share_log

Gold Springs Resource A Significant High-Grade Extension of the North Jumbo Deposit

Gold Springs Resource A Significant High-Grade Extension of the North Jumbo Deposit

Gold Springs Resource 是北巨型礦牀的重要高品位延伸部分
Accesswire ·  2023/10/17 04:05

VANCOUVER, BC / ACCESSWIRE / October 16, 2023 / Gold Springs Resource Corp. (the "Company" or "GRC") (TSX:GRC)(OTCQB:GRCAF) reports new assay results confirming a significant 425 meters higher-grade southward extension of the North Jumbo deposit at its large Gold Springs project located in USA, on the border of Nevada and Utah.

不列顛哥倫比亞省溫哥華/ACCESSWIRE/2023年10月16日/金泉資源公司(“公司”或“GRC”)(多倫多證券交易所代碼:GRC)(場外交易代碼:GRCAF)報告了新的化驗結果,證實北Jumbo礦床向南延伸425米的顯著高品位位於美國內華達州和猶他州交界處的大型金泉專案。

Highlights include:

亮點包括

  • 0.84 g/t gold equivalent over 9.2 meters and
    0.89 g/t gold equivalent over 9.2 meters and
    0.81 g/t gold equivalent over 9.1 meters and
    2.45 g/t gold equivalent over 22.9 meters including
    3.98 g/t gold equivalent over 12.2 meters in hole J-22-020
  • 1.36 g/t gold equivalent over 4.6 meters and
    1.03 g/t gold equivalent over 3.0 meters in hole J-22-019
  • 9.2米以上0.84克/噸黃金當量和
    9.2米以上0.89克/噸黃金當量及
    9.1米以上0.81克/噸黃金當量和
    2.45克/噸黃金當量超過22.9計價器包括
    3.98克/噸黃金當量超過12.2J-22-020孔中的儀表
  • 1.36超過4.6米的克/噸黃金當量和
    1.03J-22-019井中超過3.0米的克/噸黃金當量

Gold equivalent based on US$1,800/oz gold, US$25/oz silver and 50% for silver recovery.

黃金當量以1,800美元/盎司黃金、25美元/盎司白銀和50%的白銀回收計算。

Randall Moore, Executive Vice President of Exploration, stated:

蘭德爾·莫耳爾,探索部常務副總裁總裁,述明:

"We are very excited by these last drilling results at North Jumbo, as they clearly confirm the new higher-grade structural block discovered in 2022, expanding our North Jumbo deposit 425 meters further south, where it remains open.

我們對北巨型油田的這些最新鑽探結果感到非常興奮,因為它們清楚地證實了新的高等級結構塊發現於2022年,擴大了我們的北巨型礦藏再往南425米,在那裡它仍然開放。

In our press release dated 19.09.2022, we reported two holes that discovered a new area of higher-grade gold mineralization extending 200 meters south of the North Jumbo Resource:

在我們日期為2022年9月19日的新聞稿中,我們報道了兩個孔,它們在North Jumbo資源以南200米處發現了一個新的較高品位金礦化區域:

  • 1.87 g/t AuEq over 29.0 meters including 3.73 g/t AuEq over 9.2 meters in hole J-22-005.
  • 0.57 g/t AuEq over 41.2 meters and 1.88 g/t AuEq over 6.1 meters in hole J-22-004.
  • 1.87克/噸AuEQ已結束29.0米包括3.73克/噸AuEQ已結束9.2米在J-22-005井。
  • 0.57克/噸AuEQ已結束41.2米1.88克/噸AuEQ已結束6.1米在J-22-004井中

New hole J-22-020, which returned 2.45 g/t AuEq over 22.9 meters including 3.98 g/t AuEq over 12.2 meters, extends this higher-grade gold system by a further 225 meters for a total significant extension of our North Jumbo deposit of 425 meters to the south."

新井J-22-020,已返回2.45克/噸AuEQ已結束22.9米包括3.98克/噸AuEQ已結束12.2米,將這個更高品位的黃金系統再延伸225米,總共我們北巨型礦藏的重大擴展 南面425米處

The North Jumbo Resource is the largest of our six existing M&I resources with 309,000 ounces of gold and 6,718,000 ounces of silver, according to our latest resource estimate based on drilling up to 2021 and without results from 2022-2023 in this high-grade southern extension (please see detailed table below and GRC's press release dated June 13, 2022 concerning our last mineral resource estimate).

北方巨無霸資源是我們現有的六個並購資源中最大的一個根據我們基於鑽探至2021年的最新資源評估,這一高品位南延長線2022-2023年沒有結果,黃金儲量為309,000盎司,白銀儲量為6,718,000盎司(請參閱下表和GRC日期為2022年6月13日的新聞稿,瞭解我們上次礦產資源評估的情況)。

North Jumbo

北巨無霸

The North Jumbo Resource is located on the Utah side of the Gold Springs project at the northern end of the +5-kilometer-long Jumbo Trend which is defined by a very strong and well-developed CSAMT high resistivity anomaly.

北巨型資源位於猶他州金泉專案的北端+5公里長的巨型趨勢它是由非常強烈和發育良好的CSAMT高電阻率異常來定義的。

The North Jumbo Resource based on drilling up to 2021 extends over a north-south strike length of 1,800 meters. The drill holes J-22-004, J-22-005 and J-22-020 extend the deposit in a higher-grade gold system 425 meters to the south. The North Jumbo deposit remains open to the north and to the southwest.

基於鑽探到2021年的北巨型資源橫跨南北走向長度1800米。J-22-004、J-22-005和J-22-020號鑽孔將礦床延伸到更高品位的金制425米 在南邊。北巨型礦藏仍然向北和向西南開放。

Future drilling will focus on continuing to expand the gold mineralization of the North Jumbo Resource to the south and to the north, where a new gold system the company considers an Intrusive-Related Gold System (IRGS) was discovered in 2021 with the hole J-21-015 which intersected 1.0 g/t gold equivalent over 163.1 meters.

未來鑽探的重點將是繼續向南和向北擴大North Jumbo資源的金礦化,那裡有一個新金制該公司考慮與侵入性相關的黃金系統(IRGS)於2021年被髮現,與J-21-015孔相交1.0克/噸黃金當量完畢163.1米。

Summary of drill intercepts

鑽探截獲摘要

Hole ID

From
(m)

To
(m)

Thickness
(m)

Au
g/t

Ag
g/t

AuEq
g/t

J-22-014

27.4

36.6

9.2

0.39

3.4

0.44

and

51.8

57.9

6.1

0.46

8.9

0.58

J-22-015

13.7

21.3

7.6

0.68

18.6

0.94

J-22-016

114.3

117.3

3.0

0.53

38.7

1.07

and

138.7

147.8

9.1

0.57

8.7

0.69

J-22-017

91.4

99.1

7.7

0.36

8.2

0.47

J-22-018

25.9

29

3.1

0.56

1.1

0.58

and

51.8

53.3

1.5

1.22

1.1

1.24

J-22-19

45.7

50.3

4.6

1.3

4

1.36

and

94.5

97.5

3.0

0.66

26.8

1.03

J-22-020

7.6

16.8

9.2

0.47

26.8

0.84

and

47.2

56.4

9.2

0.62

19.7

0.89

and

108.2

117.3

9.1

0.58

16.8

0.81

and

128

150.9

22.9

2.12

23.4

2.45

inc.

129.5

141.7

12.2

3.52

32.8

3.98

孔ID

從…
(M)


(M)

厚度
(M)

Au
克/噸


克/噸

AUEQ
克/噸

J-22-014

27.4

36.6

9.2

0.39

3.4

0.44

51.8

57.9

6.1

0.46

8.9

0.58

J-22-015

13.7

21.3

7.6

0.68

18.6

0.94

J-22-016

114.3

117.3

3.0

0.53

38.7

1.07

138.7

147.8

9.1

0.57

8.7

0.69

J-22-017

91.4

99.1

7.7

0.36

8.2

0.47

J-22-018

25.9

29

3.1

0.56

1.1

0.58

51.8

53.3

1.5

1.22

1.1

1.24

J-22-19

45.7

50.3

4.6

1.3

4.

1.36

94.5

97.5

3.0

0.66

26.8

1.03

J-22-020

7.6

16.8

9.2

0.47

26.8

0.84

47.2

56.4

9.2

0.62

19.7

0.89

108.2

117.3

9.1

0.58

16.8

0.81

128

150.9

22.9

2.12

23.4

2.45

Inc.

129.5

141.7

12.2

3.52

32.8

3.98

True thickness is estimated to be 60-100% of reported length. Grams per tonne of gold and silver abbreviated as "Au g/t" and "Ag g/t" respectively. Gold equivalent based on US$1,800/oz gold, US$25/oz silver and 50% for silver recovery.

真實厚度估計為報告長度的60%-100%。每噸黃金和白銀的克數分別縮寫為“AU g/t”和“Ag g/t”。黃金當量以1,800美元/盎司黃金、25美元/盎司白銀和50%的白銀回收計算。

Drill Hole Table

鑽孔表

Hole ID

Target

Easting UTM
NAD 27 Z11

Northing

Elevation (m)

Azimuth

Inclination

TD
(m)

J-22-014

North Jumbo

761398

4199395

2118

270

-55

243.8

J-22-015

North Jumbo

761377

4199475

2120

270

-55

134.1

J-22-016

North Jumbo

761231

4199518

1968

140

-60

310.9

J-22-017

North Jumbo

761257

4199636

1990

90

-70

225.6

J-22-018

North Jumbo

761028

4198087

2051

300

-45

170.7

J-22-019

North Jumbo

760969

4198002

2051

290

-55

137.2

J-22-020

North Jumbo

761004

4198028

2058

240

-50

219.5

孔ID

目標

東距UTM
NAD 27 Z11

北距

高程(米)

方位角

傾角

白破疫苗
(M)

J-22-014

北巨無霸

761398

4199395

2118

270

-55

243.8

J-22-015

北巨無霸

761377

4199475

2120

270

-55

134.1

J-22-016

北巨無霸

761231

4199518

一九六八年

140

-60

310.9

J-22-017

北巨無霸

761257

4199636

一九九零年

90

-70

225.6

J-22-018

北巨無霸

761028

4198087

2051年

300個

-45

170.7

J-22-019

北巨無霸

760969

4198002

2051年

二百九十

-55

137.2

J-22-020

北巨無霸

761004

4198028

2058年

240

-50

219.5

North Jumbo Resource based on drilling to 2021 and without results from 2022-2023
Mineral Resource Estimate NI 43-101 Technical Report - Gold Springs Project, Utah-Nevada, USA"
dated July 11, 2022, with an effective date of June 13, 2022

北巨型資源基於2021年的鑽探和2022-2023年的無結果
礦產資源評估NI 43-101技術報告-美國猶他州-內華達州金泉專案
日期為2022年7月11日,生效日期為2022年6月13日


Category


Deposit

$1,800 Pit Constrained - 0.25 g/t gold cutoff

Tonnes (1000s)

Gold

Silver

g/t

Troy oz

g/t

Troy oz

Measured

North Jumbo

15,752

0.47

240,037

10.88

5,509,666

Indicated

North Jumbo

5,509

0.39

69,433

6.82

1,208,618

Total M&I

North Jumbo

21,261

0.45

309,470

9.83

6,718,283

Inferred

North Jumbo

1,725

0.38

20,864

4.51

250,229


類別


存款

1,800美元礦坑限制-0.25克/噸黃金下限

公噸(1000s)

黃金

白銀

克/噸

特洛伊·奧茲

克/噸

特洛伊·奧茲

測量的

北巨無霸

15,752

0.47

240,037

10.88

5,509,666

已指示

北巨無霸

5,509

0.39

69,433

6.82

1208618

並購總額

北巨無霸

21,261

0.45

309,470

9.83

6718283

推論

北巨無霸

1,725

0.38

20,864

4.51

250,229

Qualified Person

有資格的人

Randall Moore, Executive Vice-President Exploration, Gold Springs Resource Corp., is the Company's designated Qualified Person for this news release within the meaning of National Instrument 43-101 Standards of Disclosure for Mineral Projects. He has approved the scientific or technical information in this release and has verified the data disclosed in this release for its geological reasonableness, checked all the inputs and verified the analytical data through an analysis of the blanks and standards submitted with the drill-chip samples.

金泉資源公司總裁探礦部執行副總裁蘭德爾·莫耳爾是公司指定的符合國家儀器43-101標準的新聞稿合格人員《礦產專案資訊披露標準》。他批准了本新聞稿中的科學或技術資訊,並核實了本新聞稿中披露的數據的地質合理性,檢查了所有輸入,並通過對隨鑽片樣品提交的空白和標準進行分析,驗證了分析數據。

Quality Assurance and Quality Control

品質保證和質量控制

Approximately 7 kg of RC chips were sent to the laboratory for each 1.52 meters drill interval. Standards and blanks are submitted into the sample stream at the rate of 15% for QA/QC purposes. In addition, the laboratory also includes duplicates of samples, standards and blanks. The results of these check assays are reviewed prior to the release of data. All RC sample assays are also reviewed for their geological context and checked against the drill logs.

每隔1.52米的鑽井間隔,大約有7公斤RC晶片被送到實驗室。出於品質保證/質量控制的目的,標準和空白以15%的比率提交到樣品流中。此外,實驗室還包括樣品、標準和空白的複製品。在數據發佈之前,對這些檢查分析的結果進行審查。還審查了所有RC樣品分析的地質背景,並對照鑽井日誌進行了核對。

Assay Method

化驗方法

Assays were performed in Reno, Nevada by ALS Geochemical, an ISO 9001:2000 certified and independent laboratory. Gold was analyzed by fire assay of a 30-gram sample with an AAS finish with samples assaying greater than 5 g/t re-assayed using a 30-gram sample and a gravity finish. Silver is analyzed by a four-acid leach ICP method.

化驗是在內華達州里諾由ALS地球化公司進行的,該公司是一家獲得ISO 9001:2000認證的獨立實驗室。用火焰分析法對30克重的樣品進行金的分析,用30克的樣品和重力塗層對大於5克/噸的樣品進行重新分析。銀的分析採用四酸浸出電感耦合等離子體法。

About Gold Springs Resource Corp.

關於金泉資源公司

Gold Springs Resource Corp. (TSX:GRC and OTCQB:GRCAF) is focused on the exploration and expansion of the gold and silver resources of its Gold Springs project located on the border of Nevada and Utah, USA. The project is situated in the prolific Great Basin of Western USA, one of the best mining jurisdictions in the world.

金泉資源公司(多倫多證券交易所股票代碼:GRC和場外交易市場代碼:GRCAF)專注於勘探和擴大其位於美國內華達州和猶他州交界處的金泉專案的金銀資源。該專案位於美國西部多產的大盆地,是世界上最好的採礦管轄區之一。

Gold Springs Resource Corp. Contact:

金泉資源公司聯繫人:

Antonio Canton, President and CEO
acanton@goldspringsresource.com

安東尼奧·坎頓、總裁和首席執行官
郵箱:acanton@goldspringsresource ce.com

Forward-Looking Statements

前瞻性陳述

Certain statements contained herein constitute "forward-looking information" under applicable Canadian securities laws ("forward-looking statements"). Forward-looking statements look into the future and provide an opinion as to the effect of certain events and trends on the business. Forward-looking statements herein include statements related to the Company's goal of extending the gold mineralization from the 1.5 km long North Jumbo Resource towards the 1.3 km long South Jumbo Resource and may also include words such as "creating", "believe", "would", "continue", "will", "promising", "should", and similar expressions. These forward-looking statements are based on current expectations and entail various risks and uncertainties. Actual results may materially differ from expectations if known and unknown risks or uncertainties affect our business or if our estimates or assumptions prove inaccurate. Factors that could cause results or events to differ materially from current expectations expressed or implied by the forward-looking statements, include, but are not limited to, risks of the mineral exploration industry which may affect the advancement of the Gold Springs project, including possible variations in mineral resources, grade, recovery rates, metal prices, capital and operating costs, and the application of taxes; availability of sufficient financing to fund planned or further required work in a timely manner and on acceptable terms; availability of equipment and qualified personnel, failure of equipment or processes to operate as anticipated, changes in project parameters, including water requirements for operations, as plans continue to be refined; regulatory, environmental and other risks of the mining industry more fully described in the Company's Annual Information Form and continuous disclosure documents, which are available on SEDAR+ at . The assumptions made in developing the forward-looking statements include: the accuracy of current resource estimates and the interpretation of drill, metallurgical testing and other exploration results; the continuing support for mining by local governments in Nevada and Utah; the availability of equipment and qualified personnel to advance the Gold Springs project; execution of the Company's existing plans and further exploration and development programs for Gold Springs, which may change due to changes in the views of the Company or if new information arises which makes it prudent to change such plans or programs.Readers are cautioned not to place undue reliance on the forward-looking statements contained in this press release. Except as required by law, the Company assumes no obligation to update or revise any forward-looking statement, whether as a result of new information, future events or any other reason. Unless otherwise indicated, forward-looking statements in this press release describe the Company's expectations as of the date hereof.

根據適用的加拿大證券法,本文中包含的某些陳述構成“前瞻性資訊”(“前瞻性陳述”)。前瞻性陳述展望未來,並就某些事件和趨勢對業務的影響提供意見。本文中的前瞻性表述包括與公司將金礦化從1.5公里長的北巨型金礦資源擴展到1.3公里長的南巨型金礦資源的目標有關的表述,還可能包括“創造”、“相信”、“將會”、“將繼續”、“將會”、“有希望”、“應該”等詞語以及類似的表述。這些前瞻性陳述是基於當前的預期,存在各種風險和不確定性。如果已知和未知的風險或不確定性影響我們的業務,或者如果我們的估計或假設被證明是不準確的,實際結果可能與預期大不相同。可能導致結果或事件與前瞻性陳述明示或暗示的當前預期大不相同的因素包括但不限於:礦產勘探行業可能影響金泉專案進展的風險,包括礦產資源、品位、回收率、金屬價格、資本和運營成本以及稅收的適用方面的可能變化;是否有足夠的資金及時和可接受地為計劃的或進一步需要的工作提供資金;設備和合格人員的可獲得性;設備或進程未能按預期運行;隨著計劃的繼續完善,專案參數的變化,包括業務的用水需求;採礦業的監管、環境和其他風險在公司的年度資訊表格和持續披露檔案中有更全面的描述,這些檔案可在SEDAR+at上查閱。在編制前瞻性陳述時所做的假設包括:當前資源估計的準確性以及對鑽探、冶金測試和其他勘探結果的解釋;內華達州和猶他州地方政府對採礦的持續支持;推進Gold Springs專案的設備和合格人員的可用性;公司現有計劃以及對Gold Springs的進一步勘探和開發計劃的執行情況,這些計劃可能會因公司觀點的變化或如果出現新的資訊而發生變化,因此改變此類計劃或計劃是謹慎的。提醒讀者不要過度依賴本新聞稿中包含的前瞻性陳述。除法律另有規定外,公司不承擔因新資訊、未來事件或任何其他原因而更新或修改任何前瞻性陳述的義務。除非另有說明,否則本新聞稿中的前瞻性陳述描述了該公司截至本新聞稿發佈之日的預期。

SOURCE: Gold Springs Resources Corporation

資料來源:金泉資源公司


View source version on accesswire.com:
在Accesswire.com上查看源代碼版本:

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論