share_log

ACME Lithium Advances Lithium Discovery With Additional Lab Results From Test Well TW-1 at Clayton Valley Nevada Lithium Brine Project

ACME Lithium Advances Lithium Discovery With Additional Lab Results From Test Well TW-1 at Clayton Valley Nevada Lithium Brine Project

ACME Lithium 利用內華達州克萊頓谷鋰鹽水項目 TW-1 測試井的更多實驗室結果,推動鋰的發現
newsfile ·  2023/06/26 20:30

Carson City, Nevada--(Newsfile Corp. - June 26, 2023) - ACME Lithium Inc. (CSE: ACME) (OTCQX: ACLHF) (the "Company", or "ACME") announced today results from the recently completed Dissolved Mineral Resource Exploration (DMRE) test well TW-1 as part of the Phase 2 expanded drill program at ACME's Clayton Valley Nevada lithium brine project.

內華達州卡森城-(Newsfile Corp.-2023年6月26日)-Acme Lithium Inc.(CSE:ACME)(OTCQX:ACLHF)該公司(“本公司”,簡稱“ACME”)今天宣佈了最近完成的溶解礦物資源勘探(DMRE)測試井TW-1的結果,這是ACME的內華達州克萊頓谷鋰鹵水專案第二階段擴展鑽探計劃的一部分。

The results indicate a total lithium concentration of 110 mg/L was present in fluids airlifted from approximately 496 feet of perforated casing crossing the Lower Gravel Unit (LGU). The adjacent operator's property, contiguous to ACME's project area, has a reported cut off grade of 50 mg/l.

結果表明,從穿過下礫石單元的約496英尺射孔套管空運的流體中,總鋰濃度為110毫克/L。毗鄰的運營商的物業,毗鄰ACME的專案區,據報道,截止等級為50毫克/L。

The LGU extends from approximately 1250 to 1820 feet below ground surface (bgs) at the test well location. The perforated casing of TW-1 captures just under 500 feet of the LGU which is a targeted high concentration lithium brine aquifer. The well was developed using airlifting to remove latent drilling fluids from the wellbore. Water quality parameters including total dissolved solids, electrical conductivity, temperature, and pH values were recorded in the field by direct measurement with a Myron L Company Ultrameter II 6PFC water meter. A water quality sample was collected near the end of the well development activity when field parameters had stabilized in accordance with accepted practices.

LGU在測試井位置從地面(BGS)以下約1250英尺延伸到1820英尺。TW-1的穿孔外殼捕獲了不到500英尺的LGU,這是一個有針對性的高濃度鋰鹵水含水層。這口井是通過氣舉從井筒中清除潛在鑽井液而開發的。水質參數包括總溶解固形物、電導率、溫度和pH值在現場用Myron L公司的Ultraeter II 6PFC水錶直接測量。按照公認的做法,當現場參數穩定下來時,在油井開發活動接近尾聲時採集了水質樣本。

As announced in August 2022, the LGU presented some of the highest lithium values, up to 130 mg/L in brine samples collected in ACME's Phase 1 program which was completed in July 2022. The LGU presents a deep, laterally expansive aquifer, which overlies bedrock throughout a significant portion of Clayton Valley.

正如2022年8月宣佈的那樣,LGU提供了一些最高的鋰值,在2022年7月完成的ACME第一階段計劃中收集的鹵水樣本中的鋰含量高達130mg/L。LGU提供了一個深的、橫向擴展的含水層,它覆蓋在克萊頓山谷的大部分基岩上。

The sample result provides a preliminary indication of the composite concentration of lithium in the brines across the LGU at the TW-1 location. Brine samples collected from DH-1 and DH-1A show strong potential stratification of waters in multiple aquifers down to the contact with bedrock. The preliminary data provides further evidence that some of the highest concentrations of lithium are contained in the LGU at the TW-1 drill location. The laboratory analysis of the airlift development fluid further validates previous evidence of a lithium brine deposit contained in the LGU and as indicated by other operators to be a potential production aquifer within Clayton Valley. Lithium analysis from the sample collected was completed by Western Environmental Testing Laboratory in Sparks, Nevada using ICPMS-EPA approved methods.

採樣結果提供了TW-1位置LGU上鹵水中鋰的綜合濃度的初步指示。從dh-1和dh-1a採集的鹵水樣品表明,在多個含水層中,直到與基岩接觸的水域都有很強的潛在層化。初步數據提供了進一步的證據,表明TW-1鑽探地點的LGU中含有一些濃度最高的鋰。對空運開發流體的實驗室分析進一步證實了先前的證據,即LGU中含有鋰鹵水礦床,其他運營商表示,該礦床可能是克萊頓山谷內的生產含水層。收集的樣本中的鋰分析由內華達州斯帕克斯的西部環境測試實驗室使用ICPMS-EPA批准的方法完成。

TW-1 will be prepared for an upcoming permitted pumping test from which hydraulic properties and brine chemistry of the LGU will be further assessed. The assessment will examine the potential extractability and average lithium concentration of the brine in the LGU at TW-The results of the TW-1 pumping test and response propagated to the DH-1A-grouted in vibrating wire piezometers, will be used to assess the potential volume of lithium brine in the LGU that could be extracted through pumping. The assessment of extractable brine volume and concentration of lithium in the brine will be used to infer if a lithium resource potentially exists at the ACME project.

TW-1將為即將到來的許可抽水試驗做準備,通過該試驗將進一步評估LGU的水力特性和鹽水化學。評估將檢查TW時LGU中鹵水的潛在可萃取性和平均鋰濃度-TW-1抽水測試的結果和傳播到DH-1A型壓力計的回應將被用於評估LGU中可通過抽水提取的鋰鹵水的潛在體積。對可提取鹵水體積和鹵水中鋰濃度的評估將用於推斷ACME專案是否可能存在鋰資源。

William Feyerabend, Certified Professional Geologist and Mathew Banta, Certified Professional Hydrogeologist are qualified persons as defined by NI 43-101 and have supervised the preparation of the scientific and technical information that forms the basis for this news release.

註冊專業地質學家威廉·費耶阿本德和註冊專業水文地質學家馬修·班塔是NI 43-101定義的合格人員,並監督構成本新聞稿基礎的科學和技術資訊的準備工作。

About ACME Lithium Inc.

ACME Lithium公司簡介

Led by an experienced team, ACME Lithium is a mineral exploration Company focused on acquiring, exploring, and developing battery metal projects in partnership with leading technology and commodity companies. ACME has acquired or is under option to acquire a 100-per-cent interest in projects located in Clayton Valley and Fish Lake Valley, Esmeralda County Nevada, at Shatford, Birse, and Cat-Euclid Lakes in southeastern Manitoba, and at Bailey Lake in northern Saskatchewan.

ACME鋰是一家礦產勘探公司,由經驗豐富的團隊領導,與領先的技術和大宗商品公司合作,專注於收購、勘探和開發電池金屬專案。Acme已收購或正在選擇收購位於內華達州埃斯梅拉達縣克萊頓山谷和魚湖谷、馬尼託巴省東南部的Shatford、Birse和Cat-Euclid Lake以及薩斯喀徹溫省北部的Bailey Lake的專案的100%權益。

On behalf of the Board of Directors

我謹代表董事會

Steve Hanson
Chief Executive Officer, President and Director
Telephone: (604) 564-9045
info@acmelithium.com

史蒂夫·漢森
總裁和董事首席執行官
電話:(604)564-9045
郵箱:Info@acmelithium.com

For Investor Inquiries
Anthony Simone
Simone Capital
Telephone: (416) 818-5154
asimone@simonecapital.ca

供投資者查詢
安東尼·西蒙
西蒙尼資本
電話:(416)818-5154
郵箱:asimone@simonecapital.ca

Neither the CSE nor its regulations service providers accept responsibility for the adequacy or accuracy of this news release. This news release may contain forward-looking information within the meaning of applicable securities laws ("forward-looking statements"). Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur and in this news release include but are not limited to the attributes of, timing for and expected benefits to be derived from exploration, drilling or development at ACME's project properties. Information inferred from the interpretation of drilling, sampling and other technical results may also be deemed to be forward-looking statements, as it constitutes a prediction of what might be found to be present when and if a project is actually developed. ACME's project location adjacent to or nearby lithium projects does not guarantee exploration success or that mineral resources or reserves will be defined on ACME's properties. Exploration, development, and activities conducted by regional companies provide assistance and additional data for exploration work being completed by ACME. These forward-looking statements are subject to a variety of risks and uncertainties which could cause actual events or results to differ materially from those reflected in the forward-looking statements, including, without limitation: risks related to fluctuations in metal prices; uncertainties related to raising sufficient financing to fund the planned work in a timely manner and on acceptable terms; changes in planned work resulting from weather, logistical, technical or other factors; the possibility that results of work will not fulfill expectations and realize the perceived potential of the Company's properties; risk of accidents, equipment breakdowns and labour disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in the work program; the risk of environmental contamination or damage resulting from the Company's operations and other risks and uncertainties. Any forward-looking statement speaks only as of the date it is made and, except as may be required by applicable securities laws, the Company disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events or results or otherwise.

CSE及其法規服務提供商均不對本新聞稿的充分性或準確性承擔責任。本新聞稿可能包含適用證券法(“前瞻性聲明”)所指的前瞻性資訊。前瞻性陳述是指不是歷史事實的陳述,通常但不總是由“預期”、“計劃”、“預期”、“相信”、“打算”、“估計”、“專案”、“潛在”和類似的表述,或事件或條件“將”、“將”、“可能”、“可能”或“應該”發生的陳述,在本新聞稿中包括但不限於從勘探中獲得的屬性、時機和預期收益。在ACME專案物業進行鑽探或開發。從對鑽探、採樣和其他技術結果的解釋中推斷出的資訊也可被視為前瞻性陳述,因為它構成了對專案實際開發時以及是否開發時可能發現的情況的預測。Acme的專案位置與鋰專案相鄰或附近,並不能保證勘探成功,也不能保證礦產資源或儲量將在ACME的屬性中確定。區域公司進行的勘探、開發和活動為ACME正在完成的勘探工作提供了幫助和額外的數據。這些前瞻性表述受各種風險和不確定因素的影響,可能導致實際事件或結果與前瞻性表述中反映的情況大不相同,包括但不限於:與金屬價格波動有關的風險;與及時以可接受的條件籌集足夠資金為計劃工作提供資金有關的不確定因素;天氣、後勤、技術或其他因素導致計劃工作發生變化;工作結果不能達到預期並實現公司財產的預期潛力的可能性;事故、設備故障和勞資糾紛或其他意想不到的困難或中斷的風險;工作計劃中成本超領或意外支出的可能性;公司運營造成環境汙染或損害的風險以及其他風險和不確定性。任何前瞻性表述僅在作出之日發表,除適用的證券法可能要求外,公司不承擔任何更新任何前瞻性表述的意圖或義務,無論是由於新資訊、未來事件或結果或其他原因。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論