share_log

MONUMENTAL ENERGY CORP. PROVIDES UPDATE ON ITS LAGUNA BLANCA CHILEAN LITHIUM BRINE-CESIUM SEDIMENT SALAR

MONUMENTAL ENERGY CORP. PROVIDES UPDATE ON ITS LAGUNA BLANCA CHILEAN LITHIUM BRINE-CESIUM SEDIMENT SALAR

紀念能源公司提供其拉古納布蘭卡智利鋰鹽水-銫沉積物鹽的最新情況
PR Newswire ·  05/07 20:00

VANCOUVER, BC, May 7, 2024 /CNW/ - Monumental Energy Corp. ("Monumental" or the "Company") (TSXV: MNRG) (FSE: BE5) (OTCQB: MNMRF) is pleased to announce the latest Chilean Government update on its Lithium Strategy. On April 15, 2024, Chile, through its Ministry of Mines, launched the process for Chilean and foreign investors to express interest in developing projects to explore and/or extract lithium from deposits located in Chile. Under this strategy, the Ministry of Mines has approved the procedure for the Request for Information ("RFI") which is intended to obtain the information necessary to promote the implementation of projects for the exploration, extraction and processing of lithium deposits and to design the mechanisms, requirements and conditions for granting special lithium operation contracts.

不列顛哥倫比亞省溫哥華,2024 年 5 月 7 日 /CNW/-Monumental Energy Corp. (”不朽的“或者”公司“)(多倫多證券交易所股票代碼:MNRG)(FSE:BE5)(OTCQB:MNMRF)很高興地宣佈智利政府關於其鋰戰略的最新更新。2024年4月15日,智利通過其礦業部啓動了智利和外國投資者表示有興趣開發從智利礦牀中勘探和/或開採鋰的項目的程序。根據該戰略,礦業部批准了信息請求程序(”RFI“)其目的是獲取必要的信息,以促進鋰礦牀勘探、開採和加工項目的實施,並設計授予特殊鋰運營合同的機制、要求和條件。

Monumental, through its Chilean subsidiary, Monumental Minerals Chile SpA, announces its plan to file a RFI to pursue necessary exploration for future lithium operation contracts related to 'Project Laguna Blanca'. The Company acknowledges the Chilean Government's prioritization of areas of interest and confirms that the Laguna Blanca Brine System falls within eligible territories for the RFI process.

Monumental通過其智利子公司Monumental Minerals Chile SpA宣佈計劃提交RFI,以對與 “拉古納布蘭卡項目” 相關的未來鋰運營合同進行必要的勘探。該公司承認智利政府將利益領域列爲優先事項,並確認拉古納布蘭卡鹽水系統屬於符合RFI程序條件的區域。

Michelle DeCecco, CEO remarks, "These announcements affirm Chile's commitment to upholding its role as a leading lithium player for the global energy transition. I commend Chile for facilitating the involvement of companies like Monumental Energy in the national lithium market. Moving forward, we remain dedicated to proactive engagement and collaborative with the Government and the local communities in our Project's area."

首席執行官米歇爾·德塞科表示:“這些公告證實了智利致力於維護其作爲全球能源轉型領先鋰參與者的作用。我讚揚智利爲像Monumental Energy這樣的公司參與全國鋰市場提供便利。展望未來,我們將繼續致力於與項目所在地區的政府和當地社區積極參與和合作。”

About Salar De Laguna Blanca

關於拉古納布蘭卡鹽沼

The Laguna Project is located within the prolific lithium triangle, a zone within the central Andes high desert that includes Chile, Argentina, and Bolivia. This zone is estimated to contain more than half of the world's lithium supply beneath the many salt flats, also known as salars, that are common to the region. The Laguna Blanca property consists of 51 exploration concessions totaling 12,425 hectares, 100% owned by Lithium Chile through its wholly owned Chilean subsidiary Minera Kairos Chile Limitada. The Laguna Blanca Project includes both active and paleo salar brines and salts with samples including 1230 mg/l from surface.

拉古納項目位於多產的鋰三角地帶,該區域位於安第斯山脈中部高地沙漠內,包括智利、阿根廷和玻利維亞。據估計,該區域包含該地區常見的許多鹽灘(也稱爲鹽沼)下方的全球鋰供應量的一半以上。拉古納布蘭卡的物業包括51個勘探特許權,總面積爲12,425公頃,由智利鋰業公司通過其全資智利子公司Minera Kairos Chile Limitada100%擁有。拉古納布蘭卡項目包括活性鹽和古鹽鹽水和鹽,樣品包括來自表面的1230 mg/l。

About Monumental Energy Corp.

關於紀念能源公司

Monumental Energy Corp. is an exploration company focused on the acquisition, exploration, and development of properties in the critical and clean energy sector. The Company has an option to acquire a 75% interest and title to the Laguna cesium-lithium brine project located in Chile. The Company holds a 2% net smelter return royalty on Summit Nanotech's share of any future lithium production from the Salar de Turi Project. The Company has an option to acquire a 100% interest in the Jemi HREE project located in Coahuila, Mexico near the Texas, USA border. The Company owns securities of New Zealand Energy Corp.

Monumental Energy Corp. 是一家勘探公司,專注於關鍵和清潔能源領域物業的收購、勘探和開發。該公司可以選擇收購位於智利的拉古納銫鋰鹽水項目75%的權益和所有權。該公司持有Sammit Nanotech在Salar de Turi項目未來鋰產量中所佔份額的2%的冶煉廠淨回報特許權使用費。該公司可以選擇收購位於墨西哥科阿韋拉州靠近美國德克薩斯州邊境的Jemi HREE項目的100%權益。該公司擁有新西蘭能源公司的證券

On behalf of the Board of Directors,

我代表董事會,

/s/ "Michelle DeCecco"
Michelle DeCecco, CEO

/s/ “Michelle DeCecco”
米歇爾·德塞科, 首席執行官

Contact Information:

聯繫信息:

Email: michelle@monumental.energy

電子郵件: michelle@monumental.energy

Or

或者

Maximilian Sali, VP Corporate Development, Director and founder
Email: max@monumental.energy

馬克西米利安·薩利,企業發展副總裁、董事兼創始人
電子郵件: max@monumental.energy

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Forward Looking Information

前瞻性信息

This news release contains "forward–looking information or statements" within the meaning of applicable securities laws, which may include, without limitation, the potential plans for the Company's projects, the plan to file a RFI for the Laguna project, other statements relating to the technical, financial and business prospects of the Company, its projects and other matters. All statements in this news release, other than statements of historical facts, that address events or developments that the Company expects to occur, are forward-looking statements. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results may differ materially from those in the forward-looking statements. Such statements are based on numerous assumptions regarding present and future business strategies and the environment in which the Company will operate in the future, including the price of metals and the price of oil and gas, the ability to achieve its goals, that general business and economic conditions will not change in a material adverse manner and that financing will be available if and when needed and on reasonable terms. Such forward-looking information reflects the Company's views with respect to future events and is subject to risks, uncertainties and assumptions, including the risks and uncertainties relating to the interpretation of exploration results, risks related to the inherent uncertainty of exploration and cost estimates and the potential for unexpected costs and expenses and those other risks filed under the Company's profile on SEDAR at . While such estimates and assumptions are considered reasonable by the management of the Company, they are inherently subject to significant business, economic, competitive and regulatory uncertainties and risks. Factors that could cause actual results to differ materially from those in forward looking statements include, but are not limited to, continued availability of capital and financing and general economic, market or business conditions, failure to secure personnel and equipment for work programs, adverse weather and climate conditions, risks relating to unanticipated operational difficulties (including failure of equipment or processes to operate in accordance with specifications or expectations, cost escalation, unavailability of materials and equipment, government action or delays in the receipt of government approvals, industrial disturbances or other job action, and unanticipated events related to health, safety and environmental matters), risks relating to inaccurate geological assumptions, failure to maintain all necessary government permits, approvals and authorizations, failure to obtain surface access agreements or understandings from local communities, land owners or Indigenous groups, fluctuation in exchange rates, the impact of Covid-19 or other viruses and diseases on the Company's ability to operate, capital market conditions, restriction on labour and international travel and supply chains, decrease in the price of rare earth elements, lithium, cesium and other metals, decrease in the price of oil and gas, loss of key employees, consultants, or directors, failure to maintain or obtain community acceptance (including from the Indigenous communities), increase in costs, litigation, and failure of counterparties to perform their contractual obligations. The Company does not undertake to update forward–looking statements or forward–looking information, except as required by law.

本新聞稿包含適用證券法所指的 “前瞻性信息或陳述”,其中可能包括但不限於公司項目的潛在計劃、爲拉古納項目提交RFI的計劃、與公司技術、財務和業務前景、其項目以及其他事項有關的其他聲明。除歷史事實陳述外,本新聞稿中所有涉及公司預計將發生的事件或事態發展的陳述均爲前瞻性陳述。儘管公司認爲此類前瞻性陳述中表達的預期是基於合理的假設,但此類陳述並不能保證未來的業績,實際業績可能與前瞻性陳述中的業績存在重大差異。此類陳述基於對當前和未來業務戰略以及公司未來運營環境的衆多假設,包括金屬價格和石油和天然氣價格、實現目標的能力、總體業務和經濟狀況不會發生重大不利變化,以及將在需要時以合理的條件提供融資。此類前瞻性信息反映了公司對未來事件的看法,並受風險、不確定性和假設的影響,包括與勘探結果解釋相關的風險和不確定性、與勘探和成本估算固有不確定性相關的風險以及可能出現意外成本和支出,以及根據公司在SEDAR的簡介中提交的其他風險。儘管公司管理層認爲此類估計和假設是合理的,但它們本質上會受到重大的業務、經濟、競爭和監管不確定性和風險的影響。可能導致實際結果與前瞻性陳述存在重大差異的因素包括但不限於資本和融資的持續可用性以及總體經濟、市場或業務狀況、未能爲工作計劃提供人員和設備、惡劣的天氣和氣候條件、與意想不到的運營困難相關的風險(包括設備或流程未能按照規格或預期運行、成本上漲、材料和設備不可用)政府行動或延遲收到政府批准、工業動亂或其他工作行動,以及與健康、安全和環境問題有關的意外事件)、與不準確的地質假設相關的風險、未能維持所有必要的政府許可、批准和授權、未能獲得當地社區、土地所有者或土著群體的地面准入協議或諒解、匯率波動、Covid-19或其他病毒和疾病對公司能力的影響進行操作,資本市場狀況、對勞動力、國際旅行和供應鏈的限制、稀土元素、鋰、銫和其他金屬價格下跌、石油和天然氣價格下跌、關鍵員工、顧問或董事流失、未能維持或獲得社區(包括土著社區)的認可、成本增加、訴訟以及交易對手未能履行合同義務。除非法律要求,否則公司不承諾更新前瞻性陳述或前瞻性信息。

SOURCE Monumental Minerals Corp.

來源 Monumental 礦業公司

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論