share_log

Silver Hammer Mining Engages Precision GeoSurveys for Airborne Magnetic and Radiometric Surveys at Eliza and Silverton Projects in Nevada

Silver Hammer Mining Engages Precision GeoSurveys for Airborne Magnetic and Radiometric Surveys at Eliza and Silverton Projects in Nevada

Silver Hammer Mining 在內華達州的 Eliza 和 Silverton 項目使用精確的地質調查進行空中磁學和輻射測量
newsfile ·  2023/04/18 19:35

Vancouver, British Columbia--(Newsfile Corp. - April 18, 2023) - Silver Hammer Mining Corp. (CSE: HAMR) (OTCQB: HAMRF) (FSE: 7BW0) (the "Company" or "Silver Hammer") is pleased to announced that it has engaged Precision GeoSurveys for property-wide airborne magnetic and radiometric surveys at both the Eliza and Silverton Projects in Nevada.

不列顛哥倫比亞省溫哥華--(Newsfile Corp.-2023 年 4 月 18 日)- Silver Hammer Mining Corp.(CSE:HAMR)(OTCQB:HAMRF)(FSE:7BW0) “公司” 要麼 “銀錘“)很高興地宣佈,它已聘請Precision GeoSurveys在內華達州的Eliza和Silverton項目中進行全物業的航空磁和輻射測量。

"As we continue to advance our Eliza and Silverton projects, we are pleased to engage Precision for the upcoming airborne magnetic and radiometric surveys in May and June 2023," commented President & CEO Peter A. Ball. "These surveys will provide us with an additional layer of technical data to assist in refining our currently identified priority targets prior to the execution of a drill program at each project. Our systematic approach to exploration and drill targeting, as well as taking the time to fully understand the multiple layers of technical data, will result in the increased potential for an exciting new discovery in 2023 as we strive to deliver significant value to our shareholders."

“隨着我們繼續推進我們的Eliza和Silverton項目,我們很高興聘請Precision參與即將於2023年5月和6月進行的空中磁和輻射測量,” 總裁兼首席執行官彼得·鮑爾評論道。 “這些調查將爲我們提供額外的一層技術數據,以幫助我們在每個項目執行鑽探計劃之前完善我們目前確定的優先目標。在我們努力爲股東創造巨大價值的過程中,我們採用系統的勘探和鑽探目標方法,以及花時間充分了解多層技術數據,將增加在2023年進行激動人心的新發現的可能性。”

Survey Highlights

調查要點

The helicopter supported surveys will use magnetic sensors flown in non-magnetic and non-conductive nose stinger configuration, with gamma sensors internal to the aircraft away from variable fuel cell attenuation, to allow for reduced terrain clearance minimizing noise and improving resolution and accuracy.

直升機支持的調查將使用以非磁性和非導電鼻刺配置飛行的磁傳感器,在飛機內部安裝伽瑪傳感器,遠離可變的燃料電池衰減,從而減少地形間隙,最大限度地減少噪音,提高分辨率和精度。

Eliza Project (refer to Figure 1):

Eliza 項目(參見圖 1):

  • 269 total line kilometres
  • 50 metre line spacing
  • 12.1 square kilometres coverage
  • 線路總千米 269 公里
  • 50 米線間距
  • 12.1 平方千米覆蓋範圍

Silverton Project (refer to Figure 2):

西爾弗頓項目(參見圖 2):

  • 82 total line kilometres
  • 50 metre line spacing
  • 3.6 square kilometres coverage
  • 總線里程爲 82 公里
  • 50 米線間距
  • 3.6 平方千米覆蓋範圍

About Precision

關於精密

Precision GeoSurveys is a full-service airborne geophysical contractor and industry leader in providing high resolution surveys in mountainous and remote terrain having acquired and processed high resolution multi-sensor airborne geophysical data in mountainous terrain on over 700 surveys since 2007. The company utilizes state-of-the-art geophysical instrumentation attached directly to the helicopter. The magnetic sensors are flown in a non-magnetic and non-conductive nose stinger configuration, and the gamma sensors are flown internal to the aircraft away from variable fuel cell attenuation. Compared to conventional slung bird-type survey systems, this innovative design allows the survey to be safely flown at reduced terrain clearance to minimize noise, improve resolution, and reduce the need for complex corrections to the data. The geophysical data and maps will be prepared using industry standard Geosoft algorithms and mapping software to show the geomagnetic and radiometric properties of the survey area.

Precision GeoSurveys是一家提供全方位服務的機載地球物理承包商,在山區和偏遠地區提供高分辨率測量的行業領導者,自2007年以來在700多次調查中採集和處理了山區高分辨率多傳感器航空地球物理數據。該公司使用直接連接到直升機的最先進的地球物理儀器。磁傳感器以非磁性和非導電的鼻刺配置飛行,伽瑪傳感器在飛機內部飛行,遠離可變的燃料電池衰減。與傳統的懸掛式鳥類測量系統相比,這種創新的設計允許在較小的地形間隙下安全地進行調查,從而最大限度地減少噪音,提高分辨率,並減少對數據進行復雜校正的需求。地球物理數據和地圖將使用行業標準的Geosoft算法和測繪軟件編制,以顯示調查區域的地磁和輻射特性。

Qualified Person

合格人員

Technical aspects of this press release have been reviewed and approved under the supervision of Philip Mulholland, P.Geo. Mr. Mulholland is a Qualified Person (QP) under National Instrument 43-101 Standards of Disclosure for Mineral Projects.

本新聞稿的技術方面已在P.Geo的Philip Mulholland的監督下進行了審查和批准。根據國家儀器43-101礦業項目披露標準,穆赫蘭先生是合格人員(QP)。

About Silver Hammer Mining Corp.

關於銀錘礦業公司

Silver Hammer Mining Corp. is a junior resource exploration company advancing its flagship past-producing Silver Strand Mine in the Coeur d'Alene Mining District in Idaho, as well both the Eliza Silver Project and the Silverton Silver Mine in one of the world's most prolific mining jurisdictions in Nevada. Silver Hammer's primary focus is defining and developing silver deposits near past-producing mines that have not been adequately explored. The Company's portfolio also provides exposure to copper and gold discoveries.

Silver Hammer Mining Corp. 是一家初級資源勘探公司,在愛達荷州科達倫礦區推進其過去生產的旗艦銀灘礦,以及位於內華達州世界上最多產的礦業司法管轄區之一的伊麗莎白銀項目和西爾弗頓銀礦。Silver Hammer的主要重點是在過去的生產礦山附近定義和開發尚未得到充分勘探的銀礦牀。該公司的投資組合還爲銅和金的發現提供了機會。

On Behalf of the Board of Silver Hammer Mining Corp.

代表 Silver Hammer Mining Corp. 董事會

Peter A. Ball
President & CEO, Director
E: peter@silverhammermining.com

彼得 A. 鮑爾
總裁兼首席執行官兼董事
E: peter@silverhammermining.com

For investor relations inquiries, contact:

如需諮詢投資者關係,請聯繫:

Kristina Pillon
High Tide Consulting Corp.
T: 604.908.1695
E: investors@silverhammermining.com

克里斯蒂娜·皮隆
High Tide 諮詢公司
T: 604.908.1695
E: investors@silverhammermining.com

Forward-Looking Statements

前瞻性陳述

This news release contains "forward-looking statements" within the meaning of Canadian securities legislation. Such forward-looking statements concern, without limitation, the Company's strategic plans, timing and expectations for the Company's exploration and drilling programs, estimates of mineralization from drilling, geological information projected from sampling results and the potential quantities and grades of the target zones. Such forward-looking statements or information are based on a number of assumptions, which may prove to be incorrect. Assumptions have been made regarding, among other things: conditions in general economic and financial markets; accuracy of assay results; geological interpretations from drilling results, timing and amount of capital expenditures; performance of available laboratory and other related services; future operating costs; and the historical basis for current estimates of potential quantities and grades of target zones. The actual results could differ materially from those anticipated in these forward-looking statements as a result of risk factors, including the timing and content of work programs; results of exploration activities and development of mineral properties; the interpretation and uncertainties of drilling results and other geological data; receipt, maintenance and security of permits and mineral property titles; environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses; availability of funds; failure to delineate potential quantities and grades of the target zones based on historical data, and general market and industry conditions. Forward-looking statements are based on the expectations and opinions of the Company's management on the date the statements are made. The assumptions used in the preparation of such statements, although considered reasonable at the time of preparation, may prove to be imprecise and, as such, readers are cautioned not to place undue reliance on these forward-looking statements, which speak only as of the date the statements were made. The Company undertakes no obligation to update or revise any forward-looking statements included in this news release if these beliefs, estimates and opinions or other circumstances should change, except as otherwise required by applicable law.

本新聞稿包含加拿大證券立法所指的 “前瞻性陳述”。此類前瞻性陳述涉及但不限於公司的戰略計劃、對公司勘探和鑽探計劃的時機和預期、鑽探產生的礦化估計、從抽樣結果中預測的地質信息以及目標區域的潛在數量和等級。此類前瞻性陳述或信息基於許多假設,這些假設可能被證明是不正確的。除其他外,已就以下方面做出了假設:總體經濟和金融市場狀況;分析結果的準確性;對鑽探結果的地質解釋、資本支出的時間和金額;現有實驗室和其他相關服務的業績;未來的運營成本;以及目標區域潛在數量和等級當前估計的歷史基礎。由於風險因素,包括工作計劃的時間和內容;勘探活動和礦產特性開發的結果;鑽探結果和其他地質數據的解釋和不確定性;許可證和礦產所有權的接收、維護和安全;環境和其他監管風險;項目成本超支或意外成本和支出;資金可用性;未能描述潛在的結果基於歷史數據以及總體市場和行業狀況的目標區域的數量和等級。前瞻性陳述基於公司管理層在陳述發表之日的預期和意見。在準備此類陳述時使用的假設雖然在準備時被認爲是合理的,但可能被證明是不準確的,因此,提醒讀者不要過分依賴這些前瞻性陳述,這些陳述僅代表陳述發表之日。除非適用法律另有要求,否則如果這些信念、估計和觀點或其他情況發生變化,公司沒有義務更新或修改本新聞稿中包含的任何前瞻性陳述。

The CSE does not accept responsibility for the adequacy or accuracy of this release. The Canadian Securities Exchange has neither approved nor disapproved the contents of this press release.

CSE 對本新聞稿的充分性或準確性不承擔任何責任。加拿大證券交易所既沒有批准也沒有反對本新聞稿的內容。

To view the source version of this press release, please visit

要查看本新聞稿的源版本,請訪問

譯文內容由第三人軟體翻譯。


以上內容僅用作資訊或教育之目的,不構成與富途相關的任何投資建議。富途竭力但無法保證上述全部內容的真實性、準確性和原創性。
    搶先評論