share_log

Titan Reports First Quarter 2023 Results

Titan Reports First Quarter 2023 Results

泰坦公布2023年第一季度业绩
GlobeNewswire ·  2023/05/12 06:08

VANCOUVER, British Columbia, May 11, 2023 (GLOBE NEWSWIRE) -- Titan Mining Corporation (TSX: TI) ("Titan" or the "Company") announces the results for the quarter ended March 31, 2023. (All amounts are in U.S. dollars unless otherwise stated)

温哥华,不列颠哥伦比亚省,2023年5月11日(环球社)--泰坦矿业公司(多伦多证券交易所股票代码:TI)(“泰坦“或”公司“)公布截至2023年3月31日的季度业绩。(除另有说明外,所有金额均以美元计算)

Don Taylor, President and Chief Executive Officer of Titan, commented, "Titan's ESM operations had an outstanding beginning to 2023 with a solid first quarter hitting or exceeding targets for the major metrics in safety and production while continuing to pay a quarterly dividend. Development planning and execution as well equipment purchases for the Sphaleros project continued on target for the quarter."

泰坦公司首席执行官唐·泰勒、总裁表示:“泰坦的ESM业务在2023年有了一个出色的开端,第一季度在安全和生产方面的主要指标达到或超过了目标,同时继续支付季度股息。斯帕雷洛斯项目的开发规划和执行以及设备采购继续按该季度的目标进行。”

Q1 2023 HIGHLIGHTS:

2023年第一季度亮点:

  • Zinc production of 13.8 million payable pounds and sales of 14.8 million payable pounds, up 37% and 43% respectively when compared to Q1 2022
  • $16.7 million in revenue, up 20% when compared to Q1 2022
  • Cash flow of $3.35 million, up 60% when compared to Q1 2022
  • Paid a cash dividend of C$0.01 per share on April 14, 2023 in respect of Q1 2023
  • Entered into a fixed zinc pricing arrangement for approximately 30% of the Company's forecasted zinc production for the remainder of 2023. The arrangement is for an eleven-month period covering February 2023 to December 2023 at a price of $1.55 per pound of zinc
  • Cash balance of $7.4 million at March 31, 2023
  • 锌产量1380万英镑,销售1480万英镑,分别比2022年第一季度增长37%和43%
  • 收入1670万美元,与2022年第1季度相比增长20%
  • 现金流335万美元,与2022年第一季度相比增长60%
  • 于2023年4月14日就2023年第一季度支付每股0.01加元的现金股息
  • 订立一项固定锌定价安排,占本公司于2023年余下时间的预测锌产量约30%。这项安排为期11个月,2023年2月至2023年12月,锌的价格为每磅1.55美元
  • 截至2023年3月31日的现金余额为740万美元

TABLE 1 Financial and Operating Highlights

表1财务和业务要点

Q1 2023 Q4 2022 Q1 2022 Q1 2023
vs.
Q4 2022
Q1 2023
vs.
Q1 2022
Operating
Payable Zinc Produced mlbs 13.80 14.4 10.1 -4 % 37 %
Payable Zinc Sold mlbs 14.80 13.0 10.4 14 % 43 %
Average Realized Zinc Price $/lb 1.42 1.36 1.57 4 % -10 %
Financial
Revenue $m 16.74 13.95 13.96 20 % 20 %
Net Income (loss) before tax $m 1.10 (4.08 ) (2.62 ) 127 % 142 %
Earnings (loss) per share - basic $/sh 0.01 (0.03 ) (0.02 ) 133 % 150 %
Cash Flow from Operating Activities before changes in non-cash working capital $m 3.35 2.32 2.10 45 % 60 %
Financial Position 31-Mar-23 31-Dec-22 Change
Cash and Cash Equivalents $m 7.41 6.72 0.69
Net Debt 1 $m 23.34 23.31 0.03
2023年第一季度 2022年第四季度 2022年第一季度 2023年第一季度
v.v.
2022年第四季度
2023年第一季度
v.v.
2022年第一季度
运营中
生产的应付锌 百万磅 13.80 14.4 10.1 -4 百分比 37 百分比
已售出应付锌 百万磅 14.80 13.0 10.4 14. 百分比 43 百分比
已实现锌的平均价格 美元/磅 1.42 1.36 1.57 4. 百分比 -10 百分比
金融
收入 百万美元 16.74 13.95 13.96 20个 百分比 20个 百分比
税前净收益(亏损) 百万美元 1.10 (4.08 ) (2.62 ) 127 百分比 一百四十二 百分比
每股收益(亏损)-基本 $/sh 0.01 (0.03 ) (0.02 ) 一百三十三 百分比 一百五十 百分比
非现金营运资本变动前的经营活动现金流量 百万美元 3.35 2.32 2.10 45 百分比 60 百分比
财务状况 3月31日至23日 12月31日至22日 变化
现金和现金等价物 百万美元 7.41 6.72 0.69
净债务1 百万美元 23.34 23.31 0.03

1 Net Debt is a non-GAAP measure. This term is not a standardized financial measure under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See Non-GAAP Performance Measures below for additional information.

1净债务是非公认会计准则的衡量标准。这一术语不是国际财务报告准则下的标准化财务衡量标准,可能无法与其他发行人披露的类似财务衡量标准相提并论。看见非GAAP业绩衡量标准有关更多信息,请参阅以下内容。

OPERATIONS REVIEW

运营回顾

Mining efforts in the first quarter of 2023 focused on the Mahler, New Fold, Mud Pond and N2D zones. Waste development continued to advance on the Mahler ramp system which continues to provide access to a high-grade ore horizon in the Lower Mahler mining zone. It is expected that ore from this zone will support head grade at planned levels for the remainder of the year. The long hole stoping program for New Fold continued in the first quarter but is being paused in the second quarter to focus on improving ground control and engineering design. Production from this area is scheduled to restart in the second half of the year.

2023年第一季度的采矿工作主要集中在马勒、新褶皱、泥塘和N2D地区。废物开发在马勒坡道系统上继续推进,该系统继续提供通往下马勒矿区高品位矿层的通道。预计在今年余下时间,来自该地区的矿石将支持计划水平的头品位。New Fold的深孔回采计划在第一季度继续进行,但在第二季度暂停,以专注于改善地面控制和工程设计。该地区的生产计划在今年下半年重新开始。

Engineering and design efforts are well underway for the development of the Sphaleros underground project. Equipment required for the development has been identified and the acquisition process is underway. To help facilitate planning for the Sphaleros development an extensive LiDAR survey has been completed mapping the existing underground workings of the historic #2 Mine. During Q1 electrical infrastructure was installed at the portal site to supply the required power. Final road capping of the haul road from Sphaleros to the #4 mill will occur in the second half of 2023.

开发斯帕雷洛斯地下项目的工程和设计工作正在顺利进行。开发所需的设备已经确定,采购过程正在进行中。为帮助规划斯帕雷洛斯矿的开发,一项广泛的激光雷达调查已经完成,绘制了历史悠久的2号矿的现有地下工作场所的地图。在第一季度期间,在门户网站安装了电力基础设施,以提供所需的电力。从斯帕雷洛斯到#4钢厂的运输公路的最终道路封顶将在2023年下半年进行。

EXPLORATION UPDATE

勘探更新

Underground:

地下:

Drill programs in the first quarter of 2023 focused on advancing definition drilling in Lower Mahler and N2D. A total of 30 holes totaling 8,477 ft were completed. Definition drilling will continue to focus on Mahler and N2D in the second quarter of 2023. Underground exploration continued in the first quarter of 2023 with two holes completed, for a total of 1,612 ft drilled. This program continues to test the identified mineralization between New Fold and Mahler. Exploration drilling will continue to test this area throughout 2023.

2023年第一季度的钻探计划重点是推进下马勒和N2D的清晰度钻探。总共完成了30个洞,总计8477英尺。Definition Drilling将在2023年第二季度继续专注于Mahler和N2D。2023年第一季度继续进行地下勘探,完成了两个孔,共钻了1,612英尺。该项目继续测试新褶皱和马勒之间已确定的矿化。勘探钻探将在整个2023年继续测试这一地区。

Surface:

表面:

Surface drilling in the first quarter of 2023 focused on delineating and expanding the known near surface mineralization within the footprint of the Sphaleros project area. A total of 17 holes totaling 6,089 ft were completed testing the Streeter target. Surface drilling will continue to test near surface mineralization at Sphaleros through the end of the second quarter 2023.

2023年第一季度的地面钻探重点是在斯帕雷洛斯项目区范围内圈定和扩大已知的近地表矿化。总共完成了17个洞,总计6089英尺,测试了Streeter目标。到2023年第二季度末,地面钻探将继续在斯帕雷洛斯进行近地表矿化测试。

One district exploration hole was completed in the first quarter at 24 Crescent, a near mine district target, totaling 1,227 ft. A second hole will be completed at the start of the second quarter, before moving the rig back to Sphaleros for definition drilling. Regional drill targets have been identified for testing in the third and fourth quarters of 2023.

第一季度在24新月完成了一个区域勘探孔,这是一个靠近矿区的目标,总长度为1227英尺。第二个井眼将在第二季度初完成,然后将钻井平台移回斯帕雷洛斯进行定义钻井。已经确定了2023年第三季度和第四季度进行测试的区域演习目标。

Qualified Person

有资格的人

The scientific and technical information contained in this news release and the sampling, analytical and test data underlying the scientific and technical information has been reviewed, verified and approved by Donald R. Taylor, MSc., PG, President and Chief Executive Officer of the Company, a qualified person for the purposes of NI 43-101. Mr. Taylor has more than 25 years of mineral exploration and mining experience and is a Registered Professional Geologist through the SME (registered member #4029597). The data was verified using data validation and quality assurance procedures under high industry standards.

本新闻稿中包含的科学技术信息以及作为科学技术信息基础的抽样、分析和测试数据已由唐纳德·R·泰勒、硕士、PG、总裁和公司首席执行官(符合NI 43-101的资格人员)审查、核实和批准。泰勒先生拥有超过25年的矿产勘探和采矿经验,是通过中小企业注册的专业地质学家(注册会员编号4029597)。根据高行业标准,使用数据验证和质量保证程序对数据进行了验证。

Non-GAAP Performance Measures

非GAAP业绩衡量标准

This document includes non-GAAP performance measures, discussed below, that do not have a standardized meaning prescribed by IFRS. The performance measures may not be comparable to similar measures reported by other issuers. The Company believes that these performance measures are commonly used by certain investors, in conjunction with conventional GAAP measures, to enhance their understanding of the Company's performance. The Company uses these performance measures extensively in internal decision-making processes, including to assess how well the Empire State Mine is performing and to assist in the assessment of the overall efficiency and effectiveness of the mine site management team. The tables below provide a reconciliation of these non-GAAP measures to the most directly comparable IFRS measures as contained within the Company's issued financial statements.

本文件包括以下讨论的非公认会计准则业绩衡量标准,但没有国际财务报告准则所规定的标准化含义。这些业绩指标可能无法与其他发行人报告的类似指标相提并论。公司认为,这些业绩指标通常被某些投资者与传统的公认会计准则指标结合使用,以加强他们对公司业绩的了解。该公司在内部决策过程中广泛使用这些业绩衡量标准,包括评估帝国国矿的表现如何,以及协助评估矿场管理团队的整体效率和效力。下表提供了这些非公认会计准则计量与公司已发布财务报表中包含的最直接可比的国际财务报告准则计量的对账。

Net Debt

净债务

Net debt is calculated as the sum of the current and non-current portions of long-term debt, net of the cash and cash equivalent balance as at the balance sheet date. A reconciliation of net debt is provided below.

净负债是长期债务的当期和非当期部分减去截至资产负债表日的现金和现金等值余额后的总和。对净债务的对账如下

Three months ended
March 31, 2023
Year ended
December 31, 2023
Current portion of debt $ 732 $ 176
Non-current portion of debt 30,023 29,856
Total debt $ 30,755 $ 30,032
Less: Cash and cash equivalents (7,411 ) (6,720 )
Net debt $ 23,344 $ 23,312
截至三个月
2023年3月31日
截至的年度
2023年12月31日
债务的当期部分 $ 732 $ 一百七十六
债务的非流动部分 30,023 29,856
债务总额 $ 30,755 $ 30,032
减去:现金和现金等价物 (7,411 ) (6720 )
净债务 $ 23,344 $ 23,312

About Titan Mining Corporation

关于泰坦矿业公司

Titan is an Augusta Group company which produces zinc concentrate at its 100%-owned Empire State Mine located in New York state. Titan is built for growth, focused on value and committed to excellence. For more information on the Company, please visit our website at

泰坦是奥古斯塔集团的一家公司,在其位于纽约州的全资拥有的帝国国矿生产锌精矿。泰坦是为增长而建的,专注于价值,致力于卓越。欲了解更多有关本公司的资料,请浏览我们的网站

Contact

联系方式

For further information, please contact: Investor Relations: Email: info@titanminingcorp.com

如需更多信息,请联系:投资者关系:电子邮件:info@tititiminingcorp.com

Cautionary Note Regarding Forward-Looking Information

关于前瞻性信息的注意事项

Certain statements and information contained in this new release constitute "forward-looking statements", and "forward-looking information" within the meaning of applicable securities laws (collectively, "forward-looking statements"). These statements appear in a number of places in this news release and include statements regarding our intent, or the beliefs or current expectations of our officers and directors, including that it is expected that ore from the Lower Mahler mining zone will support head grade at planned levels for the remainder of the year; production from New Fold is scheduled to restart in the second half of the year; that final road capping of the haul road from Sphaleros to the #4 mill will occur in the second half of 2023; that definition drilling will continue to focus on Mahler and N2D in the second quarter of 2023; that the underground drilling program continues to test the identified mineralization between New Fold and Mahler; and that exploration drilling will continue to test the mineralization between New Fold and Mahler throughout 2023. When used in this news release words such as "to be", "will", "planned", "expected", "potential", and similar expressions are intended to identify these forward-looking statements. Although the Company believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements since the Company can give no assurance that such expectations will prove to be correct. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to vary materially from those anticipated in such forward-looking statements, including the risks, uncertainties and other factors identified in the Company's periodic filings with Canadian securities regulators. Such forward-looking statements are based on various assumptions, including assumptions made with regard to the ability to advance exploration efforts at ESM; the results of such exploration efforts; the ability to secure adequate financing (as needed); the Company maintaining its current strategy and objectives; and the Company's ability to achieve its growth objectives. While the Company considers these assumptions to be reasonable, based on information currently available, they may prove to be incorrect. Except as required by applicable law, we assume no obligation to update or to publicly announce the results of any change to any forward-looking statement contained herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If we update any one or more forward-looking statements, no inference should be drawn that we will make additional updates with respect to those or other forward-looking statements. You should not place undue importance on forward-looking statements and should not rely upon these statements as of any other date. All forward-looking statements contained in this news release are expressly qualified in their entirety by this cautionary statement.

本新闻稿中包含的某些陈述和信息构成适用证券法所指的“前瞻性陈述”和“前瞻性信息”(统称为“前瞻性陈述”)。这些声明出现在本新闻稿的多个地方,包括关于我们的意图、信念或我们高级管理人员和董事目前的期望的声明,包括预计下马勒矿区的矿石将在今年剩余时间支持计划水平的头品位;新褶皱的生产计划在今年下半年重新开始;从斯帕雷洛斯到#4钢厂的运输道路的最终道路封顶将在2023年下半年进行;这一定义钻探将在2023年第二季度继续专注于马勒和N2D;地下钻探计划将继续测试New Fold和Mahler之间已确定的矿化;勘探钻探将在整个2023年继续测试New Fold和Mahler之间的矿化。在本新闻稿中使用“将要”、“将”、“计划”、“预期”、“潜在”等词语以及类似的表达方式,旨在识别这些前瞻性陈述。尽管公司认为这些前瞻性陈述和/或信息中反映的预期是合理的,但不应过度依赖前瞻性陈述,因为公司不能保证这些预期将被证明是正确的。这些陈述涉及已知和未知的风险、不确定因素和其他因素,这些因素可能导致实际结果或事件与这些前瞻性陈述中预期的大不相同,包括公司向加拿大证券监管机构提交的定期报告中确定的风险、不确定因素和其他因素。这些前瞻性陈述基于各种假设,包括关于推进ESM勘探工作的能力、此类勘探工作的结果、(根据需要)获得充足融资的能力、公司维持当前战略和目标以及公司实现其增长目标的能力的假设。虽然根据现有信息,公司认为这些假设是合理的,但它们可能被证明是不正确的。除适用法律另有要求外,我们没有义务更新或公开宣布本文中包含的任何前瞻性表述的任何变化的结果,以反映实际结果、未来事件或发展、假设的变化或影响前瞻性表述的其他因素的变化。如果我们更新任何一个或多个前瞻性陈述,不应推断我们将对这些或其他前瞻性陈述进行额外更新。您不应过分重视前瞻性陈述,也不应依赖截至任何其他日期的这些陈述。本新闻稿中包含的所有前瞻性陈述都明确地受到本警示性声明的限制。


译文内容由第三方软件翻译。


以上内容仅用作资讯或教育之目的,不构成与富途相关的任何投资建议。富途竭力但不能保证上述全部内容的真实性、准确性和原创性。
    抢沙发