share_log

Aztec Drilling Intersects 2.82 Gpt Gold & 176.64 Gpt Silver (5.02 Gpt AuEq) Over 36.0 M With 6.45 Gpt Gold & 408.47 Gpt Silver (11.55 Gpt AuEq) Over 15.5 M at the Tombstone Project, Arizona

Aztec Drilling Intersects 2.82 Gpt Gold & 176.64 Gpt Silver (5.02 Gpt AuEq) Over 36.0 M With 6.45 Gpt Gold & 408.47 Gpt Silver (11.55 Gpt AuEq) Over 15.5 M at the Tombstone Project, Arizona

在亚利桑那州墓碑项目,阿兹台克钻探与2.82 Gpt Gold 和 176.64 Gpt Silver(5.02 Gpt aueQ)交叉超过 3600 米,与 6.45 Gpt Gold 和 408.47 Gpt Silver(11.55 Gpt aueQ)相交
Accesswire ·  2023/06/05 19:00
  • Assay results for additional 3 holes of the core drilling program reported herein
  • Hole 23-05 intersected multiple high-grade silver-gold zones within a broad, oxidized, 36.0 m mineralized zone of 5.02 gpt AuEq, including 1.52 m of 1694 gpt Ag (54.5 oz/t Ag) and 1.52 m of 1470 gpt Ag (47.3 oz/t Ag) with 1.52 m of 53.5 gpt Au
  • The core drilling program demonstrates presence of high-grade mineralization in the southern portion of the main Contention pit
  • TC23-03, TC23-04, and TC23-05 expanded mineralization around the Contention pit to the east and at depth, confirmed gold and silver mineralization in historic workings near the sixth level
  • The 7-hole core drilling program is now complete, with assay results pending from targets drilled in the South Contention pit and the northern end of the Contention pit
  • 此处报告的岩心钻探计划中另外3个孔的化验结果
  • 23-05 洞在 5.02 gpt aueQ 的宽阔氧化的 36.0 米矿化带内与多个高品位银金区相交,包括 1.52 m 的 1694 gpt Ag(54.5 盎司/t Ag)和 1.52 m 的 1470 gpt Ag(47.3 盎司/t Ag),1.52 m 为 53.5 gpt Au
  • 岩心钻探计划表明,Contention主矿坑的南部存在高品位矿化
  • TC23-03、TC23-04 和 TC23-05 扩大了东部和深度的 Contention 矿坑周围的矿化,证实了第六层附近的历史工作中的金银矿化
  • 7孔岩心钻探计划现已完成,在South Contention矿坑和Contention矿坑北端钻探的目标的化验结果尚待确定

VANCOUVER, BC / ACCESSWIRE / June 5, 2023 / Aztec Minerals Corp. (TSX-V:AZT)(OTCQB:AZZTF) announces it has received assay results from three drill holes of its 2023 core drilling program at the Tombstone project in the historic Tombstone silver mining district in southeastern Arizona. Aztec holds a 75% interest in the Tombstone Property Joint Venture, which includes most of the original patented mining claims in the district as well as some recently acquired properties. The three drill holes are part of a recently completed 7-hole program that was drilled in a fan-grid pattern over the length of the Contention open pit. Multiple underground mine workings were intersected in all the drill holes.

不列颠哥伦比亚省温哥华/ACCESSWIRE/2023 年 6 月 5 日/Aztec Minerals Corp. (TSX-V: AZT) (OTCQB: AZZTF) 宣布已收到其2023年岩心钻探计划的化验结果,该项目位于亚利桑那州东南部历史悠久的Tombstone银矿区。阿兹台克人持有Tombstone Property Joint Venture的75%权益,其中包括该地区大部分原始的专利采矿权以及一些最近收购的房产。这三个钻孔是最近完成的7孔项目的一部分,该项目是在Contention露天矿的长度上以扇形网格模式钻出的。所有钻孔中都有多个地下矿井交叉。

High grade silver and gold was encountered in TC23-05 within a zone of oxidized, altered siltstones and sandstones and Qfp dike at a shallow depth between 19.8 m and 55.8 m. TC23-05 intersected a shallow, broad, oxidized zone of 36.0 m averaging 2.82 gpt Au and 176.64 gpt Ag (5.02 gpt AuEq), including 6.45 gpt Au & 408.47 gpt Ag (11.55 gpt AuEq) over a 15.5 m width. The drill hole intersected several high grade silver zones of 1.52 m of 1694 gpt Ag, 1.52 m of 380 gpt Ag, 1.52 m of 226 gpt Ag, 1.52 m 1470 gpt Ag as well as 1.52 m of 53.5 gpt Au. Gold equivalence (AuEq) was calculated using an 80:1 silver:gold ratio. The vertical drillhole TC23-05, along with TC23-04, was collared at the bottom of the southern portion of the main Contention pit, near the former underground mine's second level. It also intercepted four different levels of mine workings and it is interpreted that the Blue limestone target was intercepted with a mineralized zone near the end of the drillhole.

在 TC23-05 中,在 19.8 米至 55.8 米之间的浅水深度的氧化、变化的粉砂岩和砂岩以及 Qfp 堤防区域内遇到了高品位的银和金。TC23-05 与 a 相交 浅、宽、氧化区为 36.0 m,平均为 2.82 gpt Au 和 176.64 gpt Ag(5.02 gpt aueQ),包括 宽度超过 15.5 m 的 6.45 gpt Au 和 408.47 gpt Ag(11.55 gpt aueQ)。钻孔与几个高级银区相交 1694 gpt Ag 中的 1.52 m380 gpt Ag 中的 1.52 m226 gpt Ag 中的 1.52 m1.52 m 1470 gpt Ag 以及 1.52 m of 53.5 gpt Au。黄金等价性 (aueQ) 是使用 80:1 的银:金比率计算得出的。垂直钻孔 TC23-05 和 TC23-04 位于主竞坑南部的底部,靠近前地下矿山的第二层。它还拦截了四个不同等级的矿山,据解释,蓝石灰石目标是在钻孔尽头附近有一个矿化带被拦截的。

Hole TC23-03 was collared inside the central portion of the main Contention pit, on the western side and drilled under the pit to its eastern side. The collar was located near to the east of the now closed, main Contention four compartment shaft that reached more than 1,000 feet deep for ten levels. TC23-03 encountered 62.5 m of 0.47 gpt Au and 24.05 gpt Ag (0.77 gpt AuEq) in oxidized, altered siltstones and sandstones and Qfp dike with mine workings.

TC23-03 洞位于主竞坑的中心部分,位于西侧,然后在矿坑下钻到东侧。项圈位于现已关闭的 Contention 主隔间竖井以东附近,该竖井深度超过 1000 英尺,共十层。 TC23-03 遇到了 62.5 m 的 0.47 gpt Au 和 24.05 gpt Ag (0.77 gpt aueQ)在氧化、变化的粉砂岩和砂岩以及带有矿山作业的 Qfp 堤防中。

Hole TC23-04 was collared adjacent to TC23-05 near the east foot of the Contention pit and encountered 35.0 m of 0.12 gpt Au and 19.14 gpt Ag (0.36 gpt AuEq) in oxidized, altered siltstones and sandstones and Qfp dike with multiple mine workings.

TC23-04 洞位于 Contention 矿坑东脚附近的 TC23-05 附近,在氧化、变化的粉砂岩和砂岩以及具有多个矿山作业的 Qfp 堤防中遇到 35.0 m 的 0.12 gpt Au 和 19.14 gpt Ag(0.36 gpt aueQ)。

Drill Hole TC23-02, which was collared approximately 80 m southwest of the previously reported hole TC23-01 was initially drilled to a depth of 27 m, before difficult drilling conditions resulted in a temporary abandonment of the drill hole in mid-March. The drill hole was then re-entered in late April and was successfully extended to a total depth of 139 m. This hole crossed several workings, and samples have been shipped for analysis, and are expected to be reported within the next 3 weeks, along with results from holes TC23-06 and TC23-07.

TC23-02 钻孔位于先前报道的 TC23-01 洞西南约 80 米处,最初钻到了 27 米的深度,之后艰难的钻探条件导致钻孔在 3 月中旬暂时放弃。然后,该钻孔于 4 月下旬重新进入,并成功延伸到总深度为 139 米。该洞穿过了几个工作点,样品已运往分析,预计将在接下来的 3 周内报告,以及 TC23-06 和 TC23-07 洞的结果。

Aztec Mineral CEO Simon Dyakowski stated "Our first core drilling program at the Tombstone Project continues to intersect broad, shallow, and oxidized zones of high-grade silver and gold, at the Contention open pit target. These most recent results highlight the expansion of the mineralized zone in the south-central and eastern portion of the target zone. We eagerly await the receipt of assays from the final holes of the now complete core drilling program."

阿兹台克矿业首席执行官西蒙·迪亚科夫斯基表示:“我们在Tombstone Project的第一个岩心钻探计划继续在Contention露天矿目标处与宽阔、浅层和高品位白银和金的氧化区相交。这些最新结果突显了目标区中南部和东部矿化带的扩大。我们热切地等待着收到现已完成的岩心钻探计划最后一孔的化验结果。”

View drill sections here:
Link to section view hole TC23-03
Link to section view holes TC23-04 & TC23-05

在此处查看钻孔部分:
链接到剖面图孔 TC23-03
链接到剖面图孔 TC23-04 和 TC23-05

Drill holes TC23-03, TC23-04 and TC23-05 were designed to expand the known mineralization in the central and southern portions of the main Contention pit to the east and to depth. The core drilling program was planned to be able to pass through the intricate levels of old mine workings and multiple faults and to reach, at a minimum, the water table just below the sixth level and the principal district host limestones at depth. The drilling to date has expanded the extent of mineralization to the west, east and to depth and demonstrates the potential for the volume of oxidized Au-Ag mineralization to grow as it remains open.

TC23-03、TC23-04 和 TC23-05 钻孔的设计目的是将主竞矿坑中部和南部已知的矿化扩展到东部和深度。岩心钻探计划计划能够穿越错综复杂的旧矿山运作和多个断层,并至少到达第六层以下的地下水位,主要地区深处有石灰岩。迄今为止的钻探已将矿化范围扩大到西、东和深处,并表明氧化后的金银矿化量在保持开放状态时有可能增加。

Drill holes TC23-03, TC23-04 and TC23-05 intersected extensive gold and silver mineralization, see table below, extending the mineralized zone at depth east and below the Contention open pit. The drill holes also intersected old mine stope workings, likely dating back to the late 1800's and high-grade zones as well, indicating that the highest-grade bonanza mineralization in the area drilled was only partially mined out.

TC23-03、TC23-04 和 TC23-05 钻孔与大量的金银矿化相交,见下表,延伸了Contention露天矿向东深处和下方的矿化区。钻孔还与旧的采矿场相交,其历史可能可以追溯到1800年代末和高品位区域,这表明该地区最高品位的富矿化仅被部分开采。

Table 1: Significant Drill Hole Intercepts

表 1:显著的钻孔截距

Drill Hole

From m

To m

Interval m*

Au gpt

Ag gpt

Au Eq gpt (1)

Comments

TC23-01

53.3

178.3

125.0

0.58

72.19

1.63

Incl. stopes of 15.9 m**
Including:

61.0

62.5

1.52

22.40

48.70

23.01

125.0

132.6

7.65

0.52

733.92

9.70

Incl:

126.5

128.0

1.52

0.12

3477.00

43.58

TC23-03

70.1

132.6

62.5

0.47

24.05

0.77

Incl. stopes of 6.1 m**

TC23-04

12.2

47.2

35.0

0.12

19.14

0.36

Incl. stopes of 2.9 m**

TC23-05

19.8

55.8

36.0

2.82

176.64

5.02

Incl. stopes of 4.4 m**

including

23.5

39.0

15.5

6.45

408.47

11.55

钻孔

来自 m

给我

间隔 m*

Au gpt

Ag gpt

Au Eq gpt (1)

评论意见

TC23-01

53.3

178.3

125.0

0.58

72.19

1.63

包括 15.9 米的停靠点**
包括:

61.0

62.5

1.52

22.40

48.70

23.01

125.0

132.6

7.65

0.52

733.92

9.70

包括:

126.5

128.0

1.52

0.12

3477.00

43.58

TC23-03

70.1

132.6

62.5

0.47

24.05

0.77

包括 6.1 米的停靠点**

TC23-04

12.2

47.2

35.0

0.12

19.14

0.36

包括 2.9 米的停靠点**

TC23-05

19.8

55.8

36.0

2.82

176.64

5.02

包括 4.4 米的停靠点**

包括

23.5

39.0

15.5

6.45

408.47

11.55

  1. AuEq is calculated using a 80:1 silver:gold ratio
  1. aueQ 是使用 80:1 的白银:金比率计算得出的

* All interval widths are not true widths and intercept true widths are not yet estimated.

* 所有间隔宽度都不是真实宽度,截距的真实宽度尚未估算。

** The mine workings void values are treated as an average grade of the combination of samples immediately before and after the voids over the reported void widths, subject to top caps of 1 gpt Au and 100 gpt Ag when needed.

** 矿山工作空隙值被视为空隙前后的样品组合的平均等级,但需要时最高上限为 1 gpt Au 和 100 gpt Ag。

Table 2: Completed Drillhole Details (WGS84, Zone 12R)

表 2:已完成的钻孔详细信息(WGS84,区域 12R)

Drill Hole

Easting

Northing

Elevation

Azimuth

Dip

Depth

TC23-01

588804

350964

1414 m

0

-90

242.99 m

TC23-03

588832

3507837

1408 m

103

-60

138.37 m

TC23-04

588848

3507708

1387.7 m

103

-60

71.32 m

TC23-05

588846

3507707

1387.7 m

0

-90

158.19 m

钻孔

向东

北方

海拔

Azimuth

深度

TC23-01

588804

350964

1414 m

0

-90

242.99 m

TC23-03

588832

3507837

1408 m

103

-60

138.37 m

TC23-04

588848

3507708

1387.7 m

103

-60

71.32 m

TC23-05

588846

3507707

1387.7 m

0

-90

158.19 m

Aztec has now completed the 7-hole core drilling program. The company has reported assays for four holes. Samples and their collection are controlled by an industry standard conforming QAQC program including insertions of certified standards, blanks and sample duplicates. The samples are being regularly shipped to and received by the Bureau Veritas Minerals laboratory in Hermosillo, Mexico for geochemical analysis.

阿兹台克人现在已经完成了7孔岩心钻探计划。该公司报告了四个洞的化验结果。样本及其收集由符合行业标准的 QAQC 计划控制,包括插入经过认证的标准、空白和样本副本。这些样本定期运往位于墨西哥埃莫西约的必维国际检验集团矿业实验室进行地球化学分析。

Core samples are sawn and are continuously collected over 5 foot (1.52m) sample intervals from all drill holes. The samples were analyzed for gold with a 30-gram sample size using the fire assay method FA430 followed by multi-element MA300, including silver. Over limits, when present, are analyzed by MA370 or FA530. All holes contain certified blanks, standards, and duplicates as part of the quality control program.

岩心样品是锯成的,并在 5 英尺(1.52 米)的间隔内从所有钻孔中连续采集样品。使用火焰分析方法 FA430 对样本进行了样本量为 30 克的黄金,然后使用包括银在内的多元素 MA300 进行了分析。如果存在超限值,则由 MA370 或 FA530 进行分析。作为质量控制程序的一部分,所有孔都包含经过认证的空白、标准和重复品。

Tombstone 2023 Core Drill Program Plan Map

Tombstone 2023 岩芯钻探计划计划地图

The drilling program was designed with data obtained from surveys and modelling completed over 2022, following the conclusion of Aztec's previous RC drilling program in late 2021. Aztec has recently completed an ortho-topographic drone survey to construct detailed maps, surveyed all drill hole collars from 2020-21, sampled for Terraspec alteration analysis half of the North Contention pit, completed Terraspec analysis on all the 2020-21 RC chips, and advanced the construction of a wire-frame 3-D Leapfrog model of the historic, extensive, underground mine workings, with drilling, mineralization, geology, alteration, geophysics, and multi-element geochemistry.

继阿兹台克先前的RC钻探计划于2021年底结束之后,该钻探计划是根据从2022年完成的调查和建模中获得的数据设计的。阿兹台克最近完成了用于绘制详细地图的正交地形无人机测量,对2020-21年度的所有钻孔项圈进行了采样,对北方争斗坑的一半进行了Terraspec改造分析,完成了对所有2020-21年RC芯片的Terraspec分析,并推进了具有历史性、广泛的地下矿山作业的线框三维 Leapfrog 模型的构建,包括钻探、矿化、地质学、蚀变、地球物理学,以及多元素地球化学。

To date the review of exploration data has defined the following target types for exploration at Tombstone:

迄今为止,对勘探数据的审查已确定了以下在Tombstone进行勘探的目标类型:

  • Shallow, bulk tonnage, "heap leachable"-type mineralization typical of Tombstone, composed of mesothermal Au-Ag oxides associated with the enrichment of sediment hosted mineralization on favorable horizons and structures, and with crosscutting, mineralized Qfp dikes and sills, mesothermal veins and hydrothermal breccias. This is the target type of Aztec's exploration focus since 2019.
  • Sub-water table (below ~200m depth) extensions of the typical Tombstone Au-Ag mineralization, composed mostly of secondary enrichment minerals and focused by the same horizon and structure types as the extensively mined shallow deposits above.
  • Deeper, high grade, "Taylor"- style carbonate replacement silver-lead-zinc-copper-gold deposits (CRD) in the extensive carbonate section (~ 2 kms estimated thickness) below the Bisbee formation.
  • The potential for a mineralized porphyry-type deposit as a source of the Tombstone mineralization.
  • 浅层、散装吨位、“堆可渗出” 型 Tombstone的典型矿化由与沉积物富集相关的中温金银氧化物组成,在有利的地平线和结构上托管矿化,以及横切的、矿化的Qfp堤坝和石仓、中温静脉和热液角砾岩。这是自2019年以来阿兹台克人探索重点的目标类型。
  • 地下水位(约 200 米深度以下) 典型的墓石金银矿化的延伸部分,主要由二次富集矿物组成,其地平线和结构类型与上面广泛开采的浅层矿床相同。
  • 更深、更高等级、“泰勒” 式的碳酸盐替代品 比斯比地层下方广阔的碳酸盐部分(估计厚度约为2千米)中的银-铅-锌-铜-金矿床(CRD)。
  • 矿化斑岩型的潜力 矿床是墓碑矿化的来源。

Data obtained from the core drill holes is expected to supplement the previous, shallow RC drilling by providing extensive knowledge of geological relationships and testing at the depth of the water table and below the Contention system across its width and along its length. Notably, Aztec's previous drilling terminated above the water table where typically the enrichment of Ag occurs, and that the main host horizons of the Tombstone district are found at this depth in the Contention target.

预计从岩心钻孔获得的数据将提供有关地质关系的广泛知识,并在地下水位深度和Contation系统下方的宽度和长度上进行测试,从而补充之前的浅层钢筋混凝土钻探。值得注意的是, 阿兹台克人先前的钻探在地下水位上方终止,银的富集通常发生在那里,而且 Tombstone 地区的主要宿主视野位于争夺目标的这个深度。

Upon the completion of diamond drilling, Aztec plans additional work including:

钻石钻探完成后,阿兹台克计划进行更多工作,包括:

  • Examining multi-element results for correlative, spatial, and geologic relationships.
  • Terraspec analysis of the drill core.
  • Detailed mapping of the Contention Open Pit, accompanied with Terraspec.
  • Update the drilling data into the Leapfrog model, and update known district drilling, geology (lithology, structural, alteration, mineralogy, mineralization age-dating), geophysics, geochemistry, and UG workings to identify mineralization trends to help target the shallow and deep-CRD drilling.
  • Examine the possibility of using seismic geophysics for identifying the overthrusts, faults and folding in the carbonates at depth.
  • A potential 43-101 compliant resource estimation
  • 检查多元素结果中的相关关系、空间和地质关系。
  • Terraspec 对钻芯的分析。
  • Contention 露天矿坑的详细地图,附有 Terraspec。
  • 将钻探数据更新到 Leapfrog 模型中,并更新已知的区域钻探、地质学(岩性学、结构学、蚀变、矿物学、矿化年龄年代测定)、地球物理学、地球化学和 UG 工作,以确定矿化趋势,帮助瞄准浅层和深层CRD钻探。
  • 研究使用地震地球物理学来识别深度碳酸盐岩的超推力、断层和折叠的可能性。
  • 可能符合 43-101 标准的资源估算

Tombstone Project Overview

Tombstone 项目概述

The main target of the 2023 core drill program is to continue testing the shallow, bulk tonnage, heap leachable, mesothermal gold-silver oxide mineralization adjacent and below the previously mined Contention pit by infill and step-out drilling. Future drilling is expected to focus on strike and dip extensions of the shallow oxide mineralization, and move deeper to test for larger, deeper "Taylor-type" CRD targets along and adjacent to the Contention structure.

2023 年岩心钻探计划的主要目标是通过填充和跨步钻探,继续测试先前开采的 Contention 矿坑附近和下方的浅层、散装吨位、堆可渗出、中温金银氧化物矿化层。预计未来的钻探将侧重于浅层氧化物矿化的走向和向下延伸,并向更深的方向移动,以测试Contention结构沿线和附近更大、更深的 “泰勒型” CRD目标。

The Tombstone project is located 100 kilometers (km) southeast of Tucson, Arizona and covers much of the historic Tombstone silver district. Tombstone is renowned for its high grade, oxidized, silver-gold-lead-zinc-copper mesothermal and CRD mineralization hosted in veins, mantos, pipes and disseminated orebodies that were mined in the late 1800's and early 1900's.

Tombstone项目位于亚利桑那州图森市东南100千米(km)处,涵盖了历史悠久的墓碑银区的大部分地区。Tombstone 因其在 1800 年代末和 1900 年代初开采的矿脉、曼陀罗、管道和播散矿体中的高品位、氧化银-金-铅锌-铜中温矿化和 CRD 矿化而闻名。

Host rocks to the mineralization were primarily the clastic sediments of the Cretaceous Bisbee Formation. Below 200 meters (m) in depth, the Bisbee is underlain by the same Paleozoic limestone formations that host the Taylor zinc-lead-silver deposit located 60 km southwest of Tombstone. Taylor was discovered by Arizona Mining in 2015 and they accepted a takeover bid from South32 Limited in 2018.

矿化的宿主岩石主要是白垩纪比斯比组的碎屑沉积物。比斯比河深度低于 200 米(m),位于墓碑西南 60 千米处的泰勒锌铅银矿床所在的古生代石灰岩地层下方。泰勒于2015年被亚利桑那矿业公司发现,他们于2018年接受了South32 Limited的收购要约

Although the historic silver mines at Tombstone were generally small, Aztec believes they could be related to much larger mesothermal and CRD orebodies below the old mines. Since 2017, Aztec has completed geological mapping, geochemical sampling and geophysical surveying to identify the most prospective areas for Au-Ag mineralization around and below the Contention open pit, and CRD zinc-lead-copper-silver-gold mineralization below the entire district.

尽管Tombstone的历史银矿通常很小,但阿兹台克人认为它们可能与旧矿山下方更大的中温和CRD矿体有关。自2017年以来,阿兹台克人已经完成了地质测绘、地球化学采样和地球物理调查,以确定Contention露天矿坑周围和下方最有前景的金银矿化区域,以及整个区域下方的CRD锌-铅-铜-银-金矿化区域。

The 2021 drill holes were collared along the western rim and inside of the north and central parts of the Contention Pit and intersected mineralization over a north-south length of 600 meters by over 150 m of east-west width and to maximum depths of 175 m. The 2020 drilling had an area of mineralization of 850 m long by an average of 75 m wide and to maximum depths of 200 m deep. The combined 2020 and 2021 drilled area now spans 900 m long by over 230 m wide and to maximum depths of 200 m, with Au-Ag mineralization still open in all directions and at depth.

2021 年的钻孔沿着西缘以及争夺坑的北部和中部内部开采,在南北长 600 米、东西向宽度超过 150 米、最大深度为 175 米。2020 年钻探的矿化区域长 850 米,平均宽 75 米,最大深度为 200 米。2020 年和 2021 年的总钻探区域现在跨度为 900 米,宽度超过 230 米,最大深度为 200 米,金银矿化在各个方向和深度仍处于开放状态。

The low sulfidation epithermal gold-silver mineralization observed to date is impressive, marked by hydrothermal breccias, quartz veining and silicification associated with quartz-feldspar porphyry dikes and moderate to strong potassic, argillic and advanced argillic alteration and hornfels within the host Bisbee sandstones and siltstones. Areas of intense hematite, goethite and manganese wad are extensive, associated with quartz-calcite veins and localized skarn alteration in limestones. Cerargyrite (silver chloride) is observed in fractures, often with fine-grained visible gold. Most Au-Ag mineralized zones intersected in the 2020 and 2021 drill programs are proximal to the historic underground mine workings.

迄今为止观测到的低硫化超热金银矿化作用令人印象深刻,其特征是与石英长石斑岩堤相关的热液角砾岩、石英脉纹和硅化以及宿主比斯比砂岩和粉砂岩中的中度至强钾、针状和晚期针状蚀变和角岩。深度赤铁矿、针铁矿和锰岩的区域很广,与石英方解石矿脉和石灰岩中的局部矽卡岩蚀变有关。在骨折中观察到塞拉吉利特(氯化银), 通常含有细颗粒的可见黄金。在2020年和2021年钻探计划中相交的大多数金银矿化区都靠近历史性的地下矿山开采区。

Tombstone 2020-21 Drilling Highlights:

Tombstone 2020-21 钻探亮点:

  • TR21-22: 2.44 gpt Au and 66.56 gpt Ag (3.39 gpt AuEq) over 65.5m
  • TR21-10: 1.39 gpt Au and 56.40 gpt Ag (2.20 gpt AuEq) over 96.0m
  • TR21-03: 5.71 gpt Au and 40.54 gpt Ag (6.28 gpt AuEq) over 32.0m
  • TR21-13: 1.80 gpt Au and 36.90 gpt Ag (2.33 gpt AuEq) over 70.1m
  • TR21-17: 1.73 gpt Au and 56.20 gpt Ag (2.53 gpt AuEq) over 64.0m
  • TR21-08: 2.09 gpt Au and 47.1 gpt Ag (2.76 gpt AuEq) over 39.6m
  • TR21-18: 0.76 gpt Au and 20.61 gpt Ag (1.05 gpt AuEq) over 64.0m
  • TR20-02: 0.94 gpt Au and 42.1 gpt Ag (1.60 gpt AuEq) over 77.7m
  • TR20-03: 0.77 gpt Au and 25.2 gpt Ag (1.07 gpt AuEq) over 97.5m
  • TR21-22:2.44 gpt Au 和 66.56 gpt Ag (3.39 gpt aueQ) 超过 65.5 万
  • TR21-10:1.39 gpt Au 和 56.40 gpt Ag (2.20 gpt aueQ) 超过 960 万
  • TR21-03:5.71 gpt Au 和 40.54 gpt Ag (6.28 gpt aueQ) 超过 3200 米
  • TR21-13:1.80 gpt Au 和 36.90 gpt Ag (2.33 gpt aueQ) 超过 70.1 万
  • TR21-17:1.73 gpt Au 和 56.20 gpt Ag (2.53 gpt aueQ) 超过 6400 万
  • TR21-08:2.09 gpt Au 和 47.1 gpt Ag (2.76 gpt aueQ)超过 3,960 万
  • TR21-18:0.76 gpt Au 和 20.61 gpt Ag (1.05 gpt aueQ) 超过 6400 万
  • TR20-02:0.94 gpt Au 和 42.1 gpt Ag (1.60 gpt aueQ) 超过 7770 万
  • TR20-03:0.77 gpt Au 和 25.2 gpt Ag (1.07 gpt aueQ) 超过 97.5 万

Gold equivalents are calculated using a 80:1 silver:gold ratio in 2020 and 2023 and a 70:1 silver:gold ratio in 2021.Reported lengths are apparent widths, not true widths. The Contention Au-Ag mineralization zones are generally west dipping at around 60-80 degrees, associated with the quartz-feldspar porphyry dikes. However, these dikes also extend as sills in shallow angles out from the Contention fault along fold noses in the Bisbee clastic sediments so the full range of mineralization dips vary from 20 to 80 degrees. True widths for the apparent mineralization intersection widths of the five holes approximately range from 50 to 100% of the apparent widths, with the norm for the mineralized true widths being 60 to 90% of the apparent widths.

黄金等价物是在 2020 年和 2023 年使用 80:1 的银:金比率和 2021 年使用 70:1 的银金比率计算得出的。报告的长度是表观宽度,而不是实际宽度。Contention Au-Ag 矿化区通常位于西部 60-80 度左右,与石英长石斑岩堤有关。但是,在比斯比碎屑沉积物中,这些堤坝也以浅角度从Contation断层向外延伸出斜坡,因此整个矿化倾角范围从20到80度不等。五个孔的表观矿化交叉点宽度的真实宽度大约在表观宽度的50%至100%之间,矿化实际宽度的标准为表观宽度的60%至90%。

Tombstone Project Highlights

Tombstone 项目亮点

  • Well located property on patented (32) and unpatented (42) claims (434.4 hectares/1,073.4 acres), covers much of the historic Tombstone silver mining district, great infrastructure, local town, road access, full services, water, power
  • Historic silver district produced 32 million oz silver from 1878-1939, in high grade, oxidized, silver-gold-lead-zinc-copper vein and CRD deposits, and small open pit heap leach production in late 1980's
  • Drilling by Aztec in 2020-21 has demonstrated that the Contention Pit target has significant Au-Ag mineralization which is open in all directions
  • Multiple other prospective targets in Cretaceous and Paleozoic rocks related to major NW and NNE trending structures hosting porphyritic intrusions crosscutting a possible caldera ring structure
  • A very important target is a potential bulk-tonnage carbonate replacement deposit in Paleozoic limestones similar to the Taylor discovery (100+ million tonnes of 10% Zinc Equivalent) located 60 km southwest of Tombstone (mineralization hosted on adjacent and/or nearby properties is not necessarily indicative of the mineralization hosted on the Company's property) whose presence is suggested by historic deep drilling intercepts for CRD mineralization returned multiple intersections grading up to 32 gpt silver, 0.61% copper, 6.5% lead and 2.6% zinc over 7.2m core length
  • Distinct magnetic and AMT anomalies confirm multiple target areas, Contention pit hosts dikes along strongest district structure, excellent potential for CRD deposits with similar geology to the "Taylor" deposit
  • Aztec high-grade surface rock samples from the Contention Pit, grade up to 3,178 gpt silver and 23.5 gpt gold, epithermal stockwork mineralization open along strike. Out of 94 samples collected from within the pit, silver ranges between <0.1 and 3,178 gpt (114.5 gpt average) and gold ranges <0.005 and 23.5 gpt (1.60 gpt average)
  • Historic shallow mining at Contention pit for heap leachable Au-Ag mineralization, historic drilling by USMX around the pit returned multiple intersections including 1.61 gpt Au, 91.2 gpt Ag over 44.2m (see the Company's news release dated September 18, 2018 "Aztec Minerals Acquires Late 1980's-Early 1990's Drilling and Trenching Data for the Tombstone Project, Arizona" for further disclosure on USMX drilling)
  • 位置优越的房产 关于专利(32)和非专利(42)索赔(434.4 公顷/1,073.4 英亩),涵盖了历史悠久的 Tombstone 银矿区的大部分地区、完善的基础设施、当地城镇、道路通道、全方位服务、水、电
  • 历史悠久的银区 1878-1939 年间生产了 3200 万盎司白银,采用高品位、氧化型、银-金-铅-锌-铜矿脉和 CRD 矿床,在 1980 年代后期还生产了小型露天堆浸出物
  • 阿兹台克人在 2020-21 年度进行钻探 已证明Contention Pit目标具有显著的金银矿化作用,该矿化向四面八方开放
  • 其他多个潜在目标白垩纪和古生代岩石中的s与主要 NW 和 NNE 趋势结构有关,这些结构存在斑岩入侵,横穿了可能的火山口环状结构
  • 一个非常重要的目标 是古生代石灰岩中潜在的块状碳酸盐替代矿床,类似于位于墓碑西南 60 千米处的泰勒发现(超过 1 亿吨 10% 的锌当量)(位于邻近和/或附近地块上的矿化不一定表示公司财产上存在矿化),其存在是由历史上的 CRD 矿化深层钻探截点返回的多个交叉路口,银分级高达 32 gpt,铜 0.61% 在 7.2 米的核心长度上为 6.5% 的铅和 2.6% 的锌
  • 明显的磁异常和 AMT 异常 确认多个目标区域,Contention pit 在最坚固的区域结构上有堤坝,具有与 “泰勒” 矿床地质相似的 CRD 矿床的潜力极大
  • 阿兹台克高等级地表岩石样本 从争夺坑出发,等级高达 3,178 gpt 的白银和 23.5 gpt 的黄金,冲击沿线开启了浅热岩石矿化。在矿坑内采集的 94 个样本中,银的范围在
  • 历史性的浅层采矿 在争夺堆可渗出金银矿化的争夺坑中,USMX 在矿坑周围进行的历史性钻探返回了多个交叉点,包括 1.61 gpt Au、91.2 gpt Ag,超过 442 万英尺的 GPT Ag(见该公司于 2018 年 9 月 18 日发布的新闻稿)”阿兹台克矿业公司为亚利桑那州墓碑项目收购了1980年代末至1990年代初的钻探和挖沟数据” 以进一步披露USMX钻探情况)

Allen David Heyl, B.Sc., CPG., VP Exploration, is the Qualified Person overseeing the Tombstone exploration program. Mr. Heyl reviewed and approved the technical disclosures in this news release

艾伦·戴维·海尔,CPG. 理学学士,勘探副总裁,是监督墓碑勘探计划的合格人员。Heyl 先生审查并批准了本新闻稿中的技术披露

"Simon Dyakowski"
Simon Dyakowski, Chief Executive Officer

“西蒙·迪亚科夫斯基”
西蒙·迪亚科夫斯基,首席执行官

Aztec Minerals Corp.

阿兹台克矿业公司

About Aztec Minerals - Aztec is a mineral exploration company focused on two emerging discoveries in North America. The Cervantes project is an emerging porphyry gold-copper discovery in Sonora, Mexico. The Tombstone project is an emerging gold-silver discovery with high grade CRD silver-lead-zinc potential in southern Arizona. Aztec's shares trade on the TSX-V stock exchange (symbol AZT) and on the OTCQB (symbol AZZTF).

关于阿兹台克矿业 -阿兹台克是一家矿产勘探公司,专注于北美的两项新发现。塞万提斯项目是墨西哥索诺拉州一项新兴的斑岩金铜矿发现。Tombstone项目是亚利桑那州南部一项新兴的金银发现,具有高品位CRD银铅锌的潜力。阿兹台克的股票在多伦多证券交易所交易(代码为AZT)和OTCQB(代码为AZZTF)。

Contact Information - For more information, please contact:

联系信息- 欲了解更多信息,请联系:

Simon Dyakowski, President & CEO, Director
Tel: (604) 619-7469
Fax: (604) 685-9744
Email: simon@aztecminerals.com
Website:

西蒙·迪亚科夫斯基,总裁兼首席执行官、董事
电话:(604) 619-7469
传真:(604) 685-9744
电子邮件:simon@aztecminerals.com
网站:

Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein.

多伦多证券交易所及其监管服务提供商(该术语在多伦多证券交易所政策中定义)均不对本新闻稿的充分性或准确性承担责任。没有任何证券交易所、证券委员会或其他监管机构批准或不批准此处包含的信息。

Forward-Looking Statements:

前瞻性陈述:

Certain statements contained in this press release may constitute forward-looking statements under Canadian securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "expects" or "it is expected", or variations of such words and phrases or statements that certain actions, events or results "will" occur. These forward-looking statements are subject to a number of risks and uncertainties. Actual results may differ materially from results contemplated by the forward-looking statements. Factors that could cause actual results to differ materially from those in forward-looking statements. Accordingly, the actual events may differ materially from those projected in the forward-looking statements. When relying on forward-looking statements to make decisions, investors and others should carefully consider the foregoing factors and other uncertainties and should not place undue reliance on such forward-looking statements. The Company does not undertake to update any forward-looking statements, except as may be required by applicable securities laws.

根据加拿大证券立法,本新闻稿中包含的某些陈述可能构成前瞻性陈述。通常,前瞻性信息可以通过使用前瞻性术语来识别,例如 “期望” 或 “预期”,或者对某些行动、事件或结果 “将” 发生的词语和短语或陈述进行变体。这些前瞻性陈述存在许多风险和不确定性。实际结果可能与前瞻性陈述所设想的结果存在重大差异。可能导致实际结果与前瞻性陈述中的结果存在重大差异的因素。因此,实际事件可能与前瞻性陈述中的预测存在重大差异。在依靠前瞻性陈述做出决策时,投资者和其他人应仔细考虑上述因素和其他不确定性,不应过分依赖此类前瞻性陈述。除非适用的证券法有要求,否则公司不承诺更新任何前瞻性陈述。

SOURCE: Aztec Minerals Corp.

来源: 阿兹台克矿业公司


View source version on accesswire.com:
在 accesswire.com 上查看源代码版本:

译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发