share_log

T2 Metals Reports Exceptional 23.5 M at 6.8 G/t Gold Drill Intersection From the Sherridon VHMS Project, Manitoba

T2 Metals Reports Exceptional 23.5 M at 6.8 G/t Gold Drill Intersection From the Sherridon VHMS Project, Manitoba

T2 Metals報告說,曼尼托巴省Sherridon VHMS項目在6.8 g/t的金鑽交叉口處有驚人的2350米
newsfile ·  03/01 21:00

Shallow High-Grade Intersections Include 23.5m @ 1.18% Cu, 1.46% Zn, 6.8 g/t Au (7.4% CuEq)

淺層高品位交叉點包括 23.5m @ 1.18% 銅、1.46% 鋅、6.8 g/t Au (7.4% CueQ)

Vancouver, British Columbia--(Newsfile Corp. - March 1, 2024) - T2 Metals Corp. (TSXV: TWO) (OTCQB: AGLAF) (WKN: A2DR6E) ("T2" or the "Company") is pleased to announce a third set of results from the 2023 Q4 infill and delineation drill program at the Sherridon Project in Manitoba, that include the highest gold grades reported from the project to date. Sherridon is a well-known Volcanic Hosted Massive Sulphide ("VHMS") camp in the Flin Flon - Snow Lake Greenstone Belt, with both a significant mining history and substantial copper-rich historical resources (see Table 4) calculated on behalf of Halo Resources Ltd in 2010. The Project has year-round road access, is 70 km from the mining centre of Flin Flon, and lies adjacent to an operating rail line.

不列顛哥倫比亞省溫哥華--(Newsfile Corp.-2024 年 3 月 1 日)- T2 Metals Corp.(多倫多證券交易所:TWO)(場外交易代碼:AGLAF)(WKN:A2DR6E)(“T2” 或 “公司”) 很高興地在會上宣佈2023年第四季度填充和劃界鑽探計劃的第三組結果 謝里登 曼尼托巴省的項目,其中包括該項目迄今爲止報告的最高金品位。謝里登是位於弗林弗隆-雪湖綠巖帶的一個著名的火山託管塊狀硫化物(“VHMS”)營地,該營地既有重要的採礦歷史,也有大量富含銅的歷史資源(見表4),是代表Halo Resources Ltd在2010年計算得出的。該項目全年通行,距離弗林弗隆礦業中心70公里,毗鄰運營中的鐵路線。

These data represent the third set of results and include 3 shallow holes from the southeast end of the Lost Lake prospect (see Figure 2), targeted on the basis of a shallow southeast plunging exploration model. Of particular note is hole SHN23005, drilled near the southeasternmost limits of the known Lost Lake resource, with very high grades of gold and copper over 23.5m. The intersection lies only 20m below surface and includes some of the highest gold grades ever discovered at Sherridon.

這些數據代表了第三組結果,包括 Lost Lake 勘探區東南端的 3 個淺孔(見圖 2),目標是基於淺層的東南墜落勘探模型。特別值得注意的是 SHN23005 孔,該鑽孔位於已知迷失湖資源的最東南極限附近,金和銅的品位非常高,超過 235 米。該交叉路口位於地表以下僅20米處,其中包括有史以來在謝里登發現的一些最高金品位。

The high gold and copper grades over a broad interval highlight the potential of VHMS style of mineralization in complexly folded host rocks. Gold grades have been higher than anticipated in numerous holes in the 2023 Q4 program, indicative of improved analytical methods vs prior explorers. Gold results in hole SHN23005 were re-checked with screen fire assay to overcome potential coarse gold analytical issues. Additional ground in the Sherridon area has been staked by T2 Metals in response to the results from this drilling program (see Company press release dated 22/02/24).

較寬的區間內較高的金和銅品位凸顯了複雜摺疊的主巖中VHMS式礦化的潛力。在2023年第四季度計劃中,許多鑽孔的黃金品位都高於預期,這表明與之前的勘探者相比,分析方法有所改進。通過屏幕火焰分析重新檢查了 SHN23005 孔中的金礦結果,以克服潛在的粗金分析問題。爲了回應該鑽探計劃的結果,T2 Metals已在謝里登地區增建了地塊(見公司24年2月22日的新聞稿)。

The most significant drill intersections of copper ("Cu"), zinc ("Zn"), gold ("Au"), and silver ("Ag") are provided below and in Table 2.

下文和表 2 中提供了銅(“Cu”)、鋅(“Zn”)、金(“Au”)和銀(“Ag”)最重要的鑽孔交叉點。

Drilling Highlights Include:

鑽探亮點包括:

Lost Lake

失落之湖

SHN23005
23.50 m grading 1.18% Cu, 1.46% Zn, 6.8 g/t Au and 40.4 g/t Ag (7.4% CuEq) from 38.00 m;
including 4.50 m grading 0.38% Cu, 0.02% Zn, 29.2 g/t Au and 138.8 g/t Ag (25.0% CuEq) from 38.00 m;
including 8.67 m grading 2.48% Cu, 3.59% Zn, 2.5 g/t Au and 30.0 g/t Ag (5.8 % CuEq) from 50.05 m;

SHN23005
從 38.00 m 開始,23.50 m 品位爲 1.18% 銅、1.46% 鋅、6.8 g/t Au 和 40.4 g/t Ag(7.4% CueQ);
包括 從 38.00 m 開始,4.50 m 品位爲 0.38% 銅、0.02% 鋅、29.2 g/t 金和 138.8 g/t Ag(25.0% CueQ);
包括 從 50.05 m 開始,8.67 m 品位爲 2.48% 銅、3.59% 鋅、2.5 g/t 金和 30.0 g/t Ag(5.8% CueQ);

SHN23006
4.00 m grading 0.07% Cu, 0.42% Zn, 1.6 g/t Au and 17.6 g/t Ag (1.7% CuEq) from 154.00 m

SHN23006
從 154.00 m 開始,4.00 m 品位爲 0.07% 銅、0.42% 鋅、1.6 g/t 金和 17.6 g/t Ag(1.7% CueQ)

SHN23007
6.70 m grading 0.82% Cu, 2.62% Zn, 0.3 g/t Au and 7.7 g/t Ag (2.0% CuEq) from 84.82 m
including 2.54 m grading 1.48% Cu, 5.19% Zn, 0.7 g/t Au and 14.4 g/t Ag (3.8% CuEq) from 88.98 m;

SHN23007
6.70 m 品位爲 0.82% 銅、2.62% 鋅、0.3 g/t 金和 7.7 g/t Ag(2.0% CueQ),84.82 m
包括 2.54 m 品位爲 1.48% 銅、5.19% 鋅、0.7 g/t Au 和 14.4 g/t Ag(3.8% CueQ),88.98 m

Notes:

注意事項:

Copper equivalents calculated using metal prices as at the first Sherrion drill press release (25 Jan 2024) (Cu $/t = 8,174; Pb $/t = 2,032; Zn = 2,487 $/t; Au = 2,020 $/oz; Ag = 22.7 $/oz) and assume 100% recovery of all elements. The formula used to calculate CuEq. = Cu(%) + ((Zn(%) * Zn(USD/t)) + (Pb(%) * Pb(USD/t)) + (Ag(g/t) * (Ag(USD/oz)/31.1) * 100) + (Au(g/t) * (Au(USD/oz)/31.1) * 100)) / Cu(USD/t) The formula used to calculate ZnEq. = Zn(%) + ((Cu(%) * Cu(USD/t)) + (Pb(%) * Pb(USD/t)) + (Ag(g/t) * (Ag(USD/oz)/31.1) * 100) + (Au(g/t) * (Au(USD/oz)/31.1) * 100)) / Zn(USD/t)

銅當量使用第一次Sherrion鑽頭新聞稿(2024年1月25日)的金屬價格計算(銅美元/噸 = 8,174;鉛美元/噸 = 2,032;鋅 = 2,487 美元/噸;金 = 2,020 美元/盎司;銀 = 22.7 美元/盎司),並假設所有元素的回收率爲 100%。用於計算 CueQ 的公式。= Cu(%) + ((鋅(%) * 鋅(美元/噸)) + (鉛(%) * 鉛(美元/噸)) + (Ag(g/t) * (Ag(美元/盎司)/31.1) * 100) + (Au(g/t) * (Au(美元/盎司)/31.1) * 100))/銅(美元/噸) 用於計算 ZneQ 的公式。= Zn(%) + ((銅(%) * 銅(美元/噸)) + (鉛(%) * 鉛(美元/噸)) + (Ag(g/t) * (Ag(美元/盎司)/31.1) * 100) + (Au(g/t) * (Au(美元/盎司)/31.1) * 100))/鋅(美元/噸)

"Reported drill intercepts are downhole core lengths with true thickness estimated to be at least 90% of core downhole length."

“報告的鑽探截距是井下岩心長度,實際厚度估計至少爲井下岩心長度的90%。”

The 2023 Q4 drill program saw 12 holes drilled with 10 intersecting intervals of semi-massive or massive sulphide from the Lost Lake and Cold Lake prospect areas. The exceptional thickness of mineralization in hole SHN23005 may be associated with a range of factors, including late remobilization of Au, Ag and Pb into the hanging wall of the VHMS system (analogous to the Chisel Lake Basin VHMS deposits found 70 km to the southeast) following intense regional deformation and metamorphism that effectively thickened the host horizon, and present a new targeting opportunity.

在 2023 年第四季度的鑽探計劃中,從 Lost Lake 和 Cold Lake 勘探區鑽了 12 個孔,中間有 10 個相交間隔的半塊狀或塊狀硫化物。SHN23005 孔中異常的礦化厚度可能與一系列因素有關,包括在強烈的區域變形和變質作用有效加厚了宿主視野之後,金、銀和鉛的晚期再活化到 VHMS 系統的懸壁中(類似於在東南 70 公里處發現的奇塞爾湖盆地 VHMS 礦牀)。

Mark Saxon, CEO of T2 Metals Corp., said, "This set of high gold drill results from the southeast end of the Lost Lake prospect represent a key moment for the Sherridon project. Gold-rich and gold-dominant VHMS deposits are well known from the Flin Flon - Snow Lake Greenstone Belt and form very attractive targets. The grade and thickness of SHN23005 demonstrates the quality of mineralization that can exist at Sherridon, presenting new targets throughout the project area.

T2 Metals Corp. 首席執行官馬克·薩克森說,”這組來自Lost Lake勘探區東南端的高金鑽探結果代表了Sherridon項目的關鍵時刻。富含黃金且以黃金爲主的VHMS礦牀在弗林弗隆-雪湖綠巖帶廣爲人知,它們形成了非常有吸引力的目標。SHN23005 的等級和厚度表明了 Sherridon 可能存在的礦化質量,爲整個項目區域提出了新的目標。

The Sherridon project is a relatively underexplored part of the Flin Flon - Snow Lake Greenstone Belt, particularly with respect to deep drilling and targets similar to that drilled in SHN23005 lay completely untouched. We are very encouraged by the success of our exploration programs to date, along with the support of the Kiciwapa Cree and the Manitoba Mineral Development Fund (MMDF)."

Sherridon 項目是 Flin Flon-Snow Lake Greenstone Belt 中相對未被充分開發的一部分,尤其是在深層鑽探方面,與 SHN23005 鑽探的目標相似的目標完全沒有受到影響。迄今爲止,我們的勘探計劃取得了成功,以及Kiciwapa Cree和曼尼托巴省礦產開發基金(MMDF)的支持,令我們深受鼓舞。”


Figure 1. Mineralization textures from drillhole SHN23005 (37.29m to 53.71m depth), Sherridon drill program, 2023.


圖 1。來自 SHN23005 鑽孔(深度爲 37.29 米至 53.71 米)的礦化紋理,Sherridon 鑽探計劃,2023 年。

Twelve holes for a total of 1,500 metres were completed by T2 Metals during Q4 2023, testing a total strike length of 1,420 metres within, between and southeast of the Cold Lake and Lost Lake Deposits. These two deposits occur along a VHMS horizon that is both parallel to and normally less than 850 metres perpendicular to the VHMS horizon that hosts Sherritt Gordon's historic Sherridon East and Sherridon West Mines, where 7.74 million tonnes were mined at an average grade of 2.46% Cu, 2.84% Zn, 0.6 g/t Au and 33 g/t Ag (Goetz & Froese, 1981) between 1931 and 1951.

2023年第四季度,T2 Metals完成了十二個總長度爲1,500米的洞,測試了冷湖和失落湖礦牀內、之間和東南部的總衝擊長度爲1,420米。這兩個礦牀位於VHMS地平線上,該地平行於VHMS地平行,通常垂直度小於850米,而VHMS地平線是雪裏特·戈登歷史悠久的東謝里登和西部謝里登礦山的所在地, 開採了 774 萬噸,平均品位爲 2.46% 銅、2.84% 鋅、0.6 g/t Au 和 33 g/t Ag (Goetz & Froese,1981 年)在 1931 年至 1951 年之間。

The Lost Lake and Cold Lake zones comprise a continuously mineralized horizon over a known strike length of approximately 1.8 km. The current T2 Metals drilling campaign further delineates shallow-dipping and plunging massive sulphide lenses and extends the historical drilling results by the previous explorers. It is also important to note that the while the Sherridon area is spatially and genetically associated with the prolific Paleoproterozoic Flin Flon - Snow Lake Greenstone Belt ("FFSLGB"), it has been under-explored despite the abundance of highly prospective felsic volcanic rocks, which host almost all of the historic VHMS resources in the FFSLGB, and despite the widespread precious and base metal endowment.

失落湖和冷湖區構成了持續的礦化地平線,已知走向長度約爲 1.8 千米。當前的T2 Metals鑽探活動進一步描繪了淺浸和墜落的塊狀硫化物透鏡,並延續了先前勘探者的歷史鑽探結果。還需要注意的是,儘管謝里登地區在空間和基因上與多產的古元古代弗林弗隆-雪湖綠巖帶(“FFSLGB”)有關,但儘管擁有大量極具前景的長英質火山岩,這些火山岩擁有FFSLGB中幾乎所有的歷史VHMS資源,而且儘管有廣泛的貴金屬和賤金屬資源,但該地區仍未得到充分開發。

The company is incorporating 2023 results including assays, lithogeochemistry and core logging into its 3-D geological model to complete interpretation/analysis. Many geophysical follow-up opportunities and key VHMS-associated structural controls exist at Sherridon which provide additional high-value targets for planned 2024 drill programs. Cold Lake, Lost Lake and other historic resource areas are being considered for drill testing in 2024. Cross sections will be provided during Q1 2024 when all drill data is received and reported.

該公司正在將2023年包括化驗、岩石地球化學和岩心記錄在內的結果納入其三維地質模型,以完成解釋/分析。Sherridon 存在許多地球物理後續機會和與 VHMS 相關的關鍵結構控制措施,這爲計劃的 2024 年鑽探計劃提供了額外的高價值目標。正在考慮在2024年對冷湖、失落湖和其他歷史資源區進行鑽探測試。截面圖將在 2024 年第一季度提供,屆時將收到並報告所有鑽探數據。


Figure 2: Cold and Lost Prospects, Sherridon, with Drill Hole Locations


圖 2:寒冷和迷失的前景,Sherridon,以及鑽孔位置

VHMS Type Deposits

VHMS 類型存款

VHMS deposits are attractive high-value exploration targets that sustain much of the world's supply of zinc, copper and silver and, in addition, are a major source of critical "high tech" metals germanium and indium. They typically occur in districts or "camps" comprised of numerous deposits of various sizes. They can be very high grade and are regularly gold enriched, with large very long-life deposits being "company-makers" (eg the founding of Rio Tinto). Longer-life mining operations tend to show total production exceeding the original pre-mining size by more than three times.

VHMS 礦牀是有吸引力的高價值勘探目標,可維持全球大部分鋅、銅和銀的供應,此外,還是關鍵 “高科技” 金屬鍺和銦的主要來源。它們通常發生在由大量不同規模的礦牀組成的地區或 “營地” 中。它們的品位可能很高,並且經常富含黃金,大量的長期礦牀是 “公司製造者”(例如力拓的成立)。壽命較長的採礦作業往往顯示總產量比最初的開採前規模高出三倍以上。

VHMS deposits can be discovered with conventional geophysical methods. Most deposits have simple sulphide mineralogy that is amenable to processing and high recovery.

VHMS 礦牀可以通過傳統的地球物理方法發現。大多數礦牀具有簡單的硫化物礦物學,易於加工和高回收率。

Project Deposit Size* Location Owner Market Cap
(CA$)
McIlvenna Bay 39 Mt at 2.04% CuEq Saskatchewan, Canada Foran Mining Corp $1,190 m
Green Bay (Ming) 39.2 Mt at 2.07% CuEq Newfoundland, Canada FireFly Metals Ltd $155.8 m
Palmer+ 4.7 Mt at 3.92% CuEq Alaska, USA American Pacific Mining Corp $53.1 m
B26 7.0 Mt at 2.94% CuEq Quebec, Canada Abitibi Metals Corp $48.4 m
Great Burnt 1.5 Mt at 2.73% CuEq Newfoundland, Canada Benton Resources Inc $26.8 m
Pine Bay 3.4 Mt at 3.59% CuEq Manitoba, Canada Callinex Mines Inc $25.3 m
Pickett Mountain 6.3 Mt at 5.17% CuEq Maine, USA Wolfden Resources Corp $13.1 m
BMK 9.7 Mt at 2.2% CuEq Saskatchewan, Canada Murchison Minerals Ltd $9.1 m
項目 存款規模* 地點 所有者 市值
(加元)
麥克爾文納灣 39 萬噸,CueQ 爲 2.04% 加拿大薩斯喀徹溫省 福蘭礦業公司 1,190 億美元
綠灣(明代) 39.2 公噸,CueQ 爲 2.07% 加拿大紐芬蘭 螢火蟲金屬有限公司 155.8 億美元
Palmer+ 4.7 萬噸,CueQ 爲 3.92% 阿拉斯加,美國 美國太平洋礦業公司 5310 萬美元
B26 70 萬噸,CueQ 爲 2.94% 魁北克,加拿大 阿比蒂比金屬公司 48.4 億美元
大燒了 150 萬噸,CueQ 爲 2.73% 加拿大紐芬蘭 本頓資源公司 26.8 億美元
派恩灣 3.4 公噸,當量 3.59% 加拿大曼尼託巴 Callinex 礦業公司 25.3 億美元
皮克特山 630 萬噸,CueQ 爲 5.17% 美國緬因州 沃爾夫登資源公司 13.1 億美元
BMK 97 萬噸,CueQ 爲 2.2% 加拿大薩斯喀徹溫省 默奇森礦業有限公司 910 萬美元

Table 1: Notable North American VHMS Deposits with Active Exploration. *Values are derived from deposit owner company material and have not been verified by T2 Metals.

表 1:正在積極勘探的北美 VHMS 礦牀。*價值來自存款所有者的公司材料,未經T2 Metals驗證。

Sampling Procedures and Quality Assurance (QA) / Quality Control (QC)

抽樣程序和質量保證 (QA) /質量控制 (QC)

The Company's QA/QC drill core sample protocol consists of collection of samples over a minimum 0.3 m interval to a maximum 1.4 m interval (depending on the lithology and style of mineralization) over the mineralized portions of the drillhole. The drill core sample is cut in half with a diamond saw, with half of the core placed in individual sealed polyurethane bags and the remaining half securely retained in the original core box for permanent storage. Drill core samples are shipped by transport truck in sealed woven plastic bags to Bureau Veritas Minerals Analytical Lab preparation facility in Timmins, ON for sample preparation. Sample analysis was carried out at Bureau Veritas Minerals laboratory in Vancouver, BC.

該公司的質量保證/質量控制鑽芯樣本協議包括在鑽孔的礦化部分收集樣品,間隔最短 0.3 米,最長間隔 1.4 米(取決於巖性和礦化類型)。用金剛石鋸將鑽芯樣品切成兩半,一半的岩心放在單獨的密封聚氨酯袋中,其餘一半牢固地保存在原來的岩心盒中以永久存放。鑽芯樣品用運輸卡車裝在密封的編織塑料袋中運送到位於安大略省蒂明斯的必維礦產分析實驗室製備設施進行樣品製備。樣本分析是在不列顛哥倫比亞省溫哥華的必維礦業實驗室進行的。

Gold was determined by Bureau Veritas method FA430, a lead fire-assay fusion of a 30 g pulverized sample with an atomic absorption spectroscopy (AAS) finish. Select samples were re-assayed using method FS652 1kg. This method involves the metallic sieving (150 mesh), of 1 kg of pulverized sample where both the plus fraction and the minus fractions are retained. The >150 mesh size was assayed in its entirety, and the <150 mesh fraction was assayed in duplicate. Fire assay weight for all three analyses was 50 g. Analysis was conducted using FA430 and for values over 10 g/t, a gravimetric method (FA550) was used. Various metals including silver, gold, copper, lead and zinc were determined by inductively-coupled plasma atomic emission spectroscopy (ICP-AES) or inductively-coupled plasma mass spectroscopy (ICP-MS), following multi-acid digestion (Bureau Veritas method MA270). This method is considered an assay method with a precision of 5% for elements including copper, lead, zinc and silver. Select samples were analysed for gallium (Ga) and germanium (Ge) and concentrations were determined using a hydrofluoric and aqua regia digest, followed by an ICP-MS finish.

黃金是通過必維國際檢驗集團的 FA430 方法測定的,該方法是對一個 30 g 的粉碎樣品進行鉛火分析融合,表面經過原子吸收光譜 (AAS) 處理。使用 FS652 1kg 方法對選定的樣本進行了重新分析。該方法涉及對1 kg的粉碎樣品進行金屬篩分(150目),其中保留正分數和負分數。對>150的網格大小進行了全面檢測,並對

HOLE_ID FROM TO Interval Cu Zn Pb Au Ag CuEq ZnEq
(m) (m) (m) % % % g/t g/t % %
SHN23001 75.97 85.98 10.01 0.92 4.70 0.02 0.37 10.82 2.74 9.01
Including 75.97 80.79 4.82 1.45 6.88 0.02 0.65 16.96 4.21 13.84
Including 75.97 77.76 1.79 2.15 12.29 0.01 0.81 24.37 6.75 22.20
SHN23002 104.94 109.45 4.51 0.92 1.90 0.02 0.40 11.81 1.92 6.32
SHN23003 44.95 48.66 3.71 1.77 5.16 0.01 0.68 20.56 4.06 13.36
SHN23004 87.03 95.00 7.97 2.17 4.78 0.05 1.83 34.42 5.40 17.74
Including 87.03 90.83 3.80 4.23 9.77 0.03 2.30 54.00 9.52 31.30
SHN23005 38.00 61.50 23.50 1.18 1.46 0.19 6.79 40.39 7.4 24.4
Including 38.00 42.50 4.5 0.38 0.02 0.88 29.17 138.83 25.0 N.A.
Including 50.05 58.72 8.67 2.48 3.59 0.02 2.50 30.03 5.8 19.2
SHN23006 154.00 158.00 4.00 0.07 0.42 0.17 1.58 17.63 1.7 5.4
SHN23007 84.82 91.52 6.7 0.82 2.62 0.02 0.34 7.70 2.0 6.4
Including 88.98 91.52 2.54 1.48 5.19 0.03 0.72 14.39 3.8 12.4
SHN23008 49.38 63.78 14.40 0.88 2.58 0.02 0.51 9.85 2.16 7.11
Including 49.38 52.13 2.75 3.34 6.00 0.01 1.92 33.23 6.99 22.95
SHN23009 34.91 40.65 5.74 1.42 1.18 0.03 0.85 18.85 2.63 8.65
SHN23010 105.00 110.52 5.52 1.77 1.47 0.09 2.30 37.22 4.41 14.50
SHN23011 39.00 53.50 14.50 0.92 2.82 0.04 0.78 13.76 2.52 11.50
Including 44.22 53.50 9.28 0.85 4.01 0.07 1.08 17.57 3.09 10.20
SHN23012 Hole terminated before target.
HOLE_ID 來自 間隔 Pb Au Ag cueQ zneQ
(m) (m) (m) % % % g/t g/t % %
SHN23001 75.97 85.98 10.01 0.92 4.70 0.02 0.37 10.82 2.74 9.01
包括 75.97 80.79 4.82 1.45 6.88 0.02 0.65 16.96 4.21 13.84
包括 75.97 77.76 1.79 2.15 12.29 0.01 0.81 24.37 6.75 22.20
SHN23002 104.94 109.45 4.51 0.92 1.90 0.02 0.40 11.81 1.92 6.32
SHN23003 44.95 48.66 3.71 1.77 5.16 0.01 0.68 20.56 4.06 13.36
SHN23004 87.03 95.00 7.97 2.17 4.78 0.05 1.83 34.42 5.40 17.74
包括 87.03 90.83 3.80 4.23 9.77 0.03 2.30 54.00 9.52 31.30
SHN23005 38.00 61.50 23.50 1.18 1.46 0.19 6.79 40.39 7.4 24.4
包括 38.00 42.50 4.5 0.38 0.02 0.88 29.17 138.83 25.0 N.A。
包括 50.05 58.72 8.67 2.48 3.59 0.02 2.50 30.03 5.8 19.2
SHN23006 154.00 158.00 4.00 0.07 0.42 0.17 1.58 17.63 1.7 5.4
SHN23007 84.82 91.52 6.7 0.82 2.62 0.02 0.34 7.70 2.0 6.4
包括 88.98 91.52 2.54 1.48 5.19 0.03 0.72 14.39 3.8 12.4
SHN23008 49.38 63.78 14.40 0.88 2.58 0.02 0.51 9.85 2.16 7.11
包括 49.38 52.13 2.75 3.34 6.00 0.01 1.92 33.23 6.99 22.95
SHN23009 34.91 40.65 5.74 1.42 1.18 0.03 0.85 18.85 2.63 8.65
SHN23010 105.00 110.52 5.52 1.77 1.47 0.09 2.30 37.22 4.41 14.50
SHN23011 39.00 53.50 14.50 0.92 2.82 0.04 0.78 13.76 2.52 11.50
包括 44.22 53.50 9.28 0.85 4.01 0.07 1.08 17.57 3.09 10.20
SHN23012 洞在目標之前終止。

Table 2: Assay Results 2023 Q4 Drilling, Cold and Lost Prospects, Sherridon

表 2:2023 年第四季度鑽探、寒冷和失落前景的化驗結果,Sherridon

HOLE_ID EAST NORTH RL DEPTH INCLINATION AZIMUTH
SHN23001 367008 6111502 328 134.0 -45 220
SHN23002 367060 6111471 312 125.0 -55 220
SHN23003 367093 6111332 328 86.0 -52 220
SHN23004 367114 6111350 328 125.0 -50 220
SHN23005 367298 6111117 320 164.0 -45 220
SHN23006 367378 6111198 321 179.0 -45 220
SHN23007 367287 6111193 320 125.0 -45 220
SHN23008 366969 6111496 320 134.0 -60 220
SHN23009 366374 6112179 325 104.0 -45 220
SHN23010 366421 6112228 325 131.0 -55 220
SHN23011 367255 6111149 333 77.0 -45 220
SHN23012 367317 6111224 330 116.0 -52 220
HOLE_ID 向東 北方 RL 深度 傾向 方位角
SHN23001 367008 6111502 328 134.0 -45 220
SHN23002 367060 6111471 312 125.0 -55 220
SHN23003 367093 6111332 328 86.0 -52 220
SHN23004 367114 6111350 328 125.0 -50 220
SHN23005 367298 6111117 320 164.0 -45 220
SHN23006 367378 6111198 321 179.0 -45 220
SHN23007 367287 6111193 320 125.0 -45 220
SHN23008 366969 6111496 320 134.0 -60 220
SHN23009 366374 6112179 325 104.0 -45 220
SHN23010 366421 6112228 325 131.0 -55 220
SHN23011 367255 6111149 333 77.0 -45 220
SHN23012 367317 6111224 330 116.0 -52 220

Table 3: T2 Metals Drill Coordinates, 2023 Q4 (Coordinates given in UTM Zone 14N, NAD83).

表 3:2023 年第 4 季度 T2 金屬鑽孔座標(座標在 UTM 區域 14N,NAD83 中給出)。

SHERRIDON PROJECT - INDICATED RESOURCES (2010)
Mining Method Million
Tonnes
Cu (%) Zn (%) Au (g/t) Ag (g/t) Copper
(M lbs)
Zinc
(M lbs)
Gold
(oz)
Silver
(oz)
Open Pit 5.32 0.8 1.23 0.34 7.2
Underground 1.24 1.04 1.18 0.48 8.2
Total Indicated 6.55 0.85 1.22 0.37 7.4 122.1 M lb 176.3 M lb 77,192 oz 1.56 M oz
SHERRIDON PROJECT - INFERRED RESOURCES (2010)
Open Pit 12.24 0.62 0.77 0.26 5.3
Underground 3.62 0.91 1.08 0.32 7.4
Total Inferred 15.86 0.69 0.84 0.28 5.8 239.9 M lb 294.0 M lb 141,245 oz 2.94 M oz
SHERRIDON 項目-指定資源 (2010)
挖礦方法 百萬
銅 (%) 鋅 (%) 金 (g/t) 銀 (g/t)
(M 磅)

(M 磅)
黃金
(盎司)

(盎司)
露天礦坑 5.32 0.8 1.23 0.34 7.2
地下 1.24 1.04 1.18 0.48 8.2
顯示的總數 6.55 0.85 1.22 0.37 7.4 122.1 M 磅 176.3 萬磅 77,192 盎司 1.56 萬盎司
SHERRIDON 項目-推斷資源 (2010)
露天礦坑 12.24 0.62 0.77 0.26 5.3
地下 3.62 0.91 1.08 0.32 7.4
推斷總數 15.86 0.69 0.84 0.28 5.8 239.9 萬磅 294.0 萬磅 141,245 盎司 2.94 萬盎司

Indicated and Inferred resources for Bob, Lost, Cold, and Jungle deposits. Mineral Resource estimates are based upon Bloom, L., Healy, T., Giroux, G., Halo Resources Ltd. 2010, Sherridon VMS Property, Technical Report NI43-101 - November 22, 2010, which is available at .

Bob、Lost、Cold 和 Jungle 礦牀的指示和推斷資源。礦產資源估算基於 Bloom、L.、Healy、T.、Giroux、G.、Halo Resources Ltd. 2010 年、Sherridon VMS Property,NI43-101 ——2010 年 11 月 22 日技術報告,該報告可在以下網址查閱

Mineral Resources were estimated at a net smelter return (NSR) cut-off of US$20 per tonne and US$45 per tonne for open pit and underground respectively. Metal prices used were US$3.00/lb copper, US$1.05/lb zinc, US$1,000/oz gold and US$15.00/oz silver. Metallurgical recovery factors assumed were 92% for copper, 83% for zinc, 65% for gold and 57% for silver.

據估計,礦產資源的淨冶煉廠回報率(NSR)截止值分別爲每噸20美元和每噸45美元,露天和地下礦產資源淨回報率(NSR)分別爲每噸45美元。使用的金屬價格爲每磅銅3.00美元、鋅1.05美元/磅、黃金每盎司1,000美元和每盎司白銀15.00美元。假設銅的冶金回收係數爲92%,鋅爲83%,金爲65%,銀爲57%。

The Mineral Resource estimates were prepared under the direction of, and dated and signed by, a Qualified Person as defined in accordance with NI 43-101 and CIM Definition Standards. The data, information, estimates, conclusions and recommendations were consistent with the information available at the time of preparation. The terms "mineral resource", "measured mineral resource", "indicated mineral resource" and "inferred mineral resource" are defined in NI 43-101 and recognized by Canadian securities laws. Investors are cautioned not to assume that any part or all of mineral deposits in these categories will ever be upgraded to mineral reserves. T2 Metals has received the exploration and drilling data, but has not independently confirmed the Mineral Resource estimates. Halo has indicated that no Mineral Resource estimates were completed subsequent to those provided in Table 1.

礦產資源估算值是在根據NI 43-101和CIM定義標準定義的合格人員的指導下編制的,並由其註明日期和簽署。數據、信息、估計、結論和建議與編寫時獲得的資料相一致。NI 43-101對 “礦產資源”、“實測礦產資源”、“指示礦產資源” 和 “推斷礦產資源” 等術語進行了定義,並得到加拿大證券法的認可。提醒投資者不要假設這些類別的礦牀的任何部分或全部會升級爲礦產儲量。T2 Metals已收到勘探和鑽探數據,但尚未獨立證實礦產資源估計。Halo表示,在表1中提供的估算之後,沒有完成任何礦產資源估算。

Table 4: Sherridon Historical Resource Estimate, 2010

表 4:2010 年謝里登歷史資源估計

The qualified person for the Company's projects, Mr. Mark Saxon, the Company's Chief Executive Officer, a Fellow of the Australasian Institute of Mining and Metallurgy and a Member of the Australian Institute of Geoscientists, has reviewed and approved the contents of this release.

公司項目的合格人士,公司首席執行官、澳大利亞礦業和冶金學會會員、澳大利亞地球科學家協會成員馬克·薩克森先生已經審查並批准了本新聞稿的內容。

About T2 Metals Corp (TSXV: TWO) (OTCQB: AGLAF) (WKN: A2DR6E)

關於 T2 Metals Corp(多倫多證券交易所:TSXV:TWO)(OTCQB:AGLAF)(WKN:A2DR6E)

T2 Metals Corp is an emerging copper and precious metal company enhancing shareholder value through exploration and discovery. The Company continues to target under-explored areas, including the Sherridon, Lida, Cora and Copper Eagle projects where post-mineralization cover masks areas of high geological prospectivity in the vicinity of major mines.

T2 Metals Corp是一家新興的銅和貴金屬公司,通過勘探和發現提高股東價值。該公司繼續瞄準未開發區域,包括Sherridon、Lida、Cora和Copper Eagle項目,在這些項目中,礦化後的覆蓋掩蓋了主要礦山附近具有高地質前景的區域。

ON BEHALF OF THE BOARD,

代表董事會,

"Mark Saxon"
Mark Saxon
President & CEO

“馬克·薩克森”
馬克·薩克森
總裁兼首席執行官

For further information, please contact:

欲了解更多信息,請聯繫:

t2metals.com

t2metals.com

1305 - 1090 West Georgia St., Vancouver, BC, V6E 3V7
info@t2metals.com

1305-1090 西喬治亞街 1090 號,不列顛哥倫比亞省溫哥華,V6E 3V7
info@t2metals.com

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

多倫多證券交易所風險投資交易所及其監管服務提供商(該術語在多倫多證券交易所風險投資交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

Cautionary Note Regarding Forward-Looking Statements

關於前瞻性陳述的警示說明

Certain information set out in this news release constitutes forward-looking information. Forward looking statements are often, but not always, identified by the use of words such as "seek", "anticipate", "plan", "continue", "estimate", "expect", "may", "will", "intend", "could", "might", "should", "believe" and similar expressions. Forward-looking statements are based upon the opinions and expectations of management of the Company as at the effective date of such statements and, in certain cases, information provided or disseminated by third parties. Although the Company believes that the expectations reflected in forward-looking statements are based upon reasonable assumptions, and that information obtained from third party sources is reliable, they can give no assurance that those expectations will prove to have been correct. Readers are cautioned not to place undue reliance on forward-looking statements.

本新聞稿中列出的某些信息構成前瞻性信息。前瞻性陳述通常通過使用 “尋找”、“預期”、“計劃”、“繼續”、“估計”、“期望”、“可能”、“會”、“打算”、“可以”、“可能”、“應該”、“相信” 等詞語來識別。前瞻性陳述基於截至此類陳述生效之日公司管理層的意見和期望,在某些情況下,還基於第三方提供或傳播的信息。儘管公司認爲前瞻性陳述中反映的預期是基於合理的假設,並且從第三方來源獲得的信息是可靠的,但他們無法保證這些預期會被證明是正確的。提醒讀者不要過分依賴前瞻性陳述。

These forward-looking statements are subject to a number of risks and uncertainties. Actual results may differ materially from results contemplated by the forward-looking statements. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. Such risks include uncertainties relating to exploration activities. When relying on forward-looking statements to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and should not place undue reliance on such forward-looking statements. The Company does not undertake to update any forward-looking statements, except as may be required by applicable securities laws.

這些前瞻性陳述受許多風險和不確定性的影響。實際業績可能與前瞻性陳述所設想的結果存在重大差異。因此,實際事件可能與前瞻性陳述中的預測有重大差異。此類風險包括與勘探活動有關的不確定性。在依靠前瞻性陳述做出決策時,投資者和其他人應仔細考慮上述因素和其他不確定性,不應過分依賴此類前瞻性陳述。除非適用的證券法有要求,否則公司不承諾更新任何前瞻性陳述。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論