share_log

Lithium Ionic Announces 26% Increase in Global Mineral Resources With an Updated Mineral Resource Estimate at Its Bandeira Project, Minas Gerais, Brazil

Lithium Ionic Announces 26% Increase in Global Mineral Resources With an Updated Mineral Resource Estimate at Its Bandeira Project, Minas Gerais, Brazil

Lithium Ionic宣布全球矿产资源增长26%,更新了其位于巴西米纳斯吉拉斯州的Bandeira项目的矿产资源估算
GlobeNewswire ·  04/12 21:55
  • Global Mineral Resources increase 26% to 60.1Mt:
    • M&I: 32.51Mt grading 1.31% Li2O
    • Inferred: 27.57Mt grading 1.24% Li2O
  • Updated Bandeira Mineral Resources of 41.9 Mt grading 1.35% Li2O
    • M&I: 23.68Mt grading 1.34% Li2O
    • Inferred 18.25Mt grading 1.37% Li2O
  • 全球矿产资源增长26%,达到6,01万吨:
    • M&I:32.51Mt Li 等级 1.31%2O
    • 推断:27.57Mt Li 品位为 1.24%2O
  • 最新的 Bandeira 矿产资源为 4190 万吨 Li 品位 1.35%2O
    • M&I:23.68Mt Li 品位为 1.34%2O
    • 推断 18.25Mt Li 品位为 1.37%2O

TORONTO, April 12, 2024 (GLOBE NEWSWIRE) -- Lithium Ionic Corp. (TSXV: LTH; OTCQX: LTHCF; FSE: H3N) ("Lithium Ionic" or the "Company"), is pleased to report an updated NI 43-101 compliant mineral resource estimate ("MRE") for the Bandeira Lithium Project ("Bandeira" or the "Project"), located within the Lithium Valley in Minas Gerais State, Brazil. The Lithium Valley is a unique geological belt that hosts a significant concentration of lithium-bearing pegmatites, which has emerged as a globally significant lithium producer. This new MRE increases the Company's global mineral resources by 26% to 60.1Mt.

多伦多,2024年4月12日(GLOBE NEWSWIRE)——锂离子公司(TSXV:LTH;OTCQX:LTHCF;FSE:H3N)(“Lithium Ionic” 或 “公司”)欣然报告了最新的符合NI 43-101标准的Bandeira锂项目(“Bandeira” 或 “项目”)的矿产资源估算(“MRE”),该项目位于多伦多巴西米纳斯吉拉斯州的锂谷。锂谷是一个独特的地质带,拥有大量的含锂伟晶岩,现已成为全球重要的锂生产国。新的矿产资源管理使公司的全球矿产资源增加了26%,达到6,01万吨。

The Bandeira property covers only approximately 158 hectares, or 1% of its large 14,182-hectare land package. Two other NI 43-101 compliant lithium MREs have been outlined on the Company's other regional properties, Salinas and Outro Lado, however the majority of its properties remain largely unexplored and represent significant future mineral growth potential for the Company.

班德拉的房产仅占地约158公顷,占其14,182公顷大型土地一揽子土地的1%。该公司的其他区域物业萨利纳斯和Outro Lado概述了另外两处符合NI 43-101标准的锂矿物业,但其大多数物业基本上仍未开发,代表了公司巨大的未来矿产增长潜力。

Bandeira MRE Highlights:

Bandeira MRE 亮点:

  • Measured and Indicated ("M&I") MRE of 23.68 million tonnes ("Mt") at an average grade of 1.34% Li2O, with an additional 18.25Mt of Inferred MRE grading 1.37% Li2O, for a total of 41.93Mt*.
  • The updated Bandeira MRE significantly increases the Company's consolidated, global mineral resources to 60.1Mt.
  • Significant mineral growth in only ~24months: The MRE estimate is based on 233 drill holes, or 50,760 metres, drilled between April 2022 and March 2024.
  • Planned exploration programs at its existing deposits, Bandeira, Salinas and Outro Lado, as well as other regional targets, are expected to support continued mineral resource growth.
  • 测定和指示(“M&I”)MRE 为 2368 万吨(“Mt”),平均品位为 1.34% Li2O,另外还有 1825 吨推断的 MRE 品位为 1.37%,共计 4193 万吨*。
  • 更新后的Bandeira MRE将公司的合并全球矿产资源显著增加到6,010万吨。
  • 在短短的约24个月内矿产显著增长:MRE的估计是基于2022年4月至2024年3月期间钻探的233个钻孔,即50,760米。
  • 计划中的现有矿床、班代拉、萨利纳斯和奥特罗拉多以及其他区域目标的勘探计划将支持矿产资源的持续增长。

*See press release dated April 4, 2024, for details related to the Salinas MRE (effective date of January 4, 2024; QP: Leonardo Soares, P.Geo., M.Sc., of GE21), and the NI 43-101 compliant technical reports related to the Outro Lado deposit titled "Mineral Resource Estimate for Lithium Ionic, Itinga Project" (effective date of June 24, 2023; authored by Maxime Dupéré, B. Sc., P.Geo. and Faisal Sayeed, B. Sc., P.Geo).

*有关萨利纳斯 MRE(生效日期为 2024 年 1 月 4 日;QP)的相关详情,请参阅 2024 年 4 月 4 日的新闻稿: 莱昂纳多·苏亚雷斯,P.Geo.,理学硕士,GE21),以及与奥特罗拉多矿床相关的符合北爱尔兰43-101标准的技术报告,标题为 “伊廷加项目锂离子矿产资源估算”(生效日期为2023年6月24日;由马克西姆·杜佩雷,理学学士,P.Geo和P.Geo学士费萨尔·赛义德撰写)。

Blake Hylands, P.Geo., CEO of Lithium Ionic, commented, "Following closely on the heels of our initial resource at Salinas announced last week, this is yet another significant increase to our global mineral resources, highlighting the impressive pace and scale at which we have been able to delineate lithium deposits in this region. I commend our exploration team for their dedication and exceptional effort, which have driven these excellent results. This latest MRE positions us among the largest scale projects in the region, and with a largely untapped land package we expect this growth momentum to continue, aligning with our goal of becoming a major contributor to the global lithium supply chain."

Lithium Ionic 首席执行官 P.Geo. Blake Hylands 表示, “紧随我们上周宣布的萨利纳斯初始资源之后,这是我们全球矿产资源的又一次重大增长,凸显了我们在该地区划定锂矿床的惊人速度和规模。我赞扬我们的勘探团队的奉献精神和非凡的努力,推动了这些优异的成果。最新的MRE使我们成为该地区最大的项目之一,由于土地一揽子计划基本上尚未开发,我们预计这种增长势头将继续下去,符合我们成为全球锂供应链主要贡献者的目标。”

Carlos Costa, P.Geo., Lithium Ionic's VP of Exploration, commented, "Reflecting on the past two years since we started drilling at Bandeira, I am immensely proud of our team's accomplishments. Starting with just a few promising rock samples, we have now uncovered a significant mineral deposit and look forward to advancing Bandeira to the next stages of development."

Lithium Ionic 勘探副总裁 P.Geo. Carlos Costa 评论道, “回顾我们开始在Bandeira钻探以来的过去两年,我为我们团队的成就感到非常自豪。从几个有前景的岩石样本开始,我们现在已经发现了一个重要的矿床,并期待将Bandeira推进到下一个开发阶段。”

Bandeira Lithium Project – Mineral Resource Update

Bandeira 锂项目 — 矿产资源最新动态

The MRE update for Bandeira was prepared by GE21 Consultoria Mineral Ltda. ("GE21") in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101").

Bandeira 的 MRE 更新由 GE21 Consultoria Mineral Ltda 编写。(“GE21”)根据国家仪器43-101- 矿产项目披露标准 (“NI 43-101”)。

Bandeira is located in the lithium-rich Araçuaí Pegmatite District, in the northern part of the Eastern Brazilian Pegmatite Province, which hosts the largest lithium reserves in Brazil.

班德拉位于巴西东部伟晶岩省北部的富含锂的阿拉苏艾伟晶岩区,该地区拥有巴西最大的锂储量。

The updated MRE contains M&I resources of 23.68Mt grading 1.34% Li2O, containing 783.0 thousand tonnes ("kt") of Lithium Carbonate Equivalent ("LCE"), the benchmark equivalent raw material used in the lithium industry, along with Inferred resources of 18.25Mt grading 1.37% Li2O in the Inferred category, or 618.4kt of LCE (see MRE results in Table 1). The MRE is based on 233 diamond drill holes comprising 50,760 metres of drilling completed between April 2022 and March 2024.

更新后的MRE包含2368万吨的M&I资源,Li2O等级为1.34%,包含78.3万吨(“kt”)碳酸锂当量(“LCE”),这是锂行业使用的基准当量原材料,以及推断类别中1825万吨Li2O的推断资源,即618.4万吨LCE(见表1中的MRE结果)。MRE 以 2022 年 4 月至 2024 年 3 月期间完成的 233 个金刚石钻孔为基础,包括 50,760 米的钻探。

GE21 collaborated closely with the Company's geological team to confirm the presence of a series of North-East trending moderately SE dipping pegmatite veins extending up to 1,000 meters along strike and from surface to a vertical depth of approximately 500 meters (see plan view of Bandeira in Figure 1 and an isometric view of the Bandeira deposit in Figure 2).

GE21与该公司的地质小组密切合作,确认存在一系列东北向向中度倾斜的伟晶岩矿脉,沿着走向延伸至1,000米,从地表延伸到大约500米的垂直深度(参见图1中Bandeira的平面图和图2中Bandeira矿床的等距视图)。

As press released on April 4, 2024, a Feasibility Study for Bandeira is currently being finalized by AtkinsRéalis (formerly SNC-Lavalin) and is scheduled for completion in May 2024. Furthermore, the environmental license for Bandeira is expected to be granted in early Q3 2024.

正如2024年4月4日的新闻发布的那样,阿特金斯雷阿利斯(前身为SNC-Lavalin)目前正在完成班德拉的可行性研究,并计划于2024年5月完成。此外,班德拉的环境许可证预计将在2024年第三季度初颁发。

The NI 43-101 technical report related to the Bandeira MRE, will be accessible on SEDAR+ () under the Company's issuer profile and the Company's website within 45 days of this news release.

在本新闻发布后的45天内,与Bandeira MRE相关的NI 43-101技术报告将在公司发行人简介下的SEDAR+()和公司网站上公布。

Table 1: Bandeira Mineral Resource Estimate Summary

表 1:班德拉矿产资源估算摘要

Deposit /
Cut-Off Grade
Category Resource
(Mt)
Grade
(% Li2O)
Contained LCE (kt)
Bandeira
(0.5% cut-off)
Measured 3.32 1.38 113.1
Indicated 20.36 1.33 669.6
Measured + Indicated 23.68 1.34 783.0
Inferred 18.25 1.37 618.4
存款/
截止等级
类别 资源
(公吨)
等级
(% Li2O)
内含 LCE (kt)
班代拉
(0.5% 截止值)
已测量 3.32 1.38 113.1
已指明 20.36 1.33 669.6
已测量 + 已指示 23.68 1.34 783.0
推断 18.25 1.37 618.4
  1. The spodumene pegmatite domains were modeled using composites with Li2O grades greater than 0.3%
  2. The mineral resource estimates were prepared in accordance with the CIM Standards, and the CIM Guidelines, using geostatistical and/or classical methods, plus economic and mining parameters appropriate to the deposit.
  3. Mineral Resources are not ore reserves and are not demonstrably economically recoverable.
  4. Grades reported using dry density.
  5. The effective date of the MRE is January 10, 2024.
  6. The QP responsible for the MRE is the geologist Carlos Silva (MAIG #7868).
  7. The MRE numbers provided have been rounded to the estimate relative precision. Values cannot be added due to rounding.
  8. The MRE is delimited by Lithium Ionic Bandeira Target Claims (ANM).
  9. The MRE was estimated using ordinary kriging in 12m x 12m x 4m blocks.
  10. The MRE report table was produced in Leapfrog Geo software.
  11. The reported MRE only contains fresh rock domains.
  12. The MRE was restricted by RPEEE with grade shell using 0.5% Li2O cut-off.
  1. 锂辉石伟晶岩结构域是使用Li2O等级大于0.3%的复合材料建模的
  2. 矿产资源估算值是根据CIM标准和CIM指南编制的,使用地质统计和/或经典方法,以及适合矿床的经济和采矿参数。
  3. 矿产资源不是矿石储量,也没有明显的经济可开采性。
  4. 使用干密度报告等级。
  5. MRE 的生效日期为 2024 年 1 月 10 日。
  6. 负责 MRE 的 QP 是地质学家卡洛斯·席尔瓦 (MAIG #7868)。
  7. 提供的MRE数字已四舍五入到估计值的相对精度。由于四舍五入,无法添加值。
  8. MRE 由 Lithium Ionic Bandeira Target Claims (ANM) 界定。
  9. MRE 是使用普通克里金法估算的 在 12m x 12m x 4m 的方块中。
  10. MRE 报告表是在 Leapfrog Geo 软件中生成的。
  11. 报告的 MRE 仅包含新鲜的岩石域。
  12. MRE 受到 RPEEE 的限制,其等级外壳使用 0.5% 的锂离子截止值。

Figure 1. Bandeira Project Location

图 1。班德拉项目地点

View Figure 1 here:

在此处查看图 1:

Figure 2. Isometric View of the Bandeira Deposit

图 2。班德拉矿床的等距视图

View Figure 2 here:

在此处查看图 2:

Details related to the calculation of the MRE

与 MRE 计算相关的详细信息

The MRE was prepared by Carlos Silva P.Geo., M.Sc., of GE21 (the "Author" or "QP") with an effective date of January 10, 2024.

MRE由GE21的理学硕士卡洛斯·席尔瓦·P.Geo.(“作者” 或 “QP”)编写,生效日期为2024年1月10日。

The MRE was prepared using the following geological and resource block modeling parameters which are based on geological interpretations, geostatistical studies, and best practices in mineral estimation.

MRE 是使用以下地质和资源区块建模参数编制的,这些参数基于地质解释、地质统计研究和矿物估算的最佳实践。

The QP is not aware of any factors or issues that materially affect the MRE other than normal risks faced by mining projects in the province in terms of environmental, permitting, taxation, socio-economic, marketing, and political factors, and additional risk factors regarding inferred resources.

除了该省采矿项目在环境、许可、税收、社会经济、营销和政治因素以及与推断资源有关的其他风险因素方面面临的正常风险外,QP没有发现任何对MRE产生重大影响的因素或问题。

  • The Project geology comprises Neoproterozoic age sedimentary rocks of Araçuaí Orogen intruded by fertile Li-bearing pegmatites originated by fractionation of magmatic fluids from the peraluminous S-type post-tectonic granitoids of Araçuaí Orogen. Lithium mineralization is related to concordant and discordant swarms of spodumene-bearing tabular pegmatites hosted by cordierite-biotite-quartz schists.
  • Drilling conducted by Lithium Ionic included diamond core drilling of NTW (64.2mm diameter).
  • Diamond core has been sampled in intervals of ~ 1 m where possible, otherwise intervals less than 1 m have been selected based on geological boundaries. Geological boundaries have not been crossed by sample intervals. 1⁄2 core samples have been collected and submitted for analysis, with regular field duplicate samples collected and submitted for QA/QC analysis.
  • Drill core samples were submitted to SGS Geosol laboratories in Brazil where they were analyzed for a 31-element suite via ICP90A (fusion by sodium peroxide and finish with ICP- MS/ICP-OES). Assay data were composited to 1 m.
  • The MRE was estimated from the diamond drill holes completed by Lithium Ionic from April 2022 until March 2024. Data from a total of 233 drill holes comprising 8,693 assays were included in the mineral resources model.
  • The 3D modelling of lithium Mineral Resources was conducted using a minimum cut-off grade of 0.3% Li2O within a preliminary lithological model.
  • The interpolation was conducted using Krigging methodology with three interpolation passes.
  • The block model was defined by a block size of 12 m long by 12m wide by 4 m thick and covers a strike length of approximately 1,200 m to a maximal vertical depth of 300 m below surface.
  • The MRE was classified as Measured, Indicated and Inferred Mineral Resource based on data quality, sample spacing, and pegmatite continuity. The Measured Mineral Resource was defined using a search ellipsoid of 50 m by 50 m by 30 m, and where the continuity and predictability of the mineralized units was reasonable. The Indicated Mineral Resource was defined using a search ellipsoid 100 m by 100 m by 50 m. The Inferred Mineral Resource was assigned to areas where drill hole spacing was greater than 100 m by 100 m by 50 m for all remaining blocks.
  • Classification focused on spatial relation using a minimum of five composites in at least three different drill holes for the Measured and Indicated resources.
  • Validation has proven that the block model fairly reflects the underlying data inputs. Variability over distance is relatively moderate to low for this deposit type therefore the maximum classification level is Indicated.
  • Mineralization at the deposits extends to surface and is expected to be suitable for open cut mining; no minimum mining width was applied; internal mining dilution is limited to internal barren pegmatite and/or host rock intervals within the mineralized pegmatite intervals; based on these assumptions, it is considered that there are no mining factors which are likely to affect the assumption that the deposit has reasonable prospects for eventual economic extraction.
  • It is the QP's opinion that the current classification used is adequate and reliable for this type of mineralization and MRE.
  • The MRE reported is a global estimate with reasonable prospects of eventual economic extraction.
  • 该项目的地质包括阿拉夸伊造山脉的新元古代时代沉积岩,这些沉积岩被肥沃的含锂伟晶岩侵入,这些伟晶岩来自阿拉夸伊造山脉的过铝S型构造后花岗岩的岩浆流体的分离。锂矿化与一致和不协调的含锂辉石板状伟晶岩群有关,这些伟晶岩由堇青石-黑云石-石英片岩构成。
  • Lithium Ionic进行的钻探包括对NTW(直径为64.2mm)的金刚石岩心钻探。
  • 尽可能以约 1 m 的间隔对钻石岩芯进行采样,否则将根据地质边界选择小于 1 m 的间隔。样本间隔没有跨越地质边界。已经收集了 1⁄2 个岩心样本并提交分析,定期收集现场重复样本并提交质量保证/质量控制分析。
  • 钻芯样本被提交给巴西的 SGS Geosol 实验室,在那里通过 ICP90A(过氧化钠融合,最后使用 ICP-MS/ICP-OES)对这些样本进行分析,以获得 31 种元素的组合。分析数据合成到 1 m。
  • MRE是根据Lithium Ionic在2022年4月至2024年3月期间完成的金刚石钻孔估算得出的。矿产资源模型中包含了来自总共233个钻孔的数据,包括8,693次化验。
  • 锂矿产资源的三维建模使用的最低临界等级为 0.3% 的锂离子进行的2O 在初步的岩性模型中。
  • 插值是使用 Krigging 方法进行的,有三次插值通道。
  • 区块模型定义的区块大小为12 m,宽12m,厚4 m,覆盖的走向长度约为1,200米,最大垂直深度为地表以下300米。
  • 根据数据质量、样本间距和伟晶岩连续性,MRE 被归类为测量、指示和推断的矿产资源。测得的矿产资源是使用50 m x 50 m x 30 m的搜索椭球来定义的,并且矿化单位的连续性和可预测性是合理的。指定矿产资源是使用搜索椭球 100 m x 100 m x 50 m 来定义的。推断矿产资源被分配给所有剩余区块的钻孔间距大于 100 m x 100 m x 50 m 的区域。
  • 分类侧重于空间关系,在测量和指示资源的至少三个不同的钻孔中使用至少五种复合材料。
  • 验证已经证明,分组模型公平地反映了基础数据输入。对于这种矿床类型,距离上的变异性相对中等至低,因此显示了最大分类级别。
  • 矿床的矿化作用延伸到地表,预计适合露天开采;没有适用最低开采宽度;内部采矿稀释仅限于矿化伟晶岩区间内的内部贫乏伟晶岩和/或主岩间隔;基于这些假设,认为没有任何采矿因素可能影响该矿床最终具有合理经济开采前景的假设。
  • QP认为,目前使用的分类对于这种类型的矿化作用和地雷风险评估是足够和可靠的。
  • 报告的MRE是一项全球估计,具有合理的最终经济开采前景。

On behalf of the Board of Directors of Lithium Ionic Corp.

代表锂离子公司董事会

Blake Hylands
Chief Executive Officer, Director

布莱克·海兰兹
首席执行官、董事

About Lithium Ionic Corp.

关于锂离子公司

Lithium Ionic is a Canadian mining company exploring and developing its lithium properties in Brazil. Its flagship Itinga and Salinas projects are located in the northeastern part of Minas Gerais state, a mining-friendly jurisdiction that is quickly emerging as a world-class hard-rock lithium district. The Itinga Project is situated in the same region as CBL's Cachoeira lithium mine, which has produced lithium for +30 years, as well as Sigma Lithium Corp.'s Grota do Cirilo project, which hosts the largest hard-rock lithium deposit in the Americas.

Lithium Ionic是一家加拿大矿业公司,正在巴西探索和开发其锂特性。其旗舰伊廷加和萨利纳斯项目位于米纳斯吉拉斯州的东北部,该州是一个矿业友好型司法管辖区,正迅速崛起为世界一流的硬岩锂区。伊廷加项目与CBL的Cachoeira锂矿以及Sigma Lithium Corp. 位于同一地区,后者生产锂已有30多年的历史。s Grota do Cirilo项目,该项目拥有美洲最大的硬岩锂矿床。

Qualified Persons

合格人员

Carlos José Evangelista Silva, MSc Geo. (MAIG membership number 7868), of GE21 is a Qualified Person as defined by NI 43-101 and has reviewed and approved the technical information and data regarding the MRE included in this news release. Mr. Silva is independent of Lithium Ionic. All other scientific and technical information in this news release has been reviewed and approved by Carlos Costa, Vice President Exploration of Lithium Ionic and Blake Hylands, CEO and director of Lithium Ionic, and both are "qualified persons" as defined in NI 43-101.

卡洛斯·何塞·伊万杰利斯塔·席尔瓦,地理学硕士。GE21的(MAIG成员编号为7868)是NI 43-101定义的合格人员,并已审查并批准了本新闻稿中包含的有关MRE的技术信息和数据。席尔瓦先生独立于锂离子电池。本新闻稿中的所有其他科学和技术信息均已由锂离子勘探副总裁卡洛斯·科斯塔和锂离子公司首席执行官兼董事布莱克·海兰兹审查和批准,他们都是NI 43-101定义的 “合格人员”。

Investor and Media Inquiries:

投资者和媒体查询:

+1 647.316.2500
info@lithiumionic.com

+1 647.316.2500
info@lithiumionic.com

Cautionary Note Regarding Forward-Looking Statements

关于前瞻性陈述的警示说明

This press release contains statements that constitute "forward-statements." Such forward looking statements involve known and unknown risks, uncertainties and other factors that may cause the Company's actual results, performance or achievements, or developments to differ materially from the anticipated results, performance or achievements expressed or implied by such forward-looking statements. Although the Company believes, in light of the experience of its officers and directors, current conditions and expected future developments and other factors that have been considered appropriate that the expectations reflected in this forward-looking information are reasonable, undue reliance should not be placed on them because the Company can give no assurance that they will prove to be correct. When used in this press release, the words "estimate", "project", "belief", "anticipate", "intend", "expect", "plan", "predict", "may" or "should" and the negative of these words or such variations thereon or comparable terminology are intended to identify forward-looking statements and information. The forward-looking statements and information in this press release include information relating to the prospectivity of the Company's mineral properties including Salinas and Bandeira, the Company's ability to produce a NI 43-101 compliant mineral resource estimate, PEA and/or Feasibility study and the timing thereof, the Company's ability to obtain the requisite licences and permits, the economic viability of the Bandeira project, the Company's ability to obtain adequate financing, the mineralization and development of the Company's mineral properties, the Company's exploration program and other mining projects and prospects thereof and the Company's future plans. Such statements and information reflect the current view of the Company. Risks and uncertainties that may cause actual results to differ materially from those contemplated in those forward-looking statements and information. By their nature, forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause our actual results, performance or achievements, or other future events, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. The forward-looking information contained in this news release represents the expectations of the Company as of the date of this news release and, accordingly, is subject to change after such date. Readers should not place undue importance on forward-looking information and should not rely upon this information as of any other date. The Company undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates or opinions, or other factors, should change.

本新闻稿包含构成 “前瞻性陈述” 的声明。此类前瞻性陈述涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致公司的实际业绩、业绩或成就或发展与此类前瞻性陈述所表达或暗示的预期业绩、业绩或成就存在重大差异。尽管公司认为,根据其高管和董事的经验、当前的状况和预期的未来发展以及其他被认为适当的因素,这些前瞻性信息中反映的预期是合理的,但不应过度依赖这些预期,因为公司无法保证这些预期会被证明是正确的。在本新闻稿中使用时,“估计”、“项目”、“信念”、“预测”、“打算”、“期望”、“计划”、“预测”、“可能” 或 “应该” 等词语的否定词或其中的此类变体或类似术语旨在识别前瞻性陈述和信息。本新闻稿中的前瞻性陈述和信息包括与公司矿产前景(包括萨利纳斯和班代拉)、公司编制符合北爱尔兰43-101标准的矿产资源估算值的能力、PEA和/或可行性研究及其时机、公司获得必要许可证和许可证的能力、Bandeira项目的经济可行性、公司获得充足融资的能力、公司的矿化和开发相关的信息矿物特性,公司的勘探计划和其他采矿项目及其前景以及公司的未来计划。此类陈述和信息反映了公司当前的观点。可能导致实际结果与这些前瞻性陈述和信息中设想的结果存在重大差异的风险和不确定性。就其性质而言,前瞻性陈述涉及已知和未知的风险、不确定性和其他因素,这些因素可能导致我们的实际业绩、业绩或成就或其他未来事件与此类前瞻性陈述所表达或暗示的任何未来业绩、业绩或成就存在重大差异。本新闻稿中包含的前瞻性信息代表了公司截至本新闻发布之日的预期,因此,在此之后可能会发生变化。读者不应过分重视前瞻性信息,也不应从任何其他日期开始依赖这些信息。如果管理层的信念、估计或观点或其他因素发生变化,公司没有义务更新这些前瞻性陈述。

Information and links in this press release relating to other mineral resource companies are from their sources believed to be reliable, but that have not been independently verified by the Company.

本新闻稿中与其他矿产资源公司有关的信息和链接来自他们的来源,据信是可靠的,但尚未得到公司的独立证实。

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.

多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所的政策中定义)均不对本新闻稿的充分性或准确性承担责任。


译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发