share_log

Doré Copper Announces Positive Results From Ore Sorting Tests at Corner Bay

Doré Copper Announces Positive Results From Ore Sorting Tests at Corner Bay

多雷銅業宣佈角灣礦石分選測試得出積極結果
GlobeNewswire ·  2023/04/18 20:06

Sample Location for Composite Sample Used in Ore Sorting Test

礦石分選測試中使用的複合樣品的樣本位置

Figure 1. Sample Location for Composite Sample Used in Ore Sorting Test
圖 1。礦石分選測試中使用的複合樣品的樣本位置

TORONTO, April 18, 2023 (GLOBE NEWSWIRE) -- Doré Copper Mining Corp. (the "Company" or "Doré Copper") (TSXV: DCMC; OTCQX: DRCMF; FRA: DCM) is pleased to announce positive results from ore sorting test work for its flagship Corner Bay high-grade copper-gold project located approximately 55 kilometers by road from the Corporation's Copper Rand mill, near Chibougamau, Québec.

多倫多,2023 年 4 月 18 日(GLOBE NEWSWIRE)— Dore Copper Mining Corp.(”公司“或”Dore Copper“)(多倫多證券交易所股票代碼:DCMC;OTCQX:DRCMF;FRA:DCM)很高興地宣佈,其旗艦Corner Bay高品位銅金項目的礦石分選測試工作取得了積極的結果,該項目距離公司位於魁北克希布加莫附近的蘭德銅礦廠約55公里。

Steinert was commissioned to complete ore sorting tests at their facility in Kentucky, United States, using a XRT sensor (X-ray transmission) and a laser sensor on a spatially diverse sample from the Corner Bay deposit.

Steinert受委託在其位於美國肯塔基州的工廠完成礦石分選測試,使用XRT傳感器(X射線傳輸)和激光傳感器對來自角灣礦牀的空間多樣化樣本進行分析。

The results support the first ore sorting test work that was completed for the preliminary economic assessment ("PEA") and further confirm the effectiveness of utilizing ore sorting technology to improve the processed grade and reduce the mill feed tonnage.

結果支持了初步經濟評估(“PEA”)中完成的首次礦石分選測試工作,並進一步證實了利用礦石分選技術提高加工品位和減少磨機進料噸位的有效性。

Highlights of Ore Sorting Test

礦石分選測試亮點

  • Copper grade increase of 77%, from 2.20% to 3.93%
  • Recovery of 93.6% Cu
  • Reject material contains 48% of the initial mass with a copper grade of 0.30%
  • Gold, silver and molybdenum grade also upgraded with excellent recoveries and low concentration in reject
  • Cost and environmental benefits include:
    • Lower transportation costs and greenhouse gas emissions (GHGs) due to a reduction of transported material from the mine to the mill
    • Lower energy consumption at the mill due to higher feed grade and hardness decrease of the feed material
    • Less tailings produced
    • Additional capacity of the mill to treat additional materials
    • Waste material at the mine site (reject material) to be used as backfill
  • 銅等級提高了 77%,從 2.20% 到 3.93%
  • 銅的回收率爲 93.6%
  • 廢棄材料含有初始質量的 48%,銅等級爲 0.30%
  • 金、銀和鉬等級也有所提高,回收率高,廢棄物濃度低
  • 成本和環境效益包括:
    • 由於減少了從礦山運輸到磨坊的物料,從而降低了運輸成本和溫室氣體排放 (GHG)
    • 由於飼料等級提高和飼料硬度降低,磨機的能耗降低
    • 減少尾礦產量
    • 提高了磨機處理其他材料的能力
    • 礦場的廢料(廢料)用作回填物

Commenting on the results of our second ore sorting tests, Ernest Mast, President & CEO, stated, "This test work further validates the favorable mineralogy of the Corner Bay deposit for ore sorting technology and confirms the prior ore sorting results obtained from the Corner Bay stockpile, which were included in the PEA. Preliminary ore sorting test work at Devlin in 2022, our secondary hub-and-spoke asset, had also indicated positive results. Ore sorting of the Corner Bay and Devlin will remain part of any future development scenarios due to its economic and sustainability benefits."

總裁兼首席執行官歐內斯特·馬斯特在評論我們的第二次礦石分選測試結果時表示: “這項測試工作進一步驗證了Corner Bay礦牀對礦石分選技術的有利礦物學,並證實了先前從Corner Bay庫存中獲得的礦石分選結果,這些結果已包含在PEA中。我們的次要輻射型資產 Devlin 於 2022 年進行的初步礦石分選測試工作也顯示出積極的結果。由於Corner Bay和Devlin具有經濟和可持續發展方面的好處,其礦石分選仍將是未來開發情景的一部分。”

Ore Sorting Tests

礦石分選測試

As a first step, the Steinert XRT was calibrated with high, medium and low grade and waste samples representative of the selected drill core samples of the Corner Bay deposit (Figure 1). A continuous production run was done on the 202 kg sample. The testing was done with three passes with the explicit aim of generating grade vs recovery vs mass pull curves, with each pass related to an adjustment in the sensitivity. Results are shown in the table below.

作爲第一步,對Steinert XRT進行了校準,使用了代表角灣礦牀選定鑽芯樣本的高、中、低品位和廢物樣本(圖 1)。對 202 kg 的樣品進行了連續的生產運行。測試分三次通過,其明確目標是生成坡度與恢復率與質量拉力曲線,每一次通過都與靈敏度的調整有關。結果如下表所示。

The sum of the two pre-concentrates (Test 2 in table below) represented 52.5% of the feed mass at a grade of 3.93% Cu (an increase of 77%) and resulted in a cumulative copper recovery of 93.6%. The final reject portion represented 47.5% of the feed mass at a grade of 0.30% Cu, representing 6.4% of the copper fed in the sorter. In addition, all other metals to be recovered (gold, silver and molybdenum) showed an upgrade in grade:

兩種預濃縮物的總和(下表中的試驗 2)佔進料質量的 52.5%,銅品位爲 3.93%(增加 77%),銅的累計回收率爲 93.6%。最終的廢棄部分佔進料質量的47.5%,銅品位爲0.30%,佔分揀機供應的銅的6.4%。此外,所有其他待回收的金屬(金、銀和鉬)的等級都有所提高:

  • Gold grade: from 0.17 g/t to 0.29 g/t
  • Silver grade: from 7.91 g/t to 13.82 g/t
  • Molybdenum grade: from 0.037% to 0.064%
  • 黃金等級:從 0.17 克/噸到 0.29 克/噸
  • 銀級:從 7.91 克/噸到 13.82 克/噸
  • 鉬等級:從 0.037% 到 0.064%

Lastly, the arsenic grade of the two pre-concentrates was found to be 12ppm which leads to a final concentrate with very low levels of arsenic.

最後,發現兩種預濃縮物的砷等級爲12ppm,這導致最終濃縮物的砷含量非常低。

Minimal fines were generated in the test work and were not considered for calculations. In practice, the fine material from the mining and crushing would join the pre-concentrate in the ore sorting circuit and would result in a higher recovery than indicated in the test work. In addition, as the sorter can be calibrated to control the final reject grade, a higher copper feed grade would result in higher recoveries.

在測試工作中產生的罰款微乎其微,計算時未考慮在內。實際上,採礦和破碎產生的精細材料會加入礦石分選迴路中的預濃縮物,從而產生比測試工作中顯示的更高的回收率。此外,由於可以對分揀機進行校準以控制最終的廢品等級,因此較高的銅原料等級將導致更高的回收率。

Corner Bay Ore Sorting Results Cumulative Results
Result
(cumulative)
Weight
(kg)
Mass
Recovery
Cu
(%)
Cu
Rec.
Au
(g/t)
Au
Rec.
Ag
(g/t)
Ag
Rec.
Mo
(%)
Mo
Rec.
1 70 34.7% 5.18 81.4% 0.37 77.2% 17.90 78.4% 0.082 77.2%
2 106 52.5% 3.93 93.5% 0.29 92.2% 13.82 91.7% 0.064 91.7%
3 175 86.6% 2.52 99.0% 0.19 98.4% 9.00 98.6% 0.042 98.2%
4 202 100.0% 2.20 100.0% 0.17 100.0% 7.91 100.0% 0.037 100.0%
Corner Bay 礦石分選結果累積結果
結果
(累積)
重量
(千克)
彌撒
恢復

(%)

Rec。
Au
(g/t)
Au
Rec。
Ag
(g/t)
Ag
Rec。
Mo
(%)
Mo
Rec。
1 70 34.7% 5.18 81.4% 0.37 77.2% 17.90 78.4% 0.082 77.2%
2 106 52.5% 3.93 93.5% 0.29 92.2% 13.82 91.7% 0.064 91.7%
3 175 86.6% 2.52 99.0% 0.19 98.4% 9.00 98.6% 0.042 98.2%
4 202 100.0% 2.20 100.0% 0.17 100.0% 7.91 100.0% 0.037 100.0%

Corner Bay Composite Sample

角灣複合材料樣本

A spatially diverse composite sample was prepared by Doré Copper by selecting 34 diamond drill holes which intersected mineralized zones within the Corner Bay Mineral Resource estimate ("MRE") (Figure 1; one mineralized sample was outside the current MRE). The core material selected represented different rock types: semi and massive sulphides, quartz veins, diorite dyke, and fresh and altered anorthosite. The drill core was sampled by cutting a quarter split NQ core. The longer pieces of quarter split core were further manually broken down into 1 to 3 inches length to simulate a crushed product. The composite sample weighted 202 kg and graded 2.20% Cu (Test 4 in table above) and included an 18% external mining dilution from the hanging wall and foot wall of the mineralized interval.

Dore Copper 通過選擇 34 個與角灣礦產資源估算(“MRE”)內礦化區相交的金剛石鑽孔製備了空間多樣化的複合樣品(圖 1;一個礦化樣本不在當前的 MRE 範圍內)。所選的巖芯材料代表不同的岩石類型:半硫化物和塊狀硫化物、石英脈、閃長巖堤以及新鮮和變質的正長巖。通過切割四分之一的NQ岩心對鑽芯進行採樣。較長的四分之一裂芯塊被進一步手動分解成 1 到 3 英寸長,以模擬破碎的產品。複合樣品重量爲 202 kg,銅分級爲 2.20%(上表中的試驗 4),包括來自礦化間隔懸壁和底壁的 18% 的外部採礦稀釋量。

The PEA did not include the silver and molybdenum content (currently excluded from the MRE). The composite sample indicated silver and molybdenum grades that would be expected in the deposit (Test 4 in table above).

PEA 不包括銀和鉬的含量(目前不包括在 MRE 中)。複合樣本顯示了礦牀中預期的銀和鉬等級(上表中的測試 4)。

Substantial Benefits of Ore Sorting

礦石分選的巨大好處

As already indicated in the Company's PEA (May 10, 2022), ore sorting technology offers substantial benefits versus conventional processing. It will reduce operating costs for milling, flotation and tailings management due to a significant rejection of low-grade material. Sorting is expected to decrease the hardness of the ore sent to the mill (lower Bond Work Index of the sorter pre-concentrate product compared to the feed), and so, non-negligeable energy savings could be foreseen. The commensurate increase in the head grade of the ore that will report to the flotation circuit has the potential to result in improved metallurgical recoveries in the flotation circuit and higher concentrate grades.

正如該公司的PEA(2022 年 5 月 10 日)中已經指出的那樣,與傳統加工相比,礦石分選技術具有顯著的優勢。由於大量拒絕使用低品位材料,它將降低銑削、浮選和尾礦管理的運營成本。分揀預計將降低送往磨機的礦石的硬度(與進料相比,分選機預濃縮產品的粘結工作指數較低),因此可以預見可以節省不可忽視的能源。向浮選迴路報告的礦石頭品位的相應增加有可能提高浮選迴路中的冶金回收率和提高精礦品位。

Further metallurgical and environmental testing, including comminution, flotation and leachability testing, will be carried out to progress the feasibility study and ongoing permitting.

將進行進一步的冶金和環境測試,包括粉碎、浮選和浸出性測試,以推進可行性研究和正在進行的許可。

Figure 1. Sample Location for Composite Sample Used in Ore Sorting Test

圖 1。礦石分選測試中使用的複合樣品的樣本位置

Qualified Person

合格人員

Ernest Mast, P.Eng., President and CEO of the Corporation, and a "Qualified Person" within the meaning of National Instrument 43-101 – Standards of Disclosure for Mineral Projects, has reviewed and approved the scientific and technical information contained in this news release.

歐內斯特·馬斯特,P.Eng.,公司總裁兼首席執行官,National Instrument 43-101 所指的 “合格人員” — 礦產項目披露標準,已審查並批准了本新聞稿中包含的科學和技術信息。

About Steinert

關於斯坦納特

Steinert is a global provider of intelligent sorting and separation solutions for the recycling and mining industries. Steinert, has over 125 years of experience, excels at providing customers technologically advanced sorting solutions via its extensive process and industry knowledge.

Steinert 是回收和採礦行業智能分揀和分離解決方案的全球提供商。Steinert 擁有超過 125 年的經驗,擅長通過其豐富的流程和行業知識爲客戶提供技術先進的分揀解決方案。

Steinert has been a pioneer in the market, consistently pursuing and achieving its goal of supporting customers by being a global technology leader. Founded in 1889 in Cologne, Germany, Steinert is the only manufacturer of magnetic separators that has further advanced its classic field of activity and established sensor-based sorting as a new technology in its product development.

Steinert 一直是市場的先驅,一直追求並實現通過成爲全球技術領導者爲客戶提供支持的目標。Steinert 於 1889 年在德國科隆成立,是唯一一家進一步推進其傳統活動領域並在產品開發中將基於傳感器的分揀技術確立爲一項新技術的磁選機制造商。

For more information, please visit:

欲瞭解更多信息,請訪問:

About Doré Copper Mining Corp.

關於 DoréCopper Mining Corp.

Doré Copper Mining Corp. aims to be the next copper producer in Québec with an initial production target of +50 Mlbs of copper equivalent annually by implementing a hub-and-spoke operation model with multiple high-grade copper-gold assets feeding its centralized Copper Rand mill1. The Company has delivered its PEA in May 2022 and is proceeding with a feasibility study.

DoréCopper Mining Corp. 的目標是成爲魁北克的下一個銅生產商,其初始目標是實施輻射式運營模式,由多個高等級銅金資產爲其集中式蘭德銅廠供水,其初始產量爲每年超過5000萬銅當量1。該公司已於2022年5月交付了PEA,並正在進行可行性研究。

The Company has consolidated a large land package in the prolific Lac Doré/Chibougamau and Joe Mann mining camps that has historically produced 1.6 billion pounds of copper and 4.4 million ounces of gold2 The land package includes 13 former producing mines, deposits and resource target areas within a 60-kilometre radius of the Company's Copper Rand Mill.

該公司在多產的 Lac Dore'/Chibougamau 和 Joe Mann 採礦營地整合了一大片土地,這些礦區歷來生產了 16 億磅銅和 440 萬盎司黃金2 該土地一攬子計劃包括該公司Copper Rand Mill半徑60公里範圍內的13個前生產礦山、礦牀和資源目標區域。

For further information, please contact:

欲瞭解更多信息,請聯繫:

Ernest Mast Laurie Gaborit
President and Chief Executive Officer Vice President, Investor Relations
Phone: (416) 792-2229 Phone: (416) 219-2049
Email: ernest.mast@dorecopper.com Email: laurie.gaborit@dorecopper.com
歐內斯特·馬斯特 勞裏·哈博裏特
總裁兼首席執行官 投資者關係副總裁
電話:(416) 792-2229 電話:(416) 219-2049
電子郵件:ernest.mast@dorecopper.com 電子郵件:laurie.gaborit@dorecopper.com

Visit:
Facebook: Doré Copper Mining
LinkedIn: Doré Copper Mining Corp.
Twitter: @DoreCopper
Instagram: @DoreCopperMining

訪問:
Facebook:多雷銅礦業
LinkedIn:多雷銅礦業公司
推特:@DoreCopper
Instagram:@DoreCopperMining

  1. Technical report titled "Preliminary Economic Assessment for the Chibougamau Hub-and-Spoke Complex, Québec, Canada" dated June 15, 2022, in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects. The Technical Report was prepared by BBA Inc. with several consulting firms contributing to sections of the study, including SLR Consulting (Canada) Ltd., SRK Consulting (Canada) Inc. and WSP Inc.
  2. Sources for historic production figures: Economic Geology, v. 107, pp. 963–989 - Structural and Stratigraphic Controls on Magmatic, Volcanogenic, and Shear Zone-Hosted Mineralization in the Chapais-Chibougamau Mining Camp, Northeastern Abitibi, Canada by François Leclerc et al. (Lac Dore/Chibougamau mining camp) and NI 43-101 Technical Report on the Joe Mann Property dated January 11, 2016 by Geologica Groupe-Conseil Inc. for Jessie Ressources Inc. (Joe Mann mine). Doré Ramp November 1992 Summary, internal Westminer Report.
  1. 根據國家儀器43-101,2022年6月15日題爲 “加拿大魁北克省希布加莫中心輻射綜合體的初步經濟評估” 的技術報告—— 礦產項目披露標準。技術報告由BBA Inc.編寫,幾家諮詢公司爲該研究的各個部分做出了貢獻,包括SLR Consulting(加拿大)有限公司、SRK Consulting(加拿大)公司和WSP Inc.
  2. 歷史產量數據來源:《經濟地質學》,第107卷,第963—989頁——加拿大阿比提比東北部Chapais-Chibougamau採礦營地岩漿、火山成因和剪切帶礦化的結構和地層學控制,作者:Francois Leclerc等人。(Lac Dore/Chibougamau 採礦營地)和 Geologica Groupe-Conseil Inc. 於 2016 年 1 月 11 日爲 Jessie Resources Inc.(Joe Mann 礦山)撰寫的 NI 43-101 關於喬·曼恩財產的技術報告。Dore Ramp 1992 年 11 月摘要,Westminer 內部報告。

Cautionary Note Regarding Forward-Looking Statements
This news release includes certain "forward-looking statements" under applicable Canadian securities legislation. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified by the use of words such as "seek", "anticipate", "believe", "plan", "estimate", "forecast", "expect", "potential", "project", "target", "schedule", "budget" and "intend" and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar expressions and includes the negatives thereof. All statements other than statements of historical fact included in this news release, including, without limitation, statements with respect to the timing and ability of the Company to receive necessary regulatory approvals, the Company's ability to meet its production target, the commencement, timing and completion of a feasibility study, and the plans, operations and prospects of the Company and its properties are forward-looking statements. Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable, are subject to known and unknown risks, uncertainties and other factors which may cause actual results and future events to differ materially from those expressed or implied by such forward-looking statements. Such factors include, but are not limited to, actual exploration results, changes in project parameters as plans continue to be refined, future metal prices, availability of capital and financing on acceptable terms, general economic, market or business conditions, uninsured risks, regulatory changes, delays or inability to receive required regulatory approvals, health emergencies, pandemics and other exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators. Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ from those described in forward-looking statements, there may be other factors that cause such actions, events or results to differ materially from those anticipated. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company disclaims any intention or obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law.

關於前瞻性陳述的警示說明
本新聞稿包括適用的加拿大證券立法下的某些 “前瞻性陳述”。前瞻性陳述包括預測、預測和預測,通常但並非總是通過使用 “尋求”、“預期”、“相信”、“計劃”、“估計”、“預測”、“預期”、“潛力”、“項目”、“目標”、“時間表”、“預算” 和 “打算” 等詞來識別,以及關於事件或結果 “可能”、“將”、“應該”、“應該” 的陳述 “可能” 或 “可能” 發生或實現以及其他類似的表達方式,包括其否定因素。本新聞稿中除歷史事實陳述以外的所有陳述,包括但不限於有關公司獲得必要監管部門批准的時機和能力、公司實現其生產目標的能力、可行性研究的開始、時機和完成以及公司及其物業的計劃、運營和前景的陳述,均爲前瞻性陳述。前瞻性陳述必須基於許多估計和假設,這些估計和假設雖然被認爲是合理的,但受已知和未知的風險、不確定性和其他因素的影響,這些因素可能導致實際業績和未來事件與此類前瞻性陳述所表達或暗示的結果存在重大差異。這些因素包括但不限於實際勘探結果、計劃不斷完善後項目參數的變化、未來金屬價格、可接受條件的資本和融資可用性、總體經濟、市場或商業狀況、未投保風險、監管變化、延遲或無法獲得所需的監管批准、突發衛生事件、流行病和其他勘探或其他風險,本文以及公司向證券監管機構提交的文件中不時詳述的其他風險。儘管公司試圖確定可能導致實際行動、事件或結果與前瞻性陳述中描述的不同的重要因素,但可能還有其他因素導致此類行動、事件或結果與預期存在重大差異。無法保證此類陳述會被證明是準確的,因爲實際結果和未來事件可能與此類陳述中的預期存在重大差異。因此,讀者不應過分依賴前瞻性陳述。除非法律要求,否則公司不打算或有義務更新或修改任何前瞻性陳述,無論是由於新信息、未來事件還是其他原因。

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

多倫多證券交易所風險交易所及其監管服務提供商(該術語在多倫多證券交易所風險交易所的政策中定義)均不對本新聞稿的充分性或準確性承擔責任。

A photo accompanying this announcement is available at

本公告附帶的照片可在以下網址獲得


譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論