share_log

Earnings Call Summary | CAPSTONE COPPER CORP(CSCCF.US) Q1 2024 Earnings Conference

Earnings Call Summary | CAPSTONE COPPER CORP(CSCCF.US) Q1 2024 Earnings Conference

業績電話會議摘要 | CAPSTONE COPPER COPER CORP (CSCCF.US) 2024 年第一季度業績發佈會
富途資訊 ·  05/05 02:09  · 電話會議

The following is a summary of the Capstone Copper Corp (CSCCF) Q1 2024 Earnings Call Transcript:

以下是凱普斯通銅業公司(CSCCF)2024年第一季度業績電話會議記錄的摘要:

Financial Performance:

財務業績:

  • Capstone produced over 42,000 tons of copper in Q1 2024 with consolidated C1 cash costs of $2.88 per pound.

  • The company significantly improved its balance sheet by reducing net debt from $927 million at year-end 2023 to $740 million at the end of the first quarter.

  • Capstone reported an adjusted EBITDA of $80.1 million in Q1 2024, a 21% increase year-over-year.

  • The realized copper price of $3.85 per pound was in line with the LME average price.

  • 凱普斯通在2024年第一季度生產了超過42,000噸銅,合併後的C1現金成本爲每磅2.88美元。

  • 該公司通過將淨負債從2023年底的9.27億美元減少到第一季度末的7.4億美元,從而顯著改善了資產負債表。

  • Capstone報告稱,2024年第一季度調整後的息稅折舊攤銷前利潤爲8,010萬美元,同比增長21%。

  • 每磅3.85美元的已實現銅價與倫敦金屬交易所的平均價格一致。

Business Progress:

業務進展:

  • Capstone reiterated its 2024 guidance, planning to increase Sulphide's proportion in its production base, thereby reducing consolidated cash costs.

  • The company's Mantoverde Development Project (MVDP) remains on track and on budget, with a planned ramp-up over the next few months.

  • Plans are underway to release a feasibility study for the MVDP and Santo Domingo project by mid-year, alongside a $25 million exploration program involving over 61,500 meters of drilling.

  • Capstone has earned ISO 50001 energy efficiency management system certification for two of its mines and committed to reducing greenhouse gas emissions by 30% from a 2021 baseline by 2030.

  • Developments at the Pinto Valley mine will meet the rising demand for copper due to renewable energy transition and AI data centers.

  • The Santo Domingo project's updated feasibility study is set to be completed by mid-year with a partnership arrangement expected by year-end.

  • Operational issues were reported at the Mantos Blancos asset, but operations are expected to reach the 20,000-ton per day mark in the second half of the year.

  • Capstone重申了其2024年的指導方針,計劃提高硫化物在其生產基地中的比例,從而降低合併現金成本。

  • 該公司的Mantoverde開發項目(MVDP)仍在按計劃進行和按預算進行,並計劃在未來幾個月內加大力度。

  • 目前正計劃在年中之前發佈MVDP和聖多明各項目的可行性研究,以及一項耗資2500萬美元的勘探計劃,涉及超過61,500米的鑽探。

  • Capstone的兩個礦山已獲得ISO 50001能效管理體系認證,並承諾到2030年將溫室氣體排放量從2021年的基準減少30%。

  • Pinto Valley礦的開發將滿足可再生能源轉型和人工智能數據中心對銅不斷增長的需求。

  • 聖多明各項目最新的可行性研究定於年中完成,夥伴關係安排預計將在年底前完成。

  • 據報道,Mantos Blancos資產存在運營問題,但預計下半年運營量將達到每天2萬噸大關。

更多詳情: CAPSTONE 銅業公司 IR

Tips: For more comprehensive details, please refer to the IR website. The article is only for investors' reference without any guidance or recommendation suggestions.

提示:欲了解更多詳情,請訪問投資者關係網站。本文僅供投資者參考,不構成任何投資建議。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論