Einerson Project.

Strategic還宣佈將其NAD物業出售給Snowline Gold Corp.(“Snowline”)的全資子公司Senoa Gold Corp.,以5萬美元的現金對價和2%的冶煉廠淨回報率(“NSR”)特許權使用費下調至1%,購買1,000盎司黃金或現金等價物。NAD 1-76的索賠與Snowline艾納森項目的西北部分毗鄰。

About Strategic Metals Ltd.

關於戰略金屬有限公司

Strategic is a project generator with 13 royalty interests, 14 projects under option to others, and a portfolio of 82 wholly owned projects that are the product of over 50 years of focussed exploration and research by a team with a track record of major discoveries. Projects available for option, joint venture or sale include drill-confirmed prospects and drill-ready targets with high-grade surface showings and/or geochemical anomalies and geophysical features that resemble those at nearby deposits.

Strategic是一家項目生成者,擁有13個特許權使用費權益,14個項目可供其他人選擇,以及由82個全資項目組成的投資組合,這些項目是由一個有重大發現記錄的團隊經過50多年的專注勘探和研究的產物。可供選擇、合資或出售的項目包括已確認的鑽探前景和可進行鑽探的目標,這些目標具有高品位的地表顯示和/或地球化學異常以及與附近礦牀相似的地球物理特徵。

Strategic has a current cash position of approximately $1.8 million and large shareholdings in several active mineral exploration companies including 32.8% of Broden Mining Ltd., 33.4% of GGL Resources Corp., 29.6% of Rockhaven Resources Ltd., 16.2% of Silver Range Resources Ltd and 15.6% of Precipitate Gold Corp. All these companies are engaged in promising exploration projects. Strategic also owns 15 million shares of Terra CO2 Technologies Holdings Inc. ("Terra"), a private Delaware corporation developing a cost-effective alternative to Portland cement, which recently announced a definitive agreement with Asher Materials for an exclusive market license of Terra's first commercial-scale advanced processing facility.

Strategic目前的現金狀況約爲180萬美元,持有幾家活躍的礦產勘探公司的大量股份,包括布羅登礦業有限公司32.8%的股份、GGL資源公司33.4%的股份、羅克海文資源有限公司的29.6%、Silver Range Resources Ltd的16.2%和沉澱金公司的15.6%。所有這些公司都從事前景光明的勘探項目。Strategic還擁有特拉華州一傢俬營公司Terra CO2 Technologies Holdings Inc.(“Terra”)的1500萬股股份,該公司正在開發具有成本效益的波特蘭水泥替代品。該公司最近宣佈與Asher Materials達成最終協議,爲Terra的首個商業規模先進加工設施提供獨家市場許可。

ON BEHALF OF THE BOARD

代表董事會

"W. Douglas Eaton"

“W. Douglas Eaton”

President and Chief Executive Officer

總裁兼首席執行官

For further information concerning Strategic or its various exploration projects please visit our website at or contact:

有關Strategic或其各種勘探項目的更多信息,請訪問我們的網站或聯繫:

Corporate Information
Strategic Metals Ltd.
W. Douglas Eaton
President and C.E.O.
Tel: (604) 688-2568

企業信息
戰略金屬有限公司
W·道格拉斯·伊頓
總裁兼首席執行官
電話:(604) 688-2568

Investor Inquiries
Richard Drechsler
V.P. Communications
Tel: (604) 687-2522
NA Toll-Free: (888) 688-2522
rdrechsler@strategicmetalsltd.com

投資者查詢
理查德·德雷克斯勒
通信副總裁
電話:(604) 687-2522
北美免費電話:(888) 688-2522
rdrechsler@strategicmetalsltd.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

This news release may contain forward looking statements based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of exploration and other risk factors beyond its control, and actual results may differ materially from the expected results.

本新聞稿可能包含基於管理層對未來事件或結果的假設和判斷的前瞻性陳述,這些假設和判斷可能由於勘探和其他無法控制的風險因素而被證明不準確,實際結果可能與預期結果存在重大差異。

SOURCE: Strategic Metals Ltd.

來源:戰略金屬有限公司


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論