share_log

Prime Mining Q1 2024 Financial and Operating Results

Prime Mining Q1 2024 Financial and Operating Results

Prime Mining 2024 年第一季度財務和經營業績
GlobeNewswire ·  05/14 06:15

VANCOUVER, British Columbia, May  13, 2024  (GLOBE NEWSWIRE) -- Prime Mining Corp. ("Prime", or the "Company") (TSV: PRYM) (OTCQX: PRMNF) (Frankfurt: O4V3) is pleased to report its operating and financial results for the quarter ended March 31, 2023. Prime is focused on the exploration and development of its wholly owned high-grade Los Reyes Gold-Silver Project in Sinaloa State, Mexico ("Los Reyes" or the "Project").

不列顛哥倫比亞省溫哥華,2024年5月13日(GLOBE NEWSWIRE)——Prime Mining Corp.(“Prime” 或 “公司”)(TSV:PRYM)(OTCQX:PRMNF)(法蘭克福:O4V3)欣然公佈其截至2023年3月31日的季度經營和財務業績。Prime專注於勘探和開發其位於墨西哥錫那羅亞州的全資高品位洛斯雷耶斯金銀項目(“洛斯雷耶斯” 或 “項目”)。

Prime Chief Executive Officer Scott Hicks commented, "2024 is off to a great start for Prime as our high grade, gold-silver Los Reyes Project in Mexico continues to deliver excellent results. We released exciting expansion drill results from Guadalupe East and generative drill results from Las Primas, which demonstrate similarities in mineralization and potential for underground resource expansion, while expansion drilling at Z-T continues to extend mineralization along strike and at depth."

Prime首席執行官斯科特·希克斯評論說:“2024年對Prime來說是一個良好的開端,因爲我們在墨西哥的高品位金銀洛斯雷耶斯項目繼續取得優異成績。我們發佈了來自Guadalupe East的令人興奮的擴張鑽探結果和Las Primas的鑽探結果,這些結果表明了礦化作用和地下資源擴張潛力的相似之處,而Z-T的擴張鑽探繼續沿走向和深度延伸礦化。”

Corporate Highlights During the Quarter
(Unless otherwise stated, all amounts are presented in Canadian dollars.)

本季度企業亮點
(除非另有說明,否則所有金額均以加元列報。)

  • On January 16th, the Company announced that CEO Daniel Kunz would retire effective February 1, 2024, and that EVP Mr. Scott Hicks would succeed him as Chief Executive Officer with concurrent appointment to the Board of Directors.

  • On January 24th, the Company announced its 2024 Outlook for the Los Reyes Project including a planned 40,000m drill program.

  • On January 24th, the Company announced it had granted a total of 991,626 incentive stock options, 455,846 restricted share units and 661,202 deferred share units in accordance with the long-term incentive plan adopted by the Company.

  • On March 25th, the Company released its 2023 Financial and Operating Results.

  • 1月16日,公司宣佈,首席執行官丹尼爾·昆茲將於2024年2月1日退休,執行副總裁斯科特·希克斯先生將接替他擔任首席執行官,同時被任命爲董事會成員。

  • 1月24日,該公司公佈了洛斯雷耶斯項目的2024年展望,其中包括計劃中的4萬米鑽探計劃。

  • 1月24日,公司宣佈,根據公司通過的長期激勵計劃,共授予991,626份激勵性股票期權、455,846份限制性股票單位和661,202份遞延股票單位。

  • 3月25日,公司發佈了其2023年財務和經營業績。

Exploration Highlights During the Quarter

本季度的勘探亮點

Prime Intercepts High Grades at Las Primas and Record High Grades at Guadalupe East
January 10, 2024
Drill Highlights – Generative: Las Primas Area
The Company reported five core holes at Las Primas. Highlights are listed below:

Prime 在 Las Primas 取得高成績,在 Guadalupe East 取得高成績
2024年1月10日
鑽探亮點 — 生成式:拉斯普里馬斯區域
該公司報告了拉斯普里馬斯有五個核心漏洞。亮點如下:

  • 15.63 gpt AuEq (11.60 gpt Au and 311.1 gpt Ag) over 4.5 m etw in hole 23LP-18, including:

    • 27.52 gpt AuEq (20.39 gpt Au and 550.8 gpt Ag) over 2.5 m etw, and including,

    • 56.28 gpt AuEq (41.90 gpt Au and 1,111.0 gpt Ag) over 1.1 m etw;

  • 1.91 gpt AuEq (1.29 gpt Au and 47.7 gpt Ag) over 10.20 m etw in 23LP-20, including:

    • 6.43 gpt AuEq (2.2 gpt Au and 327 gpt Ag) over 1.3 m etw;

  • 1.89 gpt AuEq (0.73 gpt Au and 89.61 gpt Ag) over 2.6 m etw in hole 23LP-17, including:

    • 5.61 gpt AuEq (1.97 gpt Au and 281 gpt Ag) over 1.0 m etw.

  • 在 23LP-18 洞中超過 4.5 m etw 的 15.63 gpt auEQ(11.60 gpt Au 和 311.1 gpt Ag),包括:

    • 27.52 gpt auEq(20.39 gpt Au 和 550.8 gpt Ag)超過 2.5 m etw,包括

    • 56.28 gpt auEQ(41.90 gpt Au 和 1,111.0 gpt Ag)超過 1.1 m etw;

  • 在 23LP-20 中,1.91 gpt auEQ(1.29 gpt Au 和 47.7 gpt Ag)超過 10.20 m etw,包括:

    • 6.43 gpt auEQ(2.2 gpt Au 和 327 gpt Ag)超過 1.3 m etw;

  • 在 23LP-17 洞中超過 2.6 m etw 的 1.89 gpt auEQ(0.73 gpt Au 和 89.61 gpt Ag),包括:

    • 5.61 gpt auEQ(1.97 gpt Au 和 281 gpt Ag)超過 1.0 m etw

Drill Highlights – Expansion: Guadalupe Zone, Guadalupe East Area
The Company reported one core hole at Guadalupe East. Highlights are listed below:

演習亮點—擴展:瓜達盧佩區、瓜達盧佩東區
該公司報告說,瓜達盧佩東部有一個核心洞。亮點如下:

  • 17.95 gpt AuEq (9.69 gpt Au and 638.6 gpt Ag) over 31.25 m etw in hole 23GE-147, including:

    • 52.67 gpt AuEq (29.41 gpt Au and 1,797.3 gpt Ag) over 6.45 m etw, and including,

    • 80.57 gpt AuEq (45.34 gpt Au and 2,722.6 gpt Ag) over 3.90 m etw.

  • 17.95 gpt auEQ(9.69 gpt Au 和 638.6 gpt Ag)在 23GE-147 洞中超過 31.25 m etw,包括:

    • 52.67 gpt auEQ(29.41 gpt Au 和 1,797.3 gpt Ag)超過 645 m etw,包括,

    • 80.57 gpt auEQ(45.34 gpt Au 和 2,722.6 gpt Ag)超過 390 萬英鎊的美國東部夏令時。

Prime Intersects 3.74 gpt AuEq Over 5.7m at Z-T in New High-Grade Mineralized Zone 350m Beyond Current Resource Pit While Extending High-Grade Shoots at Depth
February 6, 2024
Expansion Drilling Highlights in the Z-T Area
The Company reported 21 core holes at Tahonitas with the following highlights:

Prime 在距離當前資源礦坑外 350 米的新高品位礦化帶 Z-T 處與 3.74 gpt auEQ 超過 5.7 米的交叉點,同時在深度延伸高品位射程
2024年2月6日
Z-T 區域的擴張鑽探亮點
該公司報告了塔霍尼塔斯有21個核心洞,其亮點如下:

  • 3.59 gpt AuEq (3.54 gpt Au and 4.1 gpt Ag) over 6.6 m etw in hole 23TA-85, including:

    • 6.21 gpt AuEq (6.17 gpt Au and 2.9 gpt Ag) over 1.4 m etw, and including,

    • 12.35 gpt AuEq (12.10 gpt Au and 19.1 gpt Ag) over 1.0 m etw.

  • 2.09 gpt AuEq (1.26 gpt Au and 63.9 gpt Ag) over 11.6 m etw in hole 23TA-90, including:

    • 3.83 gpt AuEq (2.61 gpt Au and 94.5 gpt Ag) over 2.2 m etw.

  • 3.74 gpt AuEq (0.99 gpt Au and 212.5 gpt Ag) over 5.7 m etw in hole 23TA-100, including:

    • 10.94 gpt AuEq (2.97 gpt Au and 616.0 gpt Ag) over 1.3 m etw.

  • 2.33 gpt AuEq (0.83 gpt Au and 115.9 gpt Ag) over 7.1 m etw in hole 23TA-91, including:

    • 8.14 gpt AuEq (2.85 gpt Au and 409.0 gpt Ag) over 0.9 m etw.

  • 2.21 gpt AuEq (0.69 gpt Au and 117.8 gpt Ag) over 5.0 m etw in hole 23TA-94.

  • 6.39 gpt AuEq (4.51 gpt Au and 145.3 gpt Ag) over 1.2 m etw in hole 23TA-99.

  • 3.59 gpt auEQ(3.54 gpt Au 和 4.1 gpt Ag)在 23TA-85 洞中超過 6.6 m etw,包括:

    • 6.21 gpt auEQ(6.17 gpt Au 和 2.9 gpt Ag)超過 140 萬英鎊的ETW,其中包括,

    • 12.35 gpt auEQ(12.10 gpt Au 和 19.1 gpt Ag)超過 1.0 m etw。

  • 2.09 gpt auEq(1.26 gpt Au 和 63.9 gpt Ag)在 23TA-90 洞中超過 11.6 m etw,包括:

    • 3.83 gpt auEQ(2.61 gpt Au 和 94.5 gpt Ag)超過 2.2 m etw。

  • 3.74 gpt auEq(0.99 gpt Au 和 212.5 gpt Ag)在 23TA-100 孔中超過 5.7 m etw,包括:

    • 10.94 gpt auEQ(2.97 gpt Au 和 616.0 gpt Ag)超過 1.3 m etw。

  • 在 23TA-91 洞中超過 7.1 m etw 的 2.33 gpt auEq(0.83 gpt Au 和 115.9 gpt Ag),包括:

    • 8.14 gpt auEQ(2.85 gpt Au 和 409.0 gpt Ag)超過 0.9 m etw。

  • 2.21 gpt auEq(0.69 gpt Au 和 117.8 gpt Ag)在 23TA-94 洞中超過 5.0 m etw。

  • 6.39 gpt auEq(4.51 gpt Au 和 145.3 gpt Ag)在 23TA-99 洞中超過 1.2 m etw。

Prime Releases Final 2023 Drilling Results and Recap From Los Reyes; 60,000m Post Resource Drilling Contributes to Significant Mineralization Expansion
Feb 21, 2024
Drilling Highlights from 2023 included the following holes, which were newly released:
At Mariposa, a generative target northwest of Z-T, returned strong gold grades:

Prime 發佈了 2023 年的最終鑽探結果和 Los Reyes 的回顧;60,000 米的資源鑽探有助於礦化的顯著擴張
2024 年 2 月 21 日
2023 年的鑽探亮點包括新發布的以下鑽孔:
位於Z-T西北部的生成目標Mariposa的黃金品位表現強勁:

  • 3.3 gpt AuEq (3.11 gpt Au and 14.8 gpt Ag) over 2.2 m etw downhole in new hole 23MA11
    Guadalupe East – High Grade Gold and Silver:

  • 3.3 gpt auEQ(3.11 gpt Au 和 14.8 gpt Ag)在新孔 23MA11 的井下超過 2.2 m etw
    Guadalupe East — 高等級金牌和白銀:

  • 27.56 gpt AuEq (8.17 gpt Au and 1,498.0 gpt Ag) over 0.6 m etw in new hole 23GE-144
    Orito Sur, a generative target north of Guadalupe East, returned strong gold and silver grades:

  • 27.56 gpt auEQ(8.17 gpt Au 和 1,498.0 gpt Ag)在新洞 23GE-144 中超過 0.6 m etw
    東瓜達盧佩以北的生成目標Orito Sur恢復了強勁的黃金和白銀等級:

  • 5.3 gpt AuEq (2.70 gpt Au and 200.5 gpt Ag) over 2.4 m etw in new hole 23OS-01
    Mina, a generative target northeast of Guadalupe East, also returned strong grades:

  • 5.3 gpt auEQ(2.70 gpt Au 和 200.5 gpt Ag)在新洞 23OS-01 中超過 2.4 m etw
    位於瓜達盧佩東北部的生成目標米娜也取得了不錯的成績:

  • 4.24 gpt AuEq (2.54 gpt Au and 131.3 gpt Ag) over 4.9 m downhole in new hole 23MINA13
    Central – High Grade, Near-Surface Material at Noche Buena:

  • 4.24 gpt auEQ(2.54 gpt Au 和 131.3 gpt Ag)在新井下 4.9 米以上 23MINA13
    Central — Noche Buena 的高品質近地表材料:

  • 2.43 gpt AuEq (0.91 gpt Au and 117.3 gpt Ag) over 6.5 m etw in new hole 23NB-59

  • 2.43 gpt auEQ(0.91 gpt Au 和 117.3 gpt Ag)在新洞 23NB-59 中超過 6.5 m etw

Subsequent to the Quarter, the Company issued the following exploration news releases:

本季度之後,公司發佈了以下勘探新聞稿:

  • Prime Discovers New High-Grade Shoot Containing 7.68 g/t gold-equivalent over 7.7 m - High gold grade area remains open, and continues at depth and along trend at Z-T - April 10, 2024

  • Prime Reports 11.8 gpt gold-equivalent over 3.0 metres at Las Primas And Continues to Discover High Grades at Shallow Depths - April 17, 2024

  • Prime 發現新的高品位拍品含有超過 7.7 m 的 7.68 g/t 黃金當量——高金品位區域仍然開放,在 Z-T 處繼續保持深度和沿線趨勢——2024 年 4 月 10 日

  • Prime 報告在 Las Primas 超過 3.0 米處有 11.8 gpt 的黃金當量,並繼續在淺層發現高品位——2024 年 4 月 17 日

Maintaining Health and Safety Protocols

維護健康和安全協議

Prime remains engaged with local stakeholders and is proactive in monitoring employees and contractors concerning general health conditions. The Company continues to closely adhere to the directives of all levels of government and relevant health authorities in Mexico and Canada.

Prime繼續與當地利益相關者保持接觸,並積極監測員工和承包商的總體健康狀況。公司繼續嚴格遵守墨西哥和加拿大各級政府和相關衛生當局的指令。

Community Engagement and Environmental Stewardship Strategy

社區參與和環境管理戰略

We continued to gather environmental and community data in the quarter in support of our ESG programs, including completion of a materiality assessment, strategic plan, and disclosure matrix. We strive to minimize the environmental footprint of our activities and ensure that Los Reyes has a positive impact on our host communities.

我們在本季度繼續收集環境和社區數據,以支持我們的ESG計劃,包括完成重要性評估、戰略計劃和披露矩陣。我們努力最大限度地減少我們活動的環境足跡,並確保洛斯雷耶斯對我們的東道社區產生積極影響。

The Company released its initial sustainability report during April 2023 which establishes a baseline and a new yardstick to measure our progress in meeting our commitments regarding sustainability and stewardship of the environment, relevant social issues, and corporate governance. The Company expects to release its 2024 Sustainability Report in the coming weeks.

公司於2023年4月發佈了初步的可持續發展報告,該報告確立了基準和新的衡量標準,以衡量我們在履行有關可持續發展和環境管理、相關社會問題和公司治理的承諾方面的進展情況。該公司預計將在未來幾周內發佈其2024年可持續發展報告。

Selected Financial Data

精選財務數據

The following selected financial data is summarized from the Company's consolidated financial statements and related notes thereto (the "Financial Statements") for the three months ended March 31, 2024 and 2023. A copy of the Financial Statements and MD&A is available at  or on SEDAR at .

以下選定財務數據摘自公司截至2024年3月31日和2023年3月31日的三個月的合併財務報表及其相關附註(“財務報表”)。可在SEDAR上或在SEDAR上獲得財務報表和管理與分析的副本,網址爲。

Three Months ended
March 31, 2024

Three Months ended
March 31, 2023

Loss and comprehensive loss

$(6,450,142)

$(5,995,467)

Loss per share – basic and diluted

$(0.04)

$(0.05)

三個月已結束
2024年3月31日

三個月已結束
2023年3月31日

損失和綜合損失

$ (6,450,142)

$ (5,995,467)

每股虧損——基本虧損和攤薄後虧損

$ (0.04)

美元 (0.05)

March 31, 2024

December 31, 2023

Cash

$27,897,697

$33,811,215

Total assets

$41,969,945

$47,908,403

Total current liabilities

$1,355,464

$2,470,659

Total liabilities

$2,188,048

$3,295,811

Total shareholders' equity

$39,781,897

$44,612,592

2024年3月31日

2023年12月31日

現金

27,897,697 美元

33,811,215 美元

總資產

41,969,945 美元

47,908,403 美元

流動負債總額

1,355,464 美元

2,470,659 美元

負債總額

2,188,048 美元

3,295,811 美元

股東權益總額

39,781,897 美元

44,612,592 美元

2024 Outlook
Prime is targeting 40,000 metres in its 2024 drill program and will continue to evaluate drilling plans using its success-based approach. This evaluation will also include prioritization of targets based on probability of resource development and generative area discovery potential.

2024 年展望
Prime在2024年的鑽探計劃中將目標定爲40,000米,並將繼續使用其基於成功的方法評估鑽探計劃。該評估還將包括根據資源開發概率和創造性區域發現潛力對目標進行優先排序。

Four drill rigs are currently active on site at Los Reyes, with 2024 exploration focused on:

洛斯雷耶斯目前有四臺鑽機活躍,2024年的勘探重點是:

  • Extending the high-grade Z-T Area shoots that remain open at depth, as well as along strike, both north and south.

  • Expanding the known high-grade mineralization at Guadalupe East.

  • Increasing the Central Area resource through additions at Noche Buena and its connection to San Miguel East.

  • Generative target drilling of high-grade intercepts at Las Primas, Mariposa, Fresnillo, Mina and others to further develop the resource potential at Los Reyes.

  • 擴展在深度保持開放的高等級 Z-T 區域射擊,以及沿着向北和向南的射擊。

  • 擴大瓜達盧佩東部的已知高品位礦化區。

  • 通過增建Noche Buena及其與聖米格爾東部的連接,增加中心區的資源。

  • 在拉斯普里馬斯、馬裏波薩、弗雷斯尼洛、米納等地進行高品位截獲物的生成式目標鑽探,以進一步開發洛斯雷耶斯的資源潛力。

About the Los Reyes Gold and Silver Project

關於洛斯雷耶斯金銀項目

Los Reyes is a rapidly evolving high-grade, low sulphidation epithermal gold-silver project located in Sinaloa State, Mexico. Since acquiring Los Reyes in 2019, Prime has spent approximately CAD$52 million on direct exploration activities and has completed over 185,000 metres of drilling. On May 2, 2023, Prime announced an updated multi-million-ounce high-grade open pit constrained resource (see the May 2, 2023 press release for more details).

Los Reyes是一個快速發展的高品位、低硫化度的超熱金銀項目,位於墨西哥錫那羅亞州。自2019年收購洛斯雷耶斯以來,Prime已在直接勘探活動上花費了約5200萬加元,並完成了超過18.5萬米的鑽探。2023年5月2日,Prime宣佈了更新的數百萬盎司高品位露天礦受限資源(更多細節見2023年5月2日的新聞稿)。

May 2, 2023 Resource Statement

Assurance
Category

Ore
Tonnes
Mt

Average
Gold Grade
(g/t)

Contained
Gold
(k ozs)

Average
Silver Grade
(g/t)

Contained
Silver
(k ozs)

Average
AuEq Grade
(g/t)(1)

Contained
AuEq
(k ozs)

Measured (M)

-

-

-

-

-

-

-

Indicated (I)

27.2

1.16

1, 013

40.40

35,263

1.68

1,470

M+I

27.2

1.16

1, 013

40.40

35,263

1.68

1,470

Inferred

18.1

0.85

497

31.52

18,334

1.26

734

2023 年 5 月 2 日資源聲明

保證
類別

礦石

平均值
黃金等級
(g/t)

已包含
黃金
(k ozs)

平均值
銀級
(g/t)

已包含

(k ozs)

平均值
AueQ 等級
(g/t) (1)

已包含
auEQ
(k ozs)

已測量 (M)

-

-

-

-

-

-

-

已指示 (I)

27.2

1.16

1, 013

40.40

35,263

1.68

1,470

M+I

27.2

1.16

1, 013

40.40

35,263

1.68

1,470

推斷

18.1

0.85

497

31.52

18,334

1.26

734

(1) Refer to the Additional Technical Notes section for the gold equivalent grade ("AuEq") calculation method.

(1) 有關黃金當量等級(“auEQ”)的計算方法,請參閱 “附加技術說明” 部分。

Drilling is on-going and suggests that the three known main deposit areas (Guadalupe, Central and Z-T) are larger than previously reported. Potential also exists for new discoveries where mineralized trends have been identified outside of the currently defined resource areas.

鑽探正在進行中,這表明三個已知的主要礦牀區域(瓜達盧佩、中央和Z-T)比先前報告的要大。在目前確定的資源區域之外已經確定了礦化趨勢的新發現的可能性也很大。

Historic operating results indicate that an estimated 1 million ounces of gold and 60 million ounces of silver were recovered from five separate operations at Los Reyes between 1770 and 1990. Prior to Prime's acquisition, recent operators of Los Reyes had spent approximately US$20 million on exploration, engineering, and prefeasibility studies.

歷史經營業績表明,在1770年至1990年間,從洛斯雷耶斯的五次獨立業務中估計回收了100萬盎司的黃金和6000萬盎司的白銀。在收購Prime之前,洛斯雷耶斯最近的運營商已在勘探、工程和預可行性研究上花費了約2000萬美元。

QA/QC Protocols and Sampling Procedures

質量保證/質量控制協議和採樣程序

Drill core at the Los Reyes project is drilled in predominately HQ size (63.5 millimetre "mm"), reducing to NQ (47.6 mm) when required. Drill core samples are generally 1.50 m long along the core axis with allowance for shorter or longer intervals if required to suit geological constraints. After logging intervals are identified to be sampled, the core is cut and one half is submitted for assay. RC drilling returns rock chips and fines from a 133.35 mm diameter tricone bit. The returns are homogenized and split into 2 halves, with one half submitted for analysis and the other half stored.

洛斯雷耶斯項目的鑽芯主要以總部大小(63.5 毫米 “mm”)進行鑽探,必要時可縮小至 NQ(47.6 mm)。鑽芯樣品沿岩心軸線的長度通常爲 1.50 m,如果需要滿足地質限制,可以縮短或更長的間隔。確定要採樣的記錄間隔後,切掉岩心並提交一半進行化驗。RC 鑽孔會從直徑爲 133.35 mm 的三錐鑽頭中回收岩屑和細粉。回報被同質化並分成兩半,一半提交分析,另一半存儲。

Sample QA/QC measures include unmarked certified reference materials, blanks, and field duplicates as well as preparation duplicates are inserted into the sample sequence and make up approximately 8% of the samples submitted to the laboratory for each drill hole.

樣本質量保證/質量控制措施包括未標記的認證參考材料、空白和現場副本,以及在樣品序列中插入製劑副本,約佔每個鑽孔提交給實驗室的樣本的8%。

Samples are picked up from the Project by the laboratory personnel and transported to their facilities in Durango or Hermosillo Mexico, for sample preparation. Sample analysis is carried out by Bureau Veritas and ALS Labs, with fire assay, including over limits fire assay re-analysis, completed at their respective Hermosillo, Mexico laboratories and multi-element analysis completed in North Vancouver, Canada. Drill core sample preparation includes fine crushing of the sample to at least 70% passing less than 2 mm, sample splitting using a riffle splitter, and pulverizing a 250-gram split to at least 85% passing 75 microns.

實驗室人員從項目中採集樣本,然後運送到他們在墨西哥杜蘭戈或埃莫西約的設施進行樣本製備。樣本分析由必維國際檢驗集團和ALS Labs進行,火試驗,包括超限火試金再分析,在各自的墨西哥埃莫西約實驗室完成,多元素分析在加拿大北溫哥華完成。鑽芯樣品製備包括將樣品精細粉碎至至少 70%,通過小於 2 mm,使用步槍分離器將樣品分裂,以及將 250 克的裂片粉碎至至少 85% 通過 75 微米。

Gold in diamond drill core is analyzed by fire assay and atomic absorption spectroscopy of a 30 g sample (code FA430 or Au-AA23). Multi-element chemistry is analyzed by 4-Acid digestion of a 0.25-gram sample split (code MA300 or ME-ICP61) with detection by inductively coupled plasma emission spectrometer for a full suite of elements.

通過火試和原子吸收光譜對 30 g 樣品(代碼 FA430 或 au-AA23)對鑽石鑽芯中的金進行分析。通過對0.25克樣品分裂(代碼 MA300 或 ME-ICP61)進行4-酸消解來分析多元素化學成分,並通過電感耦合等離子體發射光譜儀檢測全套元素。

Gold assay techniques FA430 and Au-AA23 have an upper detection limit of 10 ppm. Any sample that produces an over-limit gold value via the initial assay technique is sent for gravimetric finish via method FA-530 or Au-GRA21. Silver analyses by MA300 and ME-ICP61 have an upper limit of 200 ppm and 100 ppm, respectively. Samples with over-limit silver values are re-analyzed by fire assay with gravimetric finish FA530 or Au-GRA21.

金測定技術 FA430 和 Au-aa23 的檢出上限爲 10 ppm。任何通過初始測定技術產生超限金值的樣品都將通過方法 FA-530 或 Au-Gra21 送去重量法完成。MA300 和 ME-ICP61 的白銀分析的上限分別爲 200 ppm 和 100 ppm。銀值超限的樣品通過火法測定進行重量法處理 FA530 或 Au-Gra21 進行重新分析。

Both Bureau Veritas and ALS Labs are ISO/IEC accredited assay laboratories.

必維國際檢驗集團和 ALS 實驗室均爲 ISO/IEC 認可的化驗實驗室。

Additional Technical Notes

其他技術說明

Metres is represented by "m"; "etw" is Estimated True Width and is based on drill hole geometry or comparisons with other on-section drill holes; "Au" refers to gold, and "Ag" refers to silver; "gpt" is grams per metric tonne; some figures may not sum due to rounding; Composite assay grades presented in summary tables are calculated using a Au grade minimum average of 0.20 gpt or 1.0 gpt as indicated in "Au Cut-off" column of Summary Tables. Maximum internal waste included in any reported composite interval is 3.00 m. The 1.00 gpt Au cut-off is used to define higher-grade "cores" within the lower-grade halo.

米以 “m” 表示;“etw” 是估計的真實寬度,基於鑽孔幾何形狀或與其他截面鑽孔的比較;“Au” 指金,“Ag” 指銀;“gpt” 是指每公噸克數;由於四捨五入,一些數字可能無法求和;彙總表中顯示的複合化驗等級是使用金等級最低平均值 0.20 gpt 或 1.0 gpt 計算得出的在 “彙總表” 的 “Au 截止值” 欄中。任何報告的複合間隔中包含的最大內部廢物爲 3.00 m。1.00 gpt Au 截止值用於定義較低等級光環內更高等級的 “岩心”。

Gold equivalent grades are calculated based on an assumed gold price of US$1,700 per ounce and silver price of $22 per ounce, based on the formula AuEq grade (gpt) = Au grade + (Ag grade x ($22 / $1,700)). Metallurgical recoveries are not considered in the in-situ grade estimate but are estimated to be 93% and 83% for gold and silver, respectively, when processed in a mill, and 72% and 25% respectively when heap-leached. See the June 12, 2023 Los Reyes Technical Report for additional details.

黃金當量等級是根據假設的黃金價格爲每盎司1,700美元和每盎司22美元的白銀價格計算得出的,計算公式爲AuEq等級(gpt)=金品位+(銀等級x(22美元/1,700美元))。現場品位估算中不考慮冶金回收率,但據估計,金和銀在工廠加工時分別爲93%和83%,堆浸時分別爲72%和25%。有關更多詳細信息,請參閱 2023 年 6 月 12 日的洛斯雷耶斯技術報告。

Qualified Person

合格人員

Scott Smith, P.Geo., Executive Vice President of Exploration, is a qualified person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.

勘探執行副總裁斯科特·史密斯P.Geo是美國國家儀器43-101的合格人士,他已經審查並批准了本新聞稿中的技術內容。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論