ACME Lithium Completes Phase 1 Exploration Program at Bailey Lake Lithium Project in Saskatchewan, Canada
ACME Lithium Completes Phase 1 Exploration Program at Bailey Lake Lithium Project in Saskatchewan, Canada
Vancouver, British Columbia--(Newsfile Corp. - October 3, 2023) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") is pleased to announce that it has completed a summer exploration program at its Bailey Lake pegmatite discovery area in northeastern Saskatchewan. The program consisted of 1166 line-km of helicopter-borne tri-axial gradiometer magnetics, radiometrics, and LiDAR as well as prospecting for additional drill targets which included 336 rock samples collected for geochemical analysis.
溫哥華,不列顛哥倫比亞省-(Newsfile Corp.-2023年10月3日)-Acme Li Inc.(CSE:Acme)(OTCQX:ACLHF)(“公司”,或“ACME”)高興地宣佈,它已經完成了薩斯喀徹溫省東北部貝利湖偉晶巖發現區的夏季勘探計劃。該計劃包括1166行公里的直升機攜帶的三軸梯度儀磁體、輻射計量學和雷射雷達,以及勘探額外的鑽探目標,其中包括為地球化學分析收集的336個岩石樣本。
(Figure 1: Location of Geophysical Survey Boundary & Rock Samples Collected from the 2023 Geological Prospecting Program)
(圖一:地球物理調查界線的位置和2023年地質勘探計劃採集的岩石樣本)
The 3-in-1 Airborne Geophysical Survey consisting of Helicopter-borne Tri-axial Gradiometer Magnetics, Radiometrics, and LiDAR was completed over a 7975 hectare area on the Bailey Lake Property consisting of 1166 line km. The purpose of the survey was to help identify regional structural trends and localized controls of pegmatite bodies along trend of the Li-mineralization identified in the 2017 surface sampling. Preliminary data from this survey was used to aid in guiding the subsequent prospecting. Final geophysical data is pending.
由直升機搭載的三軸梯度儀磁學、輻射測量學和雷射雷達組成的三合一航空地球物理調查在貝利湖上7975公頃的區域內完成,該區域長達1166線公里。調查的目的是幫助識別區域構造趨勢和偉晶巖體的局部控制,沿著2017年地表採樣確定的Li礦化趨勢。本次調查的初步數據被用來幫助指導後續的勘探工作。最終的地球物理數據還在等待中。
The geological prospecting program included 336 rock samples (including a 5% QAQC consisting of CRM's, Coarse Blanks, and field duplicates) collected along trend of historically reported Li-bearing pegmatite samples. The samples collected from this program consisted of exposed boulder and outcrops. Mineralogical, alteration, and structural data (where possible) was also collected at these sample sites. Samples collected consisted of pegmatites / pegmatitic dykes and local country rock. All samples were submitted to SGS Canada Inc. in Lakefield, ON, for Sodium Peroxide Fusion / ICP-AES and ICP-MS analysis with a focus on Lithium, Tantalum, and Cesium.
地質勘查專案包括336個岩石樣品(包括由標準物質、粗巖和野外複製品組成的5%QAQC),按照歷史上報道的含Li偉晶巖樣的趨勢採集。從這個專案中採集的樣本包括裸露的巨石和露頭。礦物學、蝕變和構造數據(在可能的情況下)也在這些樣本點收集。採集的樣品包括偉晶巖/偉晶巖牆和當地的圍巖。所有樣品都提交給位於安大略省萊克菲爾德的SGS加拿大公司,用於過氧化鈉熔融/電感耦合等離子體發射光譜和電感耦合等離子體質譜分析,重點是鋰、鉭和銫。
(Figure 2: 2m wide Pegmatite Dyke in Outcrop)
(圖2:露頭處2米寬的偉晶巖牆)
Geologists identified two generations of pegmatite dykes in various outcrops which have not been historically sampled. The field crew made use of a handheld Laser-Induced Breakdown Spectroscopy (LIBS) to aid in the identification of lithium bearing minerals in the field. Some samples tested with the LIBS exhibited lithium values. Geochemical lab results will be required to verify these values which are expected in Q4 2023.
地質學家在歷史上沒有取樣的各種露頭中發現了兩代偉晶巖牆。現場工作人員利用手持雷射誘導擊穿光譜(LIBS)來幫助識別現場的含鋰礦物。用LIBS測試的一些樣品顯示出鋰的值。預計2023年第四季度將需要化探實驗室結果來驗證這些值。
(Figure 3: Pegmatite Boulder at Bailey Lake Property)
(圖3:貝利湖地產偉晶巖巨石)
Property Highlights:
物業亮點:
- The large claim block contains multiple indications of LCT pegmatites with anomalous lithium grades.
- Historical reported sampling by Gem Oil includes up to 3950 ppm Li in the Bailey Lake region.
- Historical reported sampling by the Saskatchewan Geological Survey includes results up to 3470 ppm Li at Misaw Lake region to the east of Bailey Lake.
- Till sampling in the region by the Saskatchewan Geological Survey reported numerous sites with elevated lithium and lithium pegmatite associated elements.
- 巨大的索賠區塊包含多個跡象,表明LCT偉晶巖具有異常的鋰品位。
- 寶石油歷史上報告的樣本包括貝利湖地區高達3950ppm的Li。
- 薩斯喀徹溫省地質調查局的歷史報告樣本包括貝利湖以東米索湖地區高達3470ppm的Li。
- 直到薩斯喀徹溫省地質勘探局在該地區進行採樣,才報告有許多地點含有與鋰和鋰偉晶巖相關的元素。
Saskatchewan is a highly prospective region for critical mineral development. The Government of Saskatchewan recently announced an expansion to its existing investment and innovation incentive programs to include eligible lithium projects with the aim to become one of the best resource development jurisdictions in the world.
薩斯喀徹溫省是一個非常有前景的關鍵礦產開發地區。薩斯喀徹溫省政府最近宣佈擴大其現有的投資和創新激勵計劃,將符合條件的鋰專案包括在內,目標是成為世界上最好的資源開發管轄區之一。
Qualified Person
有資格的人
Mr. Dane A. Bridge, P.Geol., a "Qualified Person" (as defined in NI 43-101 -Standards for Disclosure for Mineral Projects) and a Senior Consultant to the Company, has reviewed and approved the technical disclosures in this news release.
Dane A.Bridge,P.Geol先生是“合格人士”(定義見NI 43-101-礦物專案披露標準),也是公司的高級顧問,已審核並批准了本新聞稿中的技術披露。
About ACME Lithium Inc.
ACME Lithium公司簡介
Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba, and at Bailey Lake in northern Saskatchewan.
ACME鋰是一家礦產勘探公司,由經驗豐富的團隊領導,與領先的技術和大宗商品公司合作,專注於收購、勘探和開發電池金屬專案。Acme已收購或正在選擇收購位於內華達州埃斯梅拉達縣克萊頓山谷和魚湖谷、馬尼託巴省東南部的Shatford、Birse和Cat-Euclid Lake以及薩斯喀徹溫省北部的Bailey Lake的專案的100%權益。
On behalf of the Board of Directors
我謹代表董事會
Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com
史蒂夫·漢森
總裁和董事首席執行官
電話:(604)564-9045
郵箱:Info@acmelithium.com
For Investor Inquiries:
Anthony Simone
Simone Capital
Telephone: (416) 881-5154
asimone@simonecapital.ca
投資者諮詢:
安東尼·西蒙
西蒙尼資本
電話:(416)881-5154
郵箱:asimone@simonecapital.ca
Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release contains certain statements which may constitute forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise. Unless otherwise indicated, the market and industry data contained herein is based upon information from industry and other publications and the knowledge and experience of management. While we believe that this data is reliable, market and industry data is subject to variations and cannot be verified with complete certainty due to limits on the availability and reliability of raw data, the voluntary nature of the data gathering process and other limitations and uncertainties inherent in any statistical survey. We have not independently verified any of the data from third-party sources referred to in this news release or ascertained the underlying assumptions relied upon by such sources. All technical and scientific disclosure pertaining to our mineral property interests in this news release have been reviewed by a Qualified Person, meaning an individual who is an engineer or geoscientist with at least five years of experience in mineral exploration, mine development or operation or mineral project assessment, or any combination of these; has experience relevant to the subject matter of the mineral project and the technical report; and is a member or licensee in good standing of a professional association.
CSE及其法規服務提供商均不對本新聞稿的充分性或準確性承擔責任。本新聞稿包含的某些陳述可能構成適用證券法所指的前瞻性資訊(“前瞻性陳述”)。前瞻性陳述是指不是歷史事實的陳述,通常但不總是由“預期”、“計劃”、“預期”、“相信”、“打算”、“估計”、“專案”、“潛在”和類似的表述,或事件或條件“將”、“將”、“可能”、“可能”或“應該”發生的陳述,在本新聞稿中包括但不限於從勘探中獲得的屬性、時機和預期收益。在ACME專案物業進行鑽探或開發。從對鑽探、採樣和其他技術結果的解釋中推斷出的資訊也可被視為前瞻性陳述,因為它構成了對專案實際開發時以及是否開發時可能發現的情況的預測。Acme的專案位置與鋰專案相鄰或附近,並不能保證勘探成功,也不能保證礦產資源或儲量將在ACME的屬性中確定。區域公司進行的勘探、開發和活動為ACME正在完成的勘探工作提供了幫助和額外的數據。這些前瞻性表述受各種風險和不確定因素的影響,可能導致實際事件或結果與前瞻性表述中反映的情況大不相同,包括但不限於:與金屬價格波動有關的風險;與及時以可接受的條件籌集足夠資金為計劃工作提供資金有關的不確定因素;天氣、後勤、技術或其他因素導致計劃工作發生變化;工作結果不能達到預期並實現公司財產的預期潛力的可能性;事故、設備故障和勞資糾紛或其他意想不到的困難或中斷的風險;工作計劃中成本超領或意外支出的可能性;公司運營造成環境汙染或損害的風險以及其他風險和不確定性。任何前瞻性表述僅在作出之日發表,除適用的證券法可能要求外,公司不承擔任何更新任何前瞻性表述的意圖或義務,無論是由於新資訊、未來事件或結果或其他原因。除非另有說明,本文中包含的市場和行業數據均基於行業和其他出版物的資訊以及管理知識和經驗。雖然我們相信這些數據是可靠的,但由於原始數據的可獲得性和可靠性的限制、數據收集過程的自願性以及任何統計調查固有的其他限制和不確定性,市場和行業數據可能會發生變化,無法完全確定地核實。我們沒有獨立核實本新聞稿中提到的來自第三方來源的任何數據,也沒有確定這些來源所依賴的基本假設。本新聞稿中與我們的礦產產權權益有關的所有技術和科學披露均已由一名合格人士審核,指的是在礦產勘探、礦山開發或運營或礦產專案評估方面具有至少五年經驗的工程師或地球科學家,或上述兩者的任何組合;具有與礦產專案標的和技術報告相關的經驗;以及是專業協會的良好成員或持牌人。
To view the source version of this press release, please visit
要查看本新聞稿的源版本,請訪問
譯文內容由第三人軟體翻譯。