share_log

Fission Uranium Announces Funding For Uranium Project In Saskatchewan

Fission Uranium Announces Funding For Uranium Project In Saskatchewan

裂变铀宣布为萨斯喀彻温省的铀项目提供资金
Benzinga ·  02/07 06:19

Fission Uranium (OTC:FCUUF) is in the process of raising 75 million Canadian dollars to fund exploration and development activities at its Patterson Lake South (PLS) uranium project in Saskatchewan, Canada.

裂变铀(场外交易代码:FCUUF)正在筹集7500万加元,用于资助其位于加拿大萨斯喀彻温省的南帕特森湖(PLS)铀项目的勘探和开发活动。

The funding initiative involves the sale of approximately 65.6 million common shares at CA$1.18 each, with Canaccord Genuity (OTCPK: CCORF) and SCP Resource Finance leading the deal.

该融资计划涉及以每股1.18加元的价格出售约6,560万股普通股,由Canaccord Genuity(OTCPK:CCORF)和SCP Resource Finance牵头交易。

The anticipated completion date for the financing is Feb. 12, pending regulatory approvals. Additionally, the underwriters retain the option to purchase up to an additional 15% of the shares sold under the offer within 30 days after the offer closes.

融资的预计完成日期为2月12日,尚待监管部门的批准。此外,承销商保留在要约结束后的30天内额外购买根据要约出售的股票的15%的选择权。

The PLS project, situated on the southwest rim of the Athabasca Basin, is within a region recognized for significant uranium production. Per the Fraser Institute's report, Saskatchewan is the third-most attractive mining jurisdiction globally and supplies about 20% of the world's uranium.

PLS项目位于阿萨巴斯卡盆地的西南边缘,位于公认的铀产量很大的地区内。根据弗雷泽研究所的报告,萨斯喀彻温省是全球第三大吸引力的采矿管辖区,其铀供应量约占全球20%。

The company's major mines include McArthur River and Rabbit Lake, operated by Cameco (NYSE:CCJ), and the recently revived Denison Mines' (AMEX:DNN) McClean Lake.

该公司的主要矿山包括由Cameco(纽约证券交易所代码:CCJ)运营的麦克阿瑟河和兔子湖,以及最近恢复的丹尼森矿业(AMEX: DNN)的麦克莱恩湖。

Now Read: Capstone Copper Announces Multimillion-Dollar Financing To Support Its Chilean Expansion

立即阅读:Capstone Copper宣布提供数百万美元的融资以支持其在智利的扩张

Based on a feasibility study conducted in March 2023, the PLS project demonstrates robust post-tax economics, boasting a 27.2% internal rate of return, a CA$1.2 billion net present value at an 8% discount, and a 2.6-year payback period.

根据2023年3月进行的一项可行性研究,PLS项目表现出强劲的税后经济效益,其内部回报率为27.2%,净现值为12亿加元,折扣为8%,投资回收期为2.6年。

The mine plan prioritizes the shallow, high-grade Triple R deposit, specifically targeting the R780E and R840W zones. The study envisions the production of 90.9 million pounds of uranium oxide (U3O8) over a ten-year mine life, with a total estimated cost of CA$1.1 billion and a three-year construction period, slated to commence in 2029.

该采矿计划优先考虑浅层的高品位三元矿床,特别针对 R780E 和 R840W 区域。该研究设想在十年的矿山寿命内生产9,090万磅的氧化铀(U3O8),估计总成本为11亿加元,为期三年的施工期,定于2029年开始。

Fission Uranium is also conducting a 6,000-meter regional exploration drill program at PLS. The goal is to assess multiple targets along the Patterson Lake Conductive corridor hosting the Triple R deposit. This strategic move to secure additional funding aligns with Fission's commitment to unlocking the full potential of the PLS uranium project.

裂变铀公司还在PLS进行一项6000米的区域勘探钻探计划。目标是评估托管 Triple R 矿床的帕特森湖导电走廊沿线的多个目标。这一确保额外资金的战略举措符合Fission对释放PLS铀项目全部潜力的承诺。

According to Business Insider's data, spot uranium has surged 17.9% year-to-date. Fission's shares experienced a 10% decline in Monday's trading, closing at CA$1.17.

根据《商业内幕》的数据,现货铀今年迄今已飙升17.9%。Fission的股价在周一的交易中下跌了10%,收于1.17加元。

Now Read: KoBold Metals Announces Historic Copper Discovery In Zambia

立即阅读:KoBold Metals宣布在赞比亚发现历史性铜

Image: Shutterstock

图片:Shutterstock

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发