share_log

ACME Lithium Files NI 43-101 Technical Report Including Lithium Resource Estimate for Clayton Valley Lithium Brine Project

ACME Lithium Files NI 43-101 Technical Report Including Lithium Resource Estimate for Clayton Valley Lithium Brine Project

ACME Lithium 提交了 NI 43-101 技術報告,包括克萊頓谷鋰鹽水項目的鋰資源估算
newsfile ·  03/14 20:45

Carson City, Nevada--(Newsfile Corp. - March 14, 2024) - ACME Lithium Inc. (CSE: ACME) (OTCQB: ACLHF) (the "Company", or "ACME") announced today that it has filed on SEDAR+ a National Instrument 43-101 technical report titled "NI 43-101 Technical Report Update on the Clayton Valley Lithium Brine Project, Esmeralda County, Nevada USA" with an effective date of March 13, 2024 (the "Technical Report").

內華達州卡森城--(Newsfile Corp.-2024 年 3 月 14 日)- ACME Lithium Inc (案例:ACME) (OTCQB:ACLHF) (“公司” 或 “ACME”)今天宣佈,它已向SEDAR+提交了National Instrument 43-101技術報告,標題爲 “NI 43-101 美國內華達州埃斯梅拉達縣克萊頓谷鋰鹽水項目最新技術報告” 生效日期爲 2024年3月13日 (“技術報告”).

The Technical Report includes a maiden resource estimate of lithium carbonate equivalent (LCE) of approximately 302,900 metric tons (units rounded) over a 40-year extraction period, confirming an exploration summary and hydrological evaluation report previously announced by ACME on February 6, 2024, and received from Reno, Nevada based Confluence Water Resources LLC ("Confluence").

該技術報告包括對40年開採期內碳酸鋰當量(LCE)約爲302,900公噸(四捨五入單位)的首次資源估計,證實了ACME先前於2024年2月6日宣佈的勘探摘要和水文評估報告,該報告由總部位於內華達州里諾的Confluence Water Resources LLC(“Confluence”)收到。

The Clayton Valley claim group encompass 119 lode mining claims totalling approximately 2,230 acres, in Esmeralda County, Nevada and is contiguous to the northwest of the only operating lithium brine operation in North America, Albemarle Corporation's Silver Peak lithium deposit and facility, which has been in production since 1966.

克萊頓谷索賠組包括位於內華達州埃斯梅拉達縣的119份礦脈採礦索賠,總面積約爲2,230英畝,毗鄰北美唯一正在運營的鋰鹽水作業——雅寶公司的銀峯鋰礦牀和設施的西北部,該礦牀和設施自1966年以來一直在生產。

The Technical Report was prepared for the Clayton Valley project by David Carlson, Certified Professional Geologist in California, Idaho and Utah, independent consultant, and qualified person. The disclosure of a mineral resource estimate, as stated herein, is based upon the information prepared by such a qualified person.

該技術報告由加利福尼亞州、愛達荷州和猶他州的認證專業地質學家、獨立顧問和合格人士大衛·卡爾森爲克萊頓谷項目編寫。如本文所述,礦產資源估算的披露是基於此類合格人員準備的信息。

The Technical Report was prepared in accordance with the Canadian Securities Administrators' National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101"), and may be found here at the Company's website or under the Company's profile on SEDAR+.

該技術報告是根據加拿大證券管理局的《國家儀器43-101——礦業項目披露標準》(“NI 43-101”)編寫的,可以查閱 這裏 在公司的網站或公司在SEDAR+上的簡介下。

About ACME Lithium Inc.

關於 ACME Lithium Inc.

Led by an experienced team, ACME is a mineral exploration company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in a project area located in Clayton Valley, Nevada and has entered into option agreements with third parties on its Fish Lake Valley, Esmeralda County Nevada project, and at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba.

ACME是一家礦產勘探公司,由經驗豐富的團隊領導,專注於與領先的技術和大宗商品公司合作收購、勘探和開發電池金屬項目。ACME已經收購或有選擇收購位於內華達州克萊頓谷的項目區域的100%權益,並已就其魚湖谷、內華達州埃斯梅拉達縣項目以及曼尼托巴省東南部的沙特福德、伯斯和卡特歐幾里德湖項目與第三方簽訂了期權協議。

On behalf of the Board of Directors

代表董事會

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·漢森
首席執行官、總裁兼董事
電話:(604) 564-9045
info@acmelithium.com

For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca

投資者查詢:
安東尼西蒙尼
西蒙妮資本
電話:(416) 881-5154
asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

CSE及其監管服務提供商均不對本新聞稿的充分性或準確性承擔責任。本新聞稿可能包含適用證券法所指的前瞻性信息(“前瞻性陳述”)。前瞻性陳述不是歷史事實,通常但並非總是以 “期望”、“計劃”、“預期”、“相信”、“打算”、“估計”、“項目”、“潛力” 和類似表達方式來識別,或者事件或條件 “將”、“會”、“可能” 或 “應該” 等詞來識別,在本新聞稿中包括但不限於屬性 ACME項目物業的勘探、鑽探或開發的時機和預期收益。從對鑽探、取樣和其他技術結果的解釋中推斷出的信息也可以被視爲前瞻性陳述,因爲它構成了對項目實際開發時和是否可能出現的情況的預測。ACME的項目位置與鋰項目相鄰或附近,並不保證勘探成功,也不能保證礦產資源或儲量將在ACME的財產上確定。區域公司開展的勘探、開發和活動爲ACME正在完成的勘探工作提供援助和額外數據。這些前瞻性陳述受各種風險和不確定性的影響,這些風險和不確定性可能導致實際事件或結果與前瞻性陳述中反映的事件或結果存在重大差異,包括但不限於:與金屬價格波動相關的風險;與籌集足夠資金以按可接受的條件爲計劃工作提供資金相關的不確定性;天氣、後勤、技術或其他因素導致的計劃工作發生變化;工作結果可能無法達到預期;以及意識到公司財產的潛在潛力;發生事故、設備故障和勞資糾紛或其他意想不到的困難或中斷的風險;工作計劃中出現成本超支或意外支出的可能性;公司運營造成的環境污染或損害風險以及其他風險和不確定性。任何前瞻性陳述僅代表其發表之日,除非適用的證券法有要求,否則公司不打算或有義務更新任何前瞻性陳述,無論是由於新信息、未來事件或業績還是其他原因。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論