share_log

Torex Gold Reports Additional Impressive Drilling Results From ELG Underground

Torex Gold Reports Additional Impressive Drilling Results From ELG Underground

Torex Gold報告了ELG地下鑽探的其他令人印象深刻的結果
newsfile ·  02/26 20:00

2023 program builds on past success to prove the long-term reserve and resource potential at ELG

2023 年計劃以過去的成功爲基礎,旨在證明 ELG 的長期儲備和資源潛力

Toronto, Ontario--(Newsfile Corp. - February 26, 2024) - Torex Gold Resources Inc. (the "Company" or "Torex") (TSX: TXG) is pleased to provide an update on the Company's ongoing drilling program at ELG Underground, the results of which continue to support the Company's strategy to extend and optimize the mine life of ELG Underground and fill the mill beyond 2027.

安大略省多倫多--(Newsfile Corp.,2024年2月26日)——Torex Gold Resources Inc.(“公司” 或 “Torex”)(多倫多證券交易所股票代碼:TXG)很高興提供該公司正在進行的ELG地下鑽探計劃的最新情況,該項目的結果繼續支持該公司延長和優化ELG地下礦山壽命並在2027年之後填充該工廠的戰略。

Jody Kuzenko, President & CEO of Torex, stated:

Torex總裁兼首席執行官喬迪·庫贊科表示:

"The investment in our 2023 drilling program at ELG Underground continued to build on the positive results achieved year on year to grow the overall mineral endowment at ELG and unlock the significant cash generation potential of the Morelos asset. Drilling was successful in identifying a new zone of mineralization where the La Flaca fault intersects the El Limón Sur Trend near existing underground infrastructure. Highly positive drill results, including an outstanding intercept of 11.75 grams per tonne gold equivalent ("gpt AuEq") over nearly 23 metres ("m"), further support the potential to bring mineralization in this area into a mineral resource estimate when the Company releases its year-end 2023 mineral reserve and resource update in March.

“對我們在ELG Underground的2023年鑽探計劃的投資繼續建立在同比取得的積極成果的基礎上,以增加ELG的整體礦產儲備,並釋放莫雷洛斯資產的巨大現金創造潛力。鑽探成功地確定了一個新的礦化區域,其中拉弗拉卡斷層與現有地下基礎設施附近的 El Limo'n Sur Trend 相交。非常積極的鑽探結果,包括在近23米(“m”)上每噸黃金當量11.75克(“gpt auEq”)的出色截距,進一步支持了該公司在3月發佈2023年年底礦產儲量和資源更新時將該地區礦化納入礦產資源估算值的可能性。

"Additionally, drilling carried out in the latter portion of 2023 extended higher-grade mineralization along the southern portion of the El Limón Sur Trend (29.88 gpt AuEq over 9.6 m) and further bolstered the mineralized potential at the 400 m level (5.53 gpt AuEq over 3.7 m), which is the deepest level drilled to date within this Trend. At the El Limón West Trend, drilling continues to support the potential for a new mining front, with mineralization open along strike and at depth, while drilling along the Sub-Sill and El Limón Deep Trends also extended mineralization outside of existing resources.

“此外,2023年下半年進行的鑽探擴展了El Limo'n Sur Trend南部沿線的更高品位的礦化區域(29.88 gpt Aueq超過9.6米),並進一步增強了400米海拔(5.53 gpt Aueq超過3.7米)的礦化潛力,這是該趨勢中迄今爲止鑽探的最深水平。在 El Limon'n West Trend,鑽探繼續爲新採礦前沿線的潛力提供支持,沿走向和深度開採均呈開放式礦化區域,而沿着基坡和艾爾利蒙深度趨勢的鑽探也將礦化擴展到了現有資源之外。

"The 2023 drilling program has reinforced our confidence in the ability to continue to grow resources and extend the reserve life of ELG Underground, all with a goal of filling the mill with higher-grade feed and maintaining annual gold equivalent production of +450,000 ounces beyond 20271."

“2023年的鑽探計劃增強了我們對繼續增加資源和延長ELG Underground儲量壽命的能力的信心,所有目標是在2027年之後向磨機填充更高品位的飼料,並將年黃金當量產量維持在+45萬盎司的水平1。”

1) For additional information on Torex's five-year production outlook, please refer to the Company's press release dated January 16, 2024 titled "Torex Gold provides 2024 operational guidance and updated five-year production outlook"

1) 有關Torex五年產量展望的更多信息,請參閱該公司於2024年1月16日發佈的新聞稿,標題爲 “Torex Gold提供2024年運營指導和最新的五年產量展望”

HIGHLIGHTS

亮點

The final results of the 2023 exploration and drilling program at ELG Underground support potential reserve replacement and expansion of the mineralized footprint, indicating the potential to extend the life of ELG Underground beyond 2026. The Exploration Team has encountered untapped upside along the identified structural trends, many of which are in close proximity to existing underground infrastructure, which will allow investments made to date to be leveraged.

2023年ELG地下勘探和鑽探計劃的最終結果支持潛在的儲量更換和礦化足跡的擴大,這表明有可能將ELG地下項目的壽命延長到2026年以後。勘探團隊在已確定的結構趨勢中遇到了尚未開發的上行空間,其中許多結構趨勢都與現有的地下基礎設施非常接近,這將允許利用迄今爲止所做的投資。

El Limón Sur Trend

El Limon'n Sur Trend

  • Drill hole LS-295 returned 29.88 gpt AuEq over 9.6 m, confirming the continuity of high-grade mineralization along the southern extension of the El Limón Sur Trend. This mineralization was encountered 30 m north of the previously reported high-grade intercept in drill hole LS-293 (20.74 gpt AuEq over 4.6 m), indicating potential for a high-grade zone that is open along trend to the south.

  • Follow-up drilling to test the continuity of mineralization at the 400 m level encountered 5.53 gpt AuEq over 3.7 m in drill hole SST-318, more than 300 m south of the previously reported drill hole SST-299 (4.17 gpt AuEq over 3.7 m).

  • Drilling targeting mineralization at the junction of the El Limón Sur Trend and La Flaca fault returned outstanding results. The best intercept was from drill hole LDUG-239 at 11.75 gpt AuEq over 22.9 m, located in an expanding new zone of mineralization measuring 400 m high by 400 m wide that includes multiple intercepts above 5.0 gpt AuEq. These findings indicate the potential to increase both Indicated and Inferred resources at year-end 2023. When considered in conjunction with the other drilling results in this area, this mineralization may also be open at depth to at least the 400 m elevation level, which is the deepest the drilling has been conducted to date within the El Limón Sur Trend.

  • 鑽孔 LS-295 已返回 29.88 gpt auEQ 超過 9.6 m,證實了 El Limo'n Sur Trend 南部延伸部分沿線高品位礦化的連續性。這種礦化是在先前報告的 LS-293 鑽孔高品位截距以北 30 米處遇到的 (20.74 gpt auEQ 超過 4.6 m),這表明有可能出現一個沿着向南的趨勢開放的高等級區域。

  • 後續鑽探以測試所遇到的 400 米高度礦化的連續性 5.53 gpt auEQ 超過 3.7 m 在 SST-318 鑽孔中,位於先前報告的鑽孔 SST-299 以南 300 多米處 (4.17 gpt auEQ 超過 3.7 m)

  • 在 El Limo'n Sur Trend 和 La Flaca 斷層交界處以礦化爲目標的鑽探取得了優異的成果。最好的攔截是從 LDUG-239 的鑽孔處進行的 11.75 gpt auEQ 超過 22.9 m,位於一個不斷擴大的新的礦化區,高400米,寬400米,其中包括超過5.0 gpt auEQ的多個截距。這些發現表明,到2023年底,指示和推斷資源都有可能增加。如果結合該地區的其他鑽探結果,這種礦化區域的開放深度也可能至少達到 400 米的海拔,這是迄今爲止在 El Limon'n Sur Trend 內進行的最深鑽探。

El Limón Deep Trend

El Limon'n 深度趨勢

  • Infill drilling along the El Limón Deep Trend continued to return high-grade intercepts, including 26.93 gpt AuEq over 3.6 m, 14.75 gpt AuEq over 37.1 m and 7.87 gpt AuEq over 6.4 m in drill hole LDUG-299, and 9.26 gpt AuEq over 3.4 m and 5.26 gpt AuEq over 6.8 m in drill hole LDUG-303. Drill hole LDUG-311 (10.21 gpt AuEq over 20.6 m and 6.21 gpt AuEq over 6.8 m) extended mineralization to the south and confirmed mineralization in this region plunges to the southwest.
  • 沿着El Limon'n Deep Trend的填充鑽探繼續返回高品位的截獲物,包括 26.93 gpt auEQ 超過 3.6 m14.75 gpt auEQ 超過 37.1 m7.87 gpt auEQ 超過 6.4 m 在 LDUG-299 鑽孔中,以及 9.26 gpt auEQ 超過 3.4 m5.26 gpt auEQ 超過 6.8 m 在 LDUG-303 的鑽孔中。鑽孔 LDUG-311 (10.21 gpt auEQ 超過 20.6 m6.21 gpt auEQ(超過 6.8 m) 礦化向南延伸,該地區經證實的礦化向西南暴跌。

Sub-Sill Trend

底層趨勢

  • Drilling confirmed the continuity of mineralization along the Sub-Sill Trend north of the La Flaca fault and encountered high-grade mineralization, including drill hole LDUG-238 which returned 9.65 gpt AuEq over 12.3 m. Importantly, these intercepts are located in close proximity to existing underground infrastructure.
  • 鑽探證實了拉弗拉卡斷層以北的 Sub-Sill Trend 沿線礦化的連續性,並遇到了高品位的礦化,包括返回的 LDUG-238 鑽孔 9.65 gpt auEQ 超過 12.3 m。重要的是,這些攔截點位於現有的地下基礎設施附近。

El Limón West Trend

El Limo'n West Trend

  • Step-out drilling to the south along the El Limón West Trend encountered 13.73 gpt AuEq over 4.0 m and 11.92 gpt AuEq over 3.6 m in drill hole LS-290, expanding the mineralized footprint of the El Limón Sur pit to the south and reinforcing the high-grade potential at depth in this area.

  • Follow-up drilling conducted near drill hole LS-229 (6.90 gpt AuEq over 3.4 m, previously reported) confirmed the continuity of mineralization 100 m to the south at the 550 m level, with drill hole LS-231 returning an intercept of 3.01 gpt AuEq over 3.1 m. Further work will be conducted to assess the mineralization potential at this depth northwest along trend towards the Z71 fault.

  • 沿着 El Limon'n West Trend 向南鑽探時遇到了階梯鑽探 13.73 gpt auEQ 超過 4.0 m11.92 gpt auEQ 超過 3.6 m 在 LS-290 鑽孔中,將 El Limo'n Sur 礦坑的礦化足跡向南擴大,並增強了該區域深處的高品位潛力。

  • 在 LS-229 鑽孔附近進行了後續鑽探 (之前曾報告過 6.90 gpt auEQ 超過 340 萬英鎊) 證實了在 550 米處向南 100 米處的礦化連續性,LS-231 鑽孔返回的截距爲 3.01 gpt auEQ 超過 3.1 m。將開展進一步工作,評估沿着Z71斷層趨勢向西北偏北方向的這一深度的礦化潛力。

2023 ELG UNDERGROUND DRILLING PROGRAM

2023 年 ELG 地下鑽探計劃

In 2023, 60,699 m across 248 holes were drilled as part of the ELG brownfield and near-mine exploration and drilling programs, achieving the target set for the year. Assay results have been returned for all holes drilled and will be reported with the Company's year-end 2023 mineral reserve and resource update.

2023 年,作爲 ELG 棕地和近礦勘探和鑽探計劃的一部分,鑽探了 60,699 米,橫跨248個洞,實現了今年設定的目標。已返回所有鑽孔的化驗結果,並將與公司2023年年底的礦產儲量和資源更新一起報告。

Figure 1: Plan view of ELG Underground highlighting known mineralized zones and mineralization extensions

圖 1:ELG Underground 的平面圖,突出顯示了已知的礦化區和礦化延伸部分

A majority of this latest round of drilling was dedicated to delineating new resources within the most promising areas of the El Limón Sur Trend, where step-out drilling yielded high-grade results. Additionally, mineralization was extended both north and south along the Sub-Sill and El Limón West Trends.

最新一輪鑽探的大部分內容都致力於在 El Limo'n Sur Trend 最有前途的地區勘探新資源,這些區域的跨步鑽探取得了高品位的結果。此外,礦化作用沿着Sub-Sill和El Limon西部趨勢向北和向南延伸。

As a result of this success, the 2024 program will focus on further exploring the northeast-trending structural corridors, with a particular focus on their intersections with La Flaca fault where the highest grades and volumes of mineralization are concentrated. Initial drilling efforts will test the depth extensions of these mineralized zones before exploring lateral continuity along the corridors. Approximately $12 million has been allocated to infill and step-out drilling (total of 54,500 m) at ELG Underground in 2024. The overall objective of the program continues to be the replacement of reserves and expansion of resources, all with the aim of continuing to extend the life of ELG Underground.

由於這一成功,2024年的項目將側重於進一步探索朝東北方向的結構走廊,特別關注其與拉弗拉卡斷層的交叉點,那裏集中了最高品位和體積的礦化。最初的鑽探工作將測試這些礦化區的深度延伸,然後沿走廊探索橫向連續性。2024年,已撥款約1200萬美元在ELG地下進行填充和階梯鑽探(總計54,500米)。該計劃的總體目標仍然是更換儲量和擴大資源,所有目標都是繼續延長ELG Underground的使用壽命。

Detailed drill results are reported in Table 5 (El Limón Sur Trend), Table 6 (El Limón Deep Trend), Table 7 (Sub-Sill Trend), and Table 8 (El Limón West Trend).

詳細的鑽探結果見表 5(El Limo'n Sur 趨勢)、表 6(El Limon Deep Trend)、表 7(地下趨勢)和表 8(El Limon'n West Trend)。

Drill hole intercepts are core lengths and not true widths. AuEq grades use the same metal prices ($1,550/oz gold ("Au"), $20/oz silver ("Ag"), and $3.50/lb copper ("Cu")) and metallurgical recoveries (90% Au, 86% Ag, and 93% Cu) used in the year-end 2022 mineral resource estimate for ELG Underground (AuEq (gpt) = Au (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000).

鑽孔截距是岩心長度,而不是真實寬度。AuEq 等級使用的金屬價格(1,550 美元/盎司黃金(“金”)、20 美元/盎司的白銀(“銀”)和 3.50 美元/磅銅(“銅”))和冶金回收率(90% 金、86% 銀和 93% 銅)與 ELG Underground(aueQ (gpt) = Au (gpt) + Ag (gpt) * 0.0* 0.0* 0.0% 123 + 銅 (%) * 1.6000)。

EL LIMÓN SUR TREND (FIGURE 2)

EL LIMO'N SUR TREND(圖 2)

Drilling along the El Limón Sur Trend in 2023 focused on expanding resources, particularly where the Trend intersects La Flaca fault above the 600 m elevation level. Results have been successful, with many intercepts exceeding 5.0 gpt AuEq with widths ranging from 3.0 m to 23.0 m, indicating the potential to add ounces to year-end 2023 mineral resources.

2023 年沿着 El Limon'n Sur Trend 的鑽探重點是擴大資源,特別是在海拔高度超過 600 米的海拔高度與 La Flaca 斷層交叉的地方。結果取得了成功,許多截獲量超過5.0 gpt auEQ,寬度從3.0米到23.0米不等,這表明有可能增加2023年底的礦產資源盎司。

Of particular note, earlier results from the 2023 drilling program indicated the potential extension of this mineralized zone to a depth of 400 m. Newly reported drill hole SST-318 not only confirms the vertical continuity of mineralization, but also validates the extension of deeper mineralization within the El Limón Sur Trend south of the Z71 fault.

特別值得注意的是,2023 年鑽探計劃的先前結果表明,該礦化帶有可能延伸至 400 米的深度。新報告的 SST-318 鑽孔不僅證實了礦化的垂直連續性,還證實了深層礦化在 Z71 斷層以南的 El Limo'n Sur Trend 內的延伸。

Table 1: Recent highlights from the 2023 drilling program along the El Limón Sur Trend

表 1:沿着 El Limo'n Sur Trend 進行的 2023 年鑽探計劃的最新亮點

Drill Hole From
(m)
To
(m)
Core Length1
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
AuEq2
(gpt)
LS-295 262.31 271.88 9.57 27.95 44.3 0.86 29.88
SST-318 622.29 626.00 3.71 4.83 13.4 0.33 5.53
LDUG-239 177.16 200.07 22.91 10.94 12.0 0.41 11.75
LDUG-291 332.00 338.00 6.00 4.11 26.1 1.90 7.47

405.95 410.00 4.05 4.57 17.0 0.83 6.11
LDUG-295 201.00 204.69 3.69 5.38 6.7 0.24 5.84
LDUG-300 150.85 157.91 7.06 4.70 27.9 1.70 7.76
LDUG-304 179.18 182.60 3.42 4.34 44.3 1.76 7.71
LDUG-305 411.00 419.40 8.40 5.58 2.2 0.04 5.67
LS-266 45.00 48.40 3.40 8.54 12.0 0.22 9.03
LS-292 165.50 173.00 7.50 8.09 119.1 2.12 12.95
LS-305 47.00 55.50 8.50 12.31 1.7 0.01 12.35
SST-324 69.24 73.94 4.70 4.44 28.2 2.75 9.18
SST-332 183.00 189.98 6.98 4.83 38.1 1.70 8.02
鑽孔 來自
(m)

(m)
核心長度1
(m)
Au
(gpt)
Ag
(gpt)

(%)
auEQ2
(gpt)
LS-295 262.31 271.88 9.57 27.95 44.3 0.86 29.88
SST-318 622.29 626.00 3.71 4.83 13.4 0.33 5.53
LDUG-239 177.16 200.07 22.91 10.94 12.0 0.41 11.75
LDUG-291 332.00 338.00 6.00 4.11 26.1 1.90 7.47

405.95 410.00 4.05 4.57 17.0 0.83 6.11
LDUG-295 201.00 204.69 3.69 5.38 6.7 0.24 5.84
LDUG-300 150.85 157.91 7.06 4.70 27.9 1.70 7.76
LDUG-304 179.18 182.60 3.42 4.34 44.3 1.76 7.71
LDUG-305 411.00 419.40 8.40 5.58 2.2 0.04 5.67
LS-266 45.00 48.40 3.40 8.54 12.0 0.22 9.03
LS-292 165.50 173.00 7.50 8.09 119.1 2.12 12.95
LS-305 47.00 55.50 8.50 12.31 1.7 0.01 12.35
SST-324 69.24 73.94 4.70 4.44 28.2 2.75 9.18
SST-332 183.00 189.98 6.98 4.83 38.1 1.70 8.02


Notes to Table:
1) Intercepts are reported as core length (not true width/thickness). Core lengths reflect drilling core recovery.
2) The gold equivalent grade calculation used is as follows: AuEq (gpt) = Au (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000 and use the same metal prices ($1,550/oz Au, $20/oz Ag, and $3.50/lb Cu) and metallurgical recoveries (90% Au, 86% Ag, and 93% Cu) used in the mineral resource estimate for ELG Underground.


表格註釋:
1) 截距報告爲核心長度(不是真實的寬度/厚度)。岩心長度反映了鑽芯的回收率。
2) 使用的黃金當量等級計算方法如下:auEq (gpt) = 金 (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000,並使用相同的金屬價格(1,550 美元/盎司金、20 美元/盎司銀和 3.50 美元/磅銅)和冶金回收率(90% Au、86% Ag 和 93% Cu)來估算 ELG 的礦產資源地下。

Exploration at the southern known boundary of the El Limón Sur Trend also encountered high-grade mineralization, potentially expanding resources to the south and indicating that this mineralization may be plunging to the southeast. Drill hole LS-295, located 30 m north of the high-grade intercept previously encountered in drill hole LS-293, returned an intercept with AuEq grades close to one ounce per tonne over 9.6 m. This indicates the potential for a high-grade zone of mineralization along this Trend that is open to the south and at depth.

在 El Limo'n Sur Trend 南部已知邊界的勘探也遇到了高品位的礦化,這有可能將資源擴展到南方,並表明這種礦化可能正在向東南傾斜。LS-295 鑽孔位於先前在 LS-293 鑽孔中遇到的高品位截距以北 30 米處,在 9.6 米處返回了截距,AuEQ 品位接近每噸一盎司。這表明該趨勢沿線有可能出現向南和深度開放的高品位礦化帶。

Furthermore, ongoing drill results in this area consistently returned impressive levels of copper mineralization, indicating the potential to enhance future copper production if proven as mineral reserves and once upgrades to the processing plant are completed later this year as part of the Media Luna Project.

此外,該地區正在進行的鑽探結果始終保持了令人印象深刻的銅礦化水平,這表明如果被證實爲礦產儲量,並在今年晚些時候作爲Media Luna項目的一部分完成對加工廠的升級,則有可能提高未來的銅產量。

EL LIMÓN DEEP TREND (FIGURE 3)

EL LIMON 的深度趨勢(圖 3)

Infill drilling conducted along the northeast-trending structural corridor known as the El Limón Deep Trend returned several notable intercepts, indicating the potential to upgrade Inferred resources to the Indicated category with the year-end 2023 mineral resource update. A number of the latest drill holes, including LDUG-299 and LDUG-303, retuned multiple intercepts exceeding 5.0 gpt AuEq.

沿着名爲 El Limon'n Deep Trend 的東北向結構走廊進行的填充鑽探返回了幾個顯著的截距,這表明隨着2023年底礦產資源更新,推斷資源有可能升級到指示類別。包括 LDUG-299 和 LDUG-303 在內的許多最新鑽孔返回了超過 5.0 gpt auEQ 的多個截距。

Step-out drilling targeting resource categorization extended mineralization at depth by approximately 200 m. Mineralization remains open at depth and further work will be conducted in 2024 to test the full extension of this Trend.

針對資源分類的逐步鑽探將礦化深度延伸了大約 200 m。深度礦化區仍處於開放狀態,2024 年將進行進一步工作,以測試這一趨勢的全面延伸。

Drilling in this area also encountered high-grade mineralization such as drill hole LDUG-311, which returned 10.21 gpt AuEq over 20.6 m. This is comparable to the mineralized zone that follows the El Limón Sur Trend, a further indicator that the overall system is controlled by the intersection of north-south trending structural corridors with the northeast trending La Flaca fault.

在該地區的鑽探還遇到了高品位的礦化,例如 LDUG-311 鑽孔,該鑽孔在 20.6 米處返回 10.21 gpt Aueq。這與遵循 El Limon Sur Trend 的礦化帶相當,這進一步表明整個系統受南北趨勢結構走廊與東北向拉弗拉卡斷層交匯處的控制。

Table 2: Highlights from the 2023 resource delineation program along the El Limón Deep Trend

表 2:沿着 El Limon'n Deep Trend 開展的 2023 年資源劃定計劃的亮點

Drill Hole From
(m)
To
(m)
Core Length1
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
AuEq2
(gpt)
LDUG-278 104.00 108.00 4.00 4.48 12.3 0.30 5.11
LDUG-282 100.88 103.45 2.57 4.45 15.3 0.30 5.12
LDUG-285 105.50 111.00 5.50 6.84 3.1 0.08 7.00
LDUG-299 157.00 160.57 3.57 26.73 3.6 0.10 26.93

174.19 211.27 37.08 14.04 9.5 0.38 14.75

229.65 236.04 6.39 7.28 10.2 0.29 7.87
LDUG-303 165.64 169.00 3.36 7.79 21.3 0.75 9.26

192.77 199.55 6.78 4.92 4.6 0.18 5.26
LDUG-311 262.00 282.57 20.57 8.22 29.2 1.02 10.21

293.35 300.10 6.75 2.56 46.9 1.92 6.21
LS-303 270.20 276.00 5.80 5.93 16.7 0.16 6.40
鑽孔 來自
(m)

(m)
核心長度1
(m)
Au
(gpt)
Ag
(gpt)

(%)
auEQ2
(gpt)
LDUG-278 104.00 108.00 4.00 4.48 12.3 0.30 5.11
LDUG-282 100.88 103.45 2.57 4.45 15.3 0.30 5.12
LDUG-285 105.50 111.00 5.50 6.84 3.1 0.08 7.00
LDUG-299 157.00 160.57 3.57 26.73 3.6 0.10 26.93

174.19 211.27 37.08 14.04 9.5 0.38 14.75

229.65 236.04 6.39 7.28 10.2 0.29 7.87
LDUG-303 165.64 169.00 3.36 7.79 21.3 0.75 9.26

192.77 199.55 6.78 4.92 4.6 0.18 5.26
LDUG-311 262.00 282.57 20.57 8.22 29.2 1.02 10.21

293.35 300.10 6.75 2.56 46.9 1.92 6.21
LS-303 270.20 276.00 5.80 5.93 16.7 0.16 6.40


Notes to Table:
1) Intercepts are reported as core length (not true width/thickness). Core lengths reflect drilling core recovery.
2) The gold equivalent grade calculation used is as follows: AuEq (gpt) = Au (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000 and use the same metal prices ($1,550/oz Au, $20/oz Ag, and $3.50/lb Cu) and metallurgical recoveries (90% Au, 86% Ag, and 93% Cu) used in the mineral resource estimate for ELG Underground.


表格註釋:
1) 截距報告爲核心長度(不是真實的寬度/厚度)。岩心長度反映了鑽芯的回收率。
2) 使用的黃金當量等級計算方法如下:auEq (gpt) = 金 (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000,並使用相同的金屬價格(1,550 美元/盎司金、20 美元/盎司銀和 3.50 美元/磅銅)和冶金回收率(90% Au、86% Ag 和 93% Cu)來估算 ELG 的礦產資源地下。

SUB-SILL TREND (FIGURE 4)

底層趨勢(圖 4)

One of the most significant findings along the Sub-Sill Trend was the continuation of mineralization north of the La Flaca fault. Drilling in this area encountered high-grade mineralization, confirming the exploration potential to the north, further enhanced by their proximity to existing underground infrastructure.

Sub-Sill Trend 沿線最重要的發現之一是拉弗拉卡斷層以北的礦化仍在繼續。該地區的鑽探遇到了高品位的礦化作用,證實了北部的勘探潛力,而由於靠近現有的地下基礎設施,進一步增強了勘探潛力。

Additionally, between the La Flaca and Z71 faults, drilling in five holes confirmed the Inferred resources' block model, with grades in three holes ranging from 4.0 to 6.0 gpt AuEq and thicknesses not exceeding 6.0 meters. Two holes did not encounter mineralization, thus confirming the geometry of this mineralized zone.

此外,在拉弗拉卡斷層和Z71斷層之間,在五個孔中鑽探證實了推斷資源的區塊模型,三個孔的等級從4.0到6.0 gpt AuEQ不等,厚度不超過6.0米。兩個孔沒有遇到礦化,從而證實了這個礦化區的幾何形狀。

Finally, south of the Z71 fault, the exploratory hole SST-325 encountered mineralization along the southern extension of the Trend, indicating that the Trend remains open to the south.

最後,在 Z71 斷層以南,SST-325 勘探洞在 Trend 的南部延伸部分遇到了礦化,這表明 Trend 仍然向南開放。

Table 3: Highlights from the 2023 drilling program along the Sub-Sill Trend

表 3:2023 年鑽探計劃沿基層趨勢的亮點

Drill Hole From
(m)
To
(m)
Core Length1
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
AuEq2
(gpt)
LDUG-238 139.23 151.56 12.33 8.92 7.2 0.40 9.65
LDUG-264 165.30 171.40 6.10 4.64 5.3 0.51 5.52
LDUG-292 110.46 113.00 2.54 0.65 282.4 0.56 5.03
LDUG-294 55.29 58.41 3.12 5.07 8.4 0.20 5.49
SST-325 160.19 164.00 3.81 2.56 1.6 0.04 2.65
SST-340 220.80 225.46 4.66 2.13 36.9 2.05 5.86
鑽孔 來自
(m)

(m)
核心長度1
(m)
Au
(gpt)
Ag
(gpt)

(%)
auEQ2
(gpt)
LDUG-238 139.23 151.56 12.33 8.92 7.2 0.40 9.65
LDUG-264 165.30 171.40 6.10 4.64 5.3 0.51 5.52
LDUG-292 110.46 113.00 2.54 0.65 282.4 0.56 5.03
LDUG-294 55.29 58.41 3.12 5.07 8.4 0.20 5.49
SST-325 160.19 164.00 3.81 2.56 1.6 0.04 2.65
SST-340 220.80 225.46 4.66 2.13 36.9 2.05 5.86


Notes to Table:
1) Intercepts are reported as core length (not true width/thickness). Core lengths reflect drilling core recovery.
2) The gold equivalent grade calculation used is as follows: AuEq (gpt) = Au (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000 and use the same metal prices ($1,550/oz Au, $20/oz Ag, and $3.50/lb Cu) and metallurgical recoveries (90% Au, 86% Ag, and 93% Cu) used in the mineral resource estimate for ELG Underground.


表格註釋:
1) 截距報告爲核心長度(不是真實的寬度/厚度)。岩心長度反映了鑽芯的回收率。
2) 使用的黃金當量等級計算方法如下:auEq (gpt) = 金 (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000,並使用相同的金屬價格(1,550 美元/盎司金、20 美元/盎司銀和 3.50 美元/磅銅)和冶金回收率(90% Au、86% Ag 和 93% Cu)來估算 ELG 的礦產資源地下。

EL LIMÓN WEST TREND (FIGURE 5)

EL LIMON'N 西部趨勢(圖 5)

Follow-up drilling along the El Limón West Trend was successful in confirming the continuity of mineralization to the south, most notably in drill hole LS-290, which returned multiple high-grade intercepts. Additionally, follow-up drilling conducted via hole LS-231, located 100 meters to the south of the previously reported intercept from LS-229, confirms the continuity of deeper mineralization identified in this zone. Drilling in this area continues to support the potential for a new mining front, with mineralization open along strike and at depth. Results indicate that mineralization is trending north towards the Z71 fault, a hypothesis that will be the focus of drilling in this area in 2024.

沿着 El Limon'n West Trend 的後續鑽探成功證實了向南的礦化連續性,最值得注意的是 LS-290 鑽孔,該鑽孔返回了多個高品位截距。此外,通過位於先前報告的 LS-229 截距以南 100 米處的 LS-231 孔進行的後續鑽探證實了該區域發現的更深層礦化的連續性。該地區的鑽探繼續爲新採礦前線的潛力提供支持,沿走向和深度開採均呈開放態勢。結果表明,礦化正向北朝向Z71斷層,這一假設將成爲2024年該地區鑽探的重點。

Table 4: Highlights from the 2023 drilling program along the El Limón West Trend

表 4:2023 年沿着 El Limon'n West Trend 鑽探計劃的亮點

Drill Hole From
(m)
To
(m)
Core Length1
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
AuEq2
(gpt)
LS-290 101.00 105.00 4.00 11.78 140.4 0.14 13.73

168.00 171.55 3.55 10.07 36.5 0.87 11.92
LS-231 324.00 327.05 3.05 0.97 64.9 0.77 3.01
鑽孔 來自
(m)

(m)
核心長度1
(m)
Au
(gpt)
Ag
(gpt)

(%)
auEQ2
(gpt)
LS-290 101.00 105.00 4.00 11.78 140.4 0.14 13.73

168.00 171.55 3.55 10.07 36.5 0.87 11.92
LS-231 324.00 327.05 3.05 0.97 64.9 0.77 3.01


Notes to Table:
1) Intercepts are reported as core length (not true width/thickness). Core lengths reflect drilling core recovery.
2) The gold equivalent grade calculation used is as follows: AuEq (gpt) = Au (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000 and use the same metal prices ($1,550/oz Au, $20/oz Ag, and $3.50/lb Cu) and metallurgical recoveries (90% Au, 86% Ag, and 93% Cu) used in the mineral resource estimate for ELG Underground.


表格註釋:
1) 截距報告爲核心長度(不是真實的寬度/厚度)。岩心長度反映了鑽芯的回收率。
2) 使用的黃金當量等級計算方法如下:auEq (gpt) = 金 (gpt) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000,並使用相同的金屬價格(1,550 美元/盎司金、20 美元/盎司銀和 3.50 美元/磅銅)和冶金回收率(90% Au、86% Ag 和 93% Cu)來估算 ELG 的礦產資源地下。

GEOLOGY OF THE ELG MINE COMPLEX

ELG 礦山綜合體的地質情況

The ELG Mine Complex, located in the central part of the Guerrero Gold Belt in southwest Mexico, is hosted in the Mesozoic carbonate-rich Morelos Platform, which has been intruded by Paleocene granodiorite stocks, sills, dikes and afterwards uplifted close to surface by maar-diatreme complexes.

ELG礦山綜合體位於墨西哥西南部格雷羅金帶的中部,位於富含中生代碳酸鹽的莫雷洛斯平台中,該平台曾受到古新世花崗閃長巖儲量、基岩、堤壩的侵入,隨後被mar-diatreme複合體抬升到地表附近。

Skarn-hosted gold mineralization develops along contacts of the intrusive rocks and carbonate-rich sedimentary rocks of the Cuautla and Morelos formations, as well as along the footwall contact of the Mezcala Formation. At depth, the mineralization has a strong structural control related to the main stages of deformation, with the collision of allochthonous terrain being responsible for the major north-south faults, while the almost east-west faulting is associated with the beginning of a subduction process.

Skarn承載的金礦化沿着Cuautla和Morelos地層侵入岩和富含碳酸鹽的沉積岩的接觸以及沿着梅斯卡拉組的底部接觸而發展。在深處,礦化具有與主要變形階段相關的強大結構控制,異構地形的碰撞是主要的南北斷層造成的,而幾乎東西向的斷層則與俯衝過程的開始有關。

Gold mineralization at ELG occurs in spatial association with a skarn body that was developed along a 2-kilometre-long corridor following the northeast contact of the ELG granodiorite stock. The skarn zone that occurs at the marble stratigraphic level of the Morelos Formation is in contact with hornfels developed in the Mezcala Formation. At El Limón, skarn mineralization is also structurally controlled by north-south and north-east trending faults. Early-stage deposition corresponds to skarn alteration and mineralization at ELG and is fairly typical of calcic gold-skarn systems. Zones of coarse, massive, garnet-dominant skarn appear within and along the stock margin, with fine-grained pyroxene-dominant skarn more common at greater distances from the contact with the stock. Significant gold mineralization at ELG is spatially associated with the skarn, preferentially occurring in pyroxene-rich exoskarn but also hosted in garnet-rich endoskarn that has been affected by retrograde alteration, which suggests that the most important gold event is late stage, strongly related to bismuth, and of epithermal origin.

ELG 的金礦化與硅卡巖體在空間關聯中發生,該晶體是在 ELG 花崗閃長巖種群東北接觸後沿着 2 公里長的走廊發育而成的。出現在莫雷洛斯組的大理石地層層的硅卡巖帶與梅斯卡拉組中形成的角巖接觸。在埃爾利蒙,矽卡巖礦化在結構上也受南北和東北向斷層的控制。早期沉積對應於 ELG 的矽卡巖蝕變和礦化,是鈣化金硅卡巖系統的典型特徵。粗糙、塊狀、以石榴石爲主的錫卡巖區域出現在種群邊緣之內和沿線,而在與種群接觸的距離更遠的情況下,以細顆粒輝石爲主的錫卡巖更爲常見。ELG 的顯著金礦化在空間上與矽卡巖相關,主要發生在富含輝石的外硅卡巖中,但也存在於受逆向蝕變影響的富含石榴石的內切巖中,這表明最重要的金礦事件是晚期,與鉍密切相關,並且起源於超熱成熱物質。

Dykes and sills are found to crosscut the hornfels and marble, along the structural trends mentioned above, and are spatially associated with the skarn formation. In some cases, these are the ore controls of the main gold mineralization stage at depth.

人們發現,堤壩和門檻沿着上述結構趨勢橫穿牛角巖和大理石,在空間上與硅卡巖的形成有關。在某些情況下,這些是主要深度金礦化階段的礦石控制。

The style of mineralization along the El Limón Deep, El Limón Sur, Sub-Sill, and El Limón West Trends is characterized by gold, with locally high silver and copper grades. Given that gold precipitates due to the buffer exerted by the early stage of calc-silicate alteration and sulfide mineralization, it is free and generally dissociated from the previous copper event mainly related to chalcopyrite.

El LimonDeep、El Limon'n Sur、Sub-Sill 和 El Limon'n West Trends 沿線的礦化風格以金爲特徵,當地的銀和銅品位很高。鑑於金沉澱是由於鈣硅酸鹽蝕變和硫化物礦化的早期階段施加的緩衝作用而產生的,因此它是遊離的,並且通常與先前主要與黃銅礦有關的銅事件分離。

QA/QC AND QUALIFIED PERSON

質量保證/質量控制和合格人員

Torex maintains an industry-standard analytical quality assurance and quality control (QA/QC) and data verification program to monitor laboratory performance and ensure high-quality assays. Results from this program confirm reliability of the assay results. All sampling and analytical work for the mine exploration program is performed by SGS de Mexico S.A. de C.V. ("SGS") in Durango, and by SGS at Minera Media Luna site facilities in Mexico. Gold analyses comprise fire assays with atomic absorption or gravimetric finish. External check assays for QA/QC purposes are performed at ALS Chemex de Mexico S.A. de C.V.

Torex 維護行業標準的分析質量保證和質量控制 (QA/QC) 以及數據驗證計劃,以監控實驗室績效並確保高質量的檢測。該程序的結果證實了化驗結果的可靠性。礦山勘探計劃的所有取樣和分析工作均由位於杜蘭戈的墨西哥SGS de Mexico S.A. de C.V.(“SGS”)和墨西哥的Minera Media Luna基地設施的SGS進行。金分析包括採用原子吸收或重力法表面處理的火焰分析。用於質量保證/質量控制目的的外部檢查分析在 ALS Chemex de Mexico S.A. de C.V. 進行

The analytical QA/QC program is currently overseen by Carlo Nasi, Chief Mine Geologist for Minera Media Luna, S.A. de C.V.

分析質量保證/質量控制計劃目前由Minera Media Luna, S.A. de C.V. 的首席礦山地質學家卡洛·納西監督。

Scientific and technical data contained in this news release has been reviewed and approved by Carolina Milla, P.Eng. Ms. Milla is a member of the Association of Professional Engineers and Geoscientists of Alberta (Member ID #168350), has experience relevant to the style of mineralization under consideration, is a qualified person under NI 43-101, and is an employee of Torex. Ms. Milla has verified the data disclosed, including sampling, analytical, and test data underlying the drill results; verification included visually reviewing the drill holes in three dimensions, comparing the assay results to the original assay certificates, reviewing the drilling database, and reviewing core photography consistent with standard practice. Ms. Milla consents to the inclusion in this release of said data in the form and context in which they appear.

本新聞稿中包含的科學和技術數據已由Carolina Milla, P.Eng進行了審查和批准。米拉女士是艾伯塔省專業工程師和地球科學家協會的成員(成員編號 #168350),具有與所考慮的礦化風格相關的經驗,是NI 43-101規定的合格人士,也是Torex的員工。米拉女士已經驗證了所披露的數據,包括鑽探結果所依據的採樣、分析和測試數據;驗證包括目視檢查三維鑽孔,將化驗結果與原始化驗證書進行比較,審查鑽探數據庫,以及審查符合標準慣例的岩心照片。米拉女士同意將上述數據以其出現的形式和背景納入本新聞稿。

Additional information on the ELG Underground, sampling and analyses, analytical labs, and methods used for data verification is available in the Company's technical report entitled the "Morelos Property, NI 43-101 Technical Report, ELG Mine Complex Life of Mine Plan and Media Luna Feasibility Study, Guerrero State, Mexico", dated effective March 16, 2022 filed on March 31, 2022 (the "2022 Technical Report") and in the annual information form ("AIF") dated March 30, 2023, each filed on SEDAR+ at and the Company's website at .

有關ELG地下、採樣和分析、分析實驗室以及用於數據驗證的方法的更多信息,請參閱該公司於2022年3月31日提交的題爲 “北卡羅來納州莫雷洛斯地產 43-101技術報告、ELG礦山綜合體礦山壽命規劃和媒體露娜可行性研究,墨西哥格雷羅州” 的技術報告(“2022年技術報告”)和年度信息表(“AIF”)”)的日期均爲2023年3月30日,分別在SEDAR+和公司的網站上提交。

ABOUT TOREX GOLD RESOURCES INC.

關於託雷克斯黃金資源公司

Torex is an intermediate gold producer based in Canada, engaged in the exploration, development, and operation of its 100% owned Morelos Property, an area of 29,000 hectares in the highly prospective Guerrero Gold Belt located 180 kilometres southwest of Mexico City. The Company's principal asset is the Morelos Complex, which includes the El Limón Guajes ("ELG") Mine Complex, the Media Luna Project, a processing plant, and related infrastructure. Commercial production from the Morelos Complex commenced on April 1, 2016 and an updated Technical Report for the Morelos Complex was released in March 2022. Torex's key strategic objectives are to optimize and extend production from the ELG Mine Complex, de-risk and advance Media Luna to commercial production, build on ESG excellence, and to grow through ongoing exploration across the entire Morelos Property.

Torex是一家總部位於加拿大的中間黃金生產商,從事其100%擁有的莫雷洛斯地產的勘探、開發和運營,該地產位於墨西哥城西南180公里處極具前景的格雷羅金帶,佔地29,000公頃。該公司的主要資產是莫雷洛斯綜合體,其中包括埃爾利莫恩瓜耶斯(“ELG”)礦山綜合體、Media Luna項目、加工廠和相關基礎設施。莫雷洛斯綜合大樓的商業生產於2016年4月1日開始,莫雷洛斯綜合大樓的最新技術報告於2022年3月發佈。Torex的主要戰略目標是優化和擴大ELG礦山綜合體的產量,降低風險並將Media Luna推向商業生產,在ESG卓越的基礎上再接再厲,並通過對整個莫雷洛斯地產的持續勘探實現增長。

FOR FURTHER INFORMATION, PLEASE CONTACT:

欲了解更多信息,請聯繫:

TOREX GOLD RESOURCES INC.
Jody Kuzenko
President and CEO
Direct: (647) 725-9982
jody.kuzenko@torexgold.com

TOREX 黃金資源公司
喬迪庫贊科
總裁兼首席執行官
直接:(647) 725-9982
jody.kuzenko@torexgold.com

Dan Rollins
Senior Vice President, Corporate Development & Investor Relations
Direct: (647) 260-1503
dan.rollins@torexgold.com

丹·羅林斯
企業發展與投資者關係高級副總裁
直接:(647) 260-1503
dan.rollins@torexgold.com

CAUTIONARY NOTES ON FORWARD-LOOKING STATEMENTS

關於前瞻性陳述的警示說明

This press release contains "forward-looking statements" and "forward-looking information" within the meaning of applicable Canadian securities legislation. Forward-looking information also includes, but is not limited to, statements about: 2023 program builds on past success to prove the long-term reserve and resource potential at ELG; the results of ongoing drilling program at ELG Underground continue to support the Company's strategy to extend and optimize the mine life of ELG Underground and fill the mill beyond 2027; the investment in the Company's 2023 drilling program at ELG Underground continued to build on the positive results achieved year on year to grow the overall mineral endowment at ELG and unlock the significant cash generation potential of the Morelos asset; highly positive drill results, including an outstanding intercept of 11.75 grams per tonne gold equivalent ("gpt AuEq") over nearly 23 metres ("m"), further support the potential to bring mineralization in this area into a mineral resource estimate when the Company releases its year-end 2023 mineral reserve and resource update in March; additionally, drilling carried out in the latter portion of 2023 extended higher-grade mineralization along the southern portion of the El Limón Sur Trend (29.88 gpt AuEq over 9.6 m) and further bolstered the mineralized potential at the 400 m level (5.53 gpt AuEq over 3.7 m); at the El Limón West Trend, drilling continues to support the potential for a new mining front, with mineralization open along strike and at depth; the 2023 drilling program has reinforced the Company's confidence in the ability to continue to grow resources and extend the reserve life of ELG Underground, all with a goal of filling the mill with higher grade feed and maintaining annual gold equivalent production of +450,000 ounces beyond 2027; the final results from the 2023 exploration and drilling program at ELG Underground support potential reserve replacement and expansion of the mineralized footprint, indicating the potential to extend the life of the ELG Underground beyond 2026; exploration teams have encountered untapped upside along the identified structural trends, many of which are in close proximity to existing underground infrastructure, which will allow investments made to date to be leveraged; the high-grade mineralization of El Limon Sur Trend drill hole LS-295 was encountered 30 m north of the previously reported high-grade intercept in drill hole LS-293 (20.74 gpt AuEq over 4.6 m), indicating potential for a high-grade zone that is open along trend to the south; the findings from drilling targeting mineralization at the junction of the El Limón Sur Trend and La Flaca fault indicate the potential to increase both Indicated and Inferred resources at year-end 2023; when considered in conjunction with the other drilling results in this area, this mineralization may also be open at depth, to at least the 400 m elevation level, which is the deepest the drilling has been conducted to date within the El Limón Sur Trend; step-out drilling to the south along the El Limón West Trend encountered 13.73 gpt AuEq over 4.0 m and 11.92 gpt AuEq over 3.6 m in drill hole LS-290, expanding the mineralized footprint of the El Limón Sur pit to the south and reinforcing the high-grade potential at depth in this area; the overall objective of the 2024 drill program continues to be the replacement of reserves and expansion of resources, all with the aim of continuing to extend the life of ELG Underground; the results of drilling along the El Limón Sur Trend in 2023, particularly where the Trend intersects La Flaca fault above the 600 m elevation level, have been successful, with many intercepts exceeding 5.0 gpt AuEq with widths ranging from 3.0 m to 23.0 m, indicating the potential to add ounces to year-end 2023 mineral resources; of particular note, earlier results from the 2023 drilling program indicated the potential extension of this mineralized zone to a depth of 400 m.; exploration at the southern known boundary of the El Limón Sur Trend also encountered high-grade mineralization, potentially expanding resources to the south and indicating that this mineralization may be plunging to the southeast; infill drilling conducted along the northeast-trending structural corridor known as the El Limón Deep Trend returned several notable intercepts, indicating the potential to upgrade Inferred resources to the Indicated category with the year-end 2023 mineral resource update; mineralization remains open at depth and further work will be conducted in 2024 to test the full extension of this Trend; south of the Z71 fault, the exploratory hole SST-325 encountered mineralization along the southern extension of the Trend, indicating that the Trend remains open to the south; regarding El Limón West Trend, drilling in this area continues to support the potential for a new mining front, with mineralization open along strike and at depth; results indicate that mineralization is trending north towards the Z71 fault, a hypothesis that will be the focus of drilling in this area in 2024; and Torex's key strategic objectives are to optimize and extend production from the ELG Mine Complex, de-risk and advance Media Luna to commercial production, build on ESG excellence, and to grow through ongoing exploration across the entire Morelos Property. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "objective", "strategy", "target", "continue", "potential", "focus", "demonstrate", "aim" or variations of such words and phrases or statements that certain actions, events or results "will", "would", or "is expected to" occur. Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking information, including, without limitation, risks and uncertainties associated with: the ability to upgrade mineral resources categories of mineral resources with greater confidence levels or to mineral reserves; risks associated with mineral reserve and mineral resource estimation; uncertainty involving skarn deposits; and those risk factors identified in the Technical Report and the Company's annual information form and management's discussion and analysis or other unknown but potentially significant impacts. Forward-looking information is based on the assumptions discussed in the Technical Report and such other reasonable assumptions, estimates, analysis and opinions of management made in light of its experience and perception of trends, current conditions and expected developments, and other factors that management believes are relevant and reasonable in the circumstances at the date such statements are made. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information, there may be other factors that cause results not to be as anticipated. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, whether as a result of new information or future events or otherwise, except as may be required by applicable securities laws. The Technical Report, AIF and MD&A are filed on SEDAR+ at and the Company's website at .

本新聞稿包含適用的加拿大證券立法所指的 “前瞻性陳述” 和 “前瞻性信息”。前瞻性信息還包括但不限於以下方面的陳述:2023年計劃建立在過去的成功基礎上,旨在證明ELG的長期儲量和資源潛力;ELG Underground正在進行的鑽探計劃的結果繼續支持該公司延長和優化ELG Underground的礦山壽命並在2027年之後填補該礦山的戰略;對公司2023年ELG地下鑽探計劃的投資繼續建立在逐年取得的積極成果的基礎上,以實現增長 ELG 的總體礦產天賦並解鎖莫雷洛斯資產具有巨大的現金創造潛力;非常積極的鑽探結果,包括在近23米(“m”)上每噸黃金當量11.75克(“gpt auEQ”)的出色截距,進一步支持了該公司在3月發佈2023年年底礦產儲量和資源最新情況時將該地區的礦化納入礦產資源估計值的可能性;此外,2023年下半年進行的鑽探延續了更高品位的礦化作用沿着 El Limo'n Sur Trend(29.88 gpt)的南部超過9.6米),進一步增強了400米高度(5.53 gpt Aueq超過3.7米)的礦化潛力;在El Limon'n West Trend,鑽探繼續支持新採礦前線的潛力,沿走向和深度開放礦化;2023年的鑽探計劃增強了公司對繼續開採資源和延長ELG Underground儲量壽命的能力的信心,所有這些都有一個目標向工廠灌裝更高品位的飼料,並在2027年之後將年黃金當量產量維持在+45萬盎司的水平;最後的2023 年 ELG Underground 勘探和鑽探計劃的結果爲潛在的儲量替換和礦化足跡的擴張提供了支持,表明有可能將 ELG 地下鑽探的壽命延長 2026 年以後;勘探團隊在已確定的結構趨勢中遇到了尚未開發的上行空間,其中許多都與現有的地下基礎設施非常接近,這將使迄今爲止的投資得以槓桿;El Limon Sur Trend 鑽孔 LS-295 的高品位礦化出現了 30 m 在北邊此前曾報道過在 LS-293 鑽孔中有高等級截距 (20.74 gpt auEQ 超過 4.6 m),表明有可能出現一個沿着向南開放的高品位區域;在 El Limon'n Sur Trend 和 La Flaca 斷層交界處進行礦化的鑽探結果表明,到 2023 年底,指示和推斷資源都有可能增加;如果結合該地區的其他鑽探結果,這種礦化區也可能在深度開放,至少達到 400 米的海拔高度,這是鑽探的最深度迄今爲止,已在 El Limo'n Sur Trend 範圍內進行的;跨步鑽探直到沿着 El Limon'n West Trend 向南,在 LS-290 鑽孔中遇到了超過 4.0 米的 13.73 gpt Aueq 和 3.6 m 以上的 11.92 gpt Aueq,這擴大了 El Limon Sur 礦坑的礦化足跡,增強了該區域深度的高品位潛力;2024 年鑽探計劃的總體目標仍然是更換儲量和擴大資源,所有目標都是繼續擴大 ELG Underground 的生命;2023 年沿着 El Limo'n Sur Trend 的鑽探結果,特別是 Trend 與 La Flaca 相交的地方海拔600米以上的斷層取得了成功,許多截距超過5.0 gpt auEQ,寬度從3.0 m到23.0 m不等,這表明有可能爲2023年底的礦產資源增加盎司;特別值得注意的是,2023年鑽探計劃早些時候的結果表明,該礦化帶有可能延伸到400 m的深度;在El Limon'n Sur Trend南部已知邊界的勘探中也遇到了高品位礦物化,有可能將資源擴展到南方,並表明這種礦化可能向東南傾斜;沿着名爲 El Limon'n Deep Trend 的東北方向結構走廊進行的填充鑽探返回了幾個顯著的截距,這表明在 2023 年底礦產資源更新中,推斷資源有可能升級到指示類別;深度礦化仍處於開放狀態,並將在 2024 年進行進一步工作以測試該趨勢的全面延伸;在 Z71 斷層以南,SST-325 勘探孔遇到了礦化沿着趨勢的南部延伸部分,這表明該趨勢仍然向南開放;關於El Limon'n West Trend,該地區的鑽探繼續爲新採礦前線的潛力提供支持,沿走向和深度開採;結果表明,礦化向北朝向Z71斷層,這一假設將成爲2024年該地區鑽探的重點;Torex的主要戰略目標是優化和擴大ELG礦山綜合體的產量,降低風險和將 Media Luna 推向商業製作,在 ESG 卓越的基礎上再接再厲,持續發展對整個莫雷洛斯地產進行探索。通常,前瞻性信息可以通過使用前瞻性術語來識別,例如 “目標”、“戰略”、“目標”、“繼續”、“潛在”、“重點”、“證明”、“目標” 或某些行動、事件或結果 “將”、“預期” 發生的詞語和短語或陳述的變體。前瞻性信息受已知和未知風險、不確定性和其他因素的影響,這些因素可能導致公司的實際業績、活動水平、業績或成就與此類前瞻性信息所表達或暗示的結果存在重大差異,包括但不限於與以下方面相關的風險和不確定性:以更高的可信度升級礦產資源類別或礦產儲量的能力;與礦產儲量和礦產資源估算相關的風險;涉及錫卡巖礦牀的不確定性;以及技術報告和公司年度信息表中確定的風險因素以及管理層的討論和分析或其他未知但可能的重大影響。前瞻性信息基於技術報告中討論的假設,以及管理層根據其對趨勢、當前狀況和預期發展的經驗和看法,以及管理層認爲與發表此類聲明之日的情況相關和合理的其他因素作出的其他合理假設、估計、分析和觀點。儘管公司試圖確定可能導致實際業績與前瞻性信息中包含的業績存在重大差異的重要因素,但可能還有其他因素導致業績不如預期。無法保證此類信息會被證明是準確的,因爲實際結果和未來事件可能與此類信息中的預期存在重大差異。因此,讀者不應過分依賴前瞻性信息。除非適用的證券法另有要求,否則公司不承諾更新任何前瞻性信息,無論是由於新信息還是未來事件或其他原因造成的。技術報告、AIF和MD&A在SEDAR+和公司的網站上提交,網址爲。

Figure 2: Follow-up drilling along the El Limón Sur Trend confirmed the continuity of mineralization to the south at the 400 m level. Additionally, drilling between the La Flaca and Z71 faults encountered notable high-grade intercepts within a 400 x 400 m zone.

圖 2:沿着 El Limo'n Sur Trend 的後續鑽探證實了在 400 米高處向南的礦化連續性。此外,在拉弗拉卡和Z71斷層之間的鑽探在400 x 400米的區域內遇到了明顯的高等級截距。

Figure 3: Three drill holes confirmed that mineralization extends at depth along the El Limón Deep Trend. Infill and step-out drilling along trend also encountered a number of high-grade intercepts plunging in a south-westerly direction.

圖 3:三個鑽孔證實,礦化作用沿着El Limon深度趨勢延伸到深處。沿着趨勢的填充和階梯鑽探還遇到了許多向西南方向墜落的高品位截距。

Figure 4: Drilling confirmed the continuity of mineralization along the Sub-Sill Trend north of the La Flaca fault. Importantly, these intercepts are located near existing underground infrastructure.

圖 4:鑽探證實了拉弗拉卡斷層以北的底層趨勢沿線礦化的連續性。重要的是,這些攔截點位於現有的地下基礎設施附近。

Figure 5: Step-out drilling to the south along the El Limón West Trend expanded the mineralized footprint of the El Limón Sur pit to the south and reinforced the high-grade potential at depth in this area. Additionally, follow-up drilling confirmed the continuity of mineralization 100 m to the south at the 550 m level.

圖 5:沿着 El Limon'n West Trend 向南的階梯式鑽探將 El Limo'n Sur 礦坑的礦化足跡向南擴大,並增強了該區域深處的高品位潛力。此外,後續鑽探證實了在550米高度向南100米處的礦化連續性。

Table 5: Drill results testing mineralization extensions along the El Limón Sur Trend

表 5:沿着 El Limo'n Sur Trend 測試礦化延伸部分的鑽探結果

Drill Hole Purpose UTM-E (m) UTM-N (m) Elevation (m) Azimuth Dip Final Depth (m) From
(m)
To
(m)
Length
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
Au Eq
(gpt)
Lithology
SST-316 Brownfield 421791.13 1989372.54 837.51 78.0 -49.0 600.00 536.64 539.07 2.43 0.57 13.9 0.72 1.88 Skarn
SST-318 Brownfield 421659.95 1989453.64 845.81 55.0 -45.0 663.00 622.29 626.00 3.71 4.83 13.4 0.33 5.53 Skarn
SST-323 Step-out 422236.76 1989899.28 856.33 265.0 -7.0 170.00 125.33 129.70 4.37 1.02 1.7 0.06 1.13 Skarn
SST-324 Step-out 422236.56 1989899.85 856.85 278.0 5.0 170.00 69.24 73.94 4.70 4.44 28.2 2.75 9.18 Skarn








78.00 82.59 4.59 1.52 18.2 1.58 4.27 Skarn
SST-326 Step-out 421979.26 1990160.63 947.46 132.5 -46.5 321.00 298.88 304.10 5.22 1.31 1.1 0.02 1.36 Skarn
SST-327 Step-out 421914.04 1990094.78 949.09 138.0 -22.0 360.00 332.13 336.00 3.87 3.08 4.3 0.36 3.70 Skarn








344.00 347.15 3.15 2.38 8.8 0.62 3.48 Skarn
SST-328 Step-out 421955.18 1990115.49 948.60 111.0 -39.0 330.00 286.00 289.88 3.88 2.79 4.4 0.01 2.86 Skarn
SST-329 Step-out 421913.92 1990094.90 948.46 138.0 -30.0 408.00 348.00 351.35 3.35 3.19 2.7 0.06 3.32 Skarn
SST-330 Step-out 421954.65 1990114.52 948.20 135.0 -46.0 387.00 350.69 354.33 3.64 0.24 9.1 0.32 0.87 Skarn
SST-331 Step-out 421913.81 1990094.91 948.73 139.0 -38.0 408.00 313.30 316.54 3.24 4.09 1.0 0.06 4.20 Skarn
SST-332 Step-out 421954.62 1990114.62 948.16 126.5 -53.5 375.00 176.70 180.00 3.30 1.27 72.4 2.08 5.48 Skarn








183.00 189.98 6.98 4.83 38.1 1.70 8.02 Skarn








235.56 242.00 6.44 3.82 6.3 0.34 4.45 Skarn
SST-333 Step-out 421952.33 1990118.48 948.15 15.0 -85.0 369.00 217.25 222.40 5.15 1.46 56.1 1.40 4.39 Skarn
SST-337 Step-out 421980.61 1990162.19 947.66 123.0 -51.0 324.00 237.00 241.60 4.60 0.90 0.7 0.03 0.96 Skarn
SST-338 Infill 422288.38 1990278.10 695.55 173.0 -34.0 280.00 216.00 220.50 4.50 0.75 2.3 0.10 0.94 Skarn
SST-339 Step-out 421980.49 1990161.83 948.32 134.0 -35.0 340.00 158.44 163.46 5.02 0.36 2.0 0.04 0.44 Skarn
SST-341 Step-out 421914.25 1990095.03 948.83 132.0 -42.5 360.00 355.60 360.00 4.40 3.47 1.2 0.01 3.50 Skarn
SST-342 Infill 422390.66 1990103.68 704.30 113.0 -60.0 135.00 64.67 69.38 4.71 0.86 0.5 0.00 0.87 Skarn
LDUG-239 Step-out 421953.81 1990114.56 948.28 141.0 -61.0 258.00 177.16 200.07 22.91 10.94 12.0 0.41 11.75 Skarn
LDUG-249 Step-out 422283.48 1990283.14 696.98 287.0 10.0 180.00 144.83 147.52 2.69 0.07 8.8 0.25 0.58 Skarn
LDUG-269 Step-out 422175.99 1990140.46 676.51 305.0 9.0 180.00 141.00 147.13 6.13 0.36 2.4 0.07 0.50 Skarn
LDUG-272 Step-out 422175.22 1990139.42 676.09 285.0 0.0 219.00 174.46 178.90 4.44 0.05 2.1 0.03 0.12 Skarn
LDUG-274 Step-out 421993.14 1990232.32 947.02 233.5 -87.5 261.00 213.58 218.00 4.42 1.20 4.1 0.14 1.48 Skarn
LDUG-283 Step-out 422177.81 1990136.06 676.05 216.0 0.0 201.00 59.06 64.43 5.37 1.84 3.9 0.10 2.04 Skarn
LDUG-286 Brownfield 422176.98 1990136.50 674.47 227.0 -53.0 380.00 101.00 106.75 5.75 0.93 8.0 0.75 2.23 Skarn
LDUG-291 Step-Out 421980.10 1990161.56 947.52 125.0 -62.0 429.00 332.00 338.00 6.00 4.11 26.1 1.90 7.47 Skarn








346.00 351.70 5.70 1.10 20.7 1.08 3.09 Skarn








405.95 410.00 4.05 4.57 17.0 0.83 6.11 Skarn
LDUG-293 Step-Out 421975.26 1990163.89 947.74 300.0 -83.0 270.00 191.33 193.30 1.97 0.24 18.0 0.46 1.20 Skarn
鑽孔 目的 UTM-E (m) UTM-N (m) 海拔 (m) 方位角 最終深度 (m) 來自
(m)

(m)
長度
(m)
Au
(gpt)
Ag
(gpt)

(%)
Au Eq
(gpt)
巖性學
SST-316 布朗菲爾德 421791.13 1989372.54 837.51 78.0 -49.0 600.00 536.64 539.07 2.43 0.57 13.9 0.72 1.88 斯卡恩
SST-318 布朗菲爾德 421659.95 1989453.64 845.81 55.0 -45.0 663.00 622.29 626.00 3.71 4.83 13.4 0.33 5.53 斯卡恩
SST-323 走出去 422236.76 1989899.28 856.33 265.0 -7.0 170.00 125.33 129.70 4.37 1.02 1.7 0.06 1.13 斯卡恩
SST-324 走出去 422236.56 1989899.85 856.85 278.0 5.0 170.00 69.24 73.94 4.70 4.44 28.2 2.75 9.18 斯卡恩








78.00 82.59 4.59 1.52 18.2 1.58 4.27 斯卡恩
SST-326 走出去 421979.26 1990160.63 947.46 132.5 -46.5 321.00 298.88 304.10 5.22 1.31 1.1 0.02 1.36 斯卡恩
SST-327 走出去 421914.04 1990094.78 949.09 138.0 -22.0 360.00 332.13 336.00 3.87 3.08 4.3 0.36 3.70 斯卡恩








344.00 347.15 3.15 2.38 8.8 0.62 3.48 斯卡恩
SST-328 走出去 421955.18 1990115.49 948.60 111.0 -39.0 330.00 286.00 289.88 3.88 2.79 4.4 0.01 2.86 斯卡恩
SST-329 走出去 421913.92 1990094.90 948.46 138.0 -30.0 408.00 348.00 351.35 3.35 3.19 2.7 0.06 3.32 斯卡恩
SST-330 走出去 421954.65 1990114.52 948.20 135.0 -46.0 387.00 350.69 354.33 3.64 0.24 9.1 0.32 0.87 斯卡恩
SST-331 走出去 421913.81 1990094.91 948.73 139.0 -38.0 408.00 313.30 316.54 3.24 4.09 1.0 0.06 4.20 斯卡恩
SST-332 走出去 421954.62 1990114.62 948.16 126.5 -53.5 375.00 176.70 180.00 3.30 1.27 72.4 2.08 5.48 斯卡恩








183.00 189.98 6.98 4.83 38.1 1.70 8.02 斯卡恩








235.56 242.00 6.44 3.82 6.3 0.34 4.45 斯卡恩
SST-333 走出去 421952.33 1990118.48 948.15 15.0 -85.0 369.00 217.25 222.40 5.15 1.46 56.1 1.40 4.39 斯卡恩
SST-337 走出去 421980.61 1990162.19 947.66 123.0 -51.0 324.00 237.00 241.60 4.60 0.90 0.7 0.03 0.96 斯卡恩
SST-338 填充 422288.38 1990278.10 695.55 173.0 -34.0 280.00 216.00 220.50 4.50 0.75 2.3 0.10 0.94 斯卡恩
SST-339 走出去 421980.49 1990161.83 948.32 134.0 -35.0 340.00 158.44 163.46 5.02 0.36 2.0 0.04 0.44 斯卡恩
SST-341 走出去 421914.25 1990095.03 948.83 132.0 -42.5 360.00 355.60 360.00 4.40 3.47 1.2 0.01 3.50 斯卡恩
SST-342 填充 422390.66 1990103.68 704.30 113.0 -60.0 135.00 64.67 69.38 4.71 0.86 0.5 0.00 0.87 斯卡恩
LDUG-239 走出去 421953.81 1990114.56 948.28 141.0 -61.0 258.00 177.16 200.07 22.91 10.94 12.0 0.41 11.75 斯卡恩
LDUG-249 走出去 422283.48 1990283.14 696.98 287.0 10.0 180.00 144.83 147.52 2.69 0.07 8.8 0.25 0.58 斯卡恩
LDUG-269 走出去 422175.99 1990140.46 676.51 305.0 9.0 180.00 141.00 147.13 6.13 0.36 2.4 0.07 0.50 斯卡恩
LDUG-272 走出去 422175.22 1990139.42 676.09 285.0 0.0 219.00 174.46 178.90 4.44 0.05 2.1 0.03 0.12 斯卡恩
LDUG-274 走出去 421993.14 1990232.32 947.02 233.5 -87.5 261.00 213.58 218.00 4.42 1.20 4.1 0.14 1.48 斯卡恩
LDUG-283 走出去 422177.81 1990136.06 676.05 216.0 0.0 201.00 59.06 64.43 5.37 1.84 3.9 0.10 2.04 斯卡恩
LDUG-286 布朗菲爾德 422176.98 1990136.50 674.47 227.0 -53.0 380.00 101.00 106.75 5.75 0.93 8.0 0.75 2.23 斯卡恩
LDUG-291 走出來 421980.10 1990161.56 947.52 125.0 -62.0 429.00 332.00 338.00 6.00 4.11 26.1 1.90 7.47 斯卡恩








346.00 351.70 5.70 1.10 20.7 1.08 3.09 斯卡恩








405.95 410.00 4.05 4.57 17.0 0.83 6.11 斯卡恩
LDUG-293 走出來 421975.26 1990163.89 947.74 300.0 -83.0 270.00 191.33 193.30 1.97 0.24 18.0 0.46 1.20 斯卡恩

Table 5: Drill results testing mineralization extensions along the El Limón Sur Trend (continued)

表 5:沿着 El Limo'n Sur Trend 測試礦化延伸部分的鑽探結果(續)

Drill Hole Purpose UTM-E (m) UTM-N (m) Elevation (m) Azimuth Dip Final Depth (m) From
(m)
To
(m)
Length
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
Au Eq
(gpt)
Lithology
LDUG-295 Step-Out 421913.45 1990095.43 948.12 134.0 -73.5 280.00 201.00 204.69 3.69 5.38 6.7 0.24 5.84 Skarn
LDUG-298 Step-Out 421953.01 1990117.99 948.14 53.5 -88.5 222.00 203.80 210.47 6.67 1.71 6.0 0.18 2.07 Skarn
LDUG-300 Step-Out 422259.05 1990082.73 831.42 268.0 -30.0 252.00 150.85 157.91 7.06 4.70 27.9 1.70 7.76 Skarn
LDUG-301 Infill 421978.17 1990160.31 947.50 150.0 -65.0 231.00 197.22 202.00 4.78 3.68 10.6 0.81 5.11 Skarn
LDUG-302 Brownfield 422258.67 1990082.69 832.04 268.0 -10.0 216.00 212.65 216.00 3.35 0.12 0.7 0.02 0.16 Skarn
LDUG-304 Brownfield 422209.54 1989987.50 787.10 282.0 -50.0 485.75 179.18 182.60 3.42 4.34 44.3 1.76 7.71 Skarn








206.00 209.91 3.91 2.44 18.9 0.38 3.28 Skarn
LDUG-305 Step-Out 421978.36 1990160.21 947.54 131.0 -58.0 459.00 260.80 264.50 3.70 3.45 11.4 0.36 4.17 Skarn








411.00 419.40 8.40 5.58 2.2 0.04 5.67 Skarn








424.80 431.00 6.20 4.40 3.7 0.08 4.58 Skarn
LDUG-306 Step-Out 422271.59 1989924.18 734.46 273.0 -42.0 300.00 180.79 183.16 2.37 0.12 21.8 0.58 1.31 Skarn
LDUG-309 Step-Out 422324.31 1989893.84 863.38 262.5 -53.0 420.00 339.75 346.50 6.75 0.04 5.8 0.12 0.31 Skarn
LDUG-310 Step-Out 421953.52 1990114.21 948.33 138.0 -53.0 264.00 229.82 233.00 3.18 0.18 20.1 0.85 1.79 MSO/Skarn
LDUG-312 Step-Out 422322.45 1989893.55 862.74 262.5 -34.0 447.00 387.35 393.24 5.89 1.71 11.0 0.52 2.68 Skarn
LS-242 Infill 422147.89 1989637.72 1079.04 260.0 -51.5 138.00 No skarn intercepted
LS-247 Infill 422144.47 1989650.77 1080.94 260.0 -61.0 119.00 No skarn intercepted
LS-253 Infill 422238.76 1989576.96 1067.33 80.0 -72.0 36.00 24.50 28.14 3.64 0.35 0.6 0.03 0.41 Skarn
LS-254 Infill 422216.40 1989588.52 1069.42 260.0 -67.0 201.00 57.40 63.75 6.35 1.56 0.5 0.00 1.57 Skarn
LS-258 Infill 422176.08 1989530.37 1028.93 96.0 -53.0 72.00 41.00 48.15 7.15 3.28 8.7 0.33 3.91 Skarn
LS-259 Infill 422165.73 1989552.97 1036.23 90.0 -82.0 66.00 7.18 12.45 5.27 0.11 1.8 0.04 0.20 Skarn
LS-261 Infill 422174.22 1989491.51 1002.70 100.0 -74.0 45.00 No skarn intercepted
LS-262 Infill 422187.48 1989491.73 1004.29 95.0 -69.0 45.00 23.19 26.85 3.66 0.29 1.0 0.02 0.33 Skarn
LS-264 Infill 422205.84 1989482.60 1006.77 95.0 -58.0 30.00 8.85 12.75 3.90 0.06 0.5 0.01 0.08 Skarn
LS-266 Infill 422125.20 1989486.00 996.86 65.0 -65.0 78.00 45.00 48.40 3.40 8.54 12.0 0.22 9.03 Skarn
LS-277 Infill 422221.60 1989423.00 976.91 260.0 -79.0 81.00 No skarn intercepted
LS-278 Infill 422190.28 1989659.25 1104.83 76.0 -66.5 84.00 65.29 69.00 3.71 0.55 0.5 0.02 0.59 Skarn
LS-279 Infill 422188.91 1989660.20 1104.94 63.0 -85.0 120.00 102.00 106.00 4.00 0.09 0.5 0.00 0.10 Skarn
LS-281 Infill 422190.08 1989660.87 1104.90 198.0 -82.0 150.00 100.93 105.00 4.07 0.14 0.5 0.02 0.17 Skarn
LS-284 Infill 422254.31 1989632.66 1113.17 243.0 -66.0 102.00 71.50 75.29 3.79 1.32 0.5 0.00 1.33 Skarn
LS-285 Infill 422192.00 1989661.28 1105.20 95.0 -48.5 96.00 No skarn intercepted
LS-291 Step-out 422118.52 1989251.80 925.78 80.0 -48.0 180.00 145.83 149.54 3.71 0.38 10 0.14 0.73 Skarn
LS-292 Step-out 422117.97 1989251.75 925.88 80.0 -56.0 237.00 165.50 173.00 7.50 8.09 119.1 2.12 12.95 Skarn
鑽孔 目的 UTM-E (m) UTM-N (m) 海拔 (m) 方位角 最終深度 (m) 來自
(m)

(m)
長度
(m)
Au
(gpt)
Ag
(gpt)

(%)
Au Eq
(gpt)
巖性學
LDUG-295 走出來 421913.45 1990095.43 948.12 134.0 -73.5 280.00 201.00 204.69 3.69 5.38 6.7 0.24 5.84 斯卡恩
LDUG-298 走出來 421953.01 1990117.99 948.14 53.5 -88.5 222.00 203.80 210.47 6.67 1.71 6.0 0.18 2.07 斯卡恩
LDUG-300 走出來 422259.05 1990082.73 831.42 268.0 -30.0 252.00 150.85 157.91 7.06 4.70 27.9 1.70 7.76 斯卡恩
LDUG-301 填充 421978.17 1990160.31 947.50 150.0 -65.0 231.00 197.22 202.00 4.78 3.68 10.6 0.81 5.11 斯卡恩
LDUG-302 布朗菲爾德 422258.67 1990082.69 832.04 268.0 -10.0 216.00 212.65 216.00 3.35 0.12 0.7 0.02 0.16 斯卡恩
LDUG-304 布朗菲爾德 422209.54 1989987.50 787.10 282.0 -50.0 485.75 179.18 182.60 3.42 4.34 44.3 1.76 7.71 斯卡恩








206.00 209.91 3.91 2.44 18.9 0.38 3.28 斯卡恩
LDUG-305 走出來 421978.36 1990160.21 947.54 131.0 -58.0 459.00 260.80 264.50 3.70 3.45 11.4 0.36 4.17 斯卡恩








411.00 419.40 8.40 5.58 2.2 0.04 5.67 斯卡恩








424.80 431.00 6.20 4.40 3.7 0.08 4.58 斯卡恩
LDUG-306 走出來 422271.59 1989924.18 734.46 273.0 -42.0 300.00 180.79 183.16 2.37 0.12 21.8 0.58 1.31 斯卡恩
LDUG-309 走出來 422324.31 1989893.84 863.38 262.5 -53.0 420.00 339.75 346.50 6.75 0.04 5.8 0.12 0.31 斯卡恩
LDUG-310 走出來 421953.52 1990114.21 948.33 138.0 -53.0 264.00 229.82 233.00 3.18 0.18 20.1 0.85 1.79 MSO/SKARN
LDUG-312 走出來 422322.45 1989893.55 862.74 262.5 -34.0 447.00 387.35 393.24 5.89 1.71 11.0 0.52 2.68 斯卡恩
LS-242 填充 422147.89 1989637.72 1079.04 260.0 -51.5 138.00 沒有截獲錫卡恩
LS-247 填充 422144.47 1989650.77 1080.94 260.0 -61.0 119.00 沒有截獲錫卡恩
LS-253 填充 422238.76 1989576.96 1067.33 80.0 -72.0 36.00 24.50 28.14 3.64 0.35 0.6 0.03 0.41 斯卡恩
LS-254 填充 422216.40 1989588.52 1069.42 260.0 -67.0 201.00 57.40 63.75 6.35 1.56 0.5 0.00 1.57 斯卡恩
LS-258 填充 422176.08 1989530.37 1028.93 96.0 -53.0 72.00 41.00 48.15 7.15 3.28 8.7 0.33 3.91 斯卡恩
LS-259 填充 422165.73 1989552.97 1036.23 90.0 -82.0 66.00 7.18 12.45 5.27 0.11 1.8 0.04 0.20 斯卡恩
LS-261 填充 422174.22 1989491.51 1002.70 100.0 -74.0 45.00 沒有截獲錫卡恩
LS-262 填充 422187.48 1989491.73 1004.29 95.0 -69.0 45.00 23.19 26.85 3.66 0.29 1.0 0.02 0.33 斯卡恩
LS-264 填充 422205.84 1989482.60 1006.77 95.0 -58.0 30.00 8.85 12.75 3.90 0.06 0.5 0.01 0.08 斯卡恩
LS-266 填充 422125.20 1989486.00 996.86 65.0 -65.0 78.00 45.00 48.40 3.40 8.54 12.0 0.22 9.03 斯卡恩
LS-277 填充 422221.60 1989423.00 976.91 260.0 -79.0 81.00 沒有截獲錫卡恩
LS-278 填充 422190.28 1989659.25 1104.83 76.0 -66.5 84.00 65.29 69.00 3.71 0.55 0.5 0.02 0.59 斯卡恩
LS-279 填充 422188.91 1989660.20 1104.94 63.0 -85.0 120.00 102.00 106.00 4.00 0.09 0.5 0.00 0.10 斯卡恩
LS-281 填充 422190.08 1989660.87 1104.90 198.0 -82.0 150.00 100.93 105.00 4.07 0.14 0.5 0.02 0.17 斯卡恩
LS-284 填充 422254.31 1989632.66 1113.17 243.0 -66.0 102.00 71.50 75.29 3.79 1.32 0.5 0.00 1.33 斯卡恩
LS-285 填充 422192.00 1989661.28 1105.20 95.0 -48.5 96.00 沒有截獲錫卡恩
LS-291 走出去 422118.52 1989251.80 925.78 80.0 -48.0 180.00 145.83 149.54 3.71 0.38 10 0.14 0.73 斯卡恩
LS-292 走出去 422117.97 1989251.75 925.88 80.0 -56.0 237.00 165.50 173.00 7.50 8.09 119.1 2.12 12.95 斯卡恩

Table 5: Drill results testing mineralization extensions along the El Limón Sur Trend (continued)

表 5:沿着 El Limo'n Sur Trend 測試礦化延伸部分的鑽探結果(續)

Drill Hole Purpose UTM-E (m) UTM-N (m) Elevation (m) Azimuth Dip Final Depth (m) From
(m)
To
(m)
Length
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
Au Eq
(gpt)
Lithology
LS-294 Step-out 422116.35 1989265.73 927.68 80.0 -44.0 187.30 143.52 146.63 3.11 3.12 40.4 0.65 4.65 Skarn
LS-295 Step-out 422110.80 1989279.87 928.85 80.0 -70.0 291.00 262.31 271.88 9.57 27.95 44.3 0.86 29.88 Skarn
LS-296 Step-out 422114.66 1989265.69 927.33 80.0 -71.0 438.00 384.82 390.00 5.18 0.06 3.6 0.07 0.21 Skarn
LS-297 Step-out 422123.37 1989223.12 923.18 80.0 -60.0 300.00 No skarn intercepted
LS-298 Step-out 421833.04 1989462.14 866.01 93.0 -43.0 366.00 347.40 353.00 5.60 0.70 1.3 0.17 0.99 Skarn
LS-299 Step-out 422342.49 1989515.21 1056.33 267.0 -73.5 574.00 487.86 491.77 3.91 0.80 21.0 1.01 2.68 Skarn
LS-300 Step-out 422341.19 1989515.31 1056.32 269.0 -49.0 468.00 349.48 353.50 4.02 0.81 0.7 0.01 0.84 Skarn
LS-301 Step-out 422341.88 1989515.14 1056.40 268.0 -62.0 546.00 520.83 524.38 3.55 3.07 25.7 0.46 4.12 Skarn
LS-302 Step-out 422289.42 1989423.40 1015.91 266.0 -83.0 547.00 443.45 448.00 4.55 1.09 13.7 0.54 2.12 Skarn
LS-304 Step-out 422241.74 1989576.19 1066.62 270.0 -78.0 644.00 286.00 290.65 4.65 1.09 34.4 0.11 1.68 Skarn
LS-305 Step-out 422241.45 1989576.21 1066.56 270.0 -50.0 393.00 47.00 55.50 8.50 12.31 1.7 0.01 12.35 Skarn
LS-306 Step-out 422376.37 1989702.44 1140.22 268.0 -58.0 846.00 219.55 225.55 6.00 4.01 11.0 0.38 4.76 Skarn
LS-307 Step-out 422375.59 1989702.50 1140.15 268.0 -47.0 708.00 313.50 318.70 5.20 4.39 0.5 0.01 4.41 Skarn
鑽孔 目的 UTM-E (m) UTM-N (m) 海拔 (m) 方位角 最終深度 (m) 來自
(m)

(m)
長度
(m)
Au
(gpt)
Ag
(gpt)

(%)
Au Eq
(gpt)
巖性學
LS-294 走出去 422116.35 1989265.73 927.68 80.0 -44.0 187.30 143.52 146.63 3.11 3.12 40.4 0.65 4.65 斯卡恩
LS-295 走出去 422110.80 1989279.87 928.85 80.0 -70.0 291.00 262.31 271.88 9.57 27.95 44.3 0.86 29.88 斯卡恩
LS-296 走出去 422114.66 1989265.69 927.33 80.0 -71.0 438.00 384.82 390.00 5.18 0.06 3.6 0.07 0.21 斯卡恩
LS-297 走出去 422123.37 1989223.12 923.18 80.0 -60.0 300.00 沒有截獲錫卡恩
LS-298 走出去 421833.04 1989462.14 866.01 93.0 -43.0 366.00 347.40 353.00 5.60 0.70 1.3 0.17 0.99 斯卡恩
LS-299 走出去 422342.49 1989515.21 1056.33 267.0 -73.5 574.00 487.86 491.77 3.91 0.80 21.0 1.01 2.68 斯卡恩
LS-300 走出去 422341.19 1989515.31 1056.32 269.0 -49.0 468.00 349.48 353.50 4.02 0.81 0.7 0.01 0.84 斯卡恩
LS-301 走出去 422341.88 1989515.14 1056.40 268.0 -62.0 546.00 520.83 524.38 3.55 3.07 25.7 0.46 4.12 斯卡恩
LS-302 走出去 422289.42 1989423.40 1015.91 266.0 -83.0 547.00 443.45 448.00 4.55 1.09 13.7 0.54 2.12 斯卡恩
LS-304 走出去 422241.74 1989576.19 1066.62 270.0 -78.0 644.00 286.00 290.65 4.65 1.09 34.4 0.11 1.68 斯卡恩
LS-305 走出去 422241.45 1989576.21 1066.56 270.0 -50.0 393.00 47.00 55.50 8.50 12.31 1.7 0.01 12.35 斯卡恩
LS-306 走出去 422376.37 1989702.44 1140.22 268.0 -58.0 846.00 219.55 225.55 6.00 4.01 11.0 0.38 4.76 斯卡恩
LS-307 走出去 422375.59 1989702.50 1140.15 268.0 -47.0 708.00 313.50 318.70 5.20 4.39 0.5 0.01 4.41 斯卡恩


Notes to Table
1) Intercepts are core lengths and do not represent true thickness of mineralized zones.
2) Core lengths subject to rounding.
3) Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data.
4) Gold equivalent ("AuEq") grades use the same metal prices ($1,550/oz gold ("Au"), $20/oz silver ("Ag") and $3.50/lb copper ("Cu")) and metallurgical recoveries (90% Au, 86% Ag and 93% Cu) used in the Mineral Resource estimate for ELG Underground (AuEq (gpt) = Au (g/t) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000).

Table 6: Drill results from infill and step-out drilling at depth along the El Limón Deep Trend


表格備註
1) 截距是岩心長度,並不代表礦化區的真實厚度。
2) 磁芯長度視四捨五入而定。
3) Torex沒有發現任何可能對數據的準確性或可靠性產生重大影響的鑽探、採樣、回收或其他因素。
4) 黃金等價物(“AuEq”)等級使用的金屬價格(1550美元/盎司黃金(“金”)、20美元/盎司白銀(“銀”)和3.50美元/磅銅(“銅”))和冶金回收率(90% 金、86% 銀和 93% 銅)與 ELG 地下礦產資源估算(aueQ (gpt) = 金 (g/t) + Ag (gpt) + Ag (gpt) + Ag (gpt) pt) * 0.0123 + 銅 (%) * 1.6000)。

表 6:沿着 El Limon'n Deep Trend 深度進行填充和跨出鑽探的鑽探結果

Drill Hole Purpose UTM-E (m) UTM-N (m) Elevation (m) Azimuth Dip Final Depth (m) From
(m)
To
(m)
Length
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
Au Eq
(gpt)
Lithology
LDUG-254 Step-out 422284.01 1990280.31 697.14 245.0 12.0 210.00 198.26 201.00 2.74 0.51 2.9 0.09 0.69 Skarn
LDUG-257 Step-out 422284.18 1990283.03 695.82 290.0 -20.0 183.00 58.00 60.44 2.44 2.32 7.1 0.15 2.65 Skarn
LDUG-258 Step-out 422284.20 1990280.79 696.12 252.0 -8.0 201.00 165.05 167.29 2.24 0.29 5.7 0.14 0.59 Skarn
LDUG-263 Step-out 422283.80 1990283.62 696.38 300.0 0.0 201.00 142.16 146.20 4.04 1.00 3.3 0.17 1.32 Skarn
LDUG-275 Brownfield 422175.12 1990139.37 676.08 270.0 0.0 270.00 236.28 239.77 3.49 1.08 8.7 0.44 1.89 Skarn
LDUG-278 Brownfield 422175.90 1990138.01 676.03 253.0 0.0 318.00 104.00 108.00 4.00 4.48 12.3 0.30 5.11 Skarn








247.00 250.69 3.69 2.97 5.2 0.09 3.18 Skarn
LDUG-282 Brownfield 422175.96 1990137.82 675.73 253.0 -10.0 321.00 100.88 103.45 2.57 4.45 15.3 0.30 5.12 Skarn
LDUG-284 Step-out 422175.88 1990138.92 675.73 270.0 -11.0 261.00 221.87 226.12 4.25 1.08 0.5 0.00 1.09 Skarn
LDUG-285 Brownfield 422176.03 1990137.18 676.05 244.0 0.0 322.50 105.50 111.00 5.50 6.84 3.1 0.08 7.00 Skarn
LDUG-287 Brownfield 422175.95 1990138.31 675.03 271.0 -38.0 351.00 232.00 235.33 3.33 3.71 0.5 0.00 3.72 Skarn
LDUG-289 Brownfield 422176.04 1990137.79 675.12 252.0 -35.0 351.00 346.00 348.35 2.35 1.71 11.1 0.50 2.65 Skarn
LDUG-297 Step-Out 422176.82 1990140.95 676.02 270.0 -26.0 300.00 266.43 269.07 2.64 0.77 16.5 0.90 2.42 Skarn
LDUG-299 Infill 421978.00 1990160.28 947.48 159.0 -74.0 240.00 157.00 160.57 3.57 26.73 3.6 0.10 26.93 Skarn








174.19 211.27 37.08 14.04 9.5 0.38 14.75 Skarn








229.65 236.04 6.39 7.28 10.2 0.29 7.87 Skarn
LDUG-303 Infill 421977.65 1990160.59 947.82 183.5 -81.0 222.00 165.64 169.00 3.36 7.79 21.3 0.75 9.26 Skarn








180.00 184.89 4.89 3.57 39.3 0.68 5.14 Skarn








192.77 199.55 6.78 4.92 4.6 0.18 5.26 Skarn








208.25 211.71 3.46 4.45 1.3 0.03 4.51 Skarn
LDUG-307 Step-Out 421978.46 1990160.83 947.49 119.5 -75.5 300.00 205.39 208.37 2.98 0.78 42.1 1.17 3.18 Skarn
LDUG-311 Step-Out 421910.67 1990093.59 948.26 188.0 -75.0 339.00 262.00 282.57 20.57 8.22 29.2 1.02 10.21 Skarn








293.35 300.10 6.75 2.56 46.9 1.92 6.21 Skarn
LDUG-313 Step-Out 421912.38 1990095.09 948.49 140.0 -87.0 330.00 316.77 320.90 4.13 2.64 10.1 0.49 3.55 MSO
LS-303 Step-out 422283.25 1989426.55 1015.54 277.0 -50.0 369.00 152.25 156.40 4.15 3.17 24.5 0.49 4.26 Skarn








270.20 276.00 5.80 5.93 16.7 0.16 6.40 Skarn








345.00 349.66 4.66 2.79 6.1 0.53 3.71 Skarn
鑽孔 目的 UTM-E (m) UTM-N (m) 海拔 (m) 方位角 最終深度 (m) 來自
(m)

(m)
長度
(m)
Au
(gpt)
Ag
(gpt)

(%)
Au Eq
(gpt)
巖性學
LDUG-254 走出去 422284.01 1990280.31 697.14 245.0 12.0 210.00 198.26 201.00 2.74 0.51 2.9 0.09 0.69 斯卡恩
LDUG-257 走出去 422284.18 1990283.03 695.82 290.0 -20.0 183.00 58.00 60.44 2.44 2.32 7.1 0.15 2.65 斯卡恩
LDUG-258 走出去 422284.20 1990280.79 696.12 252.0 -8.0 201.00 165.05 167.29 2.24 0.29 5.7 0.14 0.59 斯卡恩
LDUG-263 走出去 422283.80 1990283.62 696.38 300.0 0.0 201.00 142.16 146.20 4.04 1.00 3.3 0.17 1.32 斯卡恩
LDUG-275 布朗菲爾德 422175.12 1990139.37 676.08 270.0 0.0 270.00 236.28 239.77 3.49 1.08 8.7 0.44 1.89 斯卡恩
LDUG-278 布朗菲爾德 422175.90 1990138.01 676.03 253.0 0.0 318.00 104.00 108.00 4.00 4.48 12.3 0.30 5.11 斯卡恩








247.00 250.69 3.69 2.97 5.2 0.09 3.18 斯卡恩
LDUG-282 布朗菲爾德 422175.96 1990137.82 675.73 253.0 -10.0 321.00 100.88 103.45 2.57 4.45 15.3 0.30 5.12 斯卡恩
LDUG-284 走出去 422175.88 1990138.92 675.73 270.0 -11.0 261.00 221.87 226.12 4.25 1.08 0.5 0.00 1.09 斯卡恩
LDUG-285 布朗菲爾德 422176.03 1990137.18 676.05 244.0 0.0 322.50 105.50 111.00 5.50 6.84 3.1 0.08 7.00 斯卡恩
LDUG-287 布朗菲爾德 422175.95 1990138.31 675.03 271.0 -38.0 351.00 232.00 235.33 3.33 3.71 0.5 0.00 3.72 斯卡恩
LDUG-289 布朗菲爾德 422176.04 1990137.79 675.12 252.0 -35.0 351.00 346.00 348.35 2.35 1.71 11.1 0.50 2.65 斯卡恩
LDUG-297 走出來 422176.82 1990140.95 676.02 270.0 -26.0 300.00 266.43 269.07 2.64 0.77 16.5 0.90 2.42 斯卡恩
LDUG-299 填充 421978.00 1990160.28 947.48 159.0 -74.0 240.00 157.00 160.57 3.57 26.73 3.6 0.10 26.93 斯卡恩








174.19 211.27 37.08 14.04 9.5 0.38 14.75 斯卡恩








229.65 236.04 6.39 7.28 10.2 0.29 7.87 斯卡恩
LDUG-303 填充 421977.65 1990160.59 947.82 183.5 -81.0 222.00 165.64 169.00 3.36 7.79 21.3 0.75 9.26 斯卡恩








180.00 184.89 4.89 3.57 39.3 0.68 5.14 斯卡恩








192.77 199.55 6.78 4.92 4.6 0.18 5.26 斯卡恩








208.25 211.71 3.46 4.45 1.3 0.03 4.51 斯卡恩
LDUG-307 走出來 421978.46 1990160.83 947.49 119.5 -75.5 300.00 205.39 208.37 2.98 0.78 42.1 1.17 3.18 斯卡恩
LDUG-311 走出來 421910.67 1990093.59 948.26 188.0 -75.0 339.00 262.00 282.57 20.57 8.22 29.2 1.02 10.21 斯卡恩








293.35 300.10 6.75 2.56 46.9 1.92 6.21 斯卡恩
LDUG-313 走出來 421912.38 1990095.09 948.49 140.0 -87.0 330.00 316.77 320.90 4.13 2.64 10.1 0.49 3.55 MSO
LS-303 走出去 422283.25 1989426.55 1015.54 277.0 -50.0 369.00 152.25 156.40 4.15 3.17 24.5 0.49 4.26 斯卡恩








270.20 276.00 5.80 5.93 16.7 0.16 6.40 斯卡恩








345.00 349.66 4.66 2.79 6.1 0.53 3.71 斯卡恩


Notes to Table
1) Intercepts are core lengths and do not represent true thickness of mineralized zones.
2) Core lengths subject to rounding.
3) Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data.
4) Gold equivalent ("AuEq") grades use the same metal prices ($1,550/oz gold ("Au"), $20/oz silver ("Ag") and $3.50/lb copper ("Cu")) and metallurgical recoveries (90% Au, 86% Ag and 93% Cu) used in the Mineral Resource estimate for ELG Underground (AuEq (gpt) = Au (g/t) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000).
Table 7: Drill results from step-out drilling at depth and to the north along the Sub-Sill Trend


表格備註
1) 截距是岩心長度,並不代表礦化區的真實厚度。
2) 磁芯長度視四捨五入而定。
3) Torex沒有發現任何可能對數據的準確性或可靠性產生重大影響的鑽探、採樣、回收或其他因素。
4) 黃金等價物(“AuEq”)等級使用的金屬價格(1550美元/盎司黃金(“金”)、20美元/盎司白銀(“銀”)和3.50美元/磅銅(“銅”))和冶金回收率(90% 金、86% 銀和 93% 銅)與 ELG 地下礦產資源估算(aueQ (gpt) = 金 (g/t) + Ag (gpt) + Ag (gpt) + Ag (gpt) pt) * 0.0123 + 銅 (%) * 1.6000)。
表 7:沿着底層趨勢在深度向北和向北跨步鑽探的鑽探結果

Drill Hole Purpose UTM-E (m) UTM-N (m) Elevation (m) Azimuth Dip Final Depth (m) From
(m)
To
(m)
Length
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
Au Eq
(gpt)
Lithology
SST-325 Step-out 422255.19 1989633.93 1113.26 64.0 -50.0 180.00 160.19 164.00 3.81 2.56 1.6 0.04 2.65 Skarn
SST-334 Step-out 422211.38 1990128.57 675.02 103.0 -23.0 252.00 204.72 209.86 5.14 4.36 1.8 0.03 4.44 Skarn
SST-335 Brownfield 422211.23 1990128.67 674.53 100.0 -40.0 315.00 154.42 157.81 3.39 0.81 32.1 1.75 4.00 Skarn
SST-336 Step-out 422287.86 1990278.27 695.57 181.0 -37.0 222.00 193.00 197.17 4.17 0.65 2.1 0.10 0.83 Skarn
SST-340 Infill 422288.29 1990278.10 695.33 176.0 -39.0 240.00 220.80 225.46 4.66 2.13 36.9 2.05 5.86 Skarn
SST-343 Infill 422390.57 1990104.12 704.50 111.0 -68.0 141.00 56.18 59.20 3.02 0.46 4.4 0.28 0.97 Skarn
LDUG-237 Step-out 422292.39 1990577.62 741.78 241.0 11.0 162.00 129.70 133.00 3.30 3.34 14.8 0.34 4.07 MSO
LDUG-238 Step-out 422292.73 1990578.25 742.12 271.0 16.5 174.00 139.23 151.56 12.33 8.92 7.2 0.40 9.65 Skarn/MSO
LDUG-243 Step-out 422292.63 1990578.51 740.26 273.0 -28.5 135.00 74.22 76.85 2.63 2.39 6.4 0.13 2.67 Skarn
LDUG-261 Step-out 422284.21 1990281.26 696.35 270.0 0.0 204.00 135.48 140.19 4.71 1.93 0.5 0.01 1.94 Skarn
LDUG-264 Step-out 422284.19 1990280.40 697.06 313.0 30.0 249.00 165.30 171.40 6.10 4.64 5.3 0.51 5.52 MSO
LDUG-292 Brownfield 422292.88 1990577.19 740.66 255.0 -35.0 153.00 110.46 113.00 2.54 0.65 282.4 0.56 5.03 GDI/Veinlets
LDUG-294 Brownfield 422292.83 1990577.33 739.65 255.0 -53.0 162.00 55.29 58.41 3.12 5.07 8.4 0.20 5.49 Skarn
鑽孔 目的 UTM-E (m) UTM-N (m) 海拔 (m) 方位角 最終深度 (m) 來自
(m)

(m)
長度
(m)
Au
(gpt)
Ag
(gpt)

(%)
Au Eq
(gpt)
巖性學
SST-325 走出去 422255.19 1989633.93 1113.26 64.0 -50.0 180.00 160.19 164.00 3.81 2.56 1.6 0.04 2.65 斯卡恩
SST-334 走出去 422211.38 1990128.57 675.02 103.0 -23.0 252.00 204.72 209.86 5.14 4.36 1.8 0.03 4.44 斯卡恩
SST-335 布朗菲爾德 422211.23 1990128.67 674.53 100.0 -40.0 315.00 154.42 157.81 3.39 0.81 32.1 1.75 4.00 斯卡恩
SST-336 走出去 422287.86 1990278.27 695.57 181.0 -37.0 222.00 193.00 197.17 4.17 0.65 2.1 0.10 0.83 斯卡恩
SST-340 填充 422288.29 1990278.10 695.33 176.0 -39.0 240.00 220.80 225.46 4.66 2.13 36.9 2.05 5.86 斯卡恩
SST-343 填充 422390.57 1990104.12 704.50 111.0 -68.0 141.00 56.18 59.20 3.02 0.46 4.4 0.28 0.97 斯卡恩
LDUG-237 走出去 422292.39 1990577.62 741.78 241.0 11.0 162.00 129.70 133.00 3.30 3.34 14.8 0.34 4.07 MSO
LDUG-238 走出去 422292.73 1990578.25 742.12 271.0 16.5 174.00 139.23 151.56 12.33 8.92 7.2 0.40 9.65 SKARN/MSO
LDUG-243 走出去 422292.63 1990578.51 740.26 273.0 -28.5 135.00 74.22 76.85 2.63 2.39 6.4 0.13 2.67 斯卡恩
LDUG-261 走出去 422284.21 1990281.26 696.35 270.0 0.0 204.00 135.48 140.19 4.71 1.93 0.5 0.01 1.94 斯卡恩
LDUG-264 走出去 422284.19 1990280.40 697.06 313.0 30.0 249.00 165.30 171.40 6.10 4.64 5.3 0.51 5.52 MSO
LDUG-292 布朗菲爾德 422292.88 1990577.19 740.66 255.0 -35.0 153.00 110.46 113.00 2.54 0.65 282.4 0.56 5.03 GDI/Veinlets
LDUG-294 布朗菲爾德 422292.83 1990577.33 739.65 255.0 -53.0 162.00 55.29 58.41 3.12 5.07 8.4 0.20 5.49 斯卡恩


Notes to Table
1) Intercepts are core lengths and do not represent true thickness of mineralized zones.
2) Core lengths subject to rounding.
3) Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data.
4) Gold equivalent ("AuEq") grades use the same metal prices ($1,550/oz gold ("Au"), $20/oz silver ("Ag") and $3.50/lb copper ("Cu")) and metallurgical recoveries (90% Au, 86% Ag and 93% Cu) used in the Mineral Resource estimate for ELG Underground (AuEq (gpt) = Au (g/t) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000).
Table 8: Drill results from brownfield drilling program along the El Limón West Trend


表格備註
1) 截距是岩心長度,並不代表礦化區的真實厚度。
2) 磁芯長度視四捨五入而定。
3) Torex沒有發現任何可能對數據的準確性或可靠性產生重大影響的鑽探、採樣、回收或其他因素。
4) 黃金等價物(“AuEq”)等級使用的金屬價格(1550美元/盎司黃金(“金”)、20美元/盎司白銀(“銀”)和3.50美元/磅銅(“銅”))和冶金回收率(90% 金、86% 銀和 93% 銅)與 ELG 地下礦產資源估算(aueQ (gpt) = 金 (g/t) + Ag (gpt) + Ag (gpt) + Ag (gpt) pt) * 0.0123 + 銅 (%) * 1.6000)。
表 8:El Limon West Trend 沿線棕地鑽探計劃的鑽探結果

Drill Hole Purpose UTM-E (m) UTM-N (m) Elevation (m) Azimuth Dip Final Depth (m) From
(m)
To
(m)
Length
(m)
Au
(gpt)
Ag
(gpt)
Cu
(%)
Au Eq
(gpt)
Lithology
LS-228 Brownfield 421938.51 1989238.61 791.51 33.0 -42.0 120.00 71.00 74.28 3.28 0.58 0.5 0.01 0.60 Skarn
LS-230 Brownfield 422056.80 1989112.50 868.44 334.5 -46.0 288.00 253.58 257.00 3.42 0.36 3.8 0.09 0.55 Skarn
LS-231 Brownfield 422057.06 1989112.50 868.45 326.5 -65.0 417.00 324.00 327.05 3.05 0.97 64.9 0.77 3.01 Skarn
LS-232 Brownfield 422056.92 1989112.26 868.34 343.0 -61.0 399.00 135.83 139.43 3.60 2.06 17.3 0.62 3.26 Fault
LS-233 Brownfield 422056.47 1989112.12 868.42 310.0 -61.0 399.00 273.00 276.08 3.08 1.17 29.6 0.07 1.65 Skarn
LS-286 Brownfield 422055.55 1989110.58 868.45 290.0 -62.0 339.00 117.50 121.25 3.75 0.08 43.7 0.75 1.82 Skarn
LS-288 Brownfield 421860.96 1989156.87 783.94 80.0 -58.0 247.00 226.50 231.50 5.00 2.05 1.0 0.01 2.07 Breccia
LS-289 Brownfield 422056.63 1989112.18 868.43 327.0 -53.0 396.00 243.90 251.45 7.55 3.37 26.8 0.03 3.74 Breccia
LS-290 Brownfield 422054.26 1989111.11 868.30 293.0 -54.0 282.00 101.00 105.00 4.00 11.78 140.4 0.14 13.73 Skarn








132.86 136.37 3.51 2.07 32.7 0.38 3.09 Skarn








168.00 171.55 3.55 10.07 36.5 0.87 11.92 Skarn
鑽孔 目的 UTM-E (m) UTM-N (m) 海拔 (m) 方位角 最終深度 (m) 來自
(m)

(m)
長度
(m)
Au
(gpt)
Ag
(gpt)

(%)
Au Eq
(gpt)
巖性學
LS-228 布朗菲爾德 421938.51 1989238.61 791.51 33.0 -42.0 120.00 71.00 74.28 3.28 0.58 0.5 0.01 0.60 斯卡恩
LS-230 布朗菲爾德 422056.80 1989112.50 868.44 334.5 -46.0 288.00 253.58 257.00 3.42 0.36 3.8 0.09 0.55 斯卡恩
LS-231 布朗菲爾德 422057.06 1989112.50 868.45 326.5 -65.0 417.00 324.00 327.05 3.05 0.97 64.9 0.77 3.01 斯卡恩
LS-232 布朗菲爾德 422056.92 1989112.26 868.34 343.0 -61.0 399.00 135.83 139.43 3.60 2.06 17.3 0.62 3.26 故障
LS-233 布朗菲爾德 422056.47 1989112.12 868.42 310.0 -61.0 399.00 273.00 276.08 3.08 1.17 29.6 0.07 1.65 斯卡恩
LS-286 布朗菲爾德 422055.55 1989110.58 868.45 290.0 -62.0 339.00 117.50 121.25 3.75 0.08 43.7 0.75 1.82 斯卡恩
LS-288 布朗菲爾德 421860.96 1989156.87 783.94 80.0 -58.0 247.00 226.50 231.50 5.00 2.05 1.0 0.01 2.07 角礫岩
LS-289 布朗菲爾德 422056.63 1989112.18 868.43 327.0 -53.0 396.00 243.90 251.45 7.55 3.37 26.8 0.03 3.74 角礫岩
LS-290 布朗菲爾德 422054.26 1989111.11 868.30 293.0 -54.0 282.00 101.00 105.00 4.00 11.78 140.4 0.14 13.73 斯卡恩








132.86 136.37 3.51 2.07 32.7 0.38 3.09 斯卡恩








168.00 171.55 3.55 10.07 36.5 0.87 11.92 斯卡恩


Notes to Table
1) Intercepts are core lengths and do not represent true thickness of mineralized zones.
2) Core lengths subject to rounding.
3) Torex is not aware of any drilling, sampling, recovery, or other factors that could materially affect the accuracy or reliability of the data.
4) Gold equivalent ("AuEq") grades use the same metal prices ($1,550/oz gold ("Au"), $20/oz silver ("Ag") and $3.50/lb copper ("Cu")) and metallurgical recoveries (90% Au, 86% Ag and 93% Cu) used in the Mineral Resource estimate for ELG Underground (AuEq (gpt) = Au (g/t) + Ag (gpt) * 0.0123 + Cu (%) * 1.6000).


表格備註
1) 截距是岩心長度,並不代表礦化區的真實厚度。
2) 磁芯長度視四捨五入而定。
3) Torex沒有發現任何可能對數據的準確性或可靠性產生重大影響的鑽探、採樣、回收或其他因素。
4) 黃金等價物(“AuEq”)等級使用的金屬價格(1550美元/盎司黃金(“金”)、20美元/盎司白銀(“銀”)和3.50美元/磅銅(“銅”))和冶金回收率(90% 金、86% 銀和 93% 銅)與 ELG 地下礦產資源估算(aueQ (gpt) = 金 (g/t) + Ag (gpt) + Ag (gpt) + Ag (gpt) pt) * 0.0123 + 銅 (%) * 1.6000)。

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論